<?xml version="1.0" encoding="UTF-8"?>
<itemContainer xmlns="http://omeka.org/schemas/omeka-xml/v5" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://omeka.org/schemas/omeka-xml/v5 http://omeka.org/schemas/omeka-xml/v5/omeka-xml-5-0.xsd" uri="https://sleepyhollow.localarchives.org/items/browse?collection=135&amp;output=omeka-xml" accessDate="2026-09-19T09:38:13+00:00">
  <miscellaneousContainer>
    <pagination>
      <pageNumber>1</pageNumber>
      <perPage>25</perPage>
      <totalResults>10</totalResults>
    </pagination>
  </miscellaneousContainer>
  <item itemId="2340" public="1" featured="0">
    <fileContainer>
      <file fileId="2340">
        <src>https://sleepyhollow.localarchives.org/files/original/99ea4ef6b82e8e260ad9c160ccc81b43.pdf</src>
        <authentication>d4f580fca848eecfe96061719c2d9bce</authentication>
        <elementSetContainer>
          <elementSet elementSetId="4">
            <name>PDF Text</name>
            <description/>
            <elementContainer>
              <element elementId="52">
                <name>Text</name>
                <description/>
                <elementTextContainer>
                  <elementText elementTextId="20827">
                    <text>f

REGULAR MEETING

NORTH TARRYTOWN, NEW YORK
September 22, 1994

&amp; regular meeting of the North Tarrytown Planning Board
was held on September 22, 1994 at 8:00P.M. in the Village
Hall, 28 Beekman Avenue, North Tarrytown, New York.
PRESENT:

ABSENT:

George Hritz, Chairman
Donald Caetano
Ellen Tsangaris
Steven Salman
Edward McCarthy
David Permutter
James Donovan

ALSO PRESENT:

Janet Gandolfo, Attorney
James Margotta, Building Inspector
Susan J. Portman, Assoc./Planning
Mark DiGennaro, CAMCE

Chairman Hritz called the meeting to order at 8:00P.M.
tfr. John Hughes came forward and gave a preview of the
application of Mr. James and Martha Bick of 3 Terrace Close,
No. Tarrytown, N.Y. to merge a vacant lot designated as
Section 11 * Block IS, Lot 9 on the tax assessment map of the
Village of North Tarrytown with three adjoining lots.
1.

chestnut Ridge - Continuation

flon Turnquist came forward and stated that he was the
architect for Chestnut Ridge and Larry Rodrigues was the owner.
He we*nt on to state that originally they were to come before
the fc&gt;oard 2 months ago for Chestnut Ridge - 76 Chestnut Street.
Mr. Turnquist explained the proposed plans for parking to the
boarcl . The work had already started when Mr. Rodriques decided
that the cost of creating the ramp going down to the parking
in back of the building was a very expensive proposition.
He h a s since purchase an additional lot that backs up to
76 Chestnut street which is 83 Depyster Street. He demonstrated
through the maps previously distributed to the board the 3
phase&gt;s for creating the units and the parking spaces.
The units that are in the process of being built now
require 71/2 spaces. The intent at that time was to provide
the parking spaces at 76 Chestnut Street, which was indicated

�PAGE #2
«

on the previous documents for 76 Chestnut Street. Mr. Turnquist
stated "since we have not started that project and we are going
to build the 26 spaces, we are here tonight to request that the
board allow the Vilalge Building Department to issue a temporary
certificate of occupancy with the condition that we will pick
up the 71/2 spaces".
Chairman Hritz asked how lonq it will take before the
spaces are available.
Mr. Turnquist stated that they can't start until they get
the board's approval for cutting and backup. They have to
file the documents with the Village for the retaining wall
for the drainage. Mark Digennaro has received this document
and is reviewing it. The applicant's engineer is providing
additional information. By the beginning of next week, all
these documents will be finalized and they will be sent to
the Village's Engineering Consultant.
Mr. Caetano asked Mr. Mnrgottn if, as long as the property
is within 200 ft. of the building he is speaking about, can he
take the 71/2 spaces and put It there?
Mr. Margotta answered that the Zoning Board had already
agreed that he could. He also stated that the Planning Board
could not authorize a temporary certificate of occupancy.
The Zoning Board had to do it. Tt would be a big help if this
board would be in favor of it and let the Zoning Board know it.
Ms. Gandolfo asked Mr. Turnquist what exactly they were
looking for from the Planninq Roard.
Mr. Turnquist stated that when the applicant got the final
site approval for 1R5 Valley Plazn, a condition of the appeal
was that 71/2 parking spaces would be provided.
Ms. Gandolfo corrected him in that it was a requirement
of the variance from the Zoning Board and the Planning Board
put it in the site plan approval. They couldn't get the CO
for the residencial until the parking was provided.
Susan Portman stated that it was 0 parking spaces.
Also, that 10 spaces be dedicated to the Village.
Discussion continued on the parking spaces, the retaining
wall ( 13 ft. high ), and how long it will take.
Discussion also continued on the risk of building the wall
and then later having it torn down.

�PAGE #3

Mr. Caetano brought up the fact that he had already
received approval from the Zoning Board for the project
with 8 spaces and he's within the 200 ft. He's only taking
it to another parking lot where he is building a retaining
wall. Mr. Caetano can't see a reason why the approval of
DiGennaro, after we say yes here tonight that it can't be
done.
Mr. Caetano moved that the Planning Board permit the
applicant to construct a retaining wall and grade the premises
at the Chestnut Ridge site at this time, subject to plans
being submitted to the Vilalge Engineer and the Village
Engineer approving those plans in writing.
Mr. Salman seconded the motion. Motion carried unanimously.
The applicant is permitted to proceed with the grading of the
property and retaining wall construction with the understanding
that the applicant is proceeding at his own risk of a
subsequent disapproval of the project.
Discussion insued on a grace period to provide the parking
spaces required for 185 Valley Plaza. Chairman Hritz mentioned
his concern that another project of theirs that had been approved
is short on parking spaces and is causing problems with the
firehouse next door and now there is going to be another project
where they are going to be short R spaces for some period of
time.
James Margotta mentioned that one of the solutions is that
Mr. Rodriques pay for parking spaces for his tenants until
the parking spaces are ready.
Discussion as to where to park in that area continued.
After taking a vote, Chairman Hritz was authorized to
inform the Zoning Board that the Planning Board had no
objection for a 60 day extension to provide the parking
spaces for 185 Valley Plaza.
Mr. Margotta indicated that he preferred to have it sent
to the Zoning Board in writing.
Ms. Gandolfo informed the applicant that if he went to
the Zoning Board to ask for a delay to provide the parking,
they need to let the adjcent property owners know. They
would have to have a public hearing again.
Ms. Portman bought up the fact that this was one part of
a larger action. The Type 2 Action is something that doesn't
need environmental review but if the retaining wall could have
any visual inpact or any other concern to you and if you
thought it would fall under this one you might want to say in

�PAGE #4

the minutes that you also noted that it was a Type 2 Action.
She went on to read: The construction or placement of minor
structures, accessories or pernuent to exiting facilities,
including garages, car parks, patios, swimming pools, fences,
barnes or other buildings. So if the Planning Board thinks
the re-grading and the building of the retaining wall could
fall under that, the board can say it examined that aspect.
Chairman Hritz ask for a motion to that effect.
Mr. Perlmutter motion and Ms. Tsangaris seconded.
Motion carried unanimously.
Mr. Salaman asked to speak with regard to 1 Terrace Close
in Sleepy Hollow Manor. The Zoning Code says that determination
of lot yard or other space shall not be reduced to less then the
minimum required by this ordiance. He asked for an interpertation
of the code.
Discussion followed about the law concerning the area
of a lot. Being there were applicants waiting to be heard,
Chairman Hritz stated that this issue could be taken up next
week after everybody has had an opportunity to review the
issue.
2.

Shroba Sub-division

Chairman Hritz opened the discussion with regard to the
Shroba application. He asked Mr. Shroba if he had received
a copy of the record of Frederick P. Clark, Assoc, comments
on the proposal.
Mr. Shroba answered yes.
Chairman Hritz then asked if he had made arrangements
to deal with the issues raised here or had any presentation
on what he was planning to do.
Discussion followed.
Ms. Gandolfo commented that the applicant wants to
sub-divide along the line indicated on the map and request
a variance for the rear yard setback on lot IB. They want
to leave the lot line where it is divided. This board would
have to make a conditional approval of the Zoning Board to
grant them a variance for the frame garage that you see in
the back of the existing lot where the existing 21/2 story
frame is because that's about 3 ft. too close. They need a

�PAGE #5

variance for about 3 ft. along the backyard property line.
And that would be the only variance they will need right now.
Discussion followed on the proposed plans of the subdivision and the wall. Ms. Gandolfo stated that if the board
grants the sub-division, it would have to be with the condition
that they do get the variance for the frame garage.
Mr. Gaetano asked if the property was going to be sold.
Mr. Shroba answered that it is for his daughter.
Chairman Hritz indicated that at some time in the future
it may go out of the family and be owned by two separate people.
Ms. Gandolfo suggested that the board call for a public
hearing.
Mr. Gaetano moved for a public hearing.
Mr. McCarthy seconded and motion carried unanimously.
3.

Hoqan Sub-division

Chairman Hritz asked Mr. Hogan if he had received the
Frederick P. Clark Assoc, memorandum. Mr. Hogan answered
that he had recieved it tonight just before the meeting.
Chairman Hritz asked him to give a brief explanation of
what he was proposing to the board.
Mr. Hogan stated that he was proposing a sub-division
of the property at 19 Maple Street, North Tarrytown. "We
submitted with the application a site plan dividing the property
into 3 lots." He stated that he needed time to review the
memorandum and he asked if he could communicate directly with
Clark Assoc, in regard to the memorandum. He also asked
what the options were. He wants to resolve this as soon as
possible and he's willing to use whichever way is easier 2 lots or 3.
Discussion on which way it would be easier followed.
Last year, this was approved as a 3 family residence.
Chairman Hritz asked for a motion for a public hearing.
Mr. Caetano motion and Mr. Salman seconded.
Motion carried unanimously.
Mr. Steven Salman, has decided that instead of having the
board change it's monthly meeting day to accomodate him, he
would turn in his resignation as a Planning Board Member.

�PAGE #6

Chairman Hritz said that all will miss him and he moved
to pass a resolution to honor him for his service to the
board.
Mr. McCarthy reported to the board that he attended the
Board of Trustees meeting with regard to the Rock of Salvation
Church and that it went well.
The minutes for July 21, 1994 were amended and approved.
There being no further business, the meeting was adjourned

Respectfully submitted,

fiu-nu&gt;~./j' fa'4**' ^
Carmen G. Mariano
Recording Secretary

�o^*&amp;&gt;^
11 August 1994

To:
*rom:

Planning Board
James Margotta

There will be no Planning Board meeting for the
month of August, 1994.

�«ft'&lt;

i

Approved with respect to substance and form:

VilAJage Attorney
Dared:

Approved by the Planning Board

Filed with Village Clerk

eiuik or Deputy Clerk

Dated:

f/^Jcf^L

Jate^of Metetind

�</text>
                  </elementText>
                </elementTextContainer>
              </element>
            </elementContainer>
          </elementSet>
        </elementSetContainer>
      </file>
    </fileContainer>
    <collection collectionId="135">
      <elementSetContainer>
        <elementSet elementSetId="1">
          <name>Dublin Core</name>
          <description>The Dublin Core metadata element set is common to all Omeka records, including items, files, and collections. For more information see, http://dublincore.org/documents/dces/.</description>
          <elementContainer>
            <element elementId="50">
              <name>Title</name>
              <description>A name given to the resource</description>
              <elementTextContainer>
                <elementText elementTextId="14838">
                  <text>Planning Board Minutes &amp; Resolutions-1994</text>
                </elementText>
              </elementTextContainer>
            </element>
          </elementContainer>
        </elementSet>
      </elementSetContainer>
    </collection>
    <itemType itemTypeId="1">
      <name>Text</name>
      <description>A resource consisting primarily of words for reading. Examples include books, letters, dissertations, poems, newspapers, articles, archives of mailing lists. Note that facsimiles or images of texts are still of the genre Text.</description>
    </itemType>
    <elementSetContainer>
      <elementSet elementSetId="1">
        <name>Dublin Core</name>
        <description>The Dublin Core metadata element set is common to all Omeka records, including items, files, and collections. For more information see, http://dublincore.org/documents/dces/.</description>
        <elementContainer>
          <element elementId="50">
            <name>Title</name>
            <description>A name given to the resource</description>
            <elementTextContainer>
              <elementText elementTextId="14213">
                <text>MINS_PLAN_1994-09-22</text>
              </elementText>
            </elementTextContainer>
          </element>
          <element elementId="49">
            <name>Subject</name>
            <description>The topic of the resource</description>
            <elementTextContainer>
              <elementText elementTextId="14214">
                <text>Planning Board Minutes &amp; Resolutions-1994</text>
              </elementText>
            </elementTextContainer>
          </element>
          <element elementId="40">
            <name>Date</name>
            <description>A point or period of time associated with an event in the lifecycle of the resource</description>
            <elementTextContainer>
              <elementText elementTextId="14215">
                <text>1994</text>
              </elementText>
            </elementTextContainer>
          </element>
        </elementContainer>
      </elementSet>
    </elementSetContainer>
  </item>
  <item itemId="2339" public="1" featured="0">
    <fileContainer>
      <file fileId="2339">
        <src>https://sleepyhollow.localarchives.org/files/original/b199a3f3580681d7998e2f8e13d41e46.pdf</src>
        <authentication>04f32a6d54882f761b933ee2b22696c6</authentication>
        <elementSetContainer>
          <elementSet elementSetId="4">
            <name>PDF Text</name>
            <description/>
            <elementContainer>
              <element elementId="52">
                <name>Text</name>
                <description/>
                <elementTextContainer>
                  <elementText elementTextId="20826">
                    <text>REGULAR MEETING

NORTH TARRYTOWN, NEW YORK
July 21, 1994

A regular meeting of the North Tarrytown Planning Board was
held on July 21, 1994 at 8:00P.M. in the Village Hall, 28 Beekman
Avenue, North Tarrytown, New York.
PRESENT:

George Hritz, Chairman
Donald Caetano
Steven Salman
Edward McCarthy
David Perlmutter

ALSO PRESENT:

Janet Gandolfo, Attorney
James Margotta, Building Inspector
Mark A. DiGennaro, CAMCE
Susan J. Portman, Frederick P. Clark Assoc.
Jose Blanco, Trustee

Chairman Hritz called the meeting to order at 8:00P.M. He
stated that there were three items on the agenda but two were
cancelled. The two cancelled agenda items were deferred to next
month's meeting. They were Philipse Plaza and Chestnut Ridge.
The item remaining on the agenda for this month was the Rock of
Salvation Church application.
Chairman Hritz went on to review some of the events that
preceded this meeting.
On June 6,1994, following the instructions of the Planning
Board, a sub-committee met which consisted of members of the
Planning Board, members of the Church and members of the Union
Hose Fire Company and Trustee Jose Blanco to discuss ideas for
easing some of the problems which the fire department raised
regarding traffic, parking, educating the public, etc.
Since that time the Planning Board requested that the Board
of Trustees get involved and encouraged the Trustees to see what
they could do about these conditions. Most of the conditions
were pre-existing and many of the issues were issues which could
only be addressed by the Board of Trustees. Chairman Hritz
reported that the Trustees have adopted some changes in the parking
around the area of the project and will continue to study the
issue of the traffic as the project evolves.
Chairman Hritz called upon Trustee Jose Blanco to report on
behalf of the Board of Trustees.
Trustee Blanco reported that the Board voted to eliminate
parking spaces on Cedar Street and Cortlandt Street for the
general public and just make them advailable for the firefighters

�Page #2
when they are answering emergency calls. In addition, Ttustee
Blanco suggested that the sub-committee be kept permanently to
deal with the parking and traffic problems. He relayed a
suggestion from a member of the public which was to create a
dialogue between 100 College Avenue and the church to see if there
were any available parking spaces in the lot of College Arms.
Chairman Hritz asked if there was any member of the public
who wished to address the Board on this application. He stated
that the public hearing had been adjourned from the previous
meeting and was still open to the public.
Miguel Jiminez, 95 Beekman Avenue, stated that the church
was willing to work with the Village and the Fire Department to
ensure the safety of members of the public. He stated that they
would set up a training program for parishioners and he invited
the Fire Department ot participate in this program. He said that
he had spoken to President John Cellante about this issue previously.
Another member of the public suggested that the Village provide
a school crossing guard for the church on Sunday mornings. He
said that other churches have this.
A discussion ensued regarding the monitoring of the traffic
around the church during church services.
Chairman Hritz asked if it was possible for members of the
church to volunteer to be auxiliary police officers for the
purpose of directing traffic around the church on Sunday mornings.
Donald Caetano stated that the County had outruled the
auxiliary police department and he suggested that they not
get involved at this time. He stated that he would rather see
the church provide monitors.
Mr. Jiminez stated that Mayor Treacy said, during a Board
of Trustees meeting, that the Village would consider posting
a police officer near the church during church services. Also,
the church would be willing to have boys dressed like Boy Scouts
to help with the elderly and small children.
Chairman Hritz stated that he understood that the van would'"
be unloading and loading passengers in the alley next to the
building and not in front of the church. That would be a condition
of site plan approval.
Mr. Jiminez stated that there will be a van unloading seniors
and children in the alley, not in front of the church. The van
will not park in the street.
Daivd Perlmutter asked the attorney if there was any way the
Planning Board can make it a condition of site plan approval that
the church provide a monitor during all church services.

�Page #3
Counsel Gandolfo stated that the Planning Board could not
force the Board of Trustees to provide a monitor. The Planning
Board can make any condition which is reasonable a condition of
site plan approval. However, forcing the church to provide monitors
can lead to problems if the monitors are not trained properly.
A discussion ensued regarding monitoring and parking issues.
Chairman Hritz stated that he would like to bring the
matter to a conclusion. He stated that he had sensed at the last
meeting that there was some thought on the part of the Board
that the Day Care Center application be deferred at this time.
Steven Salman made a motion to defer approval of the Day Care
Center as part of this application at this time.
The motion was seconded by Edward McCarthy.
Motion carried unanimously.
Chairman Hritz asked for further discussion on the remaining
part of the application.
Donald Caetano asked Reverend Santiago if the church was
financially ready to start construction on the project at this
time. He wanted to know if there was a rush for an approval.
Reverend Christian Santiago stated that the church was presently
paying $1000 per month for rental of a church in Tarrytown. They
are using the facility three times a week and they are paying
mortgage payments of $1500 per month on the building on Cortlandt
Street. He stated it was a financial burden on the church to have
to make payments on both places.
Edward McCarthy stated that he was concerned that the issues
that the Fire Department has raised have not been answered. He
didn't want to see combat but he thought maybe the Board should
wait a little longer until some of the traffic issues are
addressed more completely.
Chairman Hritz stated that he respectfully disagrees with
the Fire Chief. He stated that he feels the issues have been
addressed.
David Perlmutter stated that if the Board gave final approval
there would be no incentive for the church to address the issue
of parking. They should do it now or they never will. He stated
that the Planning Board asked the Board of Trustees for help and
they did not respond satisfactorily.

�Page #4
Another discussion ensued regarding parking and safety.
Donald Caetano made a motion to table the approval for
another month to see if anything else can be worked out. He
stated that the Planning Board should make a hard study and he
didn't feel that the church wduld be hurt financially by the
delay. He was concerned that the Fire Department's concerns
were not being addressed. He stated that he made this motion
in good faith for the Village and in good faith for the church.
Chairman Hritz stated that he felt that the matter had been
discussed long enough. He didn't think we were going to learn
anything more in the next month that would change our minds.
The Board of Trustees decided that a traffic light would be too
costly and that the need was not outweighed by the cost.
The discussion continued.
Donald Caetano withdrew the motion to table the approval.
Chairman Hritz stated that he knew that this was a very
important discussion and that people of good conscience can
disagree. He is glad that we are free to discuss our differences
and thoughts in the open. He was willing to listen and be persuaded
by a majority of the Board.
A discussion ensued regarding conditioning the site plan
approval upon the alley being next to the church being kept open
and used to loading and unloading of passengers.
Steven Salman made a motion to condition site plan approval
requiring the alley next to the church being kept open and used
to loading and unloading of passengers.
Chairman Hritz seconded the motion.
Motion carried unanimously.
Steven Salman made a motion to make a negative declaration
for SEQRA purposes.
David Perlmutter seconded the motion.
Motion carried unanimously.
Edward McCarthy made a motion to encourage the church to put
a monitor on the sidewalk, not to direct traffic, but to help people
cross the sidewalk and street in front of the firehouse, to help
direct the flow of pedestrian traffic and to ensure that the function
of the firehouse is not interfered with.
Donald Caetano seconded the motion.

�Page #5
Motion carried unanimously.
Steven Salman made a motion that the Planning Board grant
site plan approval to the Rock of Salvation Church, subject to
the above-mentioned conditions.
Donald Caetano seconded the motion.
Motion carried unanimously.
A discussion followed regarding the final resolution for
Phelps Memorial Hospital and the Chairman was authorized to
sign said resolution.
The minutes for the June 16,1994 were amended, revised
and approved.
There being no further business, the meeting was adjourned
Respectfully submitted,
Carmen G. Marian/5
Recording Secretary

�JUL-21-84 TKU 13:53

"rl/, iiJ,

.ri-iCO/tC'Od

LAW OFFICES

STEVEN L. KROLESKI
ISO EAST PROSPECT AVENUE
MOUNT VERNON, N.Y. 10550
TEL; (914) 668-7707
FAXs (914) 667-2639

July 21, 1994

Jim Margotta
Building Inspector
28 Beekman Avenue
N o r t h Torxryfcovn, Mow Yoifk

1HRQ1

BY FAX &amp; MAIL
RE:

PLANNING BOARD MEETING
ANTONIO RODRIGUES
PHILIPS PLAZA

Dear Mr, Mai-gotta:
I am the attorney for Antonio Rodrigues. As per your
conversation with Mr, Louis Contadino, the architect, and on
behalf of myself and as and for my client, Mr, Antonio
Rodrigues, kindly let this letter reflect my formal
cancellation of the Planning Board Meeting which is scheduled
for tonight, July 21, 1994 at 8:00 P,M. at City Hall in North
Tarrytown, regarding the above named matter.
I am currently out of town and expect to return to my office
next week, so I apologize for the unexpected postponement of
this meeting. Therefore, I request that this matter be
adjourned to a future date, and that you please contact
either myself or Mr. Rodrigues in writing when another
meeting can take place before the Board,
I thank you for your courtesy in this matter and remain,
Very tr

SLK/dg

r, t-x

�4»*

Approved wi

to substance and form:

Approved by the Planning Board

Dated::

i/nAt

Filed with Village Clerk

-Clerk oi"» Deputy Clerk
Dated: Q f&lt;y? [qu

Date of Meeting

�</text>
                  </elementText>
                </elementTextContainer>
              </element>
            </elementContainer>
          </elementSet>
        </elementSetContainer>
      </file>
    </fileContainer>
    <collection collectionId="135">
      <elementSetContainer>
        <elementSet elementSetId="1">
          <name>Dublin Core</name>
          <description>The Dublin Core metadata element set is common to all Omeka records, including items, files, and collections. For more information see, http://dublincore.org/documents/dces/.</description>
          <elementContainer>
            <element elementId="50">
              <name>Title</name>
              <description>A name given to the resource</description>
              <elementTextContainer>
                <elementText elementTextId="14838">
                  <text>Planning Board Minutes &amp; Resolutions-1994</text>
                </elementText>
              </elementTextContainer>
            </element>
          </elementContainer>
        </elementSet>
      </elementSetContainer>
    </collection>
    <itemType itemTypeId="1">
      <name>Text</name>
      <description>A resource consisting primarily of words for reading. Examples include books, letters, dissertations, poems, newspapers, articles, archives of mailing lists. Note that facsimiles or images of texts are still of the genre Text.</description>
    </itemType>
    <elementSetContainer>
      <elementSet elementSetId="1">
        <name>Dublin Core</name>
        <description>The Dublin Core metadata element set is common to all Omeka records, including items, files, and collections. For more information see, http://dublincore.org/documents/dces/.</description>
        <elementContainer>
          <element elementId="50">
            <name>Title</name>
            <description>A name given to the resource</description>
            <elementTextContainer>
              <elementText elementTextId="14209">
                <text>MINS_PLAN_1994-07-21</text>
              </elementText>
            </elementTextContainer>
          </element>
          <element elementId="49">
            <name>Subject</name>
            <description>The topic of the resource</description>
            <elementTextContainer>
              <elementText elementTextId="14210">
                <text>Planning Board Minutes &amp; Resolutions-1994</text>
              </elementText>
            </elementTextContainer>
          </element>
          <element elementId="40">
            <name>Date</name>
            <description>A point or period of time associated with an event in the lifecycle of the resource</description>
            <elementTextContainer>
              <elementText elementTextId="14211">
                <text>1994</text>
              </elementText>
            </elementTextContainer>
          </element>
        </elementContainer>
      </elementSet>
    </elementSetContainer>
  </item>
  <item itemId="2338" public="1" featured="0">
    <fileContainer>
      <file fileId="2338">
        <src>https://sleepyhollow.localarchives.org/files/original/f24351b90f9d1b521d8e2c165304a86a.pdf</src>
        <authentication>94670d96b0e1c16694f8ad04e54c9497</authentication>
        <elementSetContainer>
          <elementSet elementSetId="4">
            <name>PDF Text</name>
            <description/>
            <elementContainer>
              <element elementId="52">
                <name>Text</name>
                <description/>
                <elementTextContainer>
                  <elementText elementTextId="20825">
                    <text>REGULAR MEETING

NORTH TARRYTOWN, N.Y.
OCTOBER 20, 1994
«

A regular meeting of the North Tarrytown Planning Board was
held on October 20, 1994 at 8:00P.M. in the Village Hall,
28 Beekman Avenue, North Tarrytown, New York.
PRESENT:

George Hritz, Chairman
Donald Caetano
Ellen Tsangaris
James Donovan
Edward McCarthy
David Perlmutter

ALSO PRESENT:

Janet Gandolfo, Attorney
James Margotta, Building Inspector
Susan J. Portman, Assoc./Planning
Mark A. DiGennaro, CAMCE

Chairman Hritz called the meeting to order at 8:00P.M.
1.

Public Hearing - James Hoqan, Ex., 19 Maple St.

James Hogan came forward and stated that he was present at
the last meeting and is resubmitting a site plan dividing
the property at 19 Maple St. into 2 parcels instead of 3.
Chairman Hritz then asked Ms. Susan Portman if she had a
chance to look at the revised plans.
Ms. Portman answered that she had. She said that they looked
fine. The existing garage is on the same lot with the house.
She didn't have any other issues.
Before going any further, Chairman Hritz asked for a motion
to declare the board as a lead agency.
Ms. Tsangaris moved. Mr. McCarthy seconded.
Motion carried unanimously.
Chairman Hritz inquired as to whether we had to circulate
the lead agency status forms within 30 days and Mr. Margotta
answered that he will send the plans to the County the day
after this meeting. He did not send the plans before this
because he did not receive a complete and final plan until today.
Chairman Hritz asked if there was any member of the public who
had anything more to say on this application. There was no
answer. He asked if any member of the board had any further
thoughts or ideas.
He stated that the applicant did a good job to come within the
recommendations of the planners. He also stated that they needed
to decide if they could make a negative declaration and ask for
a motion.

�PAGE # 2
Mr. Perlmutter motioned that the board make a negative declaration.
Mr. Donovan seconded.
Motion carried unanimously.
Chairman Hritz told Mr. Hogan that he had their approval on
the condition that the County had no objections to the plan.
Mr. Hogan asked for an explaination of the mechanics of the
procedures from this point and Mr. Margotta explained the
procedures to him.
2.

Prelim Hearing - V &amp; M Shroba, Sleepy Hollow Rd. Subdivision Applic

Ms. Gandolfo stated that V &amp; M Shroba would like to withdraw
without prejudice subject to their re-submitting when they
figure out what they want to do with the vacant lot.
Board agreed to discontinue until further notice. Mr. Margotta
explained that the applicant has 1 year from this date to
re-activate the application.
3.

Prelim Hearing - Al Peck, Irving Place

Subdivision

Chairman Hritz asked Mr. Peck to give a report about the project.
Mr. Peck explained that Irving Place was a street created by the
Van Tassel Apartments considered a private street. To the best
of his knowledge, it used to be closed once a year because it was
considered a private street. He doesn't He doesn't know whether
they still close the street. The surveyor told him that Irving
Place is a small by-pass connected with Teresa Street, and it's
not marked on the survey. He will have it marked on the survey
if the board reguests it. The surveyor signed the survey and
corrected the lot numbers on it.
Discussion as to who owns Teresa Street followed.
Ms. Gandolfo stated that it is owned by the Van Tassel Apartments
and it is a private way, it is not Village owned.
Mr. Margotta pointed out that the Van Tassel pays taxes on it.
Mr. Peck said that in any event they have to put on the survey
where Irving Place is a through-way and where Teresa Street
adjoins it. The History of the property is that it's been in the
family for close to a hundred years or more and when the property
was purchased, there were 2 lots on it and it's been that way
ever since. Now that they have to dispose of the Estate, they're
going to find it difficult to sell somebody 2 houses on one lot.
It would be much easier to sell each lot and each house separtly.
Chairman Hritz asked what year the houses were built.

�PAGE #3
Mr. Peck answered over a hundred years.
Mr. Margotta commented that they're very old houses.
Mr. Caetano pointed out that the law reads that the street
has to be closed once a year in order to keep it a private
street.
Discussion on Teresa Street being a private street ensued.
Chairman Hritz pointed out that this is on for a preliminary'
hearing this week and that he'll have to come back next month.
Mr. Peck: "What do you want me to do?" "Are you going to
consider the letters that were written or is that part of
the Zoning Board problem?"
Chairman Hritz said that it's our job.

A variance is needed.

Ms. Portman pointed out that several variances are needed.
Discussion on the variances followed. The variances needed
are lot size, lot width, side yard and total side yard.
Chairman Hritz: "We are not going to resolve any of this
tonight. We should send you to the Zoning Board."
Mr. Margotta pointed out that he can't go to the Zoning Board
until December. He told Mr. Peck that he will send him a
letter telling him that he has to go before the Zoning Board
and why. He will write u p a legal notice and set it up for
the December meeting.
Chairman Hritz ask for a motion to declare our intent to
be the lead agency.
Mr. Donovan motioned. Mr. McCarthy seconded.
Motion carried unanimously.
Ms. Portman pointed out that they should wait until the
Planning Board makes a negative declaration.
Ms. Gandolfo: "We'll schedule it for a public hearing here
and a public hearing before the Zoning Board."
Chairman Hritz: "We'll send it to the Zoning Board and ask
them to review it for Zoning purposes and to see if they'll
grant the variances. If they do grant the variances, they will
be subject to our overall review of the enviromental process."
He asked for a motion to defer the Zoning issues to the
Zoning Board.

�PAGE # 4
Mr. Caetano motioned. Mr. Donovan seconded.
Motion carried unanimously.
4.

Prelim Hearing - Al Peck, Bedford Road

Subdivision

Chairman Hritz asked Mr. Peck to tell the board what the
Bedford Road was about.
Mr. Peck: "This property has also been in the family longer than
a hundred years." He went on to explain about the lots and
that he is spliting up the lots in order to sell them.
Chairman Hritz pointed out that he didn't need a variance,
Ms. Portman said that it was an unlisted action so he didn't
need to circulate for lead agency.
Discussion followed.
Chairman Hritz asked Ms. Portman if there was anything in her
report that she wanted to point out.
Ms. Portman answered that just some corrections.
Mr. McCarthy moved to schedule this for a public hearing and
set up notices.
Mr. Donovan seconded.
Motion carried unanimously.
5.

Public Hearing - James &amp; Martha Bick, 3 Terreace CloseMerge Vacant Lot

Chairman Hritz read the Public Hearing Notice.
Mr. Hughes came forward and informed the board that they had
just gotten the survey done and it wasn't complete.
He wanted to pass the maps out so that at the November meeting
he would be prepared.
Chairman Hritz asked if there were any members of the public who
wanted to speak on this application. There were none.
Mr. Hughes explained the figures on the drawing of the maps
and answered questions by the board.
Discussion followed.
Chairman Hritz asked if there was motion to continue this
public hearing to the next month.
Mr. Donovan motioned. Ms. Tsangaris seconded.
Motion carried unanimously.
t

�PAGE # 5
6.
Laurentino Rodrigues
7.
Rock of Salvation Church
Request for a reduction in Recreation Fees
Laurentino Rodrigues
$9,600.00 in Fees
Rock of Salvation Church
$32,000.00 in Fees
Chairman Hritz began by saying that both'Mr. Rodrigues
and the Rock of Salvation Church asked for a review and
the Trustees had asked for a recommendation regarding the
fees in light of a recent Supreme Court decision.
Chairman Hritz went on to say that it was an issue that is
dependent on the law and suggested that a sub-committee be
appointed to look at this.
Mr. Caetano: "I think it should go through the whole board
as a committee."
Discussion followed on the use of recreation fees and their
validity.
Chairman Hritz stated that he personaly felt that they shouldn't
take the time of all the board members but should ask two or
three people to look at the issue and get back to the board
and have a full discussion in front of the board.
Mr. Caetano, Mr. Perlmutter, Ms. Tsangaris and Mr. Hritz agreed
to be on the committee.
The committee will discuss a plan of action, then meet with
the applicants and then report back to the board with a possible
solution.
a.

Chestnut Ridge - Continued

Chairman Hritz commented to
he was here, he asked for a
spaces in order to get some
asked Mr. Rodrigues to give

Mr. Rodrigues that the last time
preliminary waiver of the parking
construction done. The Chairman
the board an update.

Mr. Rodrigues answered that they have tried to get in touch with
Clark Assoc, to review the parking lot for 185 Valley St. and
Chestnut Ridge. The plan was approved only for excavating.
Mr. DiGennaro: "What we are looking at is the retaining wall.
The board gave an approval based on the retaining wall just for
the begining of phase one which is the construction of the wall
and the parking lot. Also, in order to perform a thorough
review, we need all the components of the designs and the criteria
of the conditions. We haven't gotten these items from
Mr. Rodrigues and there are some questions that remain unanswered."

�PAGE #6
Chairman Hritz asked if Mr. Rodrigues knew what was missing.
Mr. DiGennaro answered yes.
Mr. Rodrigues stated that it's not fair to him because he's
has waited one month and hasn't gotten anywhere.
Discussion followed.
Chairman Hritz told Mr. Rodrigues that his application was
continuing to next month and he was welcome to take it up
with the Village Engineer in the interim.
Chairman asked for a motion to approve the minutes from
September 22, 1994.
Mr. Perlmutter motioned. Ms. Tsangaris seconded.
Motion Garried unanimously.
Chairman Hritz pointed out that Ms. Portman has mentioned
the provision of the Village Code that calls for an annual
report on whether the codes are working. He asked Susan to
ask around the organization and see if she seen any other
reports that other Zoning Boards or Planning Boards have
done around the County and bring it back to us.
Mr. Perlmutter moved that the committee has noted that the
Planning Board is down to 6 members and would like a 7th
member appointed as quickly as possible.
Mr. Donovan seconded.
Motion carried unanimously.
There being no further business, motion to adjourned
was made by Mr. Perlmutter and seconded by Mr. Donovan.
Motion carried unanimously.

Respectfully subm,it^ed,
Carmen G. Mariano
Recording Secretary

�AGREEMENT
The undersigned does hereby agree to the following.
1. I (We) am (are) the owner(s) of premises located at

3 Terrace Close

North Tarrytown, New York 10591

for which an application is being submitted to the Village of North Tarrytown Planning
Board for she plan review.
2 I understand and agree that there are certain fees for which I am responsible in
conjunction with said application.
3 I understand that the application fee is $500.00 per site plan submitted, plus an
additional $10 00 per required parking space, as described in Section 62-3OF. I also
understand that the Planning Board may seek the consultation of professional planners,
engineers, surveyors, etc. and I will be responsible for any and all costs incurred by the
Planning Board for such consultations and professional opinions at the prevailing hourly
rate agreed upon by the Planning Board and the consultants. 1 understand that no
employee of the Village nor any member of the Planning Board can advise me, in advance,
of what the total consulting fees might be. I also understand that I may be obligated to
pay recreation fees based upon the number of parking spaces required for site plan
approval at the rate of $1,200.00 per parking space.
4 I shall provide a retainer of $2,500.00 to the Village of North Tarrytown to be held
in escrow and applied towards the payment of consultation and professional fees incurred
by the Village with regard to my application. When the balance of the escrow account is
$1,000.00 or less, I shall deposit additional retainer funds into the escrow account so that
the minimum balance in said account is never less than $1,000.00. The Village Treasurer's
office shall provide me with a monthly statement indicating expenses incurred and the
amount of monies withdrawn from said account.
5. I understand that if I withdraw my application prior to any action being taken by the
Planning Board f am still responsible for any expenses incurred by the Village with regard
to my application prior to such withdrawal.
6 I understand that if at any time the minimum balance in said escrow account falls
below $1,000,00 the Planning Board may suspend the review of my site plan and/or the
Building Inspector may refuse to issue any permits and/or certificates with regard to the
premises.

�7 If, at the termination of the Planning Board process, I still am indebted to the
Village of North Tarrytown for any fees mentioned hereinabove, 1 undei stand that the
amount of money still owed will be added to my property tax bill and become a lien
against the property or the Village of North Tarrytown may take whatever legal action
necessary against each owner, either individually or jointly, to collect such funds
*-

ier
Owner

Owner
Dated; October 3 , 1994

�^
.
^P

VILLAGE Of NORTH TARRYTOWN
28 Beekman Avenue
North Tarrytown, New York .10591

*

PLANNING BOARD
1. Subdivision Name/Planning Board Review: Matter of James and Martha Bick
2. Location (Tax section, block and lot number or other specific information)
Section 11 Block IS, Lot 9 and 8
3. Property owner's name and address James and Martha Biick, 3 Terrace Close,
North Tarrytown, New York 10591
A. Engineer or Surveyor's Name and Address CharlesaRiley, 61 Main Street,
Tarrytown, New YOrk
5. Size in acres

1+

Proposed number of lots 1

6. Pee: $500.00

Date Paid: October 3, 1994

7. Is the entire parcel involved to be subdivided at this time? yes
8. Is any land to be dedicated to public use? No

Acres N/A

9. Will any zoning changes or subdivision regulation waivers be requested?
No
Describe: N/A
10. Date of preliminary layout submission: O c t o b e r 3 '
11. Conditions to be met in plat submission:

199

^

None

Note:Eleven(11)copies of all submissions are required with this application.
ENCLOSED PLEASE BIND CHECK IN THE AMOUNT 0B' $500.00
PLUS A CHECK FOR $

BOR SITE PLAN SUH^TTTED,

BOR EACH REQUIRED PARKING SPACE. .
Signature: &lt;
A,M,™„.
Address

^

^

^

^

, / K ^ y ,

3 Terrace Close
North Tarrytown, New York

�Additional pertinent information may be determined necessary or
appropriate in addition to the below:
Project:

Matter of James and Martha Bick

Date:

October 3, 1994

Location: 3 Terrace Close, North Tarrytown, New York
Architect/Engineer/Surveyor:

Charles Riley

Check list to be completed by applicant prior to submission to the Planning Board.
If any item on this check list is not applicable to the site plan, please make a
written notification on the site plan to this effect.
1. The name and address of the Owner of Record or the property and the name, address
and professional seal of the individual preparing the site plan.
2.

The names of all owners or record of adjacent properties.

3. The location of all existing structures and other man-made features of the site,
as well as those on adjacent properties, including existing utility lines
(gas and electric).

&lt;

4. The location and design of the proposed water supply sewage disposal and storm
water drainage systems, including the locations, sizes, invert and rim elevations
to the existing water supply, sewage disposal, and storm water drainage systems.
5. Existing and proposed topography map of the subdivision, extending at least
twenty (20) ft. beyond the site boundaries with contour intervals not greater than
five (5) ft. and referenced to USGS or other approved bench mark and scale.
6. The nature and location of all other existing site features, including wetlands,
water courses, wooded areas and rock outcrops.
7. The plan shall clearly indicate which site features are existing and proposed and
which will be removed.
8. Owner's endorsement.
9.

Planning Board Chairman's endorsement per subdivision regulations, Part IV, Page 7817 (14

10.

The locations of nearest fire hydrants.

11.

The widths of streets and avenues encompassing the site.

12.

An area map showing all streets and property within one thousand (1,000) ft. of the
applicant's property, at a scale of one (1) inch to four hundred (400) ft. All
property owned by the applicant shall be clearly indentified.

13.

Plow and pressure requirements for the fire sprinkler system and backflow preventers.

14.

Cover letter to the Planning Board, including brief summary of proposed action in
letter form, indicating scope of project, purpose and plans for development.

�14-16-2 ( 2 / 8 7 ) - 7 c
617.21
.
_
Appendix A
S t a t e Environmental Quality Review

SEQR

FULL ENVIRONMENTAL ASSESSMENT FORM
Purpose: The f u l l EAF is designed to help applicants and agencies determine, in an orderly manner, whether a project
o r action may be significant. The question of whether an action may be significant is not always easy to answer. Frequently, there are aspects of a p r o j e c t that are subjective or unmeasureable. It is also understood that those w h o determine
significance m a y have l i t t l e or no formal knowledge of the environment or may be t e c h n i c a l l y expert in e n v i r o n m e n t a l
analysis. In a d d i t i o n , m a n y w h o have knowledge in one particular area may not be aware of the broader concerns a f f e c t i n g
t h e question of significance.
The f u l l EAF is i n t e n d e d t o provide a m e t h o d whereby applicants and agencies can be assured that the d e t e r m i n a t i o n
process has been orderly, comprehensive in nature, yet flexible to allow introduction of information to f i t a project or action.
Full EAF Components: The f u l l EAF is comprised of three parts:
Part 1 : Provides o b j e c t i v e data and i n f o r m a t i o n about a given project and its site. By identifying basic p r o j e c t
data, it assists a reviewer in the analysis that takes place in Parts 2 and 3.
Part 2: Focuses o n i d e n t i f y i n g the range of possible impacts t h a t may o c c u r f r o m a project or action. It provides
guidance as to whether an I m p a c t is likely to be considered small to moderate or whether it is a p o t e n t i a l l y large i m p a c t . The form also identifies whether an i m p a c t can be m i t i g a t e d or reduced.
Part 3: If any i m p a c t in Part 2 is identified as potentially-large, then Part 3 is used to evaluate whether or not the
i m p a c t is a c t u a l l y important.

DETERMINATION OF SIGNIFICANCE-Type 1 and Unlisted Actions
Identify the Portions of EAF completed for this project:

D

Part 1

D

Part 2

DPart 3

U p o n review of the i n f o r m a t i o n recorded on this EAF (Parts 1 and 2 and 3 if appropriate), and any other supporting
i n f o r m a t i o n , and considering b o t h the magitude and importance of each impact, it is reasonably determined by the
l e a d agency that:
G$

A. The p r o j e c t w i l l not result in any large and important i m p a c t s ) and, therefore, is one w h i c h will not
have a significant impact on the environment, therefore a negative declaration w i l l be prepared.

D

B. A l t h o u g h the project could have a significant effect on the environment, there w i l l not be a significant
e f f e c t for this Unlisted A c t i o n because the mitigation measures described in PART 3 have been required,
therefore a C O N D I T I O N E D negative declaration w i l l be prepared.*

D

C. The p r o j e c t m a y result in one or more large and i m p o r t a n t impacts that may have a significant i m p a c t
on the e n v i r o n m e n t , therefore a positive declaration w i l l be prepared.
* A C o n d i t i o n e d N e g a t i v e Declaration is o n l y valid for Unlisted Actions

James Bick and Martha Bick
Planning Board - Village of North

Name of Action

Tarrytown
N a m e of Lead Agency

i

Print or Type N a m e of Responsible Officer in Lead Agency

Title of Responsible O f f i c e r

Signature of Responsible O f f i c e r in Lead Agency

responsibl officer)
Si iiggnnaattuurree^df Preparer (If different f r o m responsible

October 3 , 1994
Date

1

�PART 1-PROJECT INFORMATION
Prepared by Project Sponsor
.NOTICE: This d o c u m e n t is designed to assist in determining whether the action proposed may have a significant e f f e c t
o n the environment. Please c o m p l e t e the entire f o r m . Parts A through E. Answers to these questions w i l l be considei
as part of the a p p l i c a t i o n for approval and may be subject to further verification and p u b l i c review. Provide any a d d i t i o n a l
i n f o r m a t i o n y o u believe w i l l be needed to c o m p l e t e Parts 2 and 3.
It is expected t h a t c o m p l e t i o n of the full EAF w i l l be dependent on i n f o r m a t i o n currently available and w i l l not i n v o l v e
new studies, research or investigation. If i n f o r m a t i o n requiring such additional work is unavailable, so indicate and specify
each instance.
NAME OF ACTION

JAMES BICK a n d MARTHA BICK
LOCATION OF ACTION (Include Street Address, Municipality and County)

3 T e r r a c e C l o s e , N o r t h T a r r y t w o n , New YOrk
BUSINESS TELEPHONE

NAME OF APPLICANT/SPONSOR

'

James Bick and Martha B i c k
ADDRESS

0

CITY/PO

XT

rj,

(

914,

631-8855

-,,

3 Terrace Close,
fc,

STATE

m

North Tarrytown

ZIP CODE

NY

10591

BUSINESS TELEPHONE

NAME OF OWNER (It different)

same

(

)

ADDRESS

same
STATE

CITY/PO

ZJPCODE

same
DESCRIPTION OF ACTION

C r e a t i o n of one b u i l d i n g l o t
-

—•

Please Complete Each Q u e s t i o n — I n d i c a t e N.A. if not applicable

A. Site Description
Physical setting of o v e r a l l project, both developed and undeveloped areas.
1 . Present land use:

DUrban

Dlndustrial

DForest

DAgriculture

DCommercial

(ZlResidential (suburban)

2. Total acreage of p r o j e c t area:

acres.

APPROXIMATE ACREAGE
M e a d o w or Brushland (Non-agricultural)

PRESENTLY
acres

AFTER COMPLETION
acres

acres
acres
acres
acres
acres
acres
acres

Forested

acres

A g r i c u l t u r a l (Includes orchards, cropland, pasture, etc.)

acres

W e t l a n d (Freshwater or tidal as per Articles 24, 25 of ECL)

acres

W a t e r Surface Area

acres

Unvegetated (Rock, earth or f i l l ) -

acres

Roads, buildings and other paved surfaces

acres

Other (Indicate t y p e L

Residential

1+

3. W h a t is p r e d o m i n a n t soil type(s) on project site?
a. Soil drainage:

D R u r a l (non-farm)

DOther

© W e l l drained J Q Q
D P o o r l y drained

acres

1±_

',

% of site

D M o d e r a t e l y w e l l drained

% of site

% of site

b. If any a g r i c u l t u r a l l a n d is involved, h o w many acres of soil are classified w i t h i n soil group 1 through 4 of the N
Land C l a s s i f i c a t i o n System?
N/A
acres. (See 1 NYCRR 370).
4. Are there bedrock o u t c r o p p i n g s on project site?
a. W h a t is d e p t h t o bedrock?

10-15+

QKYes
( j n feet)
2

DNo

�• 5 . A p p r o x i m a t e percentage of proposed project site w i t h slopes:

CO-10%

%

DlO-15%

E 1 5 % or greater

%

4Q %

6. Is project substantially contiguous to, or contain a building, site-, or district, listed on the State or the N a t i o n a l
Registers of Historic Places?
DYes
C3^o
7. Is project substantially contiguous to a site listed on the Register of National N a t u r a l Landmarks?
8. W h a t is the d e p t h of the w a t e r table? 2 0 +

DYes

Lt$No

(in feet)

9. Is site located over a p r i m a r y , principal, or sole source aquifer?

DYes

CBNo

10. D o hunting, fishing or shell fishing opportunities presently exist in the project area?

DYes

DNo

1 1 . Does project site c o n t a i n any species of plant or animal life that is i d e n t i f i e d as threatened or endangered?
DYes

Q2No

According to

.

Identify each species
12. Are there any unique or unusual land forms on the project site? (i.e., cliffs, dunes, other geological formations)
DYes

$No

Describe

13. Is the project site presently used by the c o m m u n i t y or neighborhood as an open space or recreation area?
DYes
[?No
If yes, explain
14.

Does the present site i n c l u d e scenic views k n o w n t o be important to the c o m m u n i t y ?
DYes

C3NO

15. Streams w i t h i n or contiguous t o project area:

None

N/ A

a. Name of Stream and name of River to w h i c h it is tributary

16. Lakes, ponds, w e t l a n d areas w i t h i n or contiguous to project area:
a. N a m e

N/A

b. Size (In acres)

7

"' . Is the site served by existing public utilities?

SYes

DNo

a) If Yes, does sufficient c a p a c i t y exist to allow connection?

EYes

b) If Yes, w i l l i m p r o v e m e n t be necessary to allow connection?

DNo

C3Ves

DNo

18. Is the site l o c a t e d in an agricultural district certified pursuant to Agriculture and Markets Law, A r t i c l e 25-AA,
Section 303 and 304?
DYes
ENo
19. Is the site located in or substantially contiguous to a Critical Environmental Area designated pursuant t o A r t i c l e 8
of the ECL, and 6 NYCRR 617?
DYes
DNo
20. Has the site ever been used for the disposal of solid or hazardous wastes?

DYes

ENo

B. Project Description
1 . Physical dimensions and scale of project (fill in dimensions as appropriate)
a. Total contiguous acreage owned or controlled by project sponsor
b. Project acreage to be d e v e l o p e d :

1+

acres initially;

c. Project acreage t o r e m a i n undeveloped
d. Length of project, in miles: N/A

1 »5+

acres.

1+

acres u l t i m a t e l y .

acres.
(If appropriate)

e. If the project is an expansion, indicate percent of expansion proposed

N/A

f. Number of off-street p a r k i n g spaces existing

^/A

; proposed

g. M a x i m u m vehicular trips generated per hour

%•

(upon c o m p l e t i o n of project)?

h. If residential: N u m b e r a n d type of housing units:
O n e Family
Initially

I

Ultimately

_L

T w o Family

i. Dimensions (in feet) of largest proposed structure

N/A

M u l t i p l e Family

height;

j . Linear feet of frontage along a public thoroughfare project w i l l occupy is?
3

Condominium

width;

length.
ft.

�2. How much natural material (i.e., rock, earth, etc.) will be removed'from the site? J _ _
3. Wifl disturbed areas be reclaimed?

DYes

BNo

DN/A

a. If yes, for what intends, purpose is the site being reclaimed?
b. Will topsoil be stockpiled for reclamation?

tons/cubic yards

DYes

__*

(3No

c. Will upper subsoil be stockpiled for reclamation?

DYes

_fNo

4. How many acres of vegetation (trees, shrubs, ground covers) will be removed from site?

acres.

5. Will any mature forest (over 100 years old) or other locally-important vegetation be removed by this project?
DYes
d&lt;No
6. If single phase project Anticipated period of construction
7. If multi-phased:
a. Total number of phases anticipated

months, (including demolition).

(number).

b. Anticipated date of commencement phase 1

N

A

month

year, (including demolition).

c. Approximate completion date of final phase

N/A

month

year.

/

d. Is phase 1 functionally dependent on subsequent phases?
8. Will blasting occur during construction?

DYes

DYes

BNo

9. Number of jobs generated: during construction

; after project is complete
N

10. Number of jobs eliminated by this project

'

DYes

DYes

l_No

N/A

b. Name of water body into which effluent will be discharged
DYes

L

l3No

Type

14. Will surface area of an existing water body increase or decrease by proposal?
Explain
15. Is project or any portion of project located in a 100 year flood plain?
16. Will the project generate solid waste?

EYes

a. If yes, what is the amount per month

DYes

DYes

_3No

N/A

tons

;

(_Yes
:

DNo

; location

d. Will any wastes not go into a sewage disposal system or into a sanitary landfill?
e. If Yes, explain

__Yes

DNo

a. If yes, what is the anticipated rate of disposal?

tons/month.

b. If yes, what is the anticipated site life?
18. Will project use herbicides or pesticides?

years.
DYes

ENo

19. Will project routinely produce odors (more than one hour per day)? DYes
20. Will project produce operating noise exceeding the local ambient noise levels?
21. Will project result in an increase in energy use?

DYes

ENo
DYes

©No

If yes . indicate type&lt;s)
22. If water supply is from wells, indicate pumping capacity
Total anticipated water usage per day

'

24. Does project involve Local, State or Federal funding?
If Yes, explain

DYes

.

17. Will the project involve the disposal of solid waste?

23.

LUNo

DNo

b. If,yes, will an existing solid waste facility be used?
c. If yes, give name

If yes, explain

BNo

a. If yes, indicate type of waste (sewage, industrial, etc.) and amount
13. Is subsurface liquid waste disposal involved?

N/A

A

11. Will project require relocation of any projects or facilities?
12. Is surface liquid waste disposal involved?

DNo

N/A

'

gallons/minute.

gallons/day.
DYes

BNo

GDNo

__No

�25. Approvals Required:

Submittal
Date

Type
City. Town, Village Board

DYes

:ity. Town, Village Planning Board

GNo

•

_Yes C N o

Subdivision

City, Town Zoning Board

DYes

DNo

City, County Health Department

DYes

DNo

Other Local Agencies

DYes

DNo

Other Regional Agencies

DYes

DNo

.

State Agencies

DYes

DNo

.

Federal Agencies

DYes

DNo

10-3-1994

.

_,

C. Zoning and Planning Information
1 . Does proposed action involve a planning or zoning decision?

EYes

DNo

If Yes, indicate decision required:
Dzoning amendment

Dzoning variance

Dnew/revision of master plan

Dspecial use permit

Dresource management plan

2. What is the zoning c!assification(s)of the site?

-.subdivision

Dsite plan

Dother

R-15

3. What is the maximum potential development of the site if developed as permitted by the present zoning?

1 building lot
4. What is the proposed zoning of the site?

.
R-15

5. What is the maximum potential development of the site if developed as permitted by the proposed zoning?
1 building

lot;_

'•. Is the proposed action consistent with the recommended uses in adopted local land use plans?

QJYes

DNo

7. What are the predominant land use{s) and zoning classifications within a V* mile radius of proposed action?

Residential single family
8. Is the proposed action compatible with adjoining/surrounding land uses within a V* mile?

_]Yes D N o

9. If the proposed action is the subdivision of land, how many lots are proposed? _ J
a. What is the minimum lot size proposed? 1+ a c r e
10. Will proposed action require any authorization(s) for the formation of sewer or water districts?

DYes

K)No

1 1 . Will the proposed action create a demand for any community provided services (recreation, education, police,
fire protection)?
QYes
ENo
a. If yes, is existing capacity sufficient to handle projected demand?

__Yes D N o

12. Will the proposed action result in the generation of traffic significantly above present levels?
a. If yes, is the existing road network adequate to handle the additional traffic?

DYes

DYes

_]No

DNo

D. informational Details
Attach any additional information as may be needed to clarify your project. If there are or. may be any adverse
impacts associated with your proposal, please discuss such impacts and the measures which you propose to mitigate or
avoid them.

E. Verification
I certify that the information provided above is true to the best of my knowledge.
\pplicant/Sponsor Name JAMES BICK AND MARTHA BICK
signature

&lt;^Q^LZZr^^/^^

Date

October 3, 1994

Titlp Attorney

If the action is in the Coastal Area, -nd you ire a. state agency, complete the Coastal Assessment Form before proceeding
with this assessment.

�Part 2—PROJECT IMPACTS AND THEIR MAGNITUDE
Responsibility of Lead Agency
General I n f o r m a t i o n (Read Carefully)
• In c o m p l e t i n g the f o r m the reviewer should be guided by the questfon: Have my responses and d e t e r m i n a t i o n s b e e n
reasonable? The reviewer is n o t expected to be an expert environmental analyst.
• I d e n t i f y i n g that an impact w i l l be p o t e n t i a l l y large (column 2) does not mean that it is also necessarily s i g n i f i c a n t .
Any large impact must be evaluated in PART 3 to determine significance. I d e n t i f y i n g an i m p a c t in c o l u m n 2 s i m p l y
asks t h a t it be l o o k e d at further.
• The Examples provided are to assist the reviewer by showing types of impacts and wherever possible the t h r e s h o l d of
m a g n i t u d e that w o u l d trigger a response in c o l u m n 2. The examples are generally applicable t h r o u g h o u t the State a n d
for most situations. But, for any specific project or site other examples and/or lower thresholds may be a p p r o p r i a t e
for a Potential Large I m p a c t response, thus requiring evaluation in Part 3.
• The impacts of each project, on each site, in each locality, w i l l vary. Therefore, the examples are i l l u s t r a t i v e a n d
have been offered as guidance. They do not constitute an exhaustive list of impacts and thresholds to answer each question.
• The number of examples per question does not indicate the importance of each question.
• In identifying impacts, consider long t e r m , short term and cumlative effects.
Instructions (Read carefully)
a. Answer each of the 19 questions in PART 2. Answer Yes if there w i l l be any i m p a c t .
b. M a y b e answers should be considered as Yes answers.
c. If answering Yes t o a question then check the appropriate box (column 1 or 2) t o indicate the p o t e n t i a l size o f t h e
impact. If impact threshold equals or exceeds any example provided, check c o l u m n 2. If i m p a c t w i l l o c c u r b u t t h r e s h o l d
is lower than example, check c o l u m n 1 .
d. If reviewer has d o u b t about size of the i m p a c t then consider the impact as p o t e n t i a l l y large and p r o c e e d t o PART 3.
e. If a p o t e n t i a l l y large impact checked in c o l u m n 2 can be mitigated by change{s) in the project t o a small t o m o d e r a t e
impact, also check the Yes box in c o l u m n 3. A No response indicates that such a reduction is n o t possible. This
must be explained in Part 3.

1
IMPACT ON LAND
1 . W i l l the proposed action result in a physical change to the project site?
DNO
DYES
Examples that w o u l d apply to c o l u m n . 2
• Any construction on slopes of 1 5 % or greater, (15 f o o t rise per 100
f o o t of length), or where the general slopes in the project area exceed
10%.
• Construction on land where the depth to the water table is less than
3 feet.
• Construction of paved parking area for 1,000 or more vehicles.
• Construction on land where bedrock is exposed or generally within
3 feet of existing ground surface.
»
• Construction t h a t w i l l continue for more than 1 year or involve more
than one phase or stage.
• Excavation for mining purposes that w o u l d remove more than 1,000
tons of natural material (i.e., rock or soil) per year.
• Construction or expansion of a sanitary l a n d f i l l .
• Construction in a designated f l o o d w a y .
}• Other

impacts

'.

Small to
Moderate
Impact

2

Potential
Large
Impact

3
Can Impact Be
Mitigated By
Project Change

•

D

DYes

DNo

D

D

QYes

DNo

n

D
D

DYes
. DYes

DNo
GNo

DYes

DNo

DYes

DNo

DYes
DYes
DYes

DNo
DNo
DNo

DYes

DNo

•
•
D

•
D
D

•
•
•
D

•

2. W i l l there be an effect t'.. „.iy unique or unusual land forms found on
the site? (i.e., cliffs, dunes, geological f o r m a t i o n s , e t c . ) D N O
DYES
• Specific

land

forms:

a

D

�IMPACT ON WATER
3\ Will proposed action affect any water body designated as protected?
(Under Articles 15, 24. 25 of the Environmental Conservation Law, ECL)
®NO
GYES
Examples that would apply to column 2
• Developable area of site contains a protected water body.

1

2

Small to
Moderate
Impact

Potential
Large
Impact

D
D

D
D

D
D

•

D
D
D

D

Can Impact Be
Mitigated By
Project Change

DYes

DNO

GYes

DNo

DYes

DNo

DYes

DNo

DYes

DNo

D

DYes

DNo

D
D

D
D

DYes

DNo

DYes

DNo

•

DYes

DNo

D
D

D
D

DYes

DNo

D

DYes

DNo

• Construction or operation causing any contamination of a water
supply system.

D

D

DYes

DNo

• Proposed Action will adversely affect groundwater.
Liquid effluent will be conveyed off the site to facilities which presently
do not exist or have inadequate capacity.

D
D

D
D

DYes
DYes

DNo
DNo

• Proposed Action would use water in excess of 20,000 gallons per
day.

D

D

DYes

DNo

• Proposed Action will likely cause siltation or other discharge into an
existing body of water to the extent that there will be an obvious visual
contrast to natural conditions.

D

D

DYes

DNo

• Proposed Action will require the storage of petroleum or chemical
products greater than 1,100 gallons.

D

C

DYes

DNo

• Proposed Action will allow residential uses in areas without water
and/or sewer services.

D

D

DYes

DNo

• Proposed Action locates commercial and/or industrial uses which may
require new or expansion of existing waste treatment and/or storage
facilities.

D

D

DYes

DNo

D

D

DYes

DNo

q

D

DYes

DNo

• Dredging more than 100 cubic yards of material from channel of a
protected stream.
• Extension of utility distribution facilities through a protected water body.
• Construction in a designated freshwater or tidal wetland.
• Other impacts:

4 . Will proposed action affect any non-protected existing or new body
of water?
0NO
DYES
Examples that would apply to column 2
• A 10% increase or decrease in the surface area of any body of water
or more than a 10 acre increase or decrease.
• Construction of a body of water that exceeds 10 acres of surface area.
• Other impacts:

5. Will Proposed Action affect surface or groundwater
quality or quantity?
$NO
Examples that would apply to column 2

DYES

• Proposed Action will require a discharge permit.
• Proposed Action requires use of a source of water that does not
have approval to serve proposed (project) action.
• Proposed Action requires water supply from wells with greater than 45
gallons per minute pumping capacity.

tt

k* Other

impacts:

. Will proposed action alter drainage flow or patterns, or surface
water runoff?
C3NO
DYES
Examples that would apply to column 2
Proposed Action would change flood water flows.
7

�2
Small to
Moderate
Impact

Potential
Large
Impact

D
D

D

• Proposed Action will allow development in a designated floodway.

•

•

• Other impacts:

D

D
D

DYes
DYes
DYes
DYes

D

D

DYes

DNo

•
•
•

•

DYes

DNO

D

DYes

DNO

D

DYes

DNO

• Proposed action will allow an increase in the density of industrial.
development within existing industrial areas.

D

D

DYes

DNo

• Other impacts:

D

D

DYes

DNO

• Reduction of one or more species listed on the New York or Federal
list, using the site, over or near site or found on the site.

•

D

DYes

DNo

• Removal of any portion of a critical or significant wildlife habitat.

D

a

DYes
DYes

DNo
DNo

D Y es

DNo

• Proposed Action may cause substantial erosion.
• Proposed Action is incompatible with existing drainage patterns.

Can Impact Be
Mitigated By
Project Change
DNo
ONo
DNo
DNo

IMPACT ON AIR
7. W i l l proposed action affect air quality?
ENO
DYES
Examples that would apply to column 2
• Proposed Action will induce 1,000 or more vehicle trips in any given
hour.

• Proposed Action will result in the incineration of more than 1 ton of
refuse per hour.
• Emission rate of total contaminants will exceed 5 lbs. per hour or a
heat source producing more than 10 million BTU's per hour.
• Proposed action will allow an increase in the amount of land.committed
to industrial use.

IMPACT ON PLANTS AND ANIMALS
8. W i l l Proposed Action affect any threatened or endangered
species?
BSNO
Examples that would apply to column 2

DYES

• Application of pesticide or herbicide more than twice a year, other
than for agricultural purposes.
• Other

•

D

impacts:

9. Will Proposed Action substantially affect non-threatened or
non-endangered species?
D8NO
Examples that would apply to column 2

D
D

DYES

• Proposed Action would substantially interfere with any resident or
migratory fish, shellfish or wildlife species.

•

D

DYes

DNo

• Proposed Action requires the removal of more than 10 acres
of mature forest (over 100 years of age) or other locally important
vegetation.

D

D

DYes

DNo

a

D

IMPACT ON AGRICULTURAL LAND RESOURCES
^ J O . Will the Proposed Action affect agricultural land resources?
A
ElNO
DYES
^ ^
Examples that would apply to column 2
• The proposed action would sever, cross or limit access to agricultural
land (includes cropland, hayfields, pasture, vineyard, orchard, etc.)
8

DYes

DNo

�1

2

Small to
Moderate
Impact

Potential
Large
Impact

•

•

D
D
D

Can Impact Be
Mitigated By
Project Change

D
D
D

DYes
DYes
DYes
DYes

DNo
DNo
DNo
DNo

D

D

DYes

DNo

•

D

DYes

DNo

• Emission rate of total contaminants will exceed 5 lbs. per hour or a
heat source producing more than 10 million BTU's per hour.

D

D

DYes

DNo

• Proposed action will allow an increase in the amount of land.committed
to industrial use.

D

•

DYes

DNo

•

D

DYes

DNo

D

•

DYes

DNo

D

D

D Y es

DNo

•
•

•

DYes

DNO

D

DYes

DNO

D

D

D Y es

DNO

• Proposed Action would substantially interfere with any resident or
migratory fish, shellfish or wildlife species.

D

D

DYes

DNo

• Proposed Action requires the removal of more than 10 acres
of mature forest (over 100 years of age) or other locally important
ve3et_t.cn.

D

D

DYes

DNo

D

D

D Y es

• Proposed Action may cause substantial erosion.
• Proposed Action is incompatible with existing drainage patterns.
• Proposed Action will allow development in a designated floodway.
• Other impacts:

IMPACT ON AIR
• NO
DYES
7. Will proposed action affect air quality?
Examples that would apply to column 2
• Proposed Action will induce 1,000 or more vehicle trips in any given
hour.
• Proposed Action will result in the incineration of more than 1 ton of
refuse per hour.

• Proposed action will allow an increase in the density of industrial.
development within existing industrial areas.
• Other impacts:

IMPACT ON PLANTS AND ANIMALS
8. Will Proposed Action affect any threatened or endangered
species?
DNO
Examples that would apply to column 2

DYES

• Reduction of one or more species listed on the New York or Federal
list, using the site, over or near site or found on the site.
• Removal of any portion of a critical or significant wildlife habitat.
• Application of pesticide or herbicide more than twice a year, other
than for agricultural purposes.
• Other

impacts:

9. Will Proposed Action substantially affect non-threatened or
non-endangered species?
DNO
Examples that would apply to column 2

CYES

IMPACT ON AGRICULTURAL LAND RESOURCES
10. Will the Proposed Action affect agricultural land resources?
• NO
DYES
Examples that would apply to column 2
The proposed action would sever, cross or limit access to agricultural
land (includes cropland, hayfields, pasture, vineyard, orchard, etc.)

8

DNo

�2

• Construction activity would excavate or compact the soil profile of
agricultural land.
• The proposed action would irreversibly convert more than 10 acres
of agricultural land or, if located in an Agricultutal District, more
than 2.5 acres of agricultural land.
• The proposed action would disrupt or prevent installation of agricultural
land management systems (e.g., subsurface drain lines, outlet ditches,
strip cropping); or create a need for such measures (e.g. cause a farm
field to drain poorly due to increased runoff)
• Other impacts: _ _ _ _ _ _ _ ^ _ _ _

IMPACT ON AESTHETIC RESOURCES
1 1 . Will proposed action affect aesthetic resources?
ENO
DYES
(If necessary, use the Visual EAF Addendum in Section 617.21,
Appendix B.)
Examples that would apply to column 2
• Proposed land uses, or project components obviously different fro'm
or in sharp contrast to current surrounding land use patterns, whether
man-made or natural.
• Proposed land uses, or project components visible to users of
aesthetic resources which will eliminate or significantly reduce their
•srijoyment of the aesthetic qualities of that resource.
Project components that will result in the elimination or significant
screening of scenic views known to be important to the area.
• Other impacts:

Can Impact Be
Mitigated By
Project Change

Small to
Moderate
Impact

Potential
Large
Impact

D

D

DYes

DNo

D

D

DYes

DNo

D

D

D

D

D

D Y es

DYes

DNo

D

DYes

DNo

D

D

DYes

DNo

D

D

DYes

DNo

D

•

DYes

DNo

D

D

DYes

DNo

D

D

CYes

DNo

IMPACT ON HISTORIC AND ARCHAEOLOGICAL RESOURCES
12. Will Proposed Action impact any site or structure of historic, prehistoric or paleontological importance?
CNO
DYES
Examples that would apply to column 2
• Proposed Action occurring wholly or partially within or substantially contiguous to any facility or site listed on the State or National Register
of historic places.
• Any impact to an archaeological site or fossil bed located within the
project site.
• Proposed Action will occur in an area designated as sensitive for
archaeological sites on the NYS Site Inventory.
• Other impacts:

D

D

DYes

DNo

D

D

DYes

DNo

IMPACT ON OPEN SPACE AND RECREATION
13. Will Proposed Action affect the quantity or quality of existing or
future open spaces or recreational opportunities?
Examples that would apply to column 2
ENO
DYES
The permanent foreclosure of a future recreational opportunity.
• A major reduction of an open space important to the community.
• Other impacts:
I

D
D
D

D
D
D

DYes
DYes
DYes

DNo
DNo
DNo

9

�IMPACT ON TRANSPORTATION
*\4. Will there be an effect to existing transportation systems?
ENO
Examples that would apply to column 2

DYES

• Alteration of present patterns of movement of people and/or goods.

Small to
Moderate
Impact

•
•

2
Potential
Large
Impact

D

Can Impact Be
Mitigated By
Project Chanc
DYes

DNo

DYes

DNo

D

DYes

DNo

•

D

DYes

DNo

• Proposed Action will require the creation or extension of an energy
transmission or supply system to serve more than 50 single or two family
residences or to serve a major commercial or industrial use.

D

•

DYes

DNo

• Other impacts:

D

•

DYes

DNo

D

D

DYes

DNc

•
D

D
D

DYes
DYes

DNo
DNo

•

D

DYes

DNo

D

D

DYes

DNo

• Proposed Action may cause a risk of explosion or release of hazardous
substances (i.e. oil, pesticides, chemicals, radiation, etc.) in the event of
accident or upset conditions, or there may be a chronic low level
discharge or emission.

D

D

DYes

DNo

• Proposed Action may result in the burial of "hazardous wastes" in any
form (i.e. toxic, poisonous, highly reactive, radioactive, irritating,
infectious, etc.)

D

D

DYes

DNo

• Storage facilities for one million or more gallons of liquified natural
gas or other flammable liquids.

D

D

DYes

DNo

•

•

DYes

DNO

D

D

DYes

DNo

• Proposed Action will result in major traffic problems.
• Other impacts: _ _

D

•

IMPACT ON ENERGY
15. Will proposed action affect the community's sources of fuel or
energy supply?
gtlNO
DYES
Examples that would apply to column 2
• Proposed Action will cause a greater than 5% increase in the use of
any form of energy in the municipality.

NOISE AND ODOR IMPACTS
16. Will there be objectionable odors, noise, or vibration as a result
of the Proposed Action?
ENO
DYES
Examples that would apply to column 2
• Blasting within 1,500 feet of a hospital, school or other sensitive
facility.
• Odors will occur routinely (more than one hour per day).
• Proposed Action will produce operating noise exceeding the local
ambient noise levels for noise outside of structures.
• Proposed Action will remove natural barriers that would act as a
noise screen.
• Other

impacts:

IMPACT ON PUBLIC HEALTH
17. Will Proposed Action affect public health and safety?
£)NO
Examples that would apply to column 2

DYES

• Proposed action may result in the excavation or other disturbance
within 2,000 feet of a site used for the disposal of solid or hazardous
waste.
• Other impacts:

10

�1
Small to
Moderate
Impact

2
Potential
Large
Impact

• The permanent population of the city, town or village in which the
project is located is likely to grow by more than 5%.

D

D

DYes

DNo

• The municipal budget for capital expenditures or operating services
will increase by more than 5% per year as a result of this project
• Proposed action will conflict with officially adopted plans or goals.'

D

D

DYes

DNo
DNo
DNo
DNo
DNo

DYes
DYes

DNo
DNo

DYes

• No

nnn

3
Can Impact Be
Mitigated By
Project Change

nnn

IMPACT O N GROWTH A N D CHARACTER
OF COMMUNITY OR NEIGHBORHOOD
" * . W i l l proposed action affect the character of the existing community?
£JN0
DYES
Examples that would apply to column 2

DYes
DYes
DYes

• Development will create a demand for additional community services
(e.g. schools, police and fire, etc.)

D

DYes

• Proposed Action will set- an important precedent for future projects.

D

a
n
n
n

• Proposed action will cause a change in the density of land use.
• Proposed Action will replace or eliminate existing facilities, structures
or areas of historic importance to the community.

• Proposed Action will create or eliminate employment
» Other

impacts:

•

n
D

19. Is there, or is there likely to be, public controversy related to
potential adverse environmental impacts?
DNO
DYES

If Any Action In Part 2 Is Identified as a Potential Large Impact or
If You Cannot Determine the Magnitude of impact, Proceed to Part 3

Part 3—EVALUATION OF THE IMPORTANCE OF IMPACTS
Responsibility of Lead Agency
Part 3 must be prepared if one or more impact(s) is considered to be potentially large, even if the impact(s) may be
mitigated.
Instructions
Discuss the following for each impact identified in Column 2 of Part 2:
1 . Briefly describe the impact.
2. Describe (if applicable) how the impact could be mitigated or reduced to a small to moderate impact by project change(s).
3. Based on the information available, decide if it is reasonable to conclude that this impact is important.
To answer the question of importance, consider:
• The probability of the impact occurring
—
• The duration of the impact
• Its irreversibility, including permanently lost resources of value
• Whether the impact can or will.be controlled
• The regional consequence of the impact
• Its potential divergence from local needs and goals
• Whether known objections t o the project relate to this impact.
(Continue on attachments)

11

�Approved w|th respect to substance and form

Li fiM
V i l i l a g e A£torn&lt;

T e d : itHrn

Approved by the^BJLanning Board

. i
\y

Chairm
Dated:

Chairman
^

Filed with Village Clerk

Clerk or Deputy Clerk
Dated:

�</text>
                  </elementText>
                </elementTextContainer>
              </element>
            </elementContainer>
          </elementSet>
        </elementSetContainer>
      </file>
    </fileContainer>
    <collection collectionId="135">
      <elementSetContainer>
        <elementSet elementSetId="1">
          <name>Dublin Core</name>
          <description>The Dublin Core metadata element set is common to all Omeka records, including items, files, and collections. For more information see, http://dublincore.org/documents/dces/.</description>
          <elementContainer>
            <element elementId="50">
              <name>Title</name>
              <description>A name given to the resource</description>
              <elementTextContainer>
                <elementText elementTextId="14838">
                  <text>Planning Board Minutes &amp; Resolutions-1994</text>
                </elementText>
              </elementTextContainer>
            </element>
          </elementContainer>
        </elementSet>
      </elementSetContainer>
    </collection>
    <itemType itemTypeId="1">
      <name>Text</name>
      <description>A resource consisting primarily of words for reading. Examples include books, letters, dissertations, poems, newspapers, articles, archives of mailing lists. Note that facsimiles or images of texts are still of the genre Text.</description>
    </itemType>
    <elementSetContainer>
      <elementSet elementSetId="1">
        <name>Dublin Core</name>
        <description>The Dublin Core metadata element set is common to all Omeka records, including items, files, and collections. For more information see, http://dublincore.org/documents/dces/.</description>
        <elementContainer>
          <element elementId="50">
            <name>Title</name>
            <description>A name given to the resource</description>
            <elementTextContainer>
              <elementText elementTextId="14205">
                <text>MINS_PLAN_1994-10-20</text>
              </elementText>
            </elementTextContainer>
          </element>
          <element elementId="49">
            <name>Subject</name>
            <description>The topic of the resource</description>
            <elementTextContainer>
              <elementText elementTextId="14206">
                <text>Planning Board Minutes &amp; Resolutions-1994</text>
              </elementText>
            </elementTextContainer>
          </element>
          <element elementId="40">
            <name>Date</name>
            <description>A point or period of time associated with an event in the lifecycle of the resource</description>
            <elementTextContainer>
              <elementText elementTextId="14207">
                <text>1994</text>
              </elementText>
            </elementTextContainer>
          </element>
        </elementContainer>
      </elementSet>
    </elementSetContainer>
  </item>
  <item itemId="2337" public="1" featured="0">
    <fileContainer>
      <file fileId="2337">
        <src>https://sleepyhollow.localarchives.org/files/original/4ebb70540f243c38e36803165bac9bfb.pdf</src>
        <authentication>39b0a0e45155f267ea7f9544c52b3c66</authentication>
        <elementSetContainer>
          <elementSet elementSetId="4">
            <name>PDF Text</name>
            <description/>
            <elementContainer>
              <element elementId="52">
                <name>Text</name>
                <description/>
                <elementTextContainer>
                  <elementText elementTextId="20824">
                    <text>REGULAR MEETING

NORTH TARRYTOWN, NEW YORK
November 17, 1994

A regular meeting of the North Tarrytown Planning Board was held
on November 17, 1994 at 8:00 p.m. at Village Hall, 28 Beekman
Avenue, North Tarrytown, New York.
PRESENT:-

George Hritz, Chairman
Donald Caetano
Edward McCarthy
David Perlmutter

ALSO PRESENT:;

Janet Gandolfo, Attorney
James Margotta, Building Inspector
Susan J. Portman, Assoc;/Planning
Mark A. DiGennaro, CAMCE

7

Chairman Hritz called the meeting to order at 8:00 p.m.
1. CONTINUATION OF SITE PLAN APPROVAL APPLICATION RE:
CHESTNUT RIDGE
Applicant requested that application review be adjourned to
December meeting.
2. CONTINUATION OF PUBLIC HEARING RE: APPLICATION FOR
SUBDIVISION BY JAMES AND MARTHA BICK, 3 TERRACE CLOSE
Frederick P. Clark Assoc, raised the issue of whether a paper
street was located on the premises in question and this issue
was addressed by John Hughes, the attorney for the applicant.
Mr. Hughes stated that he researched the title and there did
not appear to be a paper street located in that area.
Chairman Hritz asked Susan Portman whether she had any further
outstanding issues and she replied that she did not.
Chairman Hritz asked for a motion to declare the Planning Board's
intent to be lead agency in this application. Donald Caetano
made the motion, seconded by David Perlmutter.
Motion approved unanimously.
Chairman Hritz asked for a motion to make a negative declaration
for SEQR at the December Meeting. David Perlmutter mad the
motion, seconded by Donald Caetano. Motion approved unanimously.
3. CONTINUATION OF PUBLIC HEARING RE: APPLICATION FOR
SUBDIVISION BY AL PECK, IRVING PLACE
The applicant distributed newly revised surveys of the premises
to the Board members.
A discussion ensued with regard to the parking available to
the property.

�PAGE #2
Chairman Hritz asked for a motion to declare the Planning
Board lead agency for SEQR. Donald Caetano made the motion,
seconded by David Perlmutter. Motion carried unanimously.
Chairman Hritz asked for a motion to make a negative declaration
for SEQR. David Perlmutter made the motion, seconded by
Donald Caetano. Motion carried unanimously.
Donald Caetano made a motion to approve the application for
subdivision. Seconded by David Perlmutter. Motion carried
unanimously.
4. CONTINUATION OF PUBLIC HEARING RE: APPLICATION OF AL PECK
SUBDIVISION OF PREMISES AT BEDFORD ROAD
Mr. Peck addressed the Board and stated that the existing lot
is 200 feet by 50 feet with one house. In order to sell the
property, he has to subdivide the lot. The required area
size for a lot in that district is 50 feet by 100 feet. Mr. peck
stated that this was a simple subdivision with no variances needed.
Chairman Hritz asked Susan Portman if she had any comments or
objections to the application. She indicated that she had no
additional comments other than the ones listed in her Memorandum
to the Board.
The Chairman asked for a motion to declare the Planning Board
lead agency. Edward McCarthy made the motion, seconded by
Donald Caetano. Motion carried unanimously.
The Chairman asked for a motion to make a negative declaration
for SEQR. Edward McCarthy made the motion, seconded by Donald
Caetano. Motion carried unanimously.
5. CONTINUATION OF A PUBLIC HEARING RE; PHILIPSE PLAZA BY
ANTONIO RODRIGUES FOR SITE PLAN APPROVAL, N. BROADWAY
Chairman Hritz asked the applicant's architect if there were
any substantial changes made from the previously submitted
plans.
The architect answered that he had redesigned the parking
configuration in respect to the Antonio Carpentry building.
He explained in more detail the changes that he made to the
parking. A discussion followed regarding the parking spaces
and the applearance of the project area.
The Chairman asked if there was any member of the public who
wished to address the Board.

�PAGE #3
Mr. Landi, a member of the public, came forward and stated
that he was very concerned about the retaining wall and how
the traffic was going to be affected by this project.
He owns the property adjacent to the project and he doesn't
want to see any increased traffic. The architect explained
the flow of traffic by referring to the site plans. A lengthy
discussion followed with regard to the traffic impact on
Old Broadway and the entire area as a result of this project.
The Board adjourned the public hearing in this matter to the
December meeting.
Chairman Hritz asked for a motion to have the Planning Board
declare its intent to be lead agency in this application for
SEQR. David Perlmutter made the motion, seconded by Donald
Caetano. Motion carried unanimously.
Chairman Hritz asked for a report from David Perlmutter with
regard to his research into the issue of the validity of
requiring recreation fees from applicants. Mr. Perlmutter
reported that he had reviewed the Dolan case decided by the
U.S. Supreme Court and it is his opinion that the Supreme
Court only addressed the "taking" of property rather than
the payment of a fee into a particular fund. He stated that
North Tarrytown should continue to enforce its requirement
for a recreation fees until this requirement is determined
to be invalid by the courts, if that be the case. Chairman
Hritz asked the rest of the Board members to take this discussion
under advisement until the next meeting.
The minutes of the October 20, 1994 meeting were approved
as submitted.
There being no further business, the meeting was adjourned.

Respectfully submitted,

Carmen G. Mariano
Recording Secretary

�RESOLUTION
Adopted at the November 17, 1994 Meeting of the
Village of North Tarrytown Planning Board
RESOLUTION

SUBDIVISION APPROVAL
PROPOSED ACTION: SUBDIVISION OF PROPERTY INTO
TWO (2) LOTS
OWNER: LEVY ESTATE
APPLICANT: ALBERT PECK
LOCATION: 15 SLEEPY HOLLOW ROAD
TAX DESIGNATION: SECTION 17, BLOCK 8, LOT 13
ZONING: R-3 RESIDENTIAL
WHEREAS, the Planning Board of the Village of North Tarrytown
has reviewed an application for subdivision approval (the
application) pursuant to the Subdivision Regulations of the Village
of North Tarrytown, Chapter 62, Zoning, of the Code of the Village
of North Tarrytown and other requirements of the Village Code
considered pertinent to the application, which application is to
subdivide property located on the westerly side of Sleepy Hollow
Road and the easterly side of Amos Street at 15 Sleepy Hollow Road
into two (2) lots for residential development; and

WHEREAS, Lot A would be 5,000 square feet in size and Lot B
would be 5,000 square feet in size and would contain the existing
dwelling, as shown on the drawing prepared by John J. Muldoon,
Professional Land Surveyor, and further identified as follows:
"Preliminary Subdivision Map Prepared For Levy Est., Situate
Village of No. Tarrytown, Town of Mt. Pleasant, Westchester
Co., N.Y.," scale not shown (1" = 20'), date not shown; and
WHEREAS, all references to the "Applicant" shall include the
Applicant's successor and assigns; and
WHEREAS, the site has been visited by the Village's Planning
Consultant and the Planning Board is thoroughly familiar with the
site and all aspects of the proposed subdivision; and
WHEREAS, the Planning Board noted that the existing dwelling
has a deficient front yard setback and noted that this existing
non-conformity would not be aggravated by the proposed subdivision;
and
WHEREAS, on October 25, 1994, the Westchester County Planning
Board informed the Village's Planning Consultant that they had no
comments to offer on this application; and
WHEREAS, a duly advertised public hearing was held at the
Village Hall on November 17, 1994, at which time those wishing to
be heard were given the opportunity to be heard; and

�«

WHEREAS, the Planning Board considered this a minor
subdivision and treated the preliminary and final as a single
approval; and
WHEREAS, in the course of this review and acting as Lead
Agency pursuant to Part 617 of the implementing regulations
pertaining to Article 8 of the Environmental Conservation Law, the
Planning Board has made the following findings and caused, noted or
conducted the following activities:
1.

Received an application fee;

2.

Caused field inspections to be made of the property and of the
surrounding areas;

3.

Requested, received and considered comments from the Village
Planning Consultant, the Village Engineering Consultant and
the Building Inspector;

4.

Requested, received and reviewed a short Environmental
Assessment Form (EAF) in compliance with the New York State
Environmental Quality Review Act (SEQRA);

5.

After review of said field conditions, recommendations and
EAF, as well as other materials and matters noted above, the
Planning Board has determined that the proposed action is an
Unlisted Action and made a Negative Declaration on November
17, 1994, and noted on the EAF its determination of nonsignificance of environmental impact.

NOW, THEREFORE, BE IT RESOLVED, that said application for
subdivision approval for a two (2) lot subdivision, as shown on the
drawing entitled "Preliminary Subdivision Map Prepared For Levy
Est. , Situate Village of No. Tarrytown, Town of Mt. Pleasant,
Westchester Co., N.Y.," scale not shown (1" = 20'), date not shown,
prepared by John J. Muldoon, Professional Land Surveyor, be and is
hereby granted subdivision approval and that the Applicant may
obtain the endorsed approval of the Planning Board Chairman or, as
an alternate, the Village Administrator, on a copy of this
subdivision resolution and upon the final mylar copy of the
subdivision plat drawing revised as necessary to show compliance
with the following conditions and the Applicant may obtain the
endorsement of the Westchester County Department of Health on the
final mylar subdivision plat which endorsements shall permit filing
in the offices of the Westchester County Clerk, provided, however,
that this subdivision approval shall expire within one hundred
eighty (180) days from the date of this resolution if the following
conditions have not been completed to the satisfaction of the
Planning Board:

2

�The Applicant shall pay to the Village of North Tarrytown the
reimbursement of all application review fees as noted and
required in Section 62-3OF of the Village Zoning Code.
Revision of the above noted plat to demonstrate the following:
2.1

The plat shall be revised and titled "Final Subdivision
Plat;"

2.2

The date and scale of the plat, the date of the survey,
and the names of all of the neighboring property owners
shall be provided on the plat;

2.3

The final plat shall comply with the requirements of
Section 11 of the Village of North Tarrytown Subdivision
Regulations;

2.4

The signature block for the endorsement of the Planning
Board Chairman shall be revised to comply with Section
ll.A(l)(c)(14c);

2.5

The date of this resolution shall be noted on the final
subdivision plat.

PLANNING BOARD
VILLAGE OF NORTH TARRYTOWN

By:

^—

fcP-^k

Iritz, Chairman
(f^North Tarrytown Plann^Rg-^Board
500\not4-036.sjp:ev

3

Date: /*/'&gt;'JV

�RESOLUTION
Adopted at the November 17, 1994 Meeting of the
Village of North Tarrytown Planning Board
RESOLUTION

SUBDIVISION APPROVAL
PROPOSED ACTION: SUBDIVISION OF PROPERTY INTO
TWO (2) LOTS
OWNER: LEVY ESTATE
APPLICANT: ALBERT PECK
LOCATION: 21 AND 23 IRVING PLACE
TAX DESIGNATION: SHEET 78, BLOCK 15, LOT 21
ZONING: R-5 RESIDENTIAL
WHEREAS, the Planning Board of the Village of North Tarrytown
has reviewed an application for subdivision approval (the
application) pursuant to the Subdivision Regulations of the Village
of North Tarrytown, Chapter 62, Zoning, of the Code of the Village
of North Tarrytown and other requirements of the Village Code
considered pertinent to the application, which application is to
subdivide property located at 21 and 23 Irving Place into two (2)
lots for residential development; and
WHEREAS, Lot A would be 3,096 square feet in size and would
contain the existing dwelling at 23 Irving Place and Lot B would be
3,419 square feet in size and would contain the existing dwelling
at 21 Irving Place, as shown on the drawing prepared by John J.
Muldoon, Professional Land Surveyor, and further identified as
follows:
"Preliminary Subdivision Map Prepared For Albert Peck, Situate
Village of No. Tarrytown, Town of Mount Pleasant, Westchester
Co., N.Y.," scale 1" = 2 0 ' , dated July 15, 1994; and
WHEREAS, all references to the "Applicant" shall include the
Applicant's successor and assigns; and
WHEREAS, the site has been visited by the Village's Planning
Consultant and the Planning Board is thoroughly familiar with the
site and all aspects of the proposed subdivision; and
WHEREAS, on November 16, 1994, the Zoning Board of Appeals
granted all area variances which that Board determined were
necessary for the application; and
WHEREAS, a duly advertised public hearing was held at the
Village Hall on November 17, 1994, at which time those wishing to
be heard were given the opportunity to be heard; and
WHEREAS, the Planning Board considered this a minor
subdivision and treated the preliminary and final as a single
approval; and

�The Applicant shall pay to the Village of North Tarrytown
reimbursement of all application review fees as noted
required in Section 62-3OF of the Village Zoning Code.

the
and

Revision of the above noted plat to demonstrate the follow^ ng:
2.1

The plat shall be revised and titled "Final Subdivis. ion
Plat;"

2.2

The final plat shall comply with the requirements of
Section 11 of the Village of North Tarrytown Subdivision
Regulations;

2.3

The signature block for the endorsement of the Planning
Board Chairman shall be revised to comply with Section
ll.A(l)(c)(14c);

2.4

The date of this resolution shall be noted on the fi^nal
subdivision plat.

The Building Inspector or Village Attorney shall confirm tt^at,
during the 30-day circulation period, none of the involved
agencies objected to the Planning Board becoming the I^ead
Agency.

PLANNING BOARD
VILLAGE OF NORTH TARRYTOWN

By:

hi

Date:

Chairman
Tarrytown P
500\not4-042.sjp:ev

3

Board

ll^SX

/ *"

�FREDERICK P. CLARK ASSOCIATES, INC.

David J. Portman, AICP
Howard I. Reynolds, PE
David H. Stolman, AICP

Planning/Development/Environment/Transportation
Rye, New York and Southport, Connecticut
350 Theodore Fremd Avenue
Rye, New York 10580
(914)967-6540

Michael A. Galante
Joanne P. Meder, AICP
Jim Donovan, RLA. ASLA

MEMORANDUM
To:

Village of North Tarrytown Planning Board

Date:

November 11, 1994

Subject:

Review of Bick Preliminary Subdivision

As requested, we have reviewed the preliminary subdivision
application submitted by James and Martha Bick for an area
comprised of five previously subdivided building lots and a paper
street located on the northern and western sides of the Terrace
Close cul-de-sac in the R-2A Residence District.
Tax Lots 1
(Bick), 2 (LoMascolo) and 4 (Golodetz) contain existing singlefamily dwellings. Lots 8 (owned by Bick) and 9 (ownership not
known) are presently undeveloped.
The Applicant is proposing to break up Lot 9 and distribute the
pieces to Lots 2, 4 and 8, resubdivide Lot 8 to subtract a small
triangular piece (the "new" Lot 8 is shown as "Lot B") , and add the
small triangular piece from Lot 8 and the paper street to Lot 1
(the "new" Lot 1 is shown as "Lot A") . As a result, one building
lot will be eliminated from the subdivision.
The Applicant has submitted the following plan:
"Subdivision Map Prepared For James A. &amp; Martha A. Bick, ReSubdivision of Lot 1 - Block 3, An Unnumbered Parcel, Lot 8 Block 2 and a Portion of Lot 9 - Block 2 As Shown On Revised
Map of Sleepy Hollow Manor - Filed in Westchester County
Division of Land Records On June 23, 193 0 As Map No. 3621,
Located in the Village of North Tarrytown, Town of Mount
Pleasant, Westchester County, N.Y.," scale 1" = 20', dated
October 28, 1994, prepared by Charles H. Riley, Land Surveyor.
REVIEW COMMENTS
1.

Subdivision Regulations Compliance:
The subdivision plan
should be revised to show the area of all of the properties
involved in the subdivision, the names of the property owners
of all of the involved properties and the location of the
other two existing dwellings.
The names of all involved
property owners and their addresses should be added to the

Connecticut • (203) 255-3100

FAX • (914)967-6615

Long Island -(516)364-4544

�FREDERICK P. CLARK ASSOCIATES, INC.
Planning/ Development/Environment /Transportation

plan and the application. The existing and proposed lot sizes
and dimensions of all involved properties should be shown on
the plan. T h ^ names of all adjoining property owners should
be shown on thxe plan. In addition, the existing and proposed
subdivision lines should be labeled as such.
The subdivision plan should
that the subject properties
2A (not R-2) ctxid to make the
the tax map number is shown
3, Lot 1).
2.

be corrected to reflect the fact
are located in Zoning District Rtax map numbers consistent (i.e.,
as both Block 1A, Lot 1 and Block

Zoning Compliance: The Applicant should supply information
regarding t h e current ownership of the 40-foot wide
"unnumbered jparcel" which the Applicant has previously
indicated is a "paper street." If that parcel is indeed a
paper street, further research should be done in order to
determine its status.
The Applicant should research the
history of th.e original subdivision, determine whether the
parcel was ever dedicated to the Village or offered to the
Village for dedication, and obtain the agreement of the
Village (or any other involved party) stating that no party,
other than t h e Bicks, has any right to improve the parcel.
Although we aire not attorneys, based upon our experience, the
matter of the paper street should be settled before allowing
the creation o f Lot A, which would include existing Lot 1, the
paper street and a triangular piece of existing Lot 8.
Otherwise, at some point in the future, the Phelps Memorial
Hospital property could be redeveloped for residential use and
whoever has trie right to improve that parcel as a road (even
though the wiclth of the parcel is probably substandard for a
road right-of—way) would be creating a "left-over" triangular
piece of land (approximately 6,075 square feet in size) which
could not be used for residential development.
If it is deter-mined that the parcel is a paper street, it may
simplify the i_ssue to keep the triangular piece as a part of
proposed Lot E3.
Due to its lo-t width, proposed Lot B could probably not be
subdivided in the future without a variance due to the fact
that the lot -width would be insufficient for two lots. The
Bicks have informally offered to restrict the property from
further subdivision.
If that is their intent, this offer
should be statred on the subdivision plan.
Other than t h e matters mentioned above concerning the paper
street, the proposed subdivision appears to comply with the
Zoning Ordinance.
2

�FREDERICK P. CLARK ASSOCIATES, INC.
Planning/Development/Environment/Transportation

3.

Environmental Review; According to Part 617.12 of the State
Environmental Quality Review Act (SEQR), the subdivision of
the subject property constitutes a Type I Action because the
property is located within the Hudson River Shoreline Critical
Environmental Area.
The Applicant has submitted a Full
Environmental Assessment Form (EAF). We have reviewed the EAF
and have enclosed a copy containing our recommended changes
for your consideration.
The Planning Board may declare its intent to be Lead Agency in
the review of this action. A notice of intent to be Lead
Agency should then be circulated to the involved agencies
(i.e., the Westchester County Department of Health) and
interested agencies (e.g., agencies, such as the New York
State Department of Environmental Conservation, which maintain
an interest in the application but do not have direct approval
authority). After 30 days or receipt of the responses from
the other agencies, whichever comes first, the Planning Board
may declare itself Lead Agency, provided no other involved
agency objects, and make a Determination of Significance. The
Lead Agency's preparation of a Negative Declaration or
Findings Statement (following a Positive Declaration and the
preparation of an Environmental Impact Statement) will
complete the SEQR review process. Under coordinated review,
involved agencies may not make final decisions until the SEQR
process is completed.

4.

Other Issues: It does not appear that the public hearing
notice correctly reflected the proposed subdivision since it
stated that Lot 8 would be increased in size from 46,368
square feet (when it is actually approximately 28,660 square
feet) to 58,331 square feet [which is the total area of both
proposed Lots A (developed) and B (undeveloped), not a single
undeveloped lot to be known as Lot 8 ] .
Susan J. Portman, AICP, Associate/Planning

Enclosure
cc:

Sean Treacy, Mayor
Linda E. David, Village Administrator
Janet A. Gandolfo, Esq., Village Attorney
James T. Margotta, Building Inspector
Mark A. DiGennaro, Village Engineer
John Hughes, Esq.
James and Martha Bick

500\not4-031.sjp:aj

3

�14-16-2 (2/87)-7c
617.21
. _
Appendix A
Stale Environmental Quality'Review

SEQR

. FULL ENVIRONMENTAL ASSESSMENT FORM
Purpose: The full EAF is designed to help applicants and agencies determine, in an orderly manner, whether a project
or action may be significant. The question of whether an action may be significant is not always easy to answer. Frequently, there are aspects of a project that are subjective or unmeasureable. It is also understood that those who determine
significance may have little or no formal knowledge of the environment or may be technically expert in environmental
analysis. In addition, many who have knowledge in one particular area may not be aware of the broader concerns affecting
the question of significance.
The full EAF is intended to provide a method whereby applicants and agencies can be assured that the determination
process has been orderly, comprehensive in nature, yet flexible to allow introduction of information to fit a project or action.
Full EAF Components: The full EAF is comprised of three parts:
Part 1: Provides objective data and information about a given project and its site. By identifying basic project
data, it assists a reviewer in the analysis that takes place in Parts 2 and 3.
Part 2: Focuses on identifying the range of possible impacts that may occur from a project or action. It provides
guidance as to whether an Impact is likely to be considered small to moderate or whether it is a potentiallylarge impact. The form also identifies whether an impact can be mitigated or reduced.
Part 3: If any impact in Part 2 is identified as potentially-large, then Part 3 is used to evaluate whether or not the
impact is actually important.

DETERMINATION OF S I G N I F I C A N C E - T y p e 1 a n d Unlisted A c t i o n s
Identify the Portions of EAF completed for this project:

D

Part 1

D

Part 2

DPart 3

Upon review of the information recorded on this EAF (?2rts 1 and 2 and 3 if appropriate), and any other supporting
information, and considering both the magituc'e and importance of e2ch impact, it is reasonably determined by the
lead agency that:
[^

A. The project will not result in any large and important impacts) and, therefore, is one which will not
have a significant impact on the environment, therefore a negative declaration will be prepared.

D

B. Although the project could have a significant effect on the environment, there will not be a significant
effect for this Unlisted Action because the mitigation measures described in PART 3 have been required,
therefore a CONDITIONED negative declaration will be prepared."

D

C. The project may result in one or more large 2nd important impacts that m2y have a significant impact
on the environment, therefore a positive declaration will be prepared.
* A Conditioned Negative Declaration is only valid for Unlisted Actions

James Bick and Martha Bick £+

^\

P l a n n i n g Board - V i l l a g e of North

_

f2£j&lt;^bdn,. jicv\

Name of Action

Tarrytown
Name of Lead Agency

^^P

Print or Type Name of Responsible Officer in Lead Agency

Title of Responsible Officer

Signature of Responsible Officer in Lead Agency

Signatured Preparer (If different from responsible office:er)

October 3 , 1994
Date

1

�PART 1-PROJECT INFORMATION
Prepared by Project Sponsor
.NOTICE: This d o c u m e n t is designed to assist in determining whether jhe action proposed may have a significant effect
|On the environment. Please complete the entire form. Parts A through E. Answers to these questions will be considei
as part of the application for approval and may be subject to further verification and public review. Provide any a d d i t i o n s
information you believe will be needed to complete Parts 2 and 3.
It is expected that completion of the full EAF will be dependent on information currently available and will not involve
new studies, research or investigation. If information requiring such additional work is unavailable, so indicate and specify
each instance.
NAME OF ACTION

JAMES BICK and MARTHA BICK
LOCATICN CF ACTION (Include Street Addftss, Municipality and County)

3 Terrace Close, North Tarrytwon, New YOrk
BUSINESS TELEPHONE

NAME CF ArPUCANT/SPONSCR

( 914, 631-8855

James Bick and Martha Bick
ADDRESS

CITY/PO

3 Terrace Close,
STATE

North Tarrytown

ZJPCODE

NY

10591

BUSINESS TELEPHONE

NAME OF OWNER (If different)

(

same

)

ADDRESS

same
STATE

CITY/PO

ZIP CODE

same
DESCRIPTION CF ACTION

Cj^a-fc-rGn o f o n e b u i l d i n g

lot

**&lt;$ r-6 K ^ V ^ C .

**

^ j ' * ' * *

1

- '***

Please Complete Each Question—Indicate N.A. if not applicable

A. Site D e s c r i p t i o n
Physical setting of overall project, both developed and undeveloped areas.
1. Present land use:
DUrban
Glndustrial
GCommercial
[^'Residential (suburban)
CForest
GAgriculture
GCther
2. Total acreage of project area:
^ • -^
acres.
APPROXIMATE ACREACE
Meadow or Erushland (Non-agricultural)
Forested
Agricultural (Includes orchards, cropland, pasture, etc.)
Wetland (Freshwater or tidal as per Articles 24, 25 of ECL)
Water Surface Area
Unvegetated (Rock, earth or fiil) ~
Roads, buildings and ether paved surfaces
Residential
Other (Indicate :ype)_

PRESENTLY
acres

IZ

1+

acres
acres
acres
acres
acres
acres
acres

GRural (non-farm)

AFTER COMPLETION
acres

i- £

1±_

acres
acres
acres
acres
acres
acres
acres

3. What is predominant soil type{s) on project site?
'.
a. Soil drainage:
£ W e l i drained \QQ
% of site
DModerately well drained
% of site
CPoorly drained
% of site
b. If any agricultural land is involved, how many acres of soil are classified within soil group 1 through 4 of the N
Land Classification System?
N/A acres. (See 1 NYCRR 370).
4. Are there bedrock outcroppings on project site?
a. What is depth to bedrock?
10-15+

A

CXYes
DNo
(jn feet)

�5. Approximate percentage of proposed project site with slopes:

CO-10%
E l 5 % or greater

%

DlO-15%
_Q %

_%

6. Is project substantially contiguous to, or contain a building, site-.'or district, listed on the State or the National
Registers of Historic Places?
DYes
CSs'o
'/. Is project substantially contiguous to a site listed on the Register of National Natural Landmarks?
8. What is the depth of the water table? 20+

DYes

t$No

(in feet)

9. Is site located over a primary, principal, or sole source aquifer?

DYes

ENo

10. Do hunting, fishing or shell fishing opportunities presently exist in the project area?

DYes

DNo

11. Does project site contain any species of plant or animal life that is identified as threatened or endangered?
DYes
ENo
According to
.
Identify each species

.,

_

12. Are there any unique or unusual land forms on the project site? (i.e., cliffs, dunes, other geological formations)
DYes

-?No

Describe

13. Is the project site presently used by the community or neighborhood as an' open space or recreation area?
DYes
E&amp;s'o
If yes, explain
,
__
14.

Does the present site include scenic views known to be important to the community?
DYes
ONo

15. Streams within or contiguous to project area:
None
a. Name of Stream and name of River to which it is tributary

N

16. Lakes, ponds, wetland areas within or contiguous to project area:
a. Name y / A

#

'

b. Size (In acres)

Is the site served by existing public utilities?
__Yes
DNo
a) If Yes, does sufficient capacity exist to allow connection?
EYes
b) If Yes, will improvements be necessary to allow connection?
C?Ves

DNo
DNo

IS. Is the site located in an agricultural district certified pursuant to Agriculture and Markets Law, Article 25-AA,
Section 303 and 304?
DYes
ENo
19. Is the site located in or substantially contiguous to a Critical Environmental Area designated pursuant to Article 8
of the ECL, and 6 NYCRR 617?
j^Yes
DNo
20. Has the site ever been used for the disposal of solid or hazardous wastes?

DYes

ENo

B. Project Description
1. Physical dimensions and scale of project (fill in dimensions as appropriate)
a. Total contiguous acreage owned or controlled by project sponsor
b. Project acreage to be developed:

1+

acres initially;

c. Project acreage to remain undeveloped
d. Length of project, in miles: N/A.

1.5+
1+

(If appropriate)

f. Number of off-street parking spaces existing

N/A

%;

; proposed fl/_\

g. Maximum vehicular trips generated per hour

(upon completion of project)?

h. If residential: Number and type of housing units:
' One Family
Two Family
Ultimately

acres ultimately.

acres.

e. If the project is an expansion, indicate percent of expansion proposed

Initially

acres.

Multiple Family

Condominium

i

.
1

i. Dimensions (in feet) of largest proposed structure

'

•

height;

j . Linear feet of frontage along a public thoroughfare project will occupy is?
3

width;
60+

length.
ft.

�2. How much natural material (i.e.. rock, earth, etc.) will be removecffrom the site? _____

tons/cubic yards

3. Will disturbed areas be reclaimed?
GYes
ENo
DN/A
NA
a. If yes, for what intends- purpose is the site being reclaimed?
'
b. Will topsoil be stockpiled for reclamation?
DYes
G5No
c. Will upper subsoil be stockpiled for reclamation?
DYes
_5No
4. How many acres of vegetation (trees, shrubs, ground covers) will be removed from site?

acres.

5. Will any mature forest (over 100 years old) or other locally-important vegetation be removed by this project?
DYes
C&amp;lo
' 6. If single phase project Anticipated period of construction

. months, (including demolition).

7. If multi-phased:
a. Total number of phases anticipated
(number).
N A
b. Anticipated date of commencement phase 1
/
month
c. Approximate completion date of final phase N/A
month
d. Is phase 1 functionally dependent on subsequent phases?
DYes
8. Will blasting occur during construction?

DYes

year, (including demolition).
year.
uNo

ENo

9. Number of jobs generated: during construction

; after project is complete —_L_A
N A

TO. Number of jobs eliminated by this project

'

11. Will project require relocation of any projects or facilities?

DYes

DSNo

12. Is surface liquid waste disposal involved?
DYes
ENo
a. If yes, indicate type of waste (sewage, industrial, etc.) and amount
b. Name of water body into which effluent will be discharged
|13. Is subsurface liquid waste disposal involved?

DYes

{_&amp;Jo

If yes. explain

N/A
N/A

Type

14. Will surface area of 2n existing water body increase or decrease by proposal?
Explain .
15. Is project or any portion of project located in a 100 year flood plain?
DYes

DYes
_JNO

16. Will the project generate solid waste?
EYes
GNo
a. If yes. what is the amount per month N/A
tons
b. If.yes, will an existing solid waste facility be used?
DYes
DNo
c. If yes, give name
:
:
; location
d. Will any wastes not go into a sewage disposal system or into a sanitary landfill?
e. If Yes, explain
17. Will the project involve the disposal of solid waste?
a. If yes. what is the anticipated rate of disposal?
b. If yes, what is the anticipated site life?
18. Will project use herbicides or pesticides?

_$Yes

DNo
tons/month.

ENo

19. Will project routinely produce oc'crs (mere than one hour per cay)? DYes

__No

20. Will project produce operating noise exceeding the local ambient noise levels?
DYes

22. If water supply is from wells, indicate pumping capacity
23.

Total anticipated water usage per day

DYes

years.

DYes

21. Will project result in an increase in energy use?
If yes , indicate type's)

(3No

'

24. Does project involve Local, State or Federal funding?
If Yes, explain
r_/A

DYes

©No
'

gallons/minute.

gallons/day.
DYes

_DNo

S

,

ENo

ENo

�25. Approvals Required:

Submittal
Date

Type
City. Town, Village Board
lity. Town. Village Planning Board

DYes
£iYes

CNo
GNo

•'
Subdivision

City. Town Zoning Board

DYes

CNo

«6ity. County Health Department

EYes

CNo

I***'*"-*'"^

Other Local Agencies

DYes

CNo

m

Other Regional Agencies

DYes

CNo

State Agencies

DYes

CNo

Federal Agencies

DYes

CNo

"
10-3-1994

C. Zoning and Planning Information
1. Does proposed action involve a planning or zoning decision?
EYes
CNo
If Yes. indicate decision required:
Dzoning amendment
Czoning variance
Cspecial use permit
CSsubdivision
Dnew/revision of master plan
Dresource management plan
Dother
2. What is the zoning classification(s)of the site?

R^Hk

Gsite plan

^

:

3. What is the maximum poten* ?l development of the site if developed as permitted by the present zoning?
h b u i l d i n g lot- 2~ QJ^lliVyj i
(Ctie en 1/iLh u"d€vtlcped
/cf-^
4. What is the proposed zoning of the site?

R-T5-

NO Cy^^^K^

5. What is the maximum potential development of the site if developed as permitted by the proposed zoning?

1 bun dim lut-

*Lh

•. Is the proposed action consistent with the recommended uses in adopted local land use plans?

CSYes

DNo

7. What are the predominant land use{s) and zoning classifications within a V* mile radius of proposed action?
R e s i d e n t i a l s i n g l e f a m i l y , JOJfr-fabc/)«.I ;
fl-l , K--2.fr, H .
8. Is the proposed action compatible with adjoining/surrounding land uses within a V* mile?
£)Yes
DNo
9. If the proposed action is the subdivision of land, how many lots are proposed? - 1 (£€S«hA4*. s \cv\ - r€^tt^CJ c^
a. What is the minimum lot size proposed?
10. Will proposed action require any authcrization(s) for the formation of sewer or water districts?

OYes

BDNo

11. Will the proposed action create a demand for any community provided services (recreation, education, police,
fire protection)?
CYes
KS'o
a. If yes, is existing capacity sufficient to handle projected demand? N ^ C$Yes

CNo

12. Will the proposed action result in the generation of traffic significantly above present levels?
a. If yes, is the existing read network adequate to handle the additional traffic?

CYes

CYes

£JNO

CNo

D. Informational Details
Attach any additional information as may be needed to clarify your project. If there are or. may be any adverse
impacts associated with your proposal, please discuss such impacts and the measures which you propose to mitigate or
avoid them.

E. Verification
I certify that the information provided above is true to the best of my knowledge.
A p p l i c a n t / S p o n s o r Name JAMES BICK AND MARTHA BICK
signature

^77

rlr-YJ^ry^

Title

Date

O c t o b e r 3 , 1994

Attorney

If the action is in the Coastal Area, and you are a state agency, complete the Coastal Assessment Form before proceeding
with this assessment.

�Part 2— PROJECT IMPACTS AND THEIR MAGNITUDE
Responsibility of Lead Agency
General Information (Read Carefully)
k In completing the form the reviewer should be guided by the question: Have my responses and determinations been
reasonable? The reviewer is not expected to be an expert environmental analyst.
• Identifying that an impact will be potentially large (column 2) does not mean that it is also necessarily significant. "
Any large impact must be evaluated in PART 3 to determine significance. Identifying an impact in column 2 simply
asks that it be looked at further.
• The Examples provided are to assist the reviewer by showing types of impzets and wherever possible the threshold of
magnitude that would trigger a response in column 2. The examples are generally applicable throughout the State and
for most situations. But, for any specific project or site other examples and/or lower thresholds may be appropriate
for a Potential Large Impact response, thus requiring evaluation in Part 3.
• The impacts of each project, on each site, in each locality, will vary. Therefore, the examples are illustrative and
have been offered as guidance. They do not constitute an exhaustive list of impacts and thresholds to answer each question.
• The number of examples per question does not indicate the importance of each question.
• In identifying impacts, consider long term, short term and cumlative effects.
Instructions (Read carefully)
a. Answer each of the 19 questions in PART 2. Answer Yes if there will be any impact.
b. Maybe answers should be considered as Yes answers.
c. If answering Yes to a question then check the appropriate box (column 1 or 2) to indicate the potential size of the
impact. If impact threshold equals or exceeds any example provided, check column 2. If impact will occur but threshold
is lower than example, check column 1 .
d. If reviewer has doubt about size of the impact then consider the impact as potentially large and proceed to PART 3.
e. If a potentially large impact checked in column 2 can be mitigated by changes) in the project to a small to moderate
impact, also check the Yes box in c o l u m n 3. A No response indicates that such a reduction is not possible. This
must be explained in Part 3.

IMPACT ON LAND
W i l l the proposed action result in a physical change to the project site?
fiKO
DYES
Examples that w o u l d a p p l y t o c o l u m n . 2
• Any construction on slopes of 1 5 % or greater, (15 foot rise per 100
f o o t of length), or where the general slopes in the project area exceed
"0%.

1

2

S m a l l to
Moderate
Impact

Potential
Larg9
Impact

D

D

DYes

QN&lt;

D

D

GYes

DN&lt;

n

DYes
DYes

GNo

D

D
n

DNO

•

D

DYes

DNO

D

D

DYes

DNO

D
D
D

D
D

DNO

•

DYes
DYes
DYes

D

D

D Y es

DN&lt;

C a n I m p a c t Be
M i t i g a t e d By
Project C h a n g e

1.

• Construction on land w h e r e the depth to the w a t e r table is less than
3 feet.
• Construction ci paved p a r k i n g 2rea for 1,000 or more vehicles.
• Construction en land w h e r e bedrock is exposed or generally within
3 feet of existing g r o u n d surface.
• Construction that w i l l c o n t i n u e for more than 1 year or involve more
than one phase or stage.
• Excavation for mining purposes that w o u l d remove more than 1,000
tens of natural m a t e r i e l (i.e., rock or soil) per year
• Construction or expansion of a sanitary l a n d f i i l .
• Construction in a designated f l o o d w a y .
• Other

impacts

DNO
DNO

. W i l l there be an e f f e c t t'.. _.iy unique or unusual land forms found on
the site? (i.e., cliffs, dunes, geological f o r m a t i o n s , etc.)j3^NO
DYES
Specific

land

forms:

�1

2

Small to
Moderate
Impact

Potential
Large
Impact

D
D

D
D

DYes
DYes

DNo

D
D
D

D
D
D

DYes
DYes
DYes

DNO

DNO

D

D

DYes

DNo

D
D

D
D

DYes

DNo

DYes

DNO

D
D

D
D

DYes

DNo

DYes

DNo

• Proposed Action requires water supply from wells with greater than 45
gallons per minute pumping capacity.

D

D

DYes

DNo

• Construction or operation causing any contamination of a water
supply system.

D

D

DYes

DNo

• Proposed Action will adversely affect groundwater.
Liquid effluent will be conveyed off the site to facilities which presently
do not exist or have inadequate capacity.

D
D

D
D

DYes
DYes

DNo
DNo

• Proposed Action would use water in excess of 20,000 gallons per
day.

D

D

DYes

GNo

• Proposed Action will likely cause siltation or other discharge into an
existing body of water to the extent that there will be an obvious visual
contrast to natural conditions.

D

D

DYes

GNo

• Proposed Action will require the storage of petroleum or chemical
products greater than 1.100 gallons.

D

DYes

GNo

IMPACT ON WATER
Will proposed action affect any water body designated as protected?
(Under Articles 15. 24, 25 of the Environmental Conservation Law, ECL)
®NO
GYES
Examples that would apply to column 2
• Developable area of site contains a protected water body.

•

• Dredging more than 100 cubic yards of material from channel of a
protected stream.
• Extension of utility distribution facilities through a protected water body.
• Construction in a designated freshwater or tidal wetland.
• Other impacts:
4. Will proposed action affect any non-protected existing or new body
of water?
QNO
DYES
Examples that would apply to column 2
• A 10% increase or decrease in the surface area of any body of water
or more than a 10 acre increase or decrease.
• Construction of a body of water that exceeds 10 acres of surface area.
• Other impacts:
5. Will Proposed Action affect surface or groundwater
quality or quantity?
SNO
Examples that would apply to column 2

Can Impact Be
Mitigated Sy
Project Change

DNO

DNO

DYES

• Proposed Action will require a discharge permit.
Proposed Action requires use of a source of water that does not
have approval to serve proposed (project) action.

0

a

D

DYes

DNo

• Proposed Action locates commercial and/or industrial uses which may
require new or expansion of existing waste treatment and/or storage
facilities.

a

D

C'Yes

CNO

• Other

D

D

DYes

DNo

D

D

D Y es

DNO

• Proposed Action will allow residential uses in areas without water
and/or sewer services.

impacts:

. Will proposed action alter drainage flow or patterns, or surface
water runoff?
OMO
DYES
Examples that would apply to column 2
Proposed Action would change flood water flows.
- ••
7

�1
Small to
Moderate
Impact

2
Potential
Large
Impact

D
D
D

D
D
D
D

DYes
DYes
DYes
DYes

DNO
DNo
DNo
DNo

a

DYes

DNo

• Proposed Action will result in the incineration of more than 1 ton of
refuse per hour.

•
•

D

DYes

DNo

• Emission rate of total contaminants will exceed 5 lbs. per hour or a
heat source producing more than 10 million 3TU's per hour.

D

D

DYes

DNo

• Proposed action will allow an increase in the amount of land.committed
to industrial use.

•

D

DYes

DNo

• Proposed action will allow an increase in the density of industrial.
development within existing industrial areas.

D

D

DYes

DNo

• Other impacts:

•

D

DYes

DNo

•
•

D

GY es

DNo

Proposed Action may C2use substantial erosion.
Proposed Action is incompatible with existing drainage patterns.
Proposed Action will allow development in a designated floodway.

•

Other impacts:

3
Can Impact Be
Mitigated By
Project Change

IMPACT ON AIR
7 . Will proposed action affect air quality?
CNO
DYES
Examples that would apply to column 2
• Proposed Action will induce 1,000 or more vehicle trips in any given
hour.

IMPACT ON PLANTS AND ANIMALS
Will Proposed Action affect any threatened or endangered
species?
GSNO
Examples that would apply to column 2

GYES

• Reduction of one or more species listed on the New York or Federal
list, using the site, over or near site cr found on the site.
• Application cf pesticide or herbicide mere than twice a year, other
than for agricultural purposes.

D

D
D

DYes
DYes

DNo
DNo

• Other

D

D

D Y es

DNc

• Proposed Action would substantially interfere with any resident cr
migratory fish, shellfish or wildlife species.

D

D

DYes

D.No

• Proposed Action requires the removal of more than 10 acres
cf mature forest (over 100 years of age) cr other locally important
vegetation.

D

D

DYes

D'No

D

D

D Y es

• Removal of any portion of a critical or significant wildlife habitat.

impacts-

9. Will Proposed Action substantially affect non-threatened or
non-endangered species?
CSN'O
Examples that would apply to column 2

GYES

IMPACT ON AGRICULTURAL LAND RESOURCES
1 0 . Will the Proposed Action affect agricultural land resources?

3DNO

DYES

_
Examples that would apply to column 2
^ B j T h e proposed action would sever, cress or limit access to agricultural
^ ^ l a n d (includes cropland, hayfields, pasture, vineyard, orchard, etc.)

8

G

DNC

�^ ^ J r o p o s e d Action may C2use substantial erosion.
• Proposed Action is incompatible with existing drainage patterns.
• Proposed Action will allow development in a designated floodway.
• Other impacts:

D
D

IMPACT ON AIR
7. Will proposed action affect air quality?
jCxO
DYES
Examples that would apply to column 2
• Proposed Action will induce 1,000 or more vehicle trips in any given
hour.
• Proposed Action will result in the incineration of more than 1 ton of
refuse per hour.

•
D

• Emission rate of total contaminants will exceed 5 lbs. per hour or a
heat source producing more than TO million 3TU's per hour.

D

• Proposed action will allow an increase in the amount of land.committed
to industrial use.

D

• Proposed action will allow an increase in the density of industrial.
development within existing industrial areas.

D

• Other impacts:

D

IMPACT ON PLANTS AND ANIMALS
fWill Proposed Action affect any threatened or endangered
species?
£j,NO
Examples that would apply to column 2

GYES

• Reduction of one or more species listed on the New York or Federal
list, using the site, over or near site or found on the site.

•

• Removal of any portion of a critical or significant wildlife habitat.

D

• Application of pesticide or herbicide more than twice a year, other
than for agricultural purposes.

a

• Cther

D

impacts:

9. Will Proposed Action substantially affect ncn-threatened CT
non-er.car.gered species?
,££NO
Examples that would applv to column 2

GYES

• Proposed Action would substantially interfere with any resident or
migratory fish, shellfish or wildlife species.

D

• Proposed Action requires the removal cf more than TO acres
of mature forest (over 100 years of age) or other locally important
'•egetst.cn.

D

IMPACT ON AGRICULTURAL LAND RESOURCES
TO. Will the Proposed Action affect agricultural land resources?

J2JNO

DYES

Examples that would apply to column 2
^ ^ T h e proposed action would sever, cross or limit access to agricultural
^ ^ p n d (includes cropland, hayfields, pasture, vineyard, orchard, etc.)

D

�(Construction activity would excavate or compact the soil profile of
agricultural land.
• The proposed action would irreversibly convert more than 10 acres
of agricultural land or, if located in an Agricultutal District, more
than 2.5 acres of agricultural land.
• The proposed action would disrupt or prevent installation of agricultural
land management systems (e.g., subsurface drain lines, outlet ditches,
strip cropping); or create a need for such measures (e.g. cause a farm
field to drain poorly due to increased runoff)
• Other impacts:
,

IMPACT ON AESTHETIC RESOURCES
1 1 . Will proposed action affect aesthetic resources?
KJNO
DYES
(If necessary, use the Visual EAF Addendum in Section 617.21,
Appendix B.)
Examples that would apply to column 2
• Proposed land uses, or project components obviously different fro'm
or in sharp contrast to current surrounding land use patterns, whether
man-made or natural.
• Proposed land uses, or project components visible to users of
aesthetic resources which will eliminate or significantly reduce their
-Enjoyment of the aesthetic qualities of that resource.
Project components that will result in the elimination or significant
screening of scenic views known to be important to the area.
Other impacts:
.

IMPACT ON HISTORIC AND ARCHAEOLOGICAL RESOURCES
12. Will Proposed Action impact any site or structure of historic, prehistoric or paleontological importance?
KJNO
DYES
Examples that would apply to column 2
• Proposed Action occurring wholly cr partially within or substantially contiguous to any facility or site listed on the State or National Register
of historic places.
• Any impact to an archaeological site or fossil bed located within the
project site.
• Proposed Action will occur in an area designated as sensitive for
archaeological sites en the NYS Site Inventory.
• Other impacts:

IMPACT ON OPEN SPACE AND RECREATION
13. Will Proposed Action affect the quantity or quality of existing cr
future open spaces or recreational opportunities?
Examples that would apply to column 2
ENO
DYES
. The permanent foreclosure of a future recreational opportunity.
A major reduction of an open space important to the community.
Other impacts:
I
.

1

2

Small t o
Moderate
Impact

Potential
Large
Impact

D

D

DYes

DNo

D

D

DYes

DNO

a

D

DYes

DNo

D

DYes

DNo

D

D

DYes

DNo

D

D

DYes

DNo

D

D

DYes

DNo

D

D

DYes

DNo

D

D

DYes

DNo

D

D

LJYes

DNo

D

D

DYes

DNo

D

D

DYes

DNo

D
D
D

D
D
D

DYes
DYes
DYes

DNo
DNo
DNo

D

Can Impact Be
Mitigated By
Project Change

�Small to
Moderate
Impact

2
Potential
Large •
Impact

D
D
D

D
D
D

PYes
GYes
DYes

DNo
DNo
DNo

D

D

DYes

DNo

a

D

DYes

DNo

D

D

DYes

DNo

• Blasting w i t h i n 1,500 f e e t of a hospital, school or other sensitive
facility.

D

D

D Y es

DN«

• O d o r s w i l l o c c u r r o u t i n e l y (more than one hour per day).

D
D

D
D

DYes
DYes

DNo
DNo

• Proposed A c t i o n w i l l r e m o v e natural barriers that w o u l d act as a
noise screen.

D

D

DYes

DNo

• Other

D

•

DYes

DNo

• Proposed A c t i o n m a y cause a risk of explosion or release of hazardous
substances (i.e. o i l , pesticides, chemicals, radiation, etc.) in the event of
a c c i d e n t or upset c o n d i t i o n s , or there rr.2y be a chronic low level
discharge or emission.

D

D

DYes

DNo

• Proposed A c t i o n may r e s u l t in the burial of "hazardous wastes" in any
f o r m (i.e. t o x i c , p o i s o n o u s , highly reactive, radioactive, irritating,
i n f e c t i o u s , etc.)

D

D•

DYes

C.No

• Storage facilities for o n e m i l l i o n or more gallons of liquified natural
gas or other f l a m m a b l e l i q u i d s ,

D

D

DYes

DNo

• Proposed a c t i o n m a y result in the excavation or other disturbance
w i t h i n 2,000 feet of a site used for the disposal of solid or hazardous
waste.

D

D

DYes

DNO

• '

D

DYes

DNo

IMPACT ON TRANSPORTATION
1 4 . W i l l there be an e f f e c t t o existing transportation systems?
K'NO
Examples t h a t w o u l d a p p l y t o column 2

"'
DYES

• A l t e r a t i o n of present patterns o f movement of people and/or goods.
• Proposed A c t i o n w i l l result in major traffic problems.
• O t h e r impacts: _ _ _ _ _ _ _ _ _ _

Can Impact Be
Mitigated By
project Chang-

I M P A C T O N ENERGY
15. W i l l proposed a c t i o n a f f e c t the community's sources of f u e l or
energy supply?
©NO
DYES
Examples t h a t w o u l d a p p l y t o column 2
• Proposed A c t i o n w i l l cause a greater than 5% increase in the use of
any f o r m of energy in t h e municipality.
• Proposed A c t i o n w i l l r e q u i r e the creation or extension of an energy
transmission or supply system t o serve more than 50 single or t w o f a m i l y
residences or t o serve a m a j o r commercial or industrial use.
• Other impacts:

N O I S E A N D ODOR IMPACTS
1 6 . W i l l there be o b j e c t i o n a b l e odors, noise, or vibration as a result
of the Proposed A c t i o n ?
• BONO
DYES
Examples t h a t w o u l d a p p l y t o column 2

• Proposed A c t i o n w i l l p r o d u c e operating noise exceeding the local
a m b i e n t noise levels ior noise outside of structures.

impacts:

I M P A C T O N PUBLIC H E A L T H
17. W i l l Proposed A c t i o n a f f e c t public health and safety?
_NO
Examples t h a t w o u l d a p p l y t o column 2

• O t h e r impacts:

10

DYES

�IMPACT O N GROWTH AND CHARACTER
OF COMMUNITY OR NEIGHBORHOOD
,
p. W i l l proposed action affect the character of the existing community?
£JNO
DYES

1
Small t o
Moderate
Impact

2
Potential
Large .
Impact

Can Impact Be
M i t i g a t e d By
Project Change

Examples that would apply to column 2

D

D

DYes

DNo

D

D

D Y es

DNO

D
D
D

D
D
D

DYes

DNO

DYes

DNO

DYes

DNO

Development will create a demand for additional community services
(e.g. schools, police and fire, etc.)

D

D

D Y es

DNo

Proposed Action will set- an important precedent for future projects.

D
D
D

D
D
D

DYes

DNO

DYes

DNO

DYes

DNO

The permanent population of the city, town or village in which the
project is located is likely to grow by more than 5%.
The municipal budget for capital expenditures or operating services
will increase by more than 5% per year, as a result of this project
Proposed action will conflict with officially adopted plans or goals."
Proposed action will cause a change in the density of land use.
Proposed Action will replace or eliminate existing facilities, structures
or areas of historic importance to the community.

Proposed Action will create or eliminate employment
Other

impacts:

___ •

1 9 . Is there, or is there likely to be, pubjic controversy related to
potential adverse environmental impacts?
^ 3 N O DYES

If Any Action in Part 2 Is identified as a Potential Large Impact or
If You Cannot Determine the Magnitude of Impact, Proceed to Part 3

Part 3—EVALUATION OF THE IMPORTANCE OF IMPACTS
Responsibility of Lead Agency
Part 3 must be prepared if one or more impact(s) is considered to be potentially large, even if the impact(s) may be
mitigated.

Instructions
Discuss the following for each impact identified in Column 2 of Part 2:
1 . Briefly describe the impact.
2. Describe (if applicable) how ;he impact could be mitigated or reduced to a small to moderate impact by project change-'*).
3. Based on the information available, decide if it is reasonable to conclude that this impact is important.
To answer the question of importance, consider:
• The probability of the impact occurring

.

—

• The duration of the impact
•
•
•
•
•

Its irreversibility, including permanently lost resources of value
Whether the impact can or will.be controlled
The regional consequence of the impact
Its potential divergence from local needs and goals
Whether known objections to the project relate to this impact.

(Continue on attachments)

11

�FREDERICK P. CLARK ASSOCIATES, INC.
Planning/Development/Environment/Transportation
Rye, New York and Southport, Connecticut

David J. Portman, A,CP
Howard I. Reynolds, PE
David H. Stolman, AICP

350 Theodore Fremd Avenue
Rye, New York 10580

Michael A Galante
Joanne P. Meder, AICP

(914) 967-6540

Jim Donovan, RLA, ASLA

MEMORANDUM
To:

Village of North Tarrytown Planning Board

Date:

November 10, 1994

Subject:

Annual Report on Operation of Zoning Ordinance

As requested at the last Planning Board meeting, I have asked other
staff members if they have come across a requirement for an annual
report from a Planning Board to a Village or Town Board in other
municipalities.
The only one we came across was in the
Town/Village of Harrison, where that community's Planning Board
prepares an annual summary of applications, approvals and denials.
It is our opinion that the Planning Board has the right to make
recommendations to the Village Board of Trustees regarding the
operation of the Zoning Ordinance and other related legislation at
any time. Having the Zoning Ordinance make this report mandatory
is highly unusual and we therefore recommend that Section 62-48D of
the Village Code either be removed or the term "shall prepare"
should be changed to "may prepare" in order to ensure that the
Planning Board is not prohibited from making recommendations as
necessary.
Assuming the Planning Board will be preparing a report of their
recommendations to the Village Board, we have assembled a
preliminary list of recommended Code amendments for your
consideration (see attachment).
Susan J. Portman, AICP, Associate/Planning
Attachment
cc:

Sean Treacy, Mayor
Linda E. David, Village Administrator
Janet A. Gandolfo, Esq., Village Attorney
James T. Margotta, Building Inspector
Mark DiGennaro, Village Engineer

500\not4-0A6.sjp:ev

Connecticut • (203) 255-3100

FAX * (914) 967-6615

Long Island • (516) 364-4544

�VILLAGE OF NORTH TARRYTOWN
PRELIMINARY LIST OF ITEMS TO CONSIDER RECOMMENDING
TO VILLAGE BOARD FOR AMENDMENT
Zoning Ordinance
§62-29: Re-examine and clarify issue of when a site plan
application shall be required.
§62-34: Verify that the entire Section 62-34 was not repealed
in 1992 (only Section 62-341 was to have been amended). Reexamine the recreation fee requirements and also determine
whether a fee shall be required for site plan and/or
subdivision approvals.
May also want to remove building
permit fees from Section 62-34 and add a reference to a
separate fee schedule (would be easier to update fees in the
future if not part of the Zoning Ordinance).
§62-29 or 62-30: Add a list of materials and information to
be submitted as part of a complete site plan application and
a deadline for submission prior to Planning Board meeting.
§62-3OF: Revise language to be consistent with application
form and Village Code section regarding fees. Add a reference
to a separate fee schedule.
§62-14: Reevaluate parking standards (including number of
spaces required per use, size of spaces, provide standards for
compact and angled parking, add standards for aisle width, and
add provision to give Planning Board the authority to revise
number of spaces required under certain circumstances, as
appropriate).
Revise the definition of parking space in
Section 62-4 (it is not appropriate to have regulations within
definition).
§62-30: Consider adding a requirement for a public hearing
for site plan applications. Add and/or revise time frames for
holding a public hearing, making a decision and filing of
approval to be consistent with Village Law.
§62-48D:
Either change "shall prepare" or remove Part D
altogether.
The Planning Board should be able to make
recommendations to the Village Board as appropriate without
this section requiring it.
§62-4:
Simplify definition of "corner lot."
Revise
definition of "setback" so that it does not apply solely to
front yard.

�Subdivision Regulations
Add a provision for a simplified, one-stage review process for
minor subdivisions
(two-lot subdivision and lot line
realignment).
Add definitions
of major and minor
subdivisions.
Revise time frames for holding a public hearing, making a
decision and filing of approval to be consistent with Village
Law.
§12B(2)(b):
reservation.

Revise

the

requirement

Frederick P. Clark Associates, Inc.
November 10, 1994

500\not4-046.sjp:ev

from

dedication

to

�FREDERICK P. CLARK ASSOCIATES, INC.

David J. Portman, AICP
Howard I. Reynolds, PE
David H. Stolman, AICP

Planning/Development/Environment/Transportation
Rye, New York and Southport, Connecticut

Michael A. Galante
Joanne P. Meder, AICP

350 Theodore Fremd Avenue
Rye, New York 10580
(914)967-6540

Jim Donovan, RLA, ASLA

MEMORANDUM
To:

Village of North Tarrytown Planning Board

Date:

November 11, 1994

Subject:

Review of Bick Preliminary Subdivision

As requested, we have reviewed the preliminary subdivision
application submitted by James and Martha Bick for an area
comprised of five previously subdivided building lots and a paper
street located on the northern and western sides of the Terrace
Close cul-de-sac in the R-2A Residence District.
Tax Lots 1
(Bick), 2 (LoMascolo) and 4 (Golodetz) contain existing singlefamily dwellings. Lots 8 (owned by Bick) and 9 (ownership not
known) are presently undeveloped.
The Applicant is proposing to break up Lot 9 and distribute the
pieces to Lots 2, 4 and 8, resubdivide Lot 8 to subtract a small
triangular piece (the "new" Lot 8 is shown as "Lot B") , and add the
small triangular piece from Lot 8 and the paper street to Lot 1
(the "new" Lot 1 is shown as "Lot A"). As a result, one building
lot will be eliminated from the subdivision.
The Applicant has submitted the following plan:
"Subdivision Map Prepared For James A. &amp; Martha A. Bick, ReSubdivision of Lot 1 - Block 3, An Unnumbered Parcel, Lot 8 Block 2 and a Portion of Lot 9 - Block 2 As Shown On Revised
Map of Sleepy Hollow Manor - Filed in Westchester County
Division of Land Records On June 23, 1930 As Map No. 3621,
Located in the Village of North Tarrytown, Town of Mount
Pleasant, Westchester County, N.Y.," scale 1" = 20', dated
October 28, 1994, prepared by Charles H. Riley, Land Surveyor.
REVIEW COMMENTS
1.

Subdivision Regulations Compliance:
The subdivision plan
should be revised to show the area of all of the properties
involved in the subdivision, the names of the property owners
of all of the involved properties and the location of the
other two existing dwellings.
The names of all involved
property owners and their addresses should be added to the

Connecticut • (203) 255-3100

FAX • (914) 967-6615

Long Island • (516) 364-4544

�FREDERICK P. CLARK ASSOCIATES, INC.
Planning/Development/Environment/Transportation

plan and the application. The existing and proposed lot sizes
and dimensions of all involved properties should, be shown on
the plan. The names of all adjoining property oyners should
be shown on the plan. In addition, the existing and proposed
subdivision lines should be labeled as such.
The subdivision plan should
that the subject properties
2A (not R-2) and to make the
the tax map number is shown
3, Lot 1).
2.

be corrected to reflect the fact
are located in Zoning District Rtax map numbers consistent (i.e.,
as both Block 1A, Lot: 1 and Block

Zoning Compliance: The Applicant should supply information
regarding the current ownership of the 4 o-foot wide
"unnumbered parcel" which the Applicant has previously
indicated is a "paper street." If that parcel is indeed a
paper street, further research should be done in order to
determine its status.
The Applicant should research the
history of the original subdivision, determine whether the
parcel was ever dedicated to the Village or offered to the
Village for dedication, and obtain the agreement of the
Village (or any other involved party) stating th.at no party,
other than the Bicks, has any right to improve the parcel.
Although we are not attorneys, based upon our experience, the
matter of the paper street should be settled before allowing
the creation of Lot A, which would include existing Lot 1, the
paper street and a triangular piece of existing Lot 8.
Otherwise, at some point in the future, the Phelps Memorial
Hospital property could be redeveloped for residential use and
whoever has the right to improve that parcel as a road (even
though the width of the parcel is probably substandard for a
road right-of-way) would be creating a "left-ovet" triangular
piece of land (approximately 6,075 square feet in size) which
could not be used for residential development.
If it is determined that the parcel is a paper street, it may
simplify the issue to keep the triangular piece as a part of
proposed Lot B.
Due to its lot width, proposed Lot B could probably not be
subdivided in the future without a variance due to the fact
that the lot width would be insufficient for two lots. The
Bicks have informally offered to restrict the property from
further subdivision.
If that is their intent, this offer
should be stated on the subdivision plan.
Other than the matters mentioned above concerning the paper
street, the proposed subdivision appears to comply with the
Zoning Ordinance.
2

�FREDERICK P. CLARK ASSOCIATES, INC.
Planning/Development/Environment/Transportation

3.

Environmental Review: According to Part 617.12 of the State
Environmental Quality Review Act (SEQR), the subdivision of
the subject property constitutes a Type I Action because the
property is located within the Hudson River Shoreline Critical
Environmental Area.
The Applicant has submitted a Full
Environmental Assessment Form (EAF) . We have reviewed the EAF
and have enclosed a copy containing our recommended changes
for your consideration.
The Planning Board may declare its intent to be Lead Agency in
the review of this action. A notice of intent to be Lead
Agency should then be circulated to the involved agencies
(i.e., the Westchester County Department of Health) and
interested agencies (e.g., agencies, such as the New York
State Department of Environmental Conservation, which maintain
an interest in the application but do not have direct approval
authority). After 30 days or receipt of the responses from
the other agencies, whichever comes first, the Planning Board
may declare itself Lead Agency, provided no other involved
agency objects, and make a Determination of Significance. The
Lead Agency's preparation of a Negative Declaration or
Findings Statement (following a Positive Declaration and the
preparation of an Environmental Impact Statement) will
complete the SEQR review process. Under coordinated review,
involved agencies may not make final decisions until the SEQR
process is completed.

4.

Other Issues; It does not appear that the public hearing
notice correctly reflected the proposed subdivision since it
stated that Lot 8 would be increased in size from 46,368
square feet (when it is actually approximately 28,660 square
feet) to 58,331 square feet [which is the total area of both
proposed Lots A (developed) and B (undeveloped), not a single
undeveloped lot to be known as Lot 8].
Susan J. Portman, AICP, Associate/Planning

Enclosure
cc:

Sean Treacy, Mayor
Linda E. David, Village Administrator
Janet A. Gandolfo, Esq., Village Attorney
James T. Margotta, Building Inspector
Mark A. DiGennaro, Village Engineer
John Hughes, Esq.
James and Martha Bick

500\notA-031.sjp:aj

3

�14-16-2 (2/87)-7c
617.21
.
_
Appendix A
State Environmental Quality'Review

SEQR

FULL ENVIRONMENTAL ASSESSMENT FORM
Purpose: The full EAF is designed to help applicants and agencies determine, in an orderly manner, whether a project
or action may be significant. The question of whether an action may be significant is not always easy to answer. Frequently, there are aspects of a project that are subjective or unmeasureable. It is also understood that those who determine
significance may have little or no formal knowledge of the environment or may be technically expert in environmental
analysis. In addition, many who have knowledge in one particular area may not be aware of the broader concerns affecting
the question of significance.
The full EAF is intended to provide a method whereby applicants and agencies can be assured that the determination
process has been orderly, comprehensive in nature, yet flexible to allow introduction of information to fit a project or action.
Full EAF Components: The full EAF is comprised of three parts:
Part 1: Provides objective data and information about a given project and its site. By identifying basic project
data, it assists a reviewer in the analysis that takes place in Parts 2 and 3.
Part 2: Focuses on identifying the range of possible impacts that may occur from a project or action. It provides
guidance as to whether an Impact is likely to be considered small to moderate or whether it is a potentiallylarge impact. The form also identifies whether an impact can be mitigated or reduced.
Part 3: If any impact in Part 2 is identified as potentially-large, then Part 3 is used to evaluate whether or not the
impact is actually important.

DETERMINATION OF S I G N I F I C A N C E - T y p e 1 and Unlisted Actions
Identify the Portions of EAF completed for this project:

D

Part 1

D

Part 2

DPart 3

Upon review of the information recorded on this EAF (Parts 1 and 2 2nd 3 if appropriate), 2nd 2ny other supporting
information, and considering both the magitude and importance of each impact, it is reasonably determined by the
lead agency that:
\3

A. The project will not result in any large and important i m p a c t s ) and. therefore, is one which will not
have a significant impact on the environment, therefore a negative declaration will be prepared.

D

B. Although the project could have a significant effect on the environment, there will not be a significant
effect for this Unlisted Action because the mitigation measures described in PART 3 have been required,
therefore a CONDITIONED negative declaration will be p r e p a r e d . '

D

C. The project may result in one or more large 2nd important impacts that may have a significant impact
on the environment, therefore a positive declaration will be prepared.
' A Conditioned Negative Declaration is only valid for Unlisted Actions

J a m e s B i c k a n d M a r t h a B i c k f£"-f* ^ f
P l a n n i n g Board - V i l l a g e

of N o r t h

_

f2&amp;jivbd»w. j i c v \

Name of Action

Tarrytown
N'2me of Lead Agency

Print or Type Name of Responsible Officer in Lead Agency

Title of Responsible Officer

Signature of Responsible Officer in Lead Agency

.
&gt;nsible officer)
S i g n a&amp;t u r e&amp;d Preparer
(If different from respons

October 3, 1994
Date

1

�PART 1—PROJECT INFORMATION
Prepared by Project Sponsor
NOTICE: This d o c u m e n t is designed to assist in determining whether }he action proposed may have a significant effect
on the environment. Please complete the entire form. Parts A through E. Answers t o these questions will b e considei
as part of the application for approval and may be subject to further verification and public review. Provide any a d d i t i o n s
information you believe will be needed t o complete Parts 2 and 3.
It is expected that completion of the full EAF will be dependent on information currently available and will not involve
new studies, research or investigation. If information requiring such additional work is unavailable, so indicate and specify
each instance.
NAME OF ACTION

JAMES BICK a n d MARTHA BICK
LOCATION OF ACTION (Include Street Address, Municipality and Cotjnty)

3 T e r r a c e C l o s e , N o r t h T a r r y t w o n , New YOrk
NAME OF APPLICANT/SPONSOR

3USINESS TELEPHONE

( 914,

James Bick and Martha Bick
ADDRESS

0

,_

631-8855
•

„n

3 Terrace Close,
STATE

North Tarrytown

ZIP CODE

NY

10591

BUSINESS TELEPHONE

NAME OF OWNER {If dllferent)

same

(

)

ADDRESS

same
STATE

CITY/PO

ZIP CODE

same
DESCRIPTION OF ACTION

Cr£*t-rr5n of one b u i l d i n g

lot

A\A&lt;&amp;

r-e/i, Jod'ViJi'e'"'!

a

h

c.£j* c*&gt;^t- 'o*~£

.

Please Complete Each Question—Indicate N'.A. if not applicable

A. Site Description
Physical setting of overall project, both developed and undeveloped areas.
1. Present land use:
GUrban
Dlndustrial
DCommercial
CSResidential (suburban)
GForest
DAgriculture
QOther
2. Total acreage of project area:
2. , 3
acres.
APPROXIMATE AC RE ACE
Me2dcw or Srushiand (Non-agricultural)
Forested
Agricultural (Includes orchards, cropland, pasture, etc.)
Wetland (Freshwater or tidal as per Articles 24, 25 of ECL)
Water Surface Area
Unvegetated (Rock, earth or fiil)
Roads, buildings and other paved surfaces
Residential
Other (Indicate type).

1.2.

1+

GRural (non-farm)

PRESENTLY
acres

AFTER COMPLETION
acres

acres
acres
acres
acres
acres
acres
acres

acres
acres
acres
acres
acres
acres
acres

1±_

3. What is predominant soil type(s) on project site?
[
a. Soil drainage:
©Well drained J Q Q
% of site
DModerately well drained
% of site
GPoorly drained
% of site
b. If any agricultural land is involved, how many acres of soil are classified within soil group 1 through 4 of the N"
Land Classification System?
N/A acres. (See 1 NYCRR 370).
4. Are there bedrock outcroppings on project site?
a. What is d e p t h t o bedrock?
10-15+

QYes
ONo
(in feet)

�5. A p p r o x i m a t e percentage of proposed project site w i t h slopes:

C0-10%

%

DlO-15%

E l 5% or greater

__%

__ %

6. Is project substantially c o n t i g u o u s to. or contain a building, site-.'or district, listed on the St'ate or the N a t i o n a l
Registers of Historic Places?
CYes
Grfco
'"/. Is project substantially c o n t i g u o u s to a site listed on the Register of National N a t u r a l Landmarks?

8. What is the depth of the water table? 20+

DYes

SNo

(in feet)

9. is site located over a p r i m a r y , principal, or sole source aquifer?

CYes

C_No

10. Do hunting, fishing or shell fishing opportunities presently exist in the project area?

DYes

DNo

1 1 . Does project site c o n t a i n any species of plant or animal life that is i d e n t i f i e d as threatened or endangered?
DYes

CXNo

According to

..

I d e n t i f y each species

,

,. — _ — .

_—

.

12. Are there any u n i q u e or unusual land forms on the project site? (i.e., cliffs, dunes, other g e o l o g i c a l f o r m a t i o n s )
DYes

C_&gt;No

Describe

.

-

.

_

13. Is the project site presently used by the community or neighborhood as 2n open space or recreation area?
DYes
14.

C?No

If yes, explain

Does the present site i n c l u d e scenic views k n o w n to be important to the c o m m u n i t y ?
DYes
_*No

15. Streams w i t h i n or c o n t i g u o u s to project area:

Nope

a. N a m e of Stream and name of River to w h i c h it is tributary

'

16. Lakes, ponds, w e t l a n d areas w i t h i n or contiguous to project area:
a. N a m e

y/A

-*• Size (In acres)

7

' . Is the site served by existing public utilities?

SYes

DNo

a) If Yes, does s u f f i c i e n t c a p a c i t y exist to allow connection?

EYes

b) If Yes, w i l l i m p r o v e m e n t s be necessary to allow connection?

GNo

_?Ves

DNo

13. Is the site l o c a t e d in an agricultural district certified pursuant to Agriculture and Markets Law, A r t i c l e 25-AA,
Section 303 and 304?
DYes
KJNo
19. Is the site l o c a t e d in or substantially contiguous to a Critical Environmental Area designated pursuant to A r t i c l e 8
of the ECL, and 6 NYCRR 617?
^Yes
DNo
20. Has the site ever been used for the disposal of solid or hazardous wastes?

DYes

_jNo

B. Project Description
1. Physical dimensions and scale of project (fill in dimensions 2S appropriate)
a. Total contiguous acreage owned or controlled by project sponsor
b. Project acreage to be d e v e l o p e d :

1+

c. Project acreage to r e m a i n undeveloped
d. Length of p r o j e c t , in miles: N/A

1 • 5+

acres initially;
~

acres.

H~

acres u l t i m a t e l y .

acres.

(If appropriate)

e. If the project is 2n expansion, indicate percent of expansion proposed

N/A

f. Number of off-street p a r k i n g spaces existing

K/A

; proposed

g. M a x i m u m v e h i c u l a r trips generated per hour

(upon c o m p l e t i o n of project)?

h. If residential: N u m b e r a n d type of housing units:
O n e Family
T w o Family

Initially

i

Ultimately

J

i. Dimensions (in feet) of largest proposed structure

%•

N/A
/

M u l t i p l e Family

.

height;

j . Linear feet of frontage along a public thoroughfare project w i l l occupy is?

Condominium

width;

length
ft.

�2. How much natural material (i.e.. rock, earth, etc.) will be removed'from the site? ____
3. Will disturbed areas be reclaimed?

DYes

ENo

tons/cubic yards

DN/A

a. If yes. for what i n t e n d s purpose is the site being reclaimed?
b. Will topsoil be stockpiled for reclamation?

DYes

___

______

CXNo

c. Will upper subsoil be stockpiled for reclamation?

DYes

G&amp;No

4. How many acres of vegetation (trees, shrubs, ground covers) will be removed from site?

acres.

5. Will any mature forest (over 100 years old) or other locally-important vegetation be removed by this project?

DYes

-JMO

6. If single phase p r o j e c t Anticipated period of construction
7. If multi-phased:
a. Total number of phases anticipated

months, (including demolition).

(number).

b. Anticipated d a t e of commencement phase 1

N

/A

month

c. Approximate completion date of final phase .

N

A

month

/

d. Is phase 1 functionally dependent on subsequent phases?
8. Will blasting occur during construction?

DYes

year, (including demolition).
year.

DYes

DNo

BNo

9. Number of jobs generated: during construction

; after project is complete

__A

10. Number of jobs eliminated by this project ____________
11. Will project require relocation of any projects or facilities?
12. Is surface liquid waste disposal involved?

DYes

DYes

G_No

CSNo

a. If yes, indicate type of waste (sewage, industrial, etc.) and amount

2L___

b. Name of water body into which effluent will be discharged
13. Is subsurface liquid w a s t e disposal involved?

DYes

L—

C?No

Type

14. Will surface area of an existing water body increase or decrease by proposal?
Explain
15. Is project or any portion of project located in a 100 year flood plain?
16. Will the project generate solid waste?

EYes

a. If yes, what is the a m o u n t per month

DYes

DYes

CSNo

_)No

DNo

N/A

tons

b. If.yes, will an existing solid waste facility be used?
c. If yes, give n a m e

If yes, explain

;

QYes
:

DNo

; location

d. Will any wastes not go into a sewage disposal system or into a sanitary landfill?

DYes

_No

e. If Yes, explain
17. Will the project involve the disposal of solid waste?

(_Yes

DNo

a. If yes, what is the anticipated rate of disposal?

tons/month.

b. If yes, what is the anticipated site life?
18. Will project use herbicides or pesticides?

years.
DYes

ENo

19. Will project routinely produce odors (more than one hour per cay)? DYes

ENo

20. Will project produce operating noise exceeding the local ambient noise levels?
21. Will project result in an increase in energy use?

DYes

DYes

SNo

If yes , indicate type(s)
22. If water supply is from wells, indicate pumping capacity
23.

Total anticipated w a t e r usage per day

'

gallons/day.

24. Does project involve Local. State or Federal funding?
If Yes. explain

gallons/minute.

DYes

w/A

4

_DNo

,

,

ENo

�25. Approvals Required:

Submittal
Type

City. Town. Village Board

DYes

CNo

&amp;Yes

CNo

City, Town Zoning 3oard

DYes

CNo

•ettv. County Health Department

EYes

CNo

$**&amp;«'* *Qr\

Other Local Agencies

DYes

CNo

«

Other Regional Agencies

DYes

CNo

State Agencies

DYes

CNo

Federal Agencies

DYes

CNo

:ity. Town, Village Planning Board

Date

Subdivision

10-3-1994

C. Zoning and Planning Information
1 . Does proposed action involve a planning or zoning decision?

EYes

CNo

If Yes. indicate decision required:
Dzoning amendment

Czoning variance

Dnew/revision of master plan

Cspecial use permit

Cresource management plan

2. What is the zoning classification(s)of the site?

R^S-

QSsubdivision

Dsite plan

Dother

^

3. What is the maximum poten*'?! development of the site if developed as permitted by the present zoning?

^-building lo£—

2. dyJtttin^S

4. What is the proposed zoning of the site?

(Cri€ a

R-P&gt;.

£*tcK undeveloped,

NO

/cf)

jv^

5. What is the maximum potential development of the site if developed as permitted by the proposed zoning?

1 bull dim lvfr

(L*.

"•. Is the proposed action consistent with the recommended uses in adopted local land use plans?

0Yes

DNo

7. What are the predominant land use{s) and zoning classifications wiihin a V* mile radius of proposed action?
Residential

single

f a m i l y , ioJfl'ftttfg Q&amp; f j

$--\

t

iL^Zflr

f

H.

8. Is the proposed action compatible with adjoining/surrounding land uses within a V* mile?

£)Yes

CNo

9. If the proposed action is the subdivision of land, how many lots are proposed? - 1 (K-€Suk&gt;^4y-'i,cv\ a. What is the minimum lot size proposed?

If

d t i - e - o^a&gt;A. l r o f a u &lt;
_

Q*e. b ^ I t W

^

_

r€w*cJor/

c

^

j

10. Will proposed action require any authorization(s) for the formation of sewer or water districts?

DYes

IS)No

11. Will the proposed action create a demand for any community provided services (recreation, education, police,
fire protection)?
C'Yes
ES'o
a. If yes, is existing capacity sufficient to handle projected demand? A^" C^Yes

CNo

12. Will the proposed action result in the generation of traffic significantly above present levels?
a. If yes. is the existing read network adequate to handle the additional traffic?

CYes

CYes

?]No

DNo

D. Informational Details
Attach any additional information as may be needed to clarify your project. If there are or. may be any adverse
impacts associated with your proposal, please discuss such impacts and the measures which you propose to mitigate or
avoid them.

E. Verification
I certify that the information provided above is true to the best of my knowledge.
Applicant/Sponsor Name JAKES BICK AND MARTHA BICK
i-gnature

::

&lt;= ^lf71

^ ^ l l Q ^

Date

October 3, 1994

Title Attorney

If the action is in the Coastal Area, and you are a stale agency, complete the Coastal Assessment Form before proceeding
with this assessment.
5

�Part 2-PROJECT IMPACTS AND THEIR MAGNITUDE
Responsibility of Lead Agency
General Information (Read Carefully)
f
In completing the form the reviewer should be guided by the question: Have my responses and determinations been
reasonable? The reviewer is not expected to be an expert environmental analyst.
• Identifying that an impact will be potentially large (column 2) does not mean that it is also necessarily significant. ~
Any large impact must be evaluated in PART 3 to determine significance. Identifying an impact in column 2 simply
asks that it be looked at further.
• The Examples provided are to assist the reviewer by showing types of impacts and wherever possible the threshold of
magnitude that would trigger a response in column 2. The examples are generally applicable throughout the State and
for most situations. But, for any specific project or site other examples and/or lower thresholds may be appropriate
for a Potential Large Impact response, thus requiring evaluation in Part 3.
• The impacts of each project, on each site, in each locality, will vary. Therefore, the examples are illustrative and
have been offered as guidance. They do not constitute an exhaustive list of impacts and thresholds to answer each question.
• The number of examples per question does not indicate the importance of each question.
• In identifying impacts, consider long term, short term and cumlative effects.
Instructions (Read carefully)
a. Answer each of the 19 questions in PART 2. Answer Yes if there will be any impact.
b. Maybe answers should be considered as Yes answers.
c. If answering Yes to a question then check the appropriate box (column 1 or 2) to indicate the potential size of the
impact. If impact threshold equals or exceeds any example provided, check column 2. If impact w i l l occur but threshold
is lower than example, check column 1.
d. If reviewer has doubt about size of the impact then consider the impact as potentially large and proceed to PART 3.
e. If a potentially large impact checked in column 2 can be mitigated by change{s) in the project t o a small to moderate
impact, also check the Yes box in column 3. A No response indicates that such a reduction is not possible. This
must be explained in Part 3.

2
S m a l l to
Moderate
Impact

Potential
Large
Impact

O

D

DYes

DNo

D

D

D Y es

DN(

n

DYes
. DYes

DNo

D

D
D

DNO

D

D

DYes

DNO

• Excavation for mining purposes that would remove more than 1,000
tons of natural material (i.e., rock or soil) per year.

D

•

DYes

DNO

• Construction or expansion of a sanitary landfill.

D
D
D

D
D
D

DYes
DYes
DYes

DNO
DNO

D

D

D Y es

DN&lt;

IMPACT ON LAND
1 . Will the proposed action result in a physical change to the project site?

JBNO

DYES

Examples that would apply to column-2
• Any construction on slopes of 15% or greater, (15 foot rise per 100
foot of length), or where the general slopes in the project area exceed
10%.
• Construction on land where the depth to the water table is less than
3 feet.
• Construction of paved parking area for 1,000 or more vehicles.
• Construction on land where bedrock is exposed or generally within
3 feet of existing ground surface.
»
• Construction that will continue for more than 1 year or involve more
than one phase or stage.

• Construction in a designated floodway.
• Other impacts

#

C a n Impact Be
M i t i g a t e d By
Project Change

'.

DNO

Will there be an effect tt. _.iy unique or unusual land forms found on
the site? (i.e., cliffs, dunes, geological formations, etc.JJ^NO
DYES
Specific land forms:

�2

1
I M P A C T ON WATER
3. W i l l proposed action affect any water body designated as protected?
(Under Articles 15. 24, 25 of the Environmental Conservation Law, ECL)
®NO
DYES
Examples that would apply to column 2
• Developable area of site contains a protected water body.

Small to
Moderate
Impact

D
D

D
D

DYes
DYes

DNo
DNo

D
D
D

D
D
D

DYes
DYes
DYes

DNo
DNo
DNo

DYes

DNo

• Dredging more than TOO cubic yards of material from channel of a
protected stream.
• Extension of utility distribution facilities through a protected water body.
• Construction in a designated freshwater or tidal wetland.
• Other impacts:

4. Will proposed action affect any non-protected existing or new body
of water?
E5N0
DYES
Examples that would apply to column 2
• A 10% increase or decrease in the surface area of any body of water
or mere than a 10 acre increase or decrease.

Potential Can Impact Be
Large
Mitigated By
Impact " Project Change

D
D
D

D
D

DYes
DYes

DNo
DNo

D
D

D
D

DYes
DYes

DNo
DNo

• Proposed Action requires water supply from wells with greater than 45
gallons per minute pumping capacity.

D

D

DYes

DN6

• Construction or operation causing 2ny contamination of a water
supply system.

D

D

DYes

DNO

• Proposed Action will adversely affect groundwater.
Liquid effluent will be conveyed off the site to facilities which presently
do not exist or have inadequate capacity.

D
D

D
D

DYes
DYes

DNO

• Proposed Action would use water in excess of 20,000 gallons per
day.

D

D

DYes

DNO

• Proposed Action will likely cause siltation or other discharge into an
existing body of water to the extent that there will be an obvious visual
contrast to natural conditions.

D

D

DYes '

DNO

• Proposed Action will require the storage of petroleum or chemical
products greater than 1,100 gallons.

D

D

DYes

DNO

• Proposed Action will allow residential uses in areas without water
and/or sewer services.

D

D

DYes

DNO

• Proposed Action locates commercial and/or industrial uses which may
require new or expansion of existing waste treatment and/or storage
facilities.

D

D

DYes

DNO

• Other

D

D

D Y es

DNc

D

D

DYes

DNo

• Construction of a body o f W2ter that exceeds 10 acres of surface area.
• Other impacts:

5. Will Proposed Action affect surface or groundwater
quality or quantity?
$NO
Examples that would apply to column 2

DYES

• Proposed Action will require a discharge permit.
,• Proposed Action requires use of a source of water that does not
have approval to itrve proposed (project) action.

0

impacts:

". Will proposed action alter drainage flow or patterns, or surface
' water runoff?
UNO
DYES
Examples that would apply to column 2
• Proposed Action would change flood water flows.
- ..
7

DNO

�Proposed A c t i o n may C2use substantial erosion.
• Proposed A c t i o n is i n c o m p a t i b l e w i t h existing drainage patterns.
•

Proposed A c t i o n w i l l a l l o w development in a designated f l o o d w a y .

• Other impacts:

I M P A C T O N AIR
7 . W i l l proposed a c t i o n a f f e c t air quality?
CNO
DYES
Examples that w o u l d a p p l y t o c o l u m n 2
• Proposed A c t i o n w i l l i n d u c e 1,000 or more vehicle trips in any given
hour.

D

• Proposed A c t i o n w i l l result in the incineration of more than 1 t o n of
refuse per hour.

D

• Emission rate of t o t a l c o n t a m i n a n t s will exceed 5 lbs. per hour or a
heat source p r o d u c i n g m o r e than 10 million 3TU's per hour.

D

• Proposed action w i l l a l l o w an increase in the a m o u n t of l a n d . c o m m i t t e d
t o industrial use.

D

•

D

Proposed action w i l l a l l o w an increase in the density of i n d u s t r i a l .
d e v e l o p m e n t w i t h i n existing industrial areas.

D

• Other impacts:

IMPACT ON PLANTS AND A N I M A L S
W i l l Proposed A c t i o n a f f e c t any threatened or endangered
species?
©NO
Examples that w o u l d a p p l y to column 2

DYES

• Reduction of one or more species listed on the New York or Federal
list, using the site, over or near site or found on the site.

•

• Removal of any p o r t i o n of a critical or significant w i l d l i f e h a b i t a t .

D
D

• A p p l i c a t i o n of pesticide or herbicide more than twice a year, other
than for a g r i c u l t u r a l purposes.
• Other

D

impacts:

9. W i l l Proposed A c t i o n substantially affect non-threatened cr
non-endangered species?
CSN'O
Examples that w o u l d a p p l y to column 2

DYES

Proposed A c t i o n w o u l d substantially interfere w i t h any resident or
migratory fish, shellfish or w i l d l i f e species.

D

• Proposed A c t i o n requires the removal of more than 10 acres
cf mature forest (over 100 years of age) or other l o c a l l y i m p o r t a n t
vegetation.

D

•

IMPACT ON AGRICULTURAL LAND RESOURCES
1 0 . W i l l the Proposed A c t i o n affect agricultural land resources?
£)NO
DYES
Examples that w o u l d a p p l y to c o l u m n 2
|* The proposed action w o u l d sever, cross or l i m i t access t o a g r i c u l t u r a l
land (includes c r o p l a n d , hayfields, pasture, v i n e y a r d , orchard, etc.)

D

�1
Small to
Moderate
Impact
^ ^ P r o p c s e d Action may C2use substantial erosion.
• Proposed Action is incompatible with existing drainage patterns.
• Proposed Action will allow development in a designated floodway.
• Other impacts:

D
D
D
D

IMPACT ON AIR
£'NO
DYES
7 . Will proposed action affect air quality?
Examples that would apply to column 2
• Proposed Action will induce 1,000 or more vehicle trips in any given
hour.
• Proposed Action will result in the incineration of more than 1 ton of
refuse p^r hour.

D
D

• Emission rate cf total contaminants will exceed 5 lbs. per hour or a
he2t source producing more than TO million 3TU's per hour.

D

• Proposed action will 2II0W an increase in the amount of land.committed
to industrial use.

D

• Proposed action will allow an increase in the density of industrial.
development within existing industrial areas.

D

• Other impacts:

D

IMPACT ON PLANTS AND ANIMALS
L Will Proposed Action affect any threatened or endangered
species?
£'NO
Examples that would apply to column 2

GYES

• Reduction of one or more species listed on the New York or Federal
list, using the site, over or near site or found on the site.

D

• Removal cf any portion of a critical or significant wildlife habitat.

a

• Application of pesticide or'herbicic'e more than twice a year, other
than for agricultural purposes.

•

• Other

impacts:

D

9. Will Proposed Action substantially affect non-threatened cr
non-endangered species?
Z—TN'O
Examples that would appiv to column 2

GYES

• PrcDcsed Action would substantially interfere with any resident or
migratory fish, shellfish or wiic'Iife species.

a

• Proposed Action requires the removal cf more than 10 acres
cf mature forest (over ICO years of age) or other locally important

a

IMPACT ON AGRICULTURAL LAND RESOURCES
".0. Will the Proposed Action affect agricultural land resources?

J-5NO

GYES

Examples that would apply to column 2
• The proposed action would sever, cross or limit access to agricultural
land (includes cropland, hayfields, pasture, vineyard, orchard, etc.)

D

�1
Can Impact Be
Mitigated By
Project Change

Small to
Moderate
Impact

D

DYes

DNo

D

DYes

DNo

D

DYes

DNo

D

D

DYes

DNo

D

•

DYes

DNo

D

D

DYes

DNo

D

D

DYes

DNo

D

D

DYes

DNc

D

D

DY es

DNo

D

D

DYes

DNo

D

D

DYes

DNo

D

D

DYes

DNo

• Construction activity would excavate or compact the soil profile of
agricultural land.
• The proposed action would irreversibly convert more than 10 acres
of agricultural land or, if located in an Agricultutal District, more
than 2.5 acres of agricultural land.
• The proposed action would disrupt or prevent installation of agricultural
land management systems (e.g.. subsurface drain lines, outlet ditches,
strip cropping); or create a need for such measures (e.g. cause a farm
field to drain poorly due to increased runoff)
• Other impacts:

D

IMPACT ON AESTHETIC RESOURCES
1 1 . Will proposed action affect aesthetic resources?
ENO
DYES
(If necessary, use the Visual EAF Addendum in Section 617.21,
Appendix B.)
Examples that would apply t o column 2
• Proposed land uses, or project components obviously different fro'm
or in sharp contrast to current surrounding land use patterns, whether
man-made or natural.
• Proposed land uses, or project components visible to users of
aesthetic resources which will eliminate or significantly reduce their
•enjoyment of the aesthetic qualities of that resource.
• Project components that will result in the elimination or significant
screening of scenic views known to be important to the area.
• Other impacts:

IMPACT ON HISTORIC AND ARCHAEOLOGICAL RESOURCES
12. Will Proposed Action impact any site or structure of historic, prehistoric or paleontological importance?
ENO
DYES
Examples that would apply to column 2 .«
• Proposed Action occurring wholly or partially within or substantiallycontiguous to any facility or site listed on the State or National Register
of historic places.
• Any impact to an archaeological site or fossil bed located within the
project site.
• Proposed Action will occur in an area designated as sensitive for
archaeological sites on the NYS Site Inventory.
• Other impacts:

IMPACT ON OPEN SPACE AND RECREATION
13. Will Proposed Action affect the quantity or quality of existing or
future open spaces or recreational opportunities?
Examples that would apply to column 2
ENO
DYES
. The permanent foreclosure of a future recreational opportunity.
• A major reduction of an open space important to the community.

• Other impacts:

I

D
D
D

D
D
D

DYes
DYes
DYes

DNo
DNo
DNO

�1

2

Small to
Moderate
Impact

Potential
Large Impact

D
D
D

D
D
D

DYes

DNO

DYes

DNo

DYes

DNo

D

D

DYes

DNo

• Proposed Action will require the creation or extension of an energy
transmission or supply system to serve more than 50 single or two family
residences or to serve a major commercial or industrial use.

D

D

DYes

DNo

• Other impacts:

D

D

DYes

DNo

• Blasting within 1,500 feet of a hospital, school or other sensitive
facility.

D

D

DYes

DNc

• Odors will occvr routinely (more than one hour per day).

D
D

D
D

DYes

DNo

DYes

DNo

a

D

CYes

DNo

D

D

DYes

DNo

• Proposed Action may cause a risk of explosion or release of hazardous
substances (i.e. oil, pesticides, chemicals, radiation, etc.) in the event of
accident or upset conditions, or there may be a chronic low level
discharge cr emission.

D

D

DYes

DNo

• Proposed Action may result in the burial cf "hazardous wastes" in any
form (i.e. toxic, poisonous, highly reactive, radioactive, irritating,
infectious, etc.)

D

D

DYes

CNO

• Storage facilities for one million or more gallons of liquified natural
gas or other flammable liquids.

D

D

DYes

DNo

D

DYes

DNO

D

DYes

DNo

IMPACT ON TRANSPORTATION
14. W i l l there be an effect to existing transportation systems?
ENO
Examples that would apply to column 2

''
DYES

• Alteration of present patterns of movement of people and/or goods.
• Proposed Action will result in major traffic problems.
• Other impacts:

Can Impact Be
Mitigated By
Project Chanc;

IMPACT ON ENERGY
15. Will proposed action affect the community's sources of fuel or
energy supply?
&amp;NO
DYES
Examples that would apply to column 2
• Proposed Action will cause a greater than 5% increase in the use of
any form of energy in the municipality.

NOISE AND ODOR IMPACTS
16. Will there be objectionable odors, noise, or vibration as a result
of the Proposed Action?
• ENO
DYES
Examples that would apply to column 2

• Proposed Action will produce operating noise exceeding the local
ambient noise levels for noise outside of structures.
• Proposed Action will remove natural barriers that would act as a
noise screen.
• Other

impacts:

IMPACT ON PUBLIC HEALTH
17. Will Proposed Action aiiect

public health and safety?
£'NO
Examples that would apply to column 2

DYES

• Proposed action may result in the excavation or other disturbance
within 2,000 feet of a site used for the disposal of so'id or hazardous
waste.
• Other impacts:

a

•
10

�IMPACT ON GROWTH AND CHARACTER
OF COMMUNITY OR NEIGHBORHOOD
" "*. Will proposed action affect the character of the existing community?
£3NO
DYES
Examples that would apply to column 2
• The permanent population of the city, town or village in which the
project is located is likely to grow by more than 5%.
• The municipal budget for capital expenditures or operating services
will increase by more than 5% per year as a result of this project
• Proposed action will conflict with officially adopted plans or goals.'
• Proposed action will cause a change in the density of land use.
• Proposed Action will replace or eliminate existing facilities, structures
or areas of historic importance to the community.
• Development will create a demand for additional community services
(e.g. schools, police and fire, etc.)
• Proposed Action will set an important precedent for future projects.
• Proposed Action will create or eliminate employment
• Other impacts:
•

I

i
Small to

Moderate
Impact

2

Potential Can Impact Be
Large - Mitigated By
Impact Project Change

D

D

DYes

DNo

G

D

DYes

DNo

D
D
D

D
D
D

DYes
DYes
DYes

DNo
DNo

D

D

DYes

DNo

D
D
D

D
D
D

DYes
DYes
DYes

DNO

DNO

DNo
DNo

19. Is there, or is there likely to be, public controversy related to
potential adverse environmental impacts?
&gt;&amp;NO
DYES

if Any Action in Part 2 Is identified as a Potential Large Impact or
If You Cannot Determine the Magnitude of Impact, Proceed to Part 3

Pari 3—EVALUATION OF THE IMPORTANCE OF IMPACTS
Responsibility of Lead Agency
Part 3 must be prepared if one or more impact(s) is considered to be potentially large, even if the impact(s) may be
mitigated.
Instructions
Discuss the following for each impact identified in Column 2 of Part 2:
1. Briefly describe the impact.
2. Describe (if applicable) how the impact could be mitigated or reduced to a small to moderate impact by project change's).
3. Based on the information available, decide if it is reasonable to conclude that this impact is important.
To answer the question of importance, consider:
• The probability of the impact occurring
—
• The duration of the impact
• Its irreversibility, including permanently lost resources of value
• Whether the impact can or will.be controlled
• The regional consequence of the impact
• Its potential divergence from local needs and goals
• Whether known objections to the project relate to this impact.
(Continue on attachments)

11

�F R E D E R I C K P. CLARK A S S O C I A T E S , I N C .
Planning/Development/Environment/Transportation
Rye, New York and Southport, Connecticut

David J. Portman, AICP
Howard I. Reynolds, PE
David H. Stolman, AICP

350 Theodore Fremd Avenue
Rye, New York 10580
(914) 967-6540

Michael A. Galante
Joanne P. Meder, AICP
Jim Donovan, RLA, ASLA

MEMORANDUM
To:

Village of North Tarrytown Planning Board

Date:

November 17, 1994

Subject:

Review of Philipse Plaza Site Plan

As requested, we have reviewed the revised site plan drawings for
the application known as "Philipse Plaza" located along the east
side of North Broadway, opposite Philipsburg Manor and the
intersection of North Broadway and Pocantico Street, in the C-l
Highway Commercial District.
The Philipse Plaza site plan
application was most recently put on the July 1994 meeting agenda,
at which time the application was not discussed by the Planning
Board since the Applicant was unable to attend.
The property currently contains two buildings. One building houses
Antonio Cabinetry (a manufacturing use) and the other contains
Uncle Jerry's Italian Deli (a delicatessen use) and Julio's Auto
Repair (a motor vehicle repair shop). Antonio Cabinetry was the
subject of a site plan application which was approved February 20,
1992 and received use and area variances. The Code will only allow
more than one principal building on a property when it is designed
as a "planned development group."
This application should be
considered an application for amended site plan approval for the
entire lot.
The Applicant is proposing to remove the existing delicatessen and
motor vehicle repair shop building, replace it with a two-story
commercial building (containing retail uses on the first floor and
office on the second) and continue the manufacturing use of the
Antonio Cabinetry building. The proposed building will contain
11,680 square feet of floor area, including 5,040 square feet of
retail space and 6,640 square feet of office space.
The Applicant has submitted the following plans:
1.

Sheet CA, Sketch of Proposed Facade, "Philipse Plaza, Village
of North Tarrytown, New York," dated February 22, 1993 and
most recently revised April 26, 1994, prepared by Contadino
Architects;

Connecticut • (203) 255-3100

FAX • (914) 967-6615

Long Island • (516) 364-4544

�FREDERICK P. CLARK ASSOCIATES, INC.
Planning/Development/Environment/Transportation

2.

Sheet 1, "Site Survey, Topographic Map Prepared For Antonio &amp;
Linda Rodrigues, Situate Village of No. Tarrytown, Town of Mt.
Pleasant, Westchester Co., New York," scale 1" = 20', dated
April 5, 1993 and roost recently revised April 26, 1994,
prepared by Contadino Architects and John J. Muldoon;

3.

Sheet SK-1, "Site Plan, Philipse Plaza, Village of North
Tarrytown, New York," scale 1" = 2 0 ' , dated October 7, 1994
and most recently revised November 7, 1994, prepared by
Contadino Architects;

4.

Sheet 3, "Site Grading Plan, Philipse Plaza, Village of North
Tarrytown, New York," scale 1" = 20', dated April 26, 1994 and
most recently revised November 7, 1994, prepared by Contadino
Architects;

5.

Sheet 4, "Deli Operation Plan, Philipse Plaza, Village of
North Tarrytown, New York," scale 1" = 20', dated April 26,
1994, prepared by Contadino Architects;

6.

Sheet 5, Visual Impact, "Philipse Plaza, Village of North
Tarrytown, New York," scale 1" = 10', dated April 26, 1994,
prepared by Contadino Architects;

7.

Sheet 6, "Ground Floor Plan, Second Floor Plan, Philipse
Plaza, Village of North Tarrytown, New York," scale 1/8" = 1',
dated April 26, 1994, prepared by Contadino Architects; and

8.

Sheet 7, Elevations, "Philipse Plaza, Village of North
Tarrytown, New York," scale 1/8" = 1', dated February 22, 1993
and most recently revised April 26, 1994, prepared by
Contadino Architects.

REVIEW COMMENTS
1.

Zoning Compliance:
The site plan states that the maximum
permitted lot coverage is 60%. This should be changed to
reflect the fact that the maximum permitted lot coverage for
a planned development group is 3 5%.
As noted in our June 10, 1994 memorandum to the Planning
Board, the proposed building does not comply with the required
minimum rear yard setback of 20 feet as only 15 feet is
provided.
The plan will either need to be revised or a
variance obtained from the Zoning Board of Appeals (ZBA).

2.

Parking and Loading: We assume that the entire first floor of
the proposed building will be retail and service business uses
and not contain other uses (such as a restaurant with seats,
2

�FREDERICK P. CLARK ASSOCIATES, INC.
Planning/Development/Environment/Transportation

which has a potentially more restrictive parking standard).
Based on the parking standards for office and retail uses, a
minimum of 47 parking spaces are required in addition to the
eight spaces required for the manufacturing use, for a total
of 55 required spaces. However, only 48 spaces are shown on
the plan. In addition, the Zoning Code requires spaces to be
9' X 20• and most of the spaces on the plan are smaller than
that. The deficient number and size of the parking spaces
should either be corrected or variances obtained from the ZBA.
As noted in our June 10, 1994 memorandum, we would prefer a
24-foot wide aisle rather than the 20-foot aisle shown.
However, if the aisle is widened, the extra few feet will have
to be taken from the building and/or the rear yard.
The
Applicant should consider using angled parking and one-way
traffic flow. In addition, the aisle in the area shown in the
"Compact Car Area" should be widened to at least 22 feet.
As requested, a handicapped-accessible ramp from the parking
area to the walkway arcade has been added to the plan.
As required by the Zoning Code, a second loading space has
been added to the plan.
3.

Circulation and Traffic:
10, 1994, we recommend
prepared to evaluate the
Broadway in the vicinity
and two-way access plans

As noted in our memorandum of June
that a limited traffic study be
impact of this development on North
of the site and to evaluate one-way
for the site.

The plan has been revised to show that the proposed northern
access drive has been widened to 22 feet in width (not to
scale).
The ends of some of the parking islands should be cut back in
order to allow for improved circulation.
The plan shows the location of the proposed sidewalk, planting
strip and relocated curb within the right-of-way of Route 9.
The Board may recall that in August, as per the request of the
Village, we sent a letter and a concept plan to the New York
State Department of Transportation (NYSDOT) to suggest modest
improvements to the intersection and to provide area for a
sidewalk to serve this project. The Applicant should followup with NYSDOT regarding both the modifications proposed by
the Applicant and the concept plan.
In any case, the
Applicant will need approval from NYSDOT for a Highway Work
Permit.

3

�FREDERICK P. CLARK ASSOCIATES, INC.
Planning/Development/Environment/Transportation

4.

Landscaping and Buffers: We recommend that the outstanding
comments under Review Comment #5 in our memorandum to the
Planning Board dated June 10, 1994 be addressed.

5.

Environmental Review:
We recommend that the outstanding
comments under Review Comment #6 in our memorandum to the
Planning Board dated June 10, 1994 be addressed, in particular
the submission of a full Environmental Assessment Form (EAF).

6.

Referral: As per the Westchester County Planning Department's
recommendation, the Village should send a copy of the proposed
site plan, visual impact and elevation drawings (and the
previously submitted area map) to the New York State Historic
Preservation Office (SHPO) for comment due to the site's
proximity to Philipsburg Manor.

7.

Further Information:
As requested in our June 10, 1994
memorandum, if any
freestanding
signs are proposed,
information regarding the dimensions and locations of the
signs should be provided. Also, the Applicant should indicate
whether the auto repair use will continue on the site during
construction.
Susan J. Portman, AICP, Associate/Planning

cc:

Sean Treacy, Mayor
Linda E. David, Village Administrator
Janet A. Gandolfo, Esq., Village Attorney
James T. Margotta, Building Inspector
Mark A. DiGennaro, Village Engineer
Louis Contadino, AIA

500\not4-039.sjp.crc

4

�FREDERICK P. CLARK ASSOCIATES, INC.
Planning/Development/Environment/Transportation
Rye, New York and Southport, Connecticut

David J. Portman, AICP
Howard I. Reynolds, PE
David H. Stolman, AICP

350 Theodore Fremd Avenue
Rye, New York 10580

Michael A. Galante
Joanne P. Meder, AICP

(914) 967-6540

Jim Donovan, RLA, ASLA

MEMORANDUM
To:

Village of North Tarrytown Planning Board

Date:

November 4, 1994

Subject:

Recreation Fees

I am writing in connection with the discussion recently regarding
recreation fees and the U.S. Supreme Court case, Dolan v. Citv of
Tiaard.
As you may know, the New York State Village Law was
amended (effective July 1993) concerning reservation of parkland
and fees in lieu of parkland for residential site plan and
subdivision approvals (see attachment).
The State enabling
legislation now requires planning boards to evaluate:
"the present and anticipated future needs for park and
recreational facilities in the village based on [the]
projected population growth to which the particular
[residential] site plan [or subdivision plat] will
contribute."
Other communities have prepared studies in accordance with the
enabling legislation of their existing facilities and future needs
in order to determine the amount of park and recreation land needed
and the appropriate amount of fees-in-lieu of land. A study such
as is required by Village Law would appear to be consistent with
the "rough proportionality" test from the Dolan case.
Susan J. Portman, AICP, Associate/Planning
Attachment
cc:

Sean Treacy, Mayor
Linda E. David, Village Administrator
Janet A. Gandolfo, Esq.
Donal M. Walsh, Esq.
James T. Margotta, Building Inspector

500\not4-0A5.sjp

Connecticut • (203) 255-3100

FAX • (914) 967-6615

Long Island • (516) 364-4544

�APPENDIX: VILLAGE LAW (EFFECTIVE JULY I. 19931

Relerrats o! matters to planning boards

rower to make Investigations and reports

Planning commissions

APPENDIX: VILLAGE LAW (EFFECTIVE JULY 1. 19931

a The village board of trustees may by resolution provide lor the relerence ol any
matter or class ol matters, other than those referred lo In subdivision ten ol this
section, to the planning board before Pinal action Is taken thereon by the village board
ol trustees or other office or officer of said village having final authority over said
matter The village board of trustees may further stipulate that final action thereon
shall not be taken until the planning board has submitted Its report thereon, or has
had a reasonable time to be fixed by the village board of trustees In said resolution,
to submit the report
b In addition, the planning board shall have the fuH power and authority to make
such Investigations, maps, reports, and recommendations In connection therewith
relating to the planning and development ol the village as It seems desirable, providing
the total expenditures of said board shaft not exceed the appropriation provided therefor

proval with modifications or disapproval ol site plans submitted for approval. Any such
waiver, which shal be subject lo appropriate conditions sel forth in the local taw
adopted pursuant to this section, may be exercised in the event any such requirements are found not to be requisite In the interest of the pubic health, safely or
general welfare or inappropriate to a particular site plan

y

(a) Before such authorized board may approve a site plan contorting residential
units, such site plan shal also show, when required by such board, a park or parks
suitably located for playground or other recreational purposes.

Required findings

|b) Land lor park, playground or other recreational purposes may not be required
until the authorized board has made a finding thai a proper case exists for requiring
that a part or parks be suitably located for playgrounds or other recreational purposes
within the vilage. Such timings shal include an evaluation of the present and anticipated future needs for park and recreational laclties in the vilage based on projected
population growth lo which the particular site plan wM contribute.

12 Planning commission In any village In which there is a planning commission
created under article twelve A ol the general municipal law, the board of trustees,
instead of authorizing the appointment of a planning board under this article, may
provide that the existing commission shall continue, the members thereof thereafter
to be appointed in accordance with the provisions ol such article twelve A. and to
have the powers and duties as specified for a planning board appointed under this
article, provided, however, that In such village section two hundred thirty-eight of the
general municipal law shal not be in force.
Cash In leu of parkland
S 7 725-a. Site plan review

Definition ot "site plan"

1 Definition of site plan As used in this section the term "site plan" shall mean a
rendering, drawing, or sketch prepared to specifications and containing necessary
elements, as sel forth In the applicable zoning local law. which shows the arrangement, layout and design of the proposed use of a single parcel of land as shown on
said plan Plats showing lots, blocks or sites which are subject to review pursuant to
authority provided for the review of subdivisions under section 7-728 ol this article
shal continue to be subject to such review and shall not be subject to review as site
plans under this section
2 Approval of slle plans

Approval by planning bond or other
administrative body

Ordinance or local law to specify uses
subject to site plan approval, and to specify
etements to be included on site plans

Issuance of building perm!

Area variances

Conditions

(a) The village board of trustees may. as part of a local law adopted pursuant to this
article or other enabling taw. authorize the planning board or such other administrative
body that it shal so designate, to review and approve, approve with modifications or
disapprove site plan prepared lo specifications set forth in the local law and/or in
regulations of such authorized board. Site plans shal show the arrangement, layout
and design of the proposed use of the land on said plan. The local taw shal specify
the land uses that require site plan approval and the elements to be included on plans
submitted for approval. The required slle ptan etements which are included In the local
law may include, where appropriate, those related to parking, means of access,
screening, signs, landscaping, architectural features, location and dimensions ol
buildings, adjacent land uses and physical features meant to protect adjacent land
uses as w e l as any additional elements specified by the village board ol trustees in
such local taw.

Credit for land or cash In approved
subdivision plat

Procedures; notice and hearing; decision

(b) When an authorization to approve site plans Is granted by the vilage board ol
trustees pursuant to this section, the terms thereof may condition the issuance of a
building permit upon such approval
3 Application lor area variance Nolwithatanolng any provisions ol law lo the contrary, where a proposed site plan contains one or more features which do not comply
with the zoning regulations, applications may be made lo the zoning board of appeals
for an area variance pursuant to section 7-712-b of this article, without the necessity
ol a decision or determination of an administrative official charged with the enforcement of the zoning regulations
4 Conditions attached lo the approval of site plans The authorized board shal
have the authority to impose such reasonable conditions and restrictions as are directly related to and incidental lo a proposed site plan. Upon Its approval ol said site
plan, any such conditions must be met in connection with the issuance of permits by
applicable enforcement agents or officers of the vMage
5 Waiver of conditions. The village board ol trustees may lurther empower the
authorized board to. when reasonable, waive any requirements for the approval, ap-

6. Reservation of parkland on site plana containing residential units.

Parkland or cash In leu for residential site
plans

deferral under General Municipal Law.
section 239m

Complance with Stale Environmental Quetty
Review Act

(c) In the event the authorized board makes a finolng pursuant to paragraph (b) ol
this subdivision that the proposed site plan presents a proper case lor requiring a
park or parks suitably located lor playgrounds or other recreational purposes, but that
a suitable park or parks of adequate size to meet the requirements cannot be property
located on such site ptan, the authorized board may require a sum of money In leu
thereof to be established by the vilage board of trustees. In making such determination of suilabaty, the board shal assess the size and suitaoSry of lands shown on
the site ptan which could be possible locations lor park or recreational facaWes. as
wel as practical factors inducing whether there is a need for additional fadaHe* In
the Immediate neighborhood. Any monies required by the authorized board In leu of
land for park, playground or other recreational purposes, pursuant to the provisions
of this section, shal be deposited Into a trust fund lo be used by the vilage exclusively
for park, playground or other recreational purposes, Inducing the acquisition ol property
(d) Notwithstanding the foregoing provisions of this subdivision, if the land Included
in a site plan under review is a portion of a subdrvision plat which has been reviewed
and approved, the authorized board shal credit the appScant for any land set aside
or money donated in leu thereof under such subdrvision ptat approval. In the event
ol resubdnrision ol such ptal, nothing shal preclude the additional reservation ol parkland or money donated in leu thereof.
7. Public hearing and decision on site plans. In the event a public hearing Is required
by local taw adopted by the vilage board of trustees, the authorized board shal
conduct a pubic hearing within sixty-two days from the day an apptcation is received
on any mailer referred lo M under this section. The authorized board shal mal notice
of said hearing to the applicant at least ten days before such hearing, and shal give
pubac notice ol said hearing in a newspaper of general circulation in the vttage at
least five days prior to the dale thereof and shal make a decision on the apptcation
within sixty-two days after such hearing, or after the day the apptcation is received
if no hearing has been held. The time within which the authorized board must render
its decision may be extended by mutual consent of the apptcanl and such board. The
decision of the authorized board shal immedtalery be fled In the office of the vatage
clerk and a copy thereof mailed to the apptcanl Nothing herein shal preclude the
holding ol a pubac hearing on any matter on which a pubic hearing is not so required.
8 Notice lo metropolitan, regional or county planning agency. At least tan days
before such hearing, the authorized board shal mal notices thereof lo the county,
metropolitan or regional planning agency, as required by section two hundred thirtyrune m ol the general municipal taw. which notice shal be accompanied by a lul
statement of the matter under consideration, as defined in subdrvision one of section
two hundred thirty nine-m of the general municipal taw In the event a pubac hearing
is not required, the matter shal be referred to the metropoMan. county, or regional
planning agency before final action Is taken thereon, il required by section two
hundred thirty nine-m of the general municipal taw.
9. Complance with stale environmental qualty review act. The authorized board
shal comply with the provisions of the state environmental qualty review act under
article eight of the environmental conservation law and its implementing regulations
as codHled m 0 NYCRR 6 1 7 .
121

�\

A P P E N D I X . V I L L A G E LAW I E I T E C T I V E JULY 1. I99J)

APPENP&gt;X= VRiAQE LAW (EfFECT-VE m v

a final plat shall expire wilhln one hundred eighty days after Ihe dale of Ihe resolution
granting conditional approval unless such requirements have been certified as completed
8 Extension ol time Notwithstanding the foregoing provisions ol this section, the
planning board may extend the time In which a conditionally approved plat in final form
must be submitted for signature If. In Its opinion, such extension is warranted by Ihe
particular circumstances thereof, which time shall not exceed two additional periods
of ninety days each
Approval In sections

fererraY pursuit
Miction 239-n

to General Municipal Law,

9 Approval of plat In sections. In granting conditional or final approval of a plat In
final form, the planning board may permit the plat to be subdivided and developed in
two or more sections and may in Its resolution granting conditional or final approval
state that such requirements as It deems necessary to Insure the orderly development
of the plat be completed before said sections may be signed by the duly authorized
officer ol the planning board. Conditional or final approval ol Ihe sections of a final
plat may be granted concurrently with conditional or final approval ol Ihe entire plat,
subject to any requirements Imposed by the planning board.
10 Notice to county planning agency. When a county planning agency has been
authorized to review subdivision plals pursuant to section two hundred thirty-nine-n
ol the general municipal law, Ihe clerk ol the planning board shall refer a l applicable
preliminary and final plats to such county planning agency as provided in that section.
11 Expiration ol approval. The signature of the duty authorized officer of the planning board constituting final approval by the planning board of a plat as herein provided, or the approval by such board of Ihe development of a plat or plats already
filed In the office ol Ihe county dark or register of the county In which such plat or
plats are located If such plals are entirety or partialy undeveloped; or Ihe certificate
ol the vMage clerk as to the date ol Ihe submission ol the final plat and the failure of
the planning board to take action within Ihe time herein provided, shall expire within
sixty-two days from the date ol such approval, or from the dale such certificate la
issued, unless within such sixty-two day period such plat or a section thereof shaft
have been duly filed or recorded by Ihe owner in the office of the county clerk or
register In the event Ihe owner shall file only a section ol such approved plat in Ihe
office of the county dark or register, the entire approved plat shall be filed within
thirty days of the Rang of such section with the vMage clerk in each visage In which
any portion ol the land described in the plat Is situated. Such section shall encompass
at least ten percent of the total number of tola contained in the approved plat, and
the approval ol the remaining sections of the approved plat Shad expire unless said
sections are fled before the expiration of the exemption period to which such plat la
entitled under the provisions of section 7-708 ol this article.

(b) suitable monuments be placed al block corners and other necessary points as
may be required by the board and the location thereof is shown on Ihe map of such
pial.
Required Improvements

y
Reservation ofparkJand or cash In leu
thereof

Required findings

Cash In leu of parkland
'So *t original—probably should read
"auttabWy"

ll

(a) the streets and highways be of sufficient width and suitable grade and thai ba
suitably located to accommodate the prospective traffic, to afford adequate Rght and
air. to lacaHale Are protection, and to provide access ol nrefightJng equipment to
buildings If there be an official map. vMage comprehensive plan or functional/master
plans, such streets and highways shad ba coorrjnated so as to compose a convenient

126

3 Compliance with zoning regulations. Where a zoning ordinance or local law has
been adopted by the vHage. the lots shown on said plat shal al least comply with the
requirements thereof subject, however, to the provisions of section 7-738 of this
article.
4. Reservation of parkland on subdivision plats containing residential units.
(a) Before Ihe planning board may approve a subdivision plat containing residential
units, such subdrvision pial shal also show, when required by such board, a park or
parks suitably located for playground or other recreational purposes.
(b) Land lor park, playground or other recreational purposes may not be required
until the planning board has made a finding thai a proper case exists lor requiring thai
a park or parks ba suitably located for playgrounds or other recreational purposes
within the vttage. Such findings aha* Include an evaluation of the present and anticipated future needs for park and recreational fadttea In the vMage based on projected
t'jputatton growth to which Ihe particular subdivision plat wM contribute.
(c) In the event the planning board makes a Nrwang pursuant to paragraph (b) of this
subdivision thai the proposed subdrvision plat presents a proper case for requiring a
park or parka suitably located for playgrounds or other recreational purposes, but that
a suitable park or parks of adequate aha to meet the requirement cannot ba property
located on such aubdMslon plat, the planning board may require a sum of money in
leu thereof. In an amount to be estabtahed by the vOege board of trustees. In making
such determination of auHablMy. the board shal assess the size and suitably* of land
shown on the subdMalon plat which could ba possfct* locations lor park or recreaUonai tecMlM. as w a l as practical factor* fnckjdkig whether there I* a need for additional facxWes in Ihe kwnedtete neighborhood. Any moneys required by the planning
board In l e u of land for park, playground or other recreational purposes, pursuant to
the provisions of (his (action, shal ba deposited into a trust fund to ba used by the
vHage exclusively lor park, playground or other recreational purpose*. IncfcjrJng the
acquisition of properly.
S. Character of the development, in making such determination regarding streets,
highways, parks and required Improvements, the planning board t h a i take Into consideration the prospective character of the development, whether dense residence,
open residence, business or Industrial.

Area variances

1. Purpose. Before the approval by the planning board of a plat showing lots, blocks
or sites, with or without streets or highways, or the approval ol a plat already fled In
the office of the clerk ol the county wherein such plat la situated II the plat Is entirely
or partialy undeveloped, the planning board t h a i require that the land shown on the
plat be ol such character that it can be used safety for bu»c*ng purposes without
danger to hearth or perl from fire, flood, drainage or other menace to neighboring
properties or the puofic health, safety and welfare.
2. Additional requirements The planning board shall also require that:

(c) all streets or other pubHc places shown on such plats be suitably graded and
paved: street signs, sidewalks, street lighting standards, curbs, gutters, street trees,
water mains, fire alarm signal devices (Including necessary ducts and cables or other
connecting facilities), sanitary sewers and storm drains be Installed a l in accordance
with standards, specifications and procedures acceptable to the appropriate vttage
departments except as hereinafter provided, or alternatively that a performance bond
or other security be furnished to the vWage. as hereinafter provided.

Compliance with zoning

13 Compliance with state environmental quaWy review act. The planning board
shal comply with the provisions ol the stale environmental qualty review act under
article eight ol the environmental conservation law and Its Implementing regulation"
as codified In 6 NYCRR 6 1 7 .
| 7-730. Subdivision review; approval of plals; additional requisites

General reoutremerHs

\m}

system conforming to the official map and properly related to the proposals shown in
the comprehensive plan of the village:

12. Subdrvision abandonment. The owner of an approved subdivision may abandon
such subdivision pursuant to the provisions ol section five hundred sixty of the real
property tax law.
Comptmnca with State Environment* Quality
Review Act

-,

Waivers

6 Applcatton for area variance. Notwithstanding any provision o' law to the contrary, where a pial contains one or mora lota which do not comply with the zoning
local law regulations, appacatlon may ba mad* to the zoning board of appeal* for an
area variance pursuant to section 7-712-b of thia article, without the necessity of a
decision or determination of an adrnW*lr*tiv* official charged with the enforcement
of the zoning regulations. In reviewing such appkcafJon the zoning board of appeal*
shal request the planning board to provide • written recorrvnendetton cortcerrtng the
proposed variance.
7 Waiver of requirementa. The planning board may waive, when reasonable, any
requirement* or Improvements lor the approval, approval with modWcaaon* or Disapproval of subdrvision* submitted for K* approval. Any such waiver, which shal ba
subject to appropriate conoloon*. may ba *x*rcfsad In th* event any such requirements or Improvements are found not to be requisite In t h * inter**! of t h * pubic
health, safety, and general welfare or ln*ppropn*l* because of inadequacy or lack of
connecting (acmes adjacent or in proximity to the subdrvision.
127

�FREDERICK P. CLARK ASSOCIATES, INC.

David J. Portman, AICP
Howard I. Reynolds, PE
David H. Stolman, AICP

Planning/Development/Environment/Transportation
Rye, New York and Southport, Connecticut
350 Theodore Fremd Avenue
Rye, New York 10580
(914)967-6540
70.

Michael A. Galante
Joanne P. Meder, AICP
Jim Donovan, RLA. ASLA

V i l l a g e of North Tarrytown Planning Board

DATE:

10/31/94

Sean Treacy, Mayor

PROJECT: 520.037/Hogan S u b d i v i s i o n

Linda E. David, Village Administrator

FAX NO.:

J a n e t A.-Gandolfo, E s q . , James T. Margotta, Building Inspector
Mark A. DiGennaro, V i l l a g e Engineer
WE TRANSMIT HEREWITH:

VIA:

(x)
( )
( )

( )
( )

As requested
As per conversation
Per request of

( )
( )
( )

First Class Mail
Express Delivery
Telefax - # of Pages
(including cover sheet)
Our Messenger
Your Messenger
Hand Delivery

FOR YOUR:
( )
(*)
( )

Approval
Review
Distribution

File
Information

( )
( )
( )

( )
( )

Use
Comnlent

THE FOLLOWING:
Description

Date

No. of Copies
1

10/20/94

Nee a t i v e D e c l a r a t i o n

1

10/31/94

Draft Resolut i o n

REMARKS:

0 n

October 2 8 , 1994,

County Planning Department.

I spoke with Ed Hoffmeister

a t t h e Westchester

He said the County Planning Board d i d not have

any comments on t h i s subd i v i s i o n .

cc:

James F. Hogan
192 Webber Avenue
North Tarrytown, NY 10591

Connecticut • (203) 255-3100

gy Susan J . Portman, AICP
Associate /jfiannmg

FAX • (914) 967-6615

Long Island • (516) 364-4544

�SEQR
617.21
Appendix F
State Environmental Quality Review
NEGATIVE DECLARATION
Notice of Determination of Non-Significance

K
'

Project Number

Date

October 20. 1994

This notice is issued pursuant to Part 617 of the implementing regulations pertaining to Article 8 (State
Environmental Quality Review Act) of the Environmental Conservation Law.
The Village of North Tarrvtown Planning Board . as lead agency, has determined that the proposed action
described below will not have a significant effect on the environment and a Draft Environmental Impact Statement will not
be prepared.
Name of Action:

SEQR Status:

Hogan Two-Lot Subdivision

Type I
Unlisted

X

Conditioned Negative Declaration:

Yes
X No

Description of Action:
Two-lot subdivision of a property 0.4 acres in size.

Location:

(Include street address and the name of the municipality/county. A location map of appropriate scale is
also recommended.)
19 Maple Street, Village of North Tarrvtown, Westchester County.
Tax Map Sheet 17, Block 9, Lot 2-A.

�6EQR Negative Declaration

Page 2

^measons Supporting This Determination:
See 617.6(g) for requirements of this determination; see 617.6(h) for Conditioned Negative Declaration)
The proposed action will not cause a significant adverse impact on land, water, air, plants and
animals, agricultural land resources, aesthetic resources, historic and archaeological resources,
open space and recreation, transportation, energy, public health, growth and character of the
community or cause significant adverse noise and odor.

For Further Information:

Contact Person:

Linda E. David, Village Administrator

Address:

Village Hall, 28 Beekman Avenue, North Tarrytown, New York 10591

Telephone Number:

(914) 631-1440

�D R A F T
RESOLUTION
Adopted at the October 20, 1994 Meeting of the
Village of North Tarrytown Planning Board
RESOLUTION

SUBDIVISION APPROVAL
PROPOSED ACTION: SUBDIVISION OF PROPERTY INTO
TWO (2) LOTS
OWNER: ESTATE OF VICTORIA M. HOGAN
APPLICANT: JAMES F. HOGAN
LOCATION: 19 MAPLE STREET
TAX DESIGNATION: SHEET 17, BLOCK 9, LOT 2-A
ZONING: R-4 RESIDENTIAL

�RESOLUTION
Adopted at the October 20, 1994 Meeting of the
Village of North Tarrytown Planning Board
RESOLUTION

SUBDIVISION APPROVAL
PROPOSED ACTION: SUBDIVISION OF PROPERTY INTO
TWO (2) LOTS
OWNER: ESTATE OF VICTORIA M. HOGAN
APPLICANT: JAMES F. HOGAN
LOCATION: 19 MAPLE STREET
TAX DESIGNATION: SHEET 17, BLOCK 9, LOT 2-A
ZONING: R-4 RESIDENTIAL
WHEREAS, the Planning Board of the Village of North Tarrytown
has reviewed an application for subdivision approval (the
application) pursuant to the Subdivision Regulations of the Village
of North Tarrytown, Chapter 62, Zoning, of the Code of the Village
of North Tarrytown and other requirements of the Village Code
considered pertinent to the application, which application is to
subdivide property located on the northern side of Maple Street at
19 Maple Street into two (2) lots for residential development; and
WHEREAS, Lot A would be 5,625 square feet in size and Lot B
would be 11,250 square feet in size and would contain the existing
three-family dwelling and detached garage, as shown on the drawing
prepared by John J. Muldoon, Professional Land Surveyor, and
further identified as follows:
"Subdivision Map Prepared for the Estate of Victoria M. Hogan,
Situate Village of No. Tarrytown, Town of Mt. Pleasant,
Westchester Co., N.Y.," scale 1" = 2 0 ' , dated August 7, 1994
and most recently revised September 28, 1994; and
WHEREAS, all references to the "Applicant" shall include the
Applicant's successor and assigns; and
WHEREAS, the Applicant has stated that the Zoning Board of
Appeals previously granted a use variance for the existing threefamily dwelling on Lot B; and
WHEREAS, in the original application, the Applicant proposed
a three-lot subdivision and the Applicant subsequently revised the
application to propose a two-lot subdivision; and
WHEREAS, the site has been visited by the Village's Planning
Consultant and the Planning Board is thoroughly familiar with the
site and all aspects of the proposed subdivision; and
WHEREAS, on October 28, 1994, the Westchester County Planning
Board informed the Village's Planning Consultant that they had no
comments to offer on this application; and

�WHEREAS, a duly advertised public hearing was held at the
Village Hall on October 20, 1994, at which time those wishing to be
heard were given the opportunity to be heard; and
WHEREAS, the Planning Board considered this a minor
subdivision and treated the preliminary and final as a single
approval; and
WHEREAS, in the course of this review and acting as Lead
Agency pursuant to Part 617 of the implementing regulations
pertaining to Article 8 of the Environmental Conservation Law, the
Planning Board has made the following findings and caused, noted or
conducted the following activities:
1.

Received an application fee of $580;

2.

Caused field inspections to be made of the property and of the
surrounding areas;

3.

Referred the application to the Westchester County Planning
Board pursuant to Sections 239-1, m and n of the General
Municipal Law because the subject property is within 500 feet
of the Old Croton Railway State Park;

4.

Requested, received and considered comments from the Village
Planning Consultant, the Village Engineering Consultant and
the Building Inspector;

5.

Requested, received and reviewed a short Environmental
Assessment Form (EAF) in compliance with the New York State
Environmental Quality Review Act (SEQRA);

6.

After review of said field conditions, recommendations and
EAF, as well as other materials and matters noted above, the
Planning Board has determined that the proposed action is an
Unlisted Action and made a Negative Declaration on October 20,
1994, and noted on the EAF its determination of nonsignificance of environmental impact.

NOW, THEREFORE, BE IT RESOLVED, that said application for
subdivision approval for a two (2) lot subdivision, as shown on the
drawing entitled "Subdivision Map Prepared for the Estate of
Victoria M. Hogan, Situate Village of No. Tarrytown, Town of Mt.
Pleasant, Westchester Co., N.Y.," scale 1" = 2 0', dated August 7,
1994 and most recently revised September 28, 1994, prepared by John
J. Muldoon, Professional Land Surveyor, be and is hereby granted
subdivision approval and that the Applicant may obtain the endorsed
approval of the Planning Board Chairman or, as an alternate, the
Village Administrator, on a copy of this subdivision resolution and
upon the final mylar copy of the subdivision plat drawing revised
as necessary to show compliance with the following conditions and
the Applicant may obtain the endorsement of the Westchester County
2

�Department of Health on the final mylar subdivision plat which
endorsements shall permit filing in the offices of the Westchester
County clerk, provided, however, that this subdivision approval
shall expire within one hundred eighty (180) days from the date of
this resolution if the following conditions have not been completed
to the satisfaction of the Planning Board:
1.

The Applicant shall pay to the Village of North Tarrytown the
reimbursement of all application review fees as noted and
required in Section 62-3OF of the Village Zoning Code.

2.

Revision of the above noted plat to demonstrate the following:
2.1

The plat shall be revised and titled "Final Subdivision
Plat;"

2.2

The final plat shall comply with the requirements of
Section 11 of the Village of North Tarrytown Subdivision
Regulations;

2.3

The signature block for the endorsement of the Planning
Board Chairman shall be revised to comply with Section
ll.A(l)(c)(14c);

2.4

The date of this resolution shall be noted on the final
subdivision plat.

PLANNING BOARD
VILLAGE OF NORTH TARRYTOWN

By:

Date:
George F. Hritz, Chairman
Village of North Tarrytown Planning Board

500\not4-006.sjp:ev

3

�FREDERICK P. CLARK ASSOCIATES, INC.

David J. Pcrtman. AICP
Howard I. Reynolds, PE
David H. Stolman. AICP

Plahning/Development/Environment/Transportation
Rye, New York and Southport, Connecticut

Michael A. Galante
Joanne P. Metier, AICP

350 Theodore Fremd Avenue
Rye. New York 1058C
"(914)967-05-^
JO:

Jim Donovan. RLA.ASLA

Village of North Tarrytown Planning Board D^jg. 10/21/94
Sean Treacy, Linda David, James Margotta,
Janet Gandolfo, Mark DiGennaro,

PR0JECT:

520.040/Levy E s t ; ,

FAX NO.:

Albert Peck

WE TRANSMIT HEREWITH:

VIA:

(x)
( )
( )

(x)
( )
( )

As requested
As per conversation
Per request of

( )
( )
( )

First Class Mai
.Express Delivery
Telefax-# of Pages
(including cover sheet)
Our Messenger
Your Messenger
Hand Delivery

FOR YOUR:
( )
( )
( )

Approval
Review
Distribution

( )
W
( )

( )
( )

File
Information

Use
Comment

THE FOLLOWING:
No. of Copies
1

Description

Date
10/21/94

Notice of Intent to be Lead Agency,
Circii l a t i o n L i s t and EAF

REMARKS:
;-"
... - '

cc:

Involved and Interested^"Agencies

Connecticut -(203)255-3100

By_Susan J. Portman, AICP
Associate/Planning

FAX • (914)967-6615

Long Island • (516) 3.64-4§44l

Ir

�VILLAGE OF NORTH TARRYTOWN
WESTCHESTER COUNTY, NEW YORK
LEAD AGENCY SELECTION FORM

Project Name or Description Levy Estate Subdivision, Irving Place
The s i t e p r e s e n t l y contains two single-family dwellings. A two-lot
subdivision i s proposed ( i n order t o provide one building per l o t ) .
Project Location 21 and 23 Irving Place, North Tarrytown, NY 10591
Name of Applicant Albert Peck for the Levy Estate
Village Agency Intending to Act as Lead Agency Planning Board
Address Village Hall, 28 Beekman Avenue, North Tarrytown, NY 10591
Contact Person Linda David, Village Administrator
Date Mailed

10/21/94

Telephone Number (914) 631-1440

Type off Action (Check A or B)
H A.

TYPE I

•

UNLISTED

B.

Lead agency must be chosen within 30 days of above date.

Deadline Reply Date November 21, 1994 (preferably by Planning Board meeting 11/17/94)

II.

Required Approvals and Reviews (Check all permits, waivers, or other actions which may be
required)
D

Rezoning

$ .

Subdivision Approval

•

-

• , -

Site Development Plan Approval
Special Permit

Eel . - Variance
•

Wetlands Permit

D

Stream Discharge Permit - New York State Department of Environmental Conservation

•

Sewage Disposal/Water Supply Approval - Westchester County Health Department

D

Review by Westchester County Department of Planning

•
•,

r

-

•-•- Curb Cut Approval - New York State Department of Transportation/Westchester County
Department of Public Works
Other."'Specify:

_-_

�VILLAGE OF NORTH TARRYTOWN
WESTCHESTER COUNTY, NEW YORK
LEAD AGENCY SELECTION FORM - PAGE 2

Hi.

IV.

Environmental Significance of Action: Initial Review of Environmental Assessment Form
indicates that: (Check A, B, or C - To be done by initiating agency)
D A.

The proposed action appears likely to have a significant effect on the environment; a
positive declaration is likely.

Q B.

The proposed action appears not likely to have a significant effect on the environment; a
negative declaration is likely.

•

No opinion has been made yet as to whether a positive or negative declaration is likely for
this action.

C.

A Copy of this Form and the Environmental Assessment Form Has Been Sent to the Agencies
Indicated on the Attached List.

Attachments:

Lead Agency Selection Reply Form
List of Involved or Interested Agencies
Environmental Assessment Form

�VILLAGE OF NORTH TARRYTOWN
WESTCHESTER COUNTY, NEW YORK
LEAD AGENCY SELECTION REPLY FORM

Reply Form to be FiHed Out by Involved Agencies
The

O'st agency) has examined this form

and accompanying documentation for the application known as
Levy Estate Subdivision, Irving Place
•

and:

(Check A or B)

A. Does not want to be Lead Agency.

D B. Wants to be Lead Agency for this action.
Additional comments or concerns (Attach additional pages if necessary):

Reviewed by:

Signature

Name

Title

Date

PLEASE RETURN TO THE AGENCY INITIATING THIS PROCESS (LISTED ON THE FIRST PAGE OF
THIS FORM) BY THE DATE INDICATED. IF NO REPLY IS RECEIVED BY THE DATE INDICATED, THE
VILLAGE AGENCY INDICATED WILL ASSUME THAT YOU CONCUR WITH ITS DESIGNATION AS LEAD
AGENCY.
500/nol3-030.jd

�LIST OF INVOLVED OR INTERESTED AGENCIES
(only those marked with an "X")

•

0

Planning Board
Village elf North Tarrytown
28 Beekman-Avenue
North Tarrytown, New York 10591

D

Westchester County Department
of Planning
432 County Office Bulding
White Plains, New York 10601

Zoning Board of Appeals
Village of North Tarrytown
28 Beekman Avenue
North Tarrytown, New York 10591

EI

Westchester County Department
of Health
112 East Post Road
White Plains, New York 10601

New York State Department of
Environmental Conservation
21 South Putt Corners Road
New Paltz, New York 12561

D

New York State Department of
Transportation
4 Burnett Boulevard, Region 8
Poughkeepsie, New York 12603

New York State Department of
Environmental Conservation
50 Wolf Road
Albany, New York 12233-0001

•

New York State Department of
Transportation
Saw Mil River Road
Valhalla, New York 10595

(Other Agencies)

500\not3-O30.jd

�14/16-2 (2/87)-7c

617.21
Appendix A
State Environmental Quality Review

SEQR

FULL ENVIRONMENTAL ASSESSMENT FORM
Purpose: The full EAF is designed to help applicants and agencies determine, in an orderly manner, whether a project
or action may be significant. The question of whether an action may be significant is not always easy to answer Frequently, there are aspects of a project that are subjective or unmeasureable. It is also understood that those who determine
significance may have little or no formal knowledge of the environment or may be technically expert in environmental
analysis. In addition, many who have knowledge in one particular area may not be aware of the broader concerns affecting
the question of significance.
, /&gt;_••
The full EAF is intended "to provide a method whereby applicants and agencies can be assured that the determination
process has been orderly, comprehensive in nature, yet flexible to allow introduction of information'to fit a project or action.
Full EAF Components: The full EAF is comprised of three parts:
Part 1: Provides objective data and information about a given project and its site. By identifying basic project
data, it assists a reviewer in the analysis that takes place in Parts 2 and 3.
Part 2: Focuses on identifying the range of possible impacts that may occur from a project or action. It provides
guidance as to whether an impact is likely to be considered small to moderate or whether it is a potentiallylarge impact. The form also identifies whether an impact can be mitigated or reduced.
Part 3: If any impact in Part 2 is identified as potentially-large, then Part 3 is used to evaluate whether or not the
impact is actually important.

DETERMINATION OF S I G N I F I C A N C E - T y p e 1 and Unlisted Actions
Identify the Portions of EAF completed for this project:

£D

Part 1

J3

Part 2

DPart 3

Upon review of the information recorded on this EAF (Parts 1 and 2 and 3 if appropriate), and any other supporting
information, and considering both the magitude and importance of each impact, it is reasonably determined by the
lead agency that:
D

A. The project will not result in any large and important impactfs) and, therefore, is one which will not
have a significant impact on the environment, therefore a negative declaration will be prepared.

D

B. Although the project could have a significant effect on the environment, there will not be a significant
effect for this Unlisted Action because the mitigation measures described in PART 3 have been required,
therefore a CONDITIONED negative declaration will be "prepared.*

D

C. The project may result in one or more large and important impacts that may have a significant impact
on the environment, therefore a positive declaration will be prepared.
* A Conditioned Negative Declaration is only valid for Unlisted Actions

LeV^ BifK-H.

JvJedi^Ji't*
Name of Action

Name of Lead Agency

*

Print or Type Name of Responsible Officer in Lead Agency

Title of Responsible Officer

Signature of Responsible Officer in Lead Agency

Signature
jre of Preparer (If different from responsible off leer)

Date

1

�r/.:.i - i - i r . o j t c i INF OI.I/.ATION
,!
'-.01iC£ ~it»- • - ' X ^ " . i . : . • . « . . . - .
;
.
• :
. - • ' . ' pre ; C M C r ;•&gt; f.e&gt;- &lt;-i,- :"\ :•-.: c f{ t c •.
on the envijor ••.&lt;r-r&gt;t PJc-JU-f-" c c ;
• : • ( • • • . .
'.
•: ,'• ; '..••••:•: to ) ( , ( « qui &gt;:;cr.&lt;. * . ' , :c cor.nr.a ..
e s p a r t o ' the ripplicetiori for app.'o-.fii «»:£ rue'. U ^ L ' ; i c t to further verii&lt;cat. on and public review Pio\ic"t an&gt; a d d i t i o n ^
information you b c i i t \ c will be ncccitc' to'corr.p!itc Pens 2 and 3
It is expected that completion of the full EAF will be dependent on information currently available and will not involve
r c iv !•'.-»*'.c&gt;. it : c.":: t*. C" :r \ i &gt;: t . . ; • . ii i'i : t ' • ' . .
-.'&lt;_.
&gt;.
• • : . . . . ' &lt; • 1 &lt;. '. • " . • • . • a : 1 r.:-.- •

K* *.•! C'-"*- /V."

' ... ^ u e - o i v ( s ) W

- le^j £***&amp;

LOCATION OF ACTION (include St;«l AdCess. Municipality trxJ County)
BUSINESS TELEPHONE

NAME OF APPLICANTVSPONSOr?
ADDRESS

ft PnO€*

£T&gt;

CITY/PO

M. TXigJg-VTSWM
NAME OF OWNER (II different)

ZIP CODE

K/,V.

Ito^ i

BUSINESS TELEPHONE

eg. f|

Ug.\/f

T

ADDRESS
CITY/PO

STATE

2\&amp; . krsrkiAo^T

-

621-"Wil

STATE

Z:F CODE

LA/J^J « £ 9 /

IA£&gt;^K&gt;WN&gt;,... j / , Yl
DESCRIPTION C? ACTIOS

)

'

/£

Please Complete Each Question —Indicate N.A. if not applicable

A. Site Description
Physical setting of overall project, both developed and undeveloped areas.
1. Present land use:
DUrban
Dlndustrial
DCommercial
Efoesidential (suburban)
CForest

^Agriculture

2. Totaf acreage of project area: .
* J^
APPROXIMATE ACREAGE
Meadow or Brushland (Non-agricultural)

7

COther
acres.

Forested
Agricultural (Includes orchards, cropland, pasture, etc.)
Wetland (Freshwater or tidal as per Articles 24. 25 of ECU
Water Surface Area
Unvegetated (Rock, earth or fill)
Roads, buildings and other paved surfaces
Other (Indicate type)
'.
3. What is predominant soil type(s) on project site?
a. boil drainage;
^ W e l l drained \ O Q % of site

OPoorly drained

DRural (non-farm)

PRESENTLY
acres
acres
acres

AFTER COMPLETION
acres

acres

: acres
^acres

acres
acres
acres

s/S?

acres
'.
DModerately well drained

acres
L

&lt;l**

acres

1 acres
acres
[acres

% of site

% of site

b. If any agricultural land is involved, how many acres of soil are classified within soil group 1 through 4 of the NYS
Land Classification System?
acres. (See 1 NYCRR 370).
4. Are there bedrock outcroppings on project site?
a. What is depth to bedrock?

DYes
JsSfNo
(in feet)

%

»

•

�(

•«

.

nfr::'i-: » • * - . •

••

r

•

••••••

.

r." :c •:

c " - .

. ! '.. 1 -- ••

*.:•

&lt;• c .

' ' ••• :•' '.

'.'• f-: '•• c

',! • S .

;. Is project sut i;cr.'.::-:., tosi;-^--: - : \i- c SJU . i : ; c : o:. i.\«. i . i r .:«.: ;:'»»'».; :.r.;.' '*;•...•. ' 1 tr:'.6. What is the depth o? the *a:er tar't. :
9 !• «.:'.r fo'r.'.'d o"v.

••' "• - " .

v

*•;

'.•;• hu-v. rg f i«. .. • „ c : i},i"-

"i ;

L&lt;t&gt;. . J.' . . • • - . ^.".t

*L=

(in feci)

:*"'• " '

r r &lt;r'&lt; ! ' i " ; f r r
v

:

' -• •. . : : -: " . v " : " • : ••• •"'.'•)

u-

•'*&gt;•'

f*Vr«

2*&gt;*Co

**:«•• \r, :'r- &lt;•.•••(.;'. a r c j "

Z '*o;

L^isLo

,

DYes
Zfco
According to
Identify each species

'.—1
'—1

12. Are there any unique or unusual land forms on the project site? (i.e., cliffs, dunes, other geological formations)
CYes

O&amp;to

Describe

.

13. Is the project site presently used by the community or neighborhood as an open space or recreation area?
DYes
E$No
If yes, explain ..
, _
_
14.

Does the present site include scenic views known to be important to the community?
DYes
@K'o

#A

15. Streams within or contiguous to project area:
a. Name of Stream and name of River to which it is tributary
lb

L?.'f.c-f, pcr.df, v. f.i?.r-d are2S v.;'.* .*. o: CO.v..gjc.-,_&gt; to p:c-;CC. a:vi
b. Si2e (In acres)

a. Name
17, Is the site served by existing public utilities?
£?¥es
GNo
a) If Yes, does sufficient capacity exist t o allow connection?
JSS'es
b) If Yes. will improvements be necessary to allow connection?
DYes

DNo
DNo

IS. Is the site located in an agricultural district certified pursuant t o Agriculture and Markets Lav., Arf.de 2S;AA
Section 303 and 304?
DYes
CJNo
19. Is the site located in or substantially contiguous to a Critical Environmental Area designated pursuant to Article 8
of the ECL. and 6 NYCRR 617?
ElVes
DNo
20. Has the site ever been used for the disposal of solid or hazardous wastes?

DYes

E2Ko

B. Project Description
1. Physical dimensions and scale of project (fill in dimensions as appropriate)
a. Total contiguous acreage owned or controlled by project sponsor
b. Project acreage t o be developed:

'J**?

acres initially;

c. Project acreage to remain undeveloped
d., Length of project, in miles:

'

*

' ^

-acres.

' t&lt;5~

(»f appropriate)

e . l f the project is an expansion, indicate percent of expansion proposed
f. Number of off-street parking spaces existing

'

g..Maximum vehicular trips generated per Knur

; proposed
K//A

h. if residential: Number and type of housing units:
One Family
Two Family
Initially

_2

acres ultimately.

acres.
%;
~~Z~~

(upon completion of project)?
M u l t i p l e Family

Condominium

-

Ultimately

&amp;.
i. Dimensions (in feet) of largest proposed structure

height;

width;

j . Linear feet of frontage along a public thoroughfare project will occupy is? * ^ ^
-

•--

3.

1
ft. 7

length

�2

Ho* much natu'al material (i e

'cc^. earth, etc ) * i l l be r c m o u d from the s:ie'

3. Will d'sturbed areas be recla&lt;med&gt;

DYes

i$No

^-(0

tons.'cuttc &gt;2rds

DN.'A

a. If yes. for what i n t e n d . , purpose is the site being reclaimed'
b. Will topsotl be stockpiled for reclamation?

GYes

.

l£No

c. W i l l upper subsoil be stockpiled for reclamation?

DYes

£QNo

4. How many acres of vegetation (trees, shrubs, ground covers) will be removed from site?

acres

5. Will any mature forest (over TOO years old) or other locally-important vegetation be- removed by this project?

DYes

[?No

j

6/---Jf single phase project: Anticipated period of construction
7. if multi-phased:

i/

a. Total number of phases anticipated

N/rT

__

''\

(number).

b. Anticipated date of commencement phase 1

month

c. Approximate completion date of final phase

DYes

9. Number of jobs generated: during construction
10. Number of jobs eliminated by this project

year, (including demolition)

month

a

d. Is phase 1 functionally dependent on subsequent phases?
8. Will blasting occur during construction?

months, (including demolition)

year.

DYes

DNo

l^lo
r\//f

; after project is complete

*

1 1 . Will project require relocation of any projects or facilities?

12. Is surface liquid waste disposal involved?

DYes

DYes

G3^jo

If yes. explain

G^No

a. If yes. indicate type of waste (sewage, industrial, etc.) and amount
b. Name of water body into which effluent will be discharged
13. Is subsurface liquid waste disposal involved?

DYes

BNo

Type

14. Will surface area of an existing water body increase or decrease by proposal?
Explain
15. Is project or any portion of project located in a 100 year flood plain?
16. Will the project generate solid waste?

DYes

DYes

DYes

JQNO

_5No

a. If yes, what is the amount per month

tons

b. If yes, w i l l an existing solid waste facility be used?

DYes

c. If yes. give name

DNo

; location

d. W i l l any wastes not go into a sewage disposal system or into a sanitary landfill?

DYes

DNo

e. If Yes. explain
17. Will the project involve the disposal of solid waste?

DYes

LBNo

a. If yes, what is the anticipated rate of disposal?

tons/month.

b. If yes, what is the anticipated site life?
1 8 . Will project use herbicides or pesticides?

years.
DYes

ENo

19. Will project routinely produce odors (more than one hour per day)? DYes

DNo

20. Will project produce operating noise exceeding the local ambient noise levels?
23.-Will project result in an increase in energy use?

DYes

DYes

ESNo

If yes , indicate type(sj

'_

22. If water supply is from wells, indicate pumping capacity
£: 23.

Total anticipated water usage per day

-

:

gallons/minute.

gallons/day.

24. Does project involve Local, State or Federal funding?
If Yes. explain

_JNo

DYes
4

J!_No
•

---.

�25. Approvals Requited:

Submittal

T&gt;pe
City. Town. Village Board

CYes

CNo

Qiiy Town, Village Planning Board

EYes
EJYes

DNo
D
NO

City, Toww Zoning Board

_&lt;Yes
_5Yes

DNo
DNO

€-tty. County Health Department

EYes

CN'o
CN'O

Other Local Agencies

DYes

• No

Oiher Regional Agencies

GYes

CNO

State Agencies

DYes

DN'o

Federal Agencies

CYes

• No

Date

5«-^*^ &gt; ^ ^ n

____,
C

•Q/i/l.UCEcJ Vz/MiiS

ISCPI-

f/&lt;IG l&amp;j-

\\M***'W\

C. Zoning and Planning Information
1

Does proposed action involve a planning or zoning decision?
_7¥es
DNo
If Yes. indicate decision required:
• zoning amendment
t^zoning variance
Especial use permit
^subdivision
• new/revision of master plan
Dresource management plan
Dother

2. What is the zoning c!assification(s}of the site?

Dsite plan
.

jL""^

3. What is the maximum potential development of the site if developed as permitted by the present zoning?

Q\nt

-'A-fav*\&gt;'»iD"g!l&gt;rM

&lt;_—-—-^e'C r ~~ C*o&lt;3- cr&gt;ltM£l-eh-W

4. What is the proposed zoning of the site?

K &amp; $ lfl&lt;£ U T U U -

(**&amp; C

^

^

5. What is the maximum potential development of the site if developed as permitted by the proposed zoning?

6

6. Is the proposed action consistent with the recommended uses in adopted local land use plans?

&gt;E$Yes

DNo

7. What are the predominant land use{s) and zoning classifications within a V* mile radius of proposed action?
8

Is the proposed action compatible with adjoining/surrounding land uses within a V* mile?
Q-.
9. If the proposed action is the subdivision of land, how many lots are proposed? _

__3Yes

DNo

CYes

_5NO

a. What is the minimum lot size proposed? _
10. Will proposed action require any authorizations) for the formation of sewer or water districts?

11. Will the proposed action create a demand for any community provided services (recreation, education, police.
fire protection)?
DYes
EZfNo
a. If yes. is existing capacity sufficient to handle projected demand?

DYes

DNo

12. Will the proposed action result in the generation of traffic significantly above present levels?
a. If yes. is the existing road network adequate to handle the additional traffic?

DYes

DYes

©No

DNo

D. Informational Details
Attach any additional information as may be needed to clarify your project. If there are or may be any adverse
impacts associated with your proposal, please discuss such impacts and the measures which you propose to mitigate or
avoid them.

E. Verification
I certify that the information provided above is true to the best of my knowledge.
Applicant/Sponsor Name .

%

Signature

XZ\\

J&amp;-fcifa(&amp;Cr~

T'itlp

A&amp;Ct{\Xl*&lt;ir

If the action is in the Coastal Area, and you are a state agency, complete the Coastal Assessrvjnt Form before proceeding
with this assessment.
5

�p s r i 2—PROJECT IMPACTS A N D 1 H L i R

N'.AGNuUDL

Responsibility of Lead Agency
C e n t r a l I n f o r m a t i o n (Read Carefully)
• In c o m p l e t i n g the f o r m the reviewer should be guided by the question Have my responses and determinations been
reasonable? The reviewer is not expected t o be an expert e n v i r o n m e n t a l analyst

•

• I d e n t i f y i n g t h a t an i m p a c t w i l l be potentially large (column 2) does not mean th2t it is also necessarily significant.
A n y - l a r g e i m p a c t m u s t be evaluated in PART 3 to determine significance I d e n t i f y i n g an impact in c o l u m n 2 s i m p l y
asks t h a t it be l o o k e d at further.
• The Examples p r o v i d e d are t o assist the reviewer by showing types of i m p a c t s and wherever possible the threshold of
m a g n i t u d e that w o u l d trigger a response in column 2. The examples are generally applicable throughout the State and
f o r most situations. But. for any specific project or site other examples and/or lower thresholds may be a p p r o p r i a t e
f o r a Potential Large I m p a c t response, thus requiring e v a l u a t i o n in Part 3.
• The impacts of e a c h project, on each site, in each locality, w i l l vary. Therefore, the examples are illustrative a n d
have been offered as guidance. They do not constitute an exhaustive list of impacts and thresholds to answer each question
• The number of examples per question does not indicate t h e j m p o r t a n c e of each question
•

In i d e n t i f y i n g i m p a c t s , consider long term, short term and c u m l a t i v e effects.

Instructions (Read c a r e f u l l y )
a. Answer each of t h e 19 questions in PART 2. Answer Yes if there w i l l be any i m p a c t .
b. M a y b e answers s h o u l d be considered as Yes answers.
c. If answering Yes t o a question then check the appropriate box ( c o l u m n 1 or 2) t o indicate the p o t e n t i a l size of t h e
i m p a c t . If i m p a c t t h r e s h o l d equals or exceeds any example p r o v i d e d , check c o l u m n 2. If i m p a c t w i l l occur but t h r e s h o l d
Is lower t h a n e x a m p l e , check c o l u m n 1.
d . If reviewer has d o u b t a b o u t size of the i m p a c t then consider t h e i m p a c t as p o t e n t i a l l y large and proceed t o PART 3.
e. If a p o t e n t i a l l y large i m p a c t checked in c o l u m n 2 can be m i t i g a t e d by change(s) in the project to a small to m o d e r a t e
i m p a c t , also c h e c k the Yes box in c o l u m n 3. A No response indicates t h a t such a reduction is n o t possible. This
m u s t be e x p l a i n e d in Part 3.

I M P A C T ON L A N D
1 . W i l l the proposed a c t i o n result in a physical change to the project site?
0NO
DYES
Examples t h a t w o u l d apply t o column 2
• A n y c o n s t r u c t i o n o n slopes of 1 5 % or greater, (15 foot rise per 100
f o o t of length), or w h e r e the general slopes in the project area exceed
10%.
• C o n s t r u c t i o n o n l a n d where the depth to the water table is less than
3 iect

1

2

Small to
Moderate

Impact

Potential
Large
Impact

D

D

DYes

D

D

DYes

DN&lt;

n

GYes
DYes

CNO

Can Impact Be
Mitigated By
Project Change

DNo

• C o n s t r u c t i o n o n l a n d where bedrock is exposed or generally w i t h i n
3 f e e t of existing g r o u n d surface.

D

G
D

• C o n s t r u c t i o n t h a t w i l l c o n t i n u e for more than 1 year or i n v o l v e more
t h a n one phase or stage.

D

D

DYes

DNO

• Excavation for m i n i n g purposes that w o u l d remove more t h a n 1,000
tons of n a t u r a l m a t e r i a l (i.e.. rock or soil) per year.

D

D

DYes

DNO

• C o n s t r u c t i o n or expansion of a sanitary l a n d f i l l .

D
D
D

D
D
D

DYes..
DYes
DYes

DNO

DNO

D

D

D Y es

DN&lt;

• C o n s t r u c t i o n c i p a v e d parking area for 1,000 or more vehicles.

• C o n s t r u c t i o n in a d e s l g n a t e d f l o o d w a y .
• Other

impacts

DNO

DNO

2 . W i l l there be an e f f e c t t-' ...iy un.que or unusual land f o r m s f o u n d on
t h e site? (i.e.. c l i f f s , dunes, geological formations, etc.)J3_J&gt;'0
DYES
• Specific

--•

i

land forms:

�1

2

Small to
Moderate
Impact

Potenlial
Large
Impact

D
D

D
D

DYes

DN'O

DYes

DNo

D
D
D

D
D
D

DYes

DNo

DYes

DNo

DYes

DNo

D.

D

DYes

DNo

D
D

D
D

DYes

DNo

DYes

DNo

D
D

D
D

DYes

DNo

DYes

DNo

• Proposed Action requires water supply from wells with greater than 45
gallons per minute pumping capacity.

D

D

DYes

DNo

• Construction or operation causing any contamination of a water
supply system.

D

D

DYes

DNo

• Proposed Action will adversely affect groundwater.
• Liquid effluent will be conveved off the site to facilities which presently
do not exist or have inadequate capacity.

D
D

D
D

DYes
DYes

DNo
DNo

• Proposed Action would use water in excess of 20,000 gallons per
day

D

D

DYes

DNo

• Proposed Action will like'v ca .^ siltation or other discharge into an
.existing body of water t o ti o ex;*-'*: that there will be an obvious visual
.contrast to natural conditions.

D

D.

_^es

D.So

• Proposed Action w i l l require the storage of petroleum or chemical
, products greater than 1,100 gallons.

D

D

DYes

" DNo

• Proposed Action will allow residential uses in areas without water
and/or sewer services.

D

D

DYes

DNo'

• Proposed Action locates commercial and/or industrial uses which may
require new or expansion of existing waste tieatment and/or storage facilities.

D

D

DYes

DNo

• Other

D

D

DYes

DNo

D

D

DYes

DNo

IMPACT ON WATER
3. Will proposed action affect any water body designated as protected'
(Under Articles 1 5, 24, 25 of the Environmental Conservation Law. E t l )
&lt;&amp;NO
DYES
Examples that would apply to column 2
• Developable area of site contains a protected water body.
• Dredging more than TOO cubic yards of material from channel of a
protected stream.
• Extension of utility distribution facilities through a protected water body.
• Construction in a designated freshwater or tidal wetland.
• Other impacts:

Will proposed action affect any non-protected existing or new body
of water?
,0HO
DYES
Examples that would apply to column 2
• A 10% increase or decrease in the surface area of any body of water
or more than a 10 acre increase or decrease.

Can Impact Be
l i t i g a t e d By
Project Change

4

• Construction of a body of water that exceeds 10 acres of surface area.
• Other impacts:

5. W i l l Proposed Action affect surface or groundwater
quality or quantity?
E&amp;s'O
Examples that would apply to column 2

DYES

• Proposed Action will require a discharge permit.
• Proposed Action requires use of a source of water that does not
have approval to serve proposed (project) action.

impacts:

6 . W i l l proposed action alter drainage flow or patterns, or surface
water runoff?
B&amp;O
DYES
Examples that would apply to column 2
• Proposed Action would change flood water flows.
7

V

�Small to
Moderate
Impact

2
Potential
Large
Impact

D
D
D
D

D
D
D
D

D

• Proposed Action will result in the incineration of more than 1 ton of
refuse per hour.

1

Proposed Action may cause substantial erosion

Can Impact Be
Mitigated By
Project Change
DYes

DNO

DYes

DNo

DYes

CNo

DYes

DNo

D

DYes

DNo

D

D

DYes

DNo

• Emission rate of total contaminants will exceed 5 lbs. per hour or a
heat source producing more than 10 million BTU's per hour.

D

D

DYes

DNo

• Proposed action will allow an increase in the amount of land committed
to industrial use.

D

D

DYes

DNo

• Proposed action will allow an increase in the density of industrial
development within existing industrial areas.

D

D

DYes

DNo

• Other impacts:

D

D

DYes

DNo

• Reduction of one or more species listed on the New York or Federal
list, using the site, over or near site or found on the site.

D

D

DY es

DNo

• Removal of any portion of a critical or significant wildlife habitat.

D
D

D
D

DYes

DNo

DYes

DNo

D

D

DYes

DNo

•
•

D

DYes

DNo

D

DYes

DNo

D

D

DY es

#

• Proposed Action is incompatible with existing drainage patterns.
• Proposed Action will allow development in a designated floodway.
• Other impacts: _____

IMPACT ON AIR
7. Will proposed action affect air quality?
_&amp;0
DYES
Examples that would apply to column 2
• Proposed Action will induce 1,000 or more vehicle trips in any given
hour.

IMPACT ON PLANTS AND ANIMALS
8. Will Proposed Action affect any threatened or endangered
species?
_?NO
Examples that would apply to column 2

DYES

• Application of pesticide or herbicide more than twice a year, other
than for agricultural purposes.
• Other

9

impacts:

:

Will Proposed Action substantially affect non-threatened or
non-endangered species?
&gt;__SO
" Examples that would apply to column 2

DYES

• Proposed Action would substantially interfere with any resident or
migratory fish, shellfish or wildlife species.
• Proposed Action requires the removal of more than 10 acres
of mature forest (over 100 years of age) or other locally important
vegetation.
--

-

IMPACT ON AGRICULTURAL LAND RESOURCES

10

Will the Proposed Action affect agricultural land resources?
$NO
DYES
v
Examples that would apply to column 2
;'•&lt;:* The proposed action would sever, cross or limit access to agricultural
!••'" land (includes cropland, hayfields-, pasture, vineyard, orchard, etc.)
8

Ti~-

DN&lt;

�•
Construction activity would excavate or compact the soil profile of
agricultural land.
The proposed action would irreversibly convert more than 10 acres
of agricultural land or. if located in an Agncultutsl District, more
than 2.5 acres o£''agncultural Und.
The proposed action would disrupt or prevent installation of agricultural
land management systems (e.g.. subsurface drain lines, outlet ditches.
strip cropping); or create a need for such measures (e g. cause a farm
field to drain poorly due to increased runoff)
Other impacts
:

•

IMPACT ON AESTHETIC RESOURCES
1 1 . Will proposed action affect aesthetic resources?
®NO
DYES
(If necessary, use the Visual EAF Addendum in Section 617.21,
Appendix B )
Examples that would apply to column 2
• Proposed land uses, or project components obviously different from
or in sharp contrast to current surrounding land use patterns, whether
man-made or natural.
• Proposed land uses, or project components visible to users of
aesthetic resources which will eliminate or significantly reduce their
enjoyment of the aesthetic qualities of that resource.
• Project components that will resuit in the elimination or significant
screening of scenic views known to be important to the area.
• Other impacts:

IMPACT ON HISTORIC AND ARCHAEOLOGICAL RESOURCES
12. Will Proposed Action impact any site or structure of historic, prehistoric or paleontologica) importance?
0NO
DYES
Examples that would apply to column 2
• Proposed Action occurring wholly or partially within or substantially
contiguous to an\ facility or site listed on the State or National Register
of historic places.
• Any impact to an archaeological site or fossil bed located within the
project site.
• Proposed Action will occur in an area designated as sensitive for
archaeological sites on the NYS Site inventory.
• Other impacts.

IMPACT ON OPEN SPACE A N D RECREATION
Will Proposed Action affect the quantity or quality of existing or
future open spaces or recreational opportunities?
Examples that would apj?ly to column 2
^$NQ
DYES
• The permanent foreclosure of a future recreationTTopponunrty.*"
• A major reduction of an open space important to the community
• Other impacts:
.

1

2

Small to
Moderate
Impact

Potential
Large
Impact.

D

D

DYes

DNo

D

D

DYes

CNO

D

D

DYes

DNo

D

D

DYes

DNo

D

D

DYes

DNo

D

D

DYes

DNo

D

D

DYes

DNo

D

D

DYes

DNo

D

D

DYes

DNo

D

D

DYes

Dsv»

D

D

DYes

DNo

D

D

DYes

DNo.

D
D D '

D
D
D

DYes
DYes
DYes

DNo
DNo
' DNo

Can Impact Be
Mitigated By
Project Change

13

�1
Small l o
Moderate
Impact

2
Potential
Large
Impact

D
D
D

D
D
D

DYes

DN©

DYes

DNO

D

D

DYes

DNo

• Proposed Action will require the creation or extension of an energy
transmission or supply system to serve more than 50 single or two family
residences or to serve a major commercial or industrial use.

D

D

DYes

DNo

• Other impacts:

D

"D

DYes

DNo

• Blasting within 1,500 feet of a hospital, school or other sensitive
facility.

D

D

DYes

DN(

• Odors will occur routinely (more than one hour per day).

D
D

D
D

DYes
DYes

DNO

• Proposed Action will remove natural barriers that would act as a
noise screen.

D

D

DYes

DNO

• Other

D

D

DYes

DNO

D

D

EZlYes . ' D N o

a.

D

DYes

DNo

D

D

DYes

DNo

D

D

DYes DNO

D

DYes

IMPACT ON TRANSPORTATION
14. W i l l there be an effect to existing transportation systems*
Ek'O
Example* that would apply to column 2

CY.ES

• Alteration of present patterns of movement of people and/or goods.
• Proposed Action will result in major traffic problems.
• Other impacts: __

Can Impact Be
Mitigated By
Project Change

DYes

D N O

IMPACT O N ENERGY
15. W i l l proposed action affect the community's sources of fuel or
energy supply?
0NO
DYES
Examples that would apply to column 2
• Proposed Action will cause a greater than 5% increase in the use of
any form of energy in the municipality.

NOISE AND ODOR IMPACTS
16. W i l l there be objectionable odors, noise, or vibration as a result
of the Proposed Action?
,0NO
DYES
Examples that would apply to column 2

• Proposed Action will produce operating noise exceeding the local
ambient noise levels for noise outside o f structures.

impacts:

.

DNo

IMPACT ON PUBLIC HEALTH
17. W i l l Proposed Action affect public health and safety?
jSbJO
Examples that would apply to column 2

.DYES

• Proposed Action may cause a risk o f explosion or release of hazardous
subsfances (i.e. oil, pesticides, chemicals, radiation, etc.) in the event of
• accident or upset conditions, or there may be a chronic low level
discharge or emission.
• Proposed Action may result in the burial of "hazardous wastes" in any
f o r m (i.e. toxic, poisonous, highly reactive; radioactive, irritating,
infectious**etc.)
"""' .".""" .'"" '."' . . . " . * .
• Storage facilities for one million or more gallons of liquified natural
gas or other flammable liquids.
• Proposed action may result in the excavation or other disturbance
w i t h i n 2.000 feet of a site used for the disposal of solid or hazardous
waste. "
• Other impacts: ^

'.
10

DNo

�IMPACT ON GROWTH AND CHARACTER
OF COMMUNITY OR NEIGHBORHOOD
18 . Will proposed action affect the character of the existing communis ?
#*0
DYES
Examples that would apply to column 2

1

2

3

Small to
Moderate
Impact

Potential
Large
Impact-

Can Impact Be
Mitigated By
Project Change

• The permanent population of the city, town or village in which the
project is located is likely to grow by more than 5%.
• The municipal budget for capital expenditures or operating services
will increase by more than 5% per year as a result of this project.
• Proposed action will conflict with officially adopted plans or goals.
• Proposed action will cause a change in the density of land use.
• Proposed Action will replace or eliminate existing facilities, structures
or areas of historic importance to the community.
• Development will create a demand for additional community services
(e.g. schools, police and fire, etc.)
• Proposed Action will set an important precedent for future project.
• Proposed Action will create or eliminate employment.
• Other impacts:

n
L_&gt;

D

DYes

DNo

G

D

GYes

DNO

D
D
D

D
D
D

DYes
DYes
DYes

DNo
DNo
DNo

D

D

DYes

DNo

D
D

D
D
D

DYes
DYes
DYes

DNo
DNo
DNo

D

19. Is there, or is there likely to be. public controversy related to
potential adverse environmental impacts?
xSSiO
DYES

If Any Action In Part 2 Is Identified as a Potential Large Impact or
If You Cannot Determine the Magnitude of Impact, Prnceed to Part 3

Part 3-EVALUATION OF THE IMPORTANCE OF IMPACTS
Responsibility of Lead Agency
Part 3 must be prepared if one or more impact(s) is considered to be potentially large, even if the impact(s) may be
mitigated.
Instructions
Discuss the following tor e2ch impact identified in Column 2 of Pan 2.
1. Briefly describe the impact.
2. Describe (if applicable) how the impact could be mitigated or reduced to a small to moderate impact by project changes).
3 . Based on the information available, decide if it is reasonable to conclude that this impact is important.
To answer the question of importance, consider:
• The probability of the impact occurring
• The duration of the impact
• Its irreversibility, including permanently lost resources of value
• Whether the impact can or will be controlled
. ..
. . . . _ _
• The regional consequence of the impact
• Its potential divergence from local needs and goals
• Whether known objections to the project relate to this impact.
(Continue on attachments) -

11

�F R E D E R I C K P. CLARK A S S O C I A T E S , I N C .
Planning/Development/Environment/Transportation
Rye, New York and Southport, Connecticut

David J. Portman, A,CP
Howard I. Reynolds, PE
David H. Stolman, AICP

350 Theodore Fremd Avenue
Rye, New York 10580
(914) 967-6540

Michael A. Galante
Joanne P. Meder, AICP
Jim Donovan, RLA, ASLA

MEMORANDUM
To:

Village of North Tarrytown Planning Board

Date:

October 14, 1994

Subject:

Bick Preliminary Subdivision Application

As we have received a copy of the application for preliminary
subdivision approval but have not received a plan, we do not have
any substantial comments to offer at this time. If the plan is
submitted in advance of the November meeting (a minimum of 10 days
before the meeting is required in the Subdivision Regulations), we
will review it for that meeting.
Susan J. Portman, AICP, Associate/Planning
cc:

Sean Treacy, Mayor
Linda E. David, Village Administrator
Janet A. Gandolfo, Esq., Village Attorney
James T. Margotta, Building inspector
Mark DiGennaro, Village Engineer
John Hughes, Esq.
James and Martha Bick

Connecticut • (203) 255-3100

FAX • (914) 967-6615

Long Island • (516) 364-4544

�/)

Approved ^ith respect to substance and form:

h Li./

Village /Attorney

Approved by the/PTaVining Board

Filed with Village Clerk

Clerk or Deputy Clerk
Dated:

Oct.
£d
}\??y
Date of Meeting

�</text>
                  </elementText>
                </elementTextContainer>
              </element>
            </elementContainer>
          </elementSet>
        </elementSetContainer>
      </file>
    </fileContainer>
    <collection collectionId="135">
      <elementSetContainer>
        <elementSet elementSetId="1">
          <name>Dublin Core</name>
          <description>The Dublin Core metadata element set is common to all Omeka records, including items, files, and collections. For more information see, http://dublincore.org/documents/dces/.</description>
          <elementContainer>
            <element elementId="50">
              <name>Title</name>
              <description>A name given to the resource</description>
              <elementTextContainer>
                <elementText elementTextId="14838">
                  <text>Planning Board Minutes &amp; Resolutions-1994</text>
                </elementText>
              </elementTextContainer>
            </element>
          </elementContainer>
        </elementSet>
      </elementSetContainer>
    </collection>
    <itemType itemTypeId="1">
      <name>Text</name>
      <description>A resource consisting primarily of words for reading. Examples include books, letters, dissertations, poems, newspapers, articles, archives of mailing lists. Note that facsimiles or images of texts are still of the genre Text.</description>
    </itemType>
    <elementSetContainer>
      <elementSet elementSetId="1">
        <name>Dublin Core</name>
        <description>The Dublin Core metadata element set is common to all Omeka records, including items, files, and collections. For more information see, http://dublincore.org/documents/dces/.</description>
        <elementContainer>
          <element elementId="50">
            <name>Title</name>
            <description>A name given to the resource</description>
            <elementTextContainer>
              <elementText elementTextId="14201">
                <text>MINS_PLAN_1994-11-17</text>
              </elementText>
            </elementTextContainer>
          </element>
          <element elementId="49">
            <name>Subject</name>
            <description>The topic of the resource</description>
            <elementTextContainer>
              <elementText elementTextId="14202">
                <text>Planning Board Minutes &amp; Resolutions-1994</text>
              </elementText>
            </elementTextContainer>
          </element>
          <element elementId="40">
            <name>Date</name>
            <description>A point or period of time associated with an event in the lifecycle of the resource</description>
            <elementTextContainer>
              <elementText elementTextId="14203">
                <text>1994</text>
              </elementText>
            </elementTextContainer>
          </element>
        </elementContainer>
      </elementSet>
    </elementSetContainer>
  </item>
  <item itemId="2336" public="1" featured="0">
    <fileContainer>
      <file fileId="2336">
        <src>https://sleepyhollow.localarchives.org/files/original/7ebbfb52bb0bedbaca7ff70def81e74c.pdf</src>
        <authentication>ff8edd92c42c73479b14006e673a4c33</authentication>
        <elementSetContainer>
          <elementSet elementSetId="4">
            <name>PDF Text</name>
            <description/>
            <elementContainer>
              <element elementId="52">
                <name>Text</name>
                <description/>
                <elementTextContainer>
                  <elementText elementTextId="20823">
                    <text>v.
REGULAR

NORTH TARRYTOWN, NEW YORKMARCH 17th, 1994

MEETING

A regular meeting of the North Tarrytown Planning
Board was held on March 17th, 199A at 8:00 P.M. in the
Village Hall, 28 Beekman A v e n u e , North Tarrytown, New York.
PRESENT:

George
Steve
Donald
Roman
Edward

Hritz, Chairman
Salman
Caetano
Windas
McCarthy

ABSENT:

Ellen
James

Tsangaris
Donovan

ALSO PRESENT:

Janet Gandolfo, Attorney
Susan Portman, Clark Associates
Joe Gulino, CAMCE
James Margotta, Building Inspector

Chairman Hritz called
1.

the meeting

to order at 8:00

John &amp; Maureen Petry, Amos Street-Preliminary
Sub-Division-One family residence.

P.M

Hearing-

Mr. &amp; M r s . Petry outlined the sub-division they were
seeking in order to construct a one-family residence. M r s .
Petry stated that the new residence would i";ui Anos Street
and the present house would share a common driveway with the
new house .

Mr. Margotta stated there was sufficient
separate driveway for the new residence.

would

land

for a

Chairman Hritz asked if there was anyone present
like to address the Board on the matter.

who

M s . Portman submitted memo reviewing the sub-division
with several comments regarding size of the lots, zoning
requirements and environmental review.
(Copy in official
minutes ) .
Joe Gulino, Engineer stated he does not foresee a
problem but questioned the placement of dry wells on the
property.
Mr. Petry stated plans called
water coming off the roof of proposed

for a dry well to catch
residence.

�-2Arthur Brady, Attorney for the Estate of Anna DeCarlo
stated he would be appearing before the Zoning Board for
several variances that may be required for the present residence.
He also stated that M r s . DeCarlo was Mr. Petry's grandmother.
Discussion followed regarding proposed curb cuts
the present residence when the garage is eliminated.

for

M s . Portman
stated that the plans should show the
location of parking for Lot I and indicate where parking
will be for Lot I I , after sub-division is granted.
Mr. Caetano moved, seconded by Mr. McCarthy
Public Hearing be scheduled for the April meeting.

that a
Carried.

Mr. Caetano moved, seconded by Mr. McCarthy that the
Planning Board be declared the Lead Agency for this action.
Carried.
After a discussion M r . Caetano moved, seconded by M r .
McCarthy that this is an Unlisted Action and the Board herewith
makes a negative declaration finding of non-significance of
environmental impact.
Carried.
Mr. Salman moved, seconded by Mr. Windas that
conditional approval be granted for the sub-division as
requested.
Carried.
2.

Ge r aid Bregman , 185 V a 1 1 i ;•- Stft-i i-Continua tier .

Mr. Hritz asked if there was anyone present who would
like to address the Board.
Mr. Samares asked if the owners of 185 Valley Street
have appeared before the Zoning Board and have Final Site
Plans been approved by the Board.
Mr. Margotta stated that Preliminary Site Plan is
before the Board and the Resolution for Approval of Site
Plan is before the Board for their consideration.
Chairman Hritz read the Resolution for Site
Approval and asked for comments of the Board.
Discussion followed regarding Item 3 on Page
inspection by a Structural Engineer.

Plan

3 regarding

Mr. Margotta stated that a Building Permit would not
be issued until certified drawings were received signed by
a Structural Engineer.
Mr. Salman moved, seconded by M r . Caetano that the
resolution granting Site Plan Approval for construction of
mixed use building be approved as submitted. Carried.
(Copy
in official m i n u t e s ) .

�-3Chairman Hritz read Resolution adopted at the
October 21st, 1993 meeting of the Village of North Tarrytow
wn
Planning Board granting Site Plan approval and sub-division
approval for 2-Lot sub-division and construction of threefamily residence in 2 1/2 story building at the northwest
corner of Depeyster Street and Washington Street t submitted
by Mr. Ruivo.
Discussion followed regarding the meeting to be held
in April. The tentative date was set for April 28th, 1994.
There being no further business to come before the
Board, Mr. Salman moved, seconded by Mr. Caetano that the
same be duly adjourned. Carried.
Respectfully submitted,
—CJ~

Irene Amato
Acting Clerk

�10 February 1994

To:
from:

Planning Board
James T. Margotta

There will be no scheduled meeting of the Planning Board on
February 17, 1994.

4

�Approved with respect to substance and form:

Village Attorney
Dated:

the Planning Board

hairmafi

Filed with Village Clerk

-Clerk—or Deputy Clerk

Dated:

pjfy

J
Date5 of Meeting

'

'

�</text>
                  </elementText>
                </elementTextContainer>
              </element>
            </elementContainer>
          </elementSet>
        </elementSetContainer>
      </file>
    </fileContainer>
    <collection collectionId="135">
      <elementSetContainer>
        <elementSet elementSetId="1">
          <name>Dublin Core</name>
          <description>The Dublin Core metadata element set is common to all Omeka records, including items, files, and collections. For more information see, http://dublincore.org/documents/dces/.</description>
          <elementContainer>
            <element elementId="50">
              <name>Title</name>
              <description>A name given to the resource</description>
              <elementTextContainer>
                <elementText elementTextId="14838">
                  <text>Planning Board Minutes &amp; Resolutions-1994</text>
                </elementText>
              </elementTextContainer>
            </element>
          </elementContainer>
        </elementSet>
      </elementSetContainer>
    </collection>
    <itemType itemTypeId="1">
      <name>Text</name>
      <description>A resource consisting primarily of words for reading. Examples include books, letters, dissertations, poems, newspapers, articles, archives of mailing lists. Note that facsimiles or images of texts are still of the genre Text.</description>
    </itemType>
    <elementSetContainer>
      <elementSet elementSetId="1">
        <name>Dublin Core</name>
        <description>The Dublin Core metadata element set is common to all Omeka records, including items, files, and collections. For more information see, http://dublincore.org/documents/dces/.</description>
        <elementContainer>
          <element elementId="50">
            <name>Title</name>
            <description>A name given to the resource</description>
            <elementTextContainer>
              <elementText elementTextId="14197">
                <text>MINS_PLAN_1994-03-17</text>
              </elementText>
            </elementTextContainer>
          </element>
          <element elementId="49">
            <name>Subject</name>
            <description>The topic of the resource</description>
            <elementTextContainer>
              <elementText elementTextId="14198">
                <text>Planning Board Minutes &amp; Resolutions-1994</text>
              </elementText>
            </elementTextContainer>
          </element>
          <element elementId="40">
            <name>Date</name>
            <description>A point or period of time associated with an event in the lifecycle of the resource</description>
            <elementTextContainer>
              <elementText elementTextId="14199">
                <text>1994</text>
              </elementText>
            </elementTextContainer>
          </element>
        </elementContainer>
      </elementSet>
    </elementSetContainer>
  </item>
  <item itemId="2335" public="1" featured="0">
    <fileContainer>
      <file fileId="2335">
        <src>https://sleepyhollow.localarchives.org/files/original/328f82da38226151975a0b7a16a62469.pdf</src>
        <authentication>35136c0e8491630ac5723d72cb34455f</authentication>
        <elementSetContainer>
          <elementSet elementSetId="4">
            <name>PDF Text</name>
            <description/>
            <elementContainer>
              <element elementId="52">
                <name>Text</name>
                <description/>
                <elementTextContainer>
                  <elementText elementTextId="20822">
                    <text>REGULAR MEETING

NORTH TARRYTOWN, NEW YORK
APRIL 28th, 1994

A regular meeting of the North Tarrytown Planning Board
was held on April 28th, 1994 at 8:00 P.M. in the Village Hall,
28 Beekman Avenue, North Tarrytown, New York.
PRESENT:

George Hritz, Chairman
Donald Caetano
Ellen Tsangaris
James Donovan
David Perlmutter

ABSENT:

Steve Salman
Edward McCarthy

ALSO PRESENT:

Janet Gandolfo, Attorney
Barnes Margotta, Building Inspector
Joe Gulino, CAMCE
Tom Gissen, Clark Assoc.

Mr. Hritz called the meeting to order at 8:00 P.M.
and thanked outgoing Board member, Ray Windas whose term has
expired.and stated that he will be missed. He welcomed Mr.
David Perlmutter, a resident of the Village for many years.
1.

Rock of Salvation, Cortlandt Street-Continuation.

Ron Turnquist, Architect for the Project addressed
and the Board and presented drawings for the Board to review.
Mr. Turnquist described the building as it now is and outlined
the proposed projects. He stated the building would be completed
in stages with the first stage to be the completion of a Sanctuary
with a capacity of 300 people. He also stated that eventually
meeting rooms, day care center and kitchen would be added.
Ms. Gandolfo stated that the Union Hose Fire House,
which is adjacent to the proposed project is concerned about
the increased flow of traffic and would like to review the plans
before the Public Hearing.
After a discussion regarding the Day Care Center,
Rev. San Diego stated that application will be made to the
State and they will determine the number of children and the
size of the center.
Mr. Gissen stated that a Full Environmental Assessment
Form will have to be submitted for their review.
Mr. Gulino, Engineer for the Village stated he has
reviewed the proposed site plan dated December 6th, 1993 and
offerred several comments in a memo dated April 28th, 1994.
(Copy in Official Minutes).

�-2Mr. Hritz suggested that the Architect submit site
plan to the Police and Fire Departments for their comments.
Mr. Caetano moved, seconded by Mr. Donovan that a
Public Hearing be set for the meeting to be held on May 19th,
1994. Carried.
2.

Petry Subdivision, Amos Street-Two Lots.

Mr. Hritz read the notice of Public Hearing for the
application of John and Maureen Petry seeking a subdivision for
a parcel of land located at 41 Amos Street, North Tarrytown, N.Y.
The applicants are proposing to subdivide the property into two
lots. Lot one would be 6,567.4 square feet in size and lot two
would be 6,013.4 square feet in size.
Mr. Hritz asked if there was anyone present who would
like to address the Board.
Mrs. Petry stated she had submitted a revised plot
plan to show present house, driveway and the garage that will
be torn down. It is their intention to create another lot,
and to erect a new house on the new lot.
Glen Weeks, 174 Webber Avenue stated he would like
to be able to review the Site Plan as submitted and asked
several questions regarding drainage, asbestos on the old
garage and the removal of same, erosion and stated he would
like assurances from the owners and the village that his
property would be protected during construction.
Mr. Hritz stated that the Building Inspector would
inspect and make sure that necessary precautions were taken
to protect his property.
Mr. Gulino stated he has reviewed the subdivision plan
dated April 7, 1994 and offered several comments regarding
drainage and water and sewer locations. (Copy in official minutes)
Mr. Gissen stated he has reviewed the subdivision plans
dated April 7th, 1994 and offered several comments regarding
parking and curb cut on Webber Avenue. (Copy of memo in offical
minutes) .
Mr. Weeks asked for further information regarding the
size of the proposed house and its location on the new lot.
Mr. Hritz stated that the Zoning Board will be meeting
on the matter at their May meeting and the couples should meet
to discuss the matter before then. He stated the Planning Board
would meeting after the Zoning Board meeting and would review
the matter.
Discussion followed regarding the retaining wall
and the Building Inspector stated it was in poor condition and
will have to be repaired or replaced.

�After a discussion, Mr. Perlmutter moved, seconded
by Ms. Tsangaris that the matter be adjourned to the May
meeting. Carried.
3.

Viscogliosi-176-178 North Washington Street.-Subdivision»

Mr. John Hughes, Attorney stated that the property
at 176 North Washington Street was a 4-family residence and ,
the 178 North Washington Street was a 1-family residence. He
stated it was the intent of his client to sub-divide the property
and sell one or both buildings. He stated the four family
residence has been there many years and the one family residence
was built in the 1950's. Mr. Hughes stated he would submit
a survey and an EAF for the Board to review.
Mr. Gissen stated they have reviewed the application
and stated the Zoning Board of Appeals has granted the necessary
variances and submitted a memo with their comments. (Memo in
official minutes). CAMCE memo in official minutes.
Ms. Tsangaris moved, seconded by Mr. Perlmutter to
declare the Planning Board the Lead Agency. Carried.
Mr. Caetano moved, seconded by Mr. Perlmutter that
a Public Hearing be held at the May 19th meeting to discuss
the matter. Carried.
4.

Phelps Memorial Hospital Office Building Discussion.

Mr. Gulino reported CAMCE had received a letter
from Phelps Memorial Hospital stated they have negotiated
the reduction of flow from the IBM forced main at their
World Trade Center Pump Station. (Copy in official minutes).
Discussion followed regarding the six foot fence to
be installed. Mr. Hritz stated the hospital would like the
fees waived and the matter was referred to the Village Board.
Discussion followed regarding variances that would
be needed to erect a six-foot fence. Also discussed was the
significant number of fees that the Hospital has not paid.
There being no further business to come before the
meeting Mr. Caetano moved, seconded by Ms. Tsangaris that the
same be duly adjourned. Carried.
ctfully submitted
submitted
ne Amato
ing Clerk

/j

\

�s
C H A R L E S
A . M A N G A N A R O
C O N S U L T I N G
E N G I N E E R S

MEMORANDUM
TO:

Village of North Tarrytown Planning Board

FROM:

Mr. Joseph A. Gulino, P.E.
Project Engineer

DATE:

April 28, 1994

RE:

DeCarip/PetQLSubdivision on Amos Street
Village of North Tarrytown, New York
CAMCE No. 800-22

As requested, we have reviewed the latest revised subdivision plan dated April 7, 1994
by John J. Muldoon, L.S. and offer the following comments or recommendations.

Court Pla^a North. 25 Main Street

A)

A storm drainage design for the house and driveway should be submitted for
review consisting of a dry well and piping. This will require a percolation test
signed and sealed by a New York State licensed engineer.

B)

The house connections sizes for water and sewer and location should be shown
on the drawing. The 4-inch water line should be replaced with a minimum of
6-inch pipeline, preferably an 8-inch pipeline as per the "Ten States Standards"
for water supply.

C)

A fire flow test should be performed to ascertain fire flow capacities for this
area.

Once the above information is submitted, final recommendations will be made to the
Board. If you should have any questions, please let us know.

Hackensack, NJ 07601-7032
201 342 4200 lax 201 342.0790

JAG/jr

120E 75thSI.Suite8C
New York. NY10O21
212 683 7712
PO Box io07
East Stroudsburg. PA 18301
717 421 1499

cc:

Ms. Linda David, Village Administrator
Janet A. Gandolfo, Esq., Village Attorney
Mr. James T. Margotta, Building Inspector
Ms. Susan J. Portman, Associate, Frederick P. Clark Associates
Mr. and Mrs. John Petry, Owner

VNT\800-22\JG042H4M.JR I

�FREDERICK P. CLARK ASSOCIATES, INC.
Planning/Development/Environment/Transportation
Rye, New York and Southport, Connecticut

David J. Portman, A,CP
Howard I. Reynolds, PE
David H. Stolman, AICP

350 Theodore Fremd Avenue
Rye, New York 10580
(914) 967-6540

Michael A. Galante
Joanne P. Meder, AICP
Jim Donovan, RLA. ASLA

MEMORANDUM
To:

Village of North Tarrytown Planning Board

Date:

April 22, 1994

Subject:

Review of Petrv/DeCarlo Subdivision

As requested, we have reviewed the subdivision application
submitted by John and Maureen Petry, as contract vendee, for a
property which is approximately 0.29 acres in size, located at 41
Amos Street on the western side of Amos Street and the eastern side
of Webber Avenue in the R-3 Residence District.
The site (a
"through lot") presently contains a two-story dwelling and a
detached garage with a short macadam driveway off of Amos Street.
The Applicants are proposing to subdivide the property into two
lots. Lot 1 would be 6,554.4 square feet in size and would contain
the existing dwelling. Lot 2 would be 5,999.7 square feet and
would contain the existing garage. The Plan shows that the garage
would be removed from Lot 2 and a new macadam driveway is proposed
to be constructed off of Webber Avenue to serve Lot 1.
The Applicants have submitted the following plan:
"Subdivision of Lands of the Estate of Anna DeCarlo Situate at
North Tarrytown, Town of Mount Pleasant, Westchester County,
N.Y.," scale 1" = 2 0 ' , dated April 7, 1994, prepared by John
J. Muldoon, Professional Land Surveyor.
REVIEW COMMENTS
1.

Application Status:
The Planning Board made a negative
declaration regarding the potential environmental impacts of
this subdivision and approved the preliminary subdivision at
the meeting in March. We distributed the draft resolution of
preliminary subdivision approval by mail on April 1, 1994.

2.

Subdivision Regulation Compliance:
The recent submission
generally complies with the requirements of information to be
supplied for a final subdivision plan.

3

Parking: The issue of the provision of parking for Lot 1 has
been resolved with the location of a proposed 12 ' wide macadam
driveway off of Webber Avenue.
Since Webber Avenue is a

-

Connecticut • (203) 255-3100

FAX • (914) 967-6615

Long Island • (516) 364-4544

�FREDERICK P. CLARK ASSOCIATES, INC.
Planning/Development/Environment/Transportation

County road, approval of a curb-cut along Webber Avenue will
be subject to the Westchester County Department of Public
Works. Additional comments were provided by the Department of
Public Works in the March 30, 1994 letter from the Westchester
County Planning Board to James T. Margotta.
4.

Dedication: The Applicants' plan indicates that Webber Avenue
is 49.5 feet in width. In compliance with Section 12B(2)(b)
of the Village Subdivision Regulations, a strip of land 0.25
feet in width has been shown on the plan for dedication along
Webber Avenue on both lots.
Susan J. Portman, AICP
Associate/Planning

cc:

Linda David, Village Administrator
Janet A. Gandolfo, Esq., Village Attorney
James T. Margotta, Building Inspector
Joseph A. Gulino, PE, Village Engineer
John and Maureen Petry
John J. Muldoon

500\notA-005.sjp

2

�V
x

617.21
Appendix A
State Environmental Quality Review
FULL ENVIRONMENTAL ASSESSMENT FORM

SEQR

t

: The full EAF is designed to help applicants and agencies determine, in an orderly manner, whether a project
n may be significant. The question of whether an action may be significant is not always easy to answer. Frequenti are aspects of a project that are subjective or unmeasureable. It is also understood that those who determine
inificance may have little or no formal knowledge of the environment or may be technically expert in environmental
aalysis In addition, many who have knowledge in one particular area may not be aware of the broader concerns affecting
* question of significance
The full EAF is intended to provide a method whereby applicants and agencies can be assured that the determination
•ocess has been orderly, comprehensive in nature, yet flexible to allow introduction of information to fit a project or action.
«fl EAF Components: The full EAF is comprised of three parts:
Part 1: Provides objective data and information about a given project and its site. By identifying basic project
data, it assists a reviewer in the analysis that takes place in Parts 2 and 3.
Part 2: Focuses on identifying the range of possible impacts that may occur from a project or action. It provides
guidance as to whether an impact is likely to be considered small to moderate or whether it is a potentiallylarge impact. The form also identifies whether an impact can be mitigated or reduced.
Part 3: If any impact in Part 2 is identified as potentially-large, then Part 3 is used to evaluate whether or not the
impact is actually important.

DETERMINATION OF SIGNIFICANCE-Type 1 and Unlisted Actions
Identify the Portions of EAF completed for this project:

IS

Part 1

B

Part 2

QPart 3

Upon review of the information recorded on this EAF (Parts 1 and 2 and 3 if appropriate), and any other supporting
nation, and considering both the magitude and importance of each impact, it is reasonably determined by the
agency that:
•
"B A. The project will not result in any large and important impacts) and, therefore, is one which will not
have a significant impact on the environment, therefore a negative declaration will be prepared. D

B. Although the project could have a significant effect on the environment, there will not be a significant
effect for this Unlisted Action because the mitigation measures described in PART 3 have been required,
therefore a CONDITIONED negative declaration will be prepared.*

0

C. The project may result in one or more large and important impacts that may have a significant impact
on the environment, therefore a positive declaration will be prepared.
* A Conditioned Negative Declaration is only valid for Unlisted Actions

M a t t e r of V l s c o g l i o s l ~T\MQ LOt
Name of Action

J*ubd«^»^ioA

P l a n n i n g Board - V i l l a g e of North Tarrytown
Name oi Lead Agency .

f ResponsibleOfficuJriUaidAgency

tfeof
' Title
of Responsible Officer

iature of Responsible Officer in LeadXgepcy
Signature of Preparer (If different from responsible officer)
'
JOHN J. HUGHES, JR.
May 16, 1994
Date

�i Ap

PART 1—PROJECT INFORMATION
Prepared by Project Sponsor

fc

NOTICE: This document is designed to assist in determining whether the action proposed may have a significantd RRe
(
o n the environment. Please complete the entire form, Parts A through E. Answers to these questions will be conui
^as part of the application for approval and may be subject to further verification and public review. Provide any addrtf Is
Information you believe will be needed to complete Parts 2 and 3
i Wl
It is expected that completion of the full EAF w i l l be dependent on information currently available and will notiml
new studies, research or investigation. If information requiring such additional work is unavailable, so indicate andsp ' ' $
each instance.
IQ Q
11 D

NAME OF ACTION

Matter of V l s c o g l i o s i Tuud lo-f- i u b c W t ^ C M
LOCATION OF ACTION (Include Strefll Address, Municipality and County)
1 7 6 - 1 7 8 North Washington S t r e e t , North Tarrytown, W e s t c h e s t e r

County

NAME OF APPLICANT/SPONSOR
Marcello Visjpogliosi

12 Ai

BUSINESS TELEPHONE

( 9 1 4 ) 631-8855

AOORESS

c / o J . Hughes, J r . , Esq.

49 Beekman Avenue

CTTY/FO

STATE

North Tarrytown, NY

ZIP CODE

10591

NY

NAME OF OWNER (If different)

14

BUSINESS TELEPHONE

same as owner

(

•)

:„„
C

N/A

AOORESS

15 St:

N/A
crrv/po
N/A

STATE

ZIP CO0E

N/A

N/A
16 La

DESCRIPTION OF ACTION

Subdivision - 2 lots

17 Is
a)
b)
18 Is
Se

Please Complete Each Question—Indicate N.A. if not applicable

A. Site Description
Physical setting of overall project, both developed and undeveloped areas.
1. Present land use:
OUrban
DIndustrial
•Commercial
CSResidential (suburban)
DForest

OAgriculture

2. T o t a l acreage of project area:

\ ^

0&gt;\5

19 Is
of
• R u r a l (non-ft 20 Ha

-DOther
acres.
PRESENTLY

AFTER COMPLETION

arres

arm

Forested

acres

arm

Agricultural (Includes orchards, cropland, pasture, etc

acre*

arm

W e t l a n d (Freshwater or tidal as per Articles 24, 25 of ECL))

acres

arm

W a t e r Surface Area

acres

acre?

Unvegetated (Rock, earth or fill)

acres

APPROXIMATE ACREAGE
M e a d o w or Brushland (Non-agricultural)

Roads, buildings and other paved surfaces\A\nAS£apiA&lt;i(A.C)2.J
J
Other (Indicate type! R e s i d e n t i a l
3. W h a t is predominant soil type(s) on project site?

0« l i s
-J**

U rlo&amp;n IflrtrJ - f" htor\-ton

• •

B. Pr
Phys
a.
b
c.
d

*cr«*

acres
acres

; &amp;

acre

(bw\(ikA

a. Soil drainage:

B W e l l drained
100
% of site
DModerately well drained
% of site
• Poorly drained
% of site
If any agricultural land is involved, how many acres of soil are classified within soil group 1 through 4 of theN
Land Classification System'
acres (See 1 NYCRR 370) N/A

4. A r c there bedrock outcroppings on project site?
a. W h a t is depth to bedrock' A p p r o x . 1 0 - 1 5

r

*r

DYes
(in

(£;No
feet)

In
V
i. 1
I I

�slopes.

#0-16%
D15%

/oft

or greater

_ %

!s project substantially contiguous to. or contain a building, site, or district, listed on the State or the National
icant effec Registers of Historic Places?
DYes
2lNo
consider
DYes
IS No
addition Is project substantially contiguous to a site listed on the Register of National Natural Landmarks?
What is the depth of the water tahlp?APP.10- {in feet)
otHBfoto
DYes
QNo
a n d specif Is site located over a primary, principal, or sole source aquifer?
i Do hunting, fishing or shell fishing opportunities presently exist in the project area?

DYes

CSNo

Does project site contain any species of plant or animal life that is identified as threatened or endangered?
DYes
BNo
According to
Identify each species
Are there any unique or unusual land forms on the project site? (i.e., cliffs, dunes, other geological formations)
DYes
®No
Describe
:

20DE

) Is the project site presently used by the community or neighborhood as an open space or recreation area?
DYes
©No
If yes, explain _ ^ _ &gt; _ _ _ _ _ _ _ _ _ — _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ » _ _ _ _
4 Does the present site include scenic views known to be important to the community?
DYes
®No

:OOE

5 Streams within o r contiguous t o project area:
None
a. N a m e o f Stream a n d name of River to which it is tributary
I Lakes, ponds, w e t l a n d areas within or contiguous t o project area:
a. N a m e None

N/A

b. Size (In acres)

N/A

7 Is the site served by existing public utilities?
OYes
DNo
a) If Yes, does sufficient capacity exist to allow connection?
DYes
DNo
b) If Yes, w i l l improvements be necessary to allow connection?
S9Yes
DNo
I Is the site located in a n agricultural district certified pursuant t o Agriculture a n d M a r k e t s Law, Article 25-AA,
Section 303 and 304?
DYes
K)No
' Is the site located in or substantially contiguous to a Critical Environmental Area designated pursuant to Article 8
of the ECL, and 6 NYCRR 617?
@Yes
DNo
( n o n - f a n * Has the site ever been used for the disposal o f solid or hazardous wastes?

LETION

DYes

CSNo

(J, Project Description
Physical dimensions and scale of project (fill in dimensions as appropriate)
a. Total contiguous acreage owned or controlled b y project sponsor
b. Project acreage to be developed:
']^ 0*\* acres initially;
y ^ O ' * ^
u
c.'-Project acreage to remain undeveloped
acres.

acres ultimately.
acn

d. Length of project, in miles: N/A

(If appropriate)
e. If the project is an expansion, indicate percent o f expansion proposed
f. Number of off-street parking spaces existing
-frMaxmium-wmetHai^rips^enerated -per hopr —

6
N

," ^

h. If residential: Number and tyt&amp;of housing; units;) *&amp;.
One Family
'*•
Two Family
oftl

Initially

*

Ultimately

1

...

%v

6 -fQfo.1

; proposed
(upon completion of 'project)? N^" CM&amp;totf&amp;
Multiple Family
1

Condominium

_

J. Dimensions (in feet) of largest proposed structure

35

height;

20*

j Jffi lehgth.

width

j. Linear feet of frontage along a public thoroughfare project will occupy u?APP iwfabit
3

�2. How much natural material (i.e., rock, earth, etc.) will be removed from the site?
3. Will disturbed areas be reclaimed?

DYes

DNo

N/A

tons/cub

0N/A

a. If yes. for what intend., purpose is the site being reclaimed?
b. Will topsoil be stockpiled for reclamation?

DYes

•

©No

c. Will upper subsoil be stockpiled for reclamation?

DYes

ENo

4. How many acres of vegetation (trees, shrubs, ground covers) will be removed from site? None

ac

5. Will any mature forest (over 100 years old) or other locally-important vegetation be removed by this pre
DYes
0No
6. If single phase project: Anticipated period of construction

N/A

months, (including demolition).

7. If multi-phased:
a. Total number of phases anticipated

N

^A

(number).

b. Anticipated date of commencement phase 1

N

/A

month

N

c. Approximate completion date of final phase

N

A

month

N/A

/

d. Is phase 1 functionally dependent on subsequent phases?
0. Will blasting occur during construction?

DYes

9. Number of jobs generated: during construction
.10. Number of jobs eliminated by this project

/A

DYes

yssr, (including derr
y^.
QNo

EJNo
N/A

; after project is complete . N/A

N/A

11. Will project require relocation of any projects or facilities?

12. Is surface liquid waste disposal involved?

DYes

DYes

0No

(SNo

a. If yes, indicate type of waste (sewage, industrial, etc.) and amount
b. Name of water body into which effluent will be discharged
13. Is subsurface liquid waste disposal involved?

I yes, explain

DYes

N/A

,

N/A

QNo

Type

14. Will surface area of an existing water body increase or decrease by proposal?
Explain
15. Is project or any portion of project located in a 100 year flood plain?
16. Will the project generate solid waste?

DYes

a. If yes, what is the amount per month

DYes

(SNo

C&amp;Nc

03No

N/A

tons

b. If yes, will an existing solid waste facility be used?
c. If yes, give name

OYss

No

a d d i t i o n a l waste

GO Yes

N/A

DNo

; location

N

/A

d. Will any wastes not go into a sewa'ge disposal system or into a sanitary landfill?

LYes

©No

e. If Yes, explain
17. Will the project involve the disposal of solid waste?

DYes

a. If yes, what is the anticipated rate of disposal?
b. If yes, what is the anticipated site life?
18. Will project use herbicides or pesticides?

K)No No a d d i t i o n a l

N/A

N/A

tons/month
years.

DYes

QSNo

1g, Will project routinely produce odors (more than one hour per day)? DYes

KJNo

20. W i l l project produce operating noise exceeding the local ambient noise levels?
2 1 . Will project result in an increase in energy use?
If yes , indicate type(s)

DYes

Total anticipated water usage per day

N/A

N/A

gallons/minute

gallons/day

2 4 Does project involve Local. State or Federal funding?
If Yes. explain

E3No

N/A

22. If water supply is from wells, indicate pumping capacity
23

DYes

DYes

N/A

09No
.

4

ENo

�DYes

ED No

City. Town. Village Planning Board

3Yes
3 Yes

DNo

City. Town Zoning Board

0Yes

DNo

City, County Health Department

DYes

K)No

DYes

EJNo

Other Regional Agencies

DYes

09 No

State Agencies

DYes

©No

federal Agencies

DYes

CSNo

^ City, ^own.. Village Board

her Local Agencies

Subdivision
Variances - already granted

4794_

ion) c. Zoning and Planning Information
I Does proposed action involve a planning or zoning decision?
©Yes
DNo
If Yes. indicate decision required:
Dzoning amendment
Qflzoning variance
Dspecial use permit
Bsubdivision
Dnew/revision of master plan
Dresource management plan
Dother
R

I What is the zoning classification(s)of the site?

"5

Dsite plan

^

) What is the maximum potential development of the site if developed as permitted by the present zoning?
Five (5) r e s i d e n t i a l units fecijfi'yi«t l^/f^YtfOlflHCeTy? TIAJO hor2-FfLwiitu
JfrtffliVgS CClie
i What is the proposed zoning of the site?

R-5

MO Clyanjg,

;

pe.&lt;r , / o 4 Q

5 What is the maximum potential development of the site if developed as permitted by the proposed zoning?
5—s«cidantial units.
/si A
6 Is the proposed action consistenfwith the recommended uses in adopted local land use plans?

ED Yes

DNo

^ What are the predominant land use(s) and zoning classifications within a V* mile radius of proposed action?
Residential - multi-family. Cinq/p-flwihlf CCMMencid | Cfrrfc., 'ft^fK-Hdyttl,
(hAlt&gt;licl$M'P*WC
R . - J , p - t y g - ^ i Prbi C-ht-Z
&lt;-&gt;
r^
'
'
**
'
I Is the proposed action compatible with adjoining/surrounding land uses within a V* mile?
EDYes
DNo
9 If the proposed action is the subdivision of land, how many lots are proposed?
2
a. What is the minimum lot size proposed?

^lcnac ace attached-stag. AffftiX'Z-rfOO

10 Will proposed action require any authorization(s) for the formation of sewer or water districts?

S^-ft
DYes

BNo

11 Will the proposed action create a demand for any community provided services (recreation, education, police,
fire protection)?
DYes
QNo
HA&lt;
a. If yes. is existing capacity sufficient to handle projected demand?

GBYes

DNo

12 Will the proposed action result in the generation of traffic significantly above present levels? A/A DYes
a. If yes. is the existing road network adequate to handle the additional traffic?

EYes

GSNo

DNo

D. Informational Details
Attach any additional information as may be needed to clarify your project If there are or may be any adverse
impacts associated with your proposal, please discuss such impacts and the measures which you propose to mitigate or
avoid them.

j certify that the information provided above is true to the best of my k n ^ ) e c f | e / ^
Applicant/Sponsor
Name
Cant/bponSOr Name
ture ^j/U

,

Marcello
n a r c e x x o Viecogliosi
VXBCUKXXOSX

i&amp;td&amp;1&lt;vfk , k fak**j fc H^i

'"-'

l

h

t

Title .

flats

;

V / ^ v '''•'-'•
5/16/94

9BSJL

action is in the Coastal Area, and you are a state agency, complete the Coastal Assessment Form before proceeding
this assessment.
5

�I c-ii ^ - P R O J E C T I M P A C ' I S A N D I H h i H M A G U i ' i u U L
Responsibility of Lead Agency
General Information (Read Carefully)
' • In completing the form the reviewer should be guided by the question: Have my responses and determinations b*
reasonable? The reviewer is not expected to be an expert environmental analyst.
• Identifying that an impact will be potentially large (column 2) does not mean that it is also necessarily signifies
Any large impact must be evaluated in PART 3 to determine significance. Identifying an impact in column 2 sim:
asks that it be looked at further.
• The Examples provided are to assist the reviewer by showing types of impacts and wherever possible the threshold
magnitude that would trigger a response in column 2. The examples are generally applicable throughout the State?
for most situations. But, for any specific project or site other examples and/or lower thresholds may be appropn&lt;!
for a Potential Large Impact response, thus requiring evaluation in Part 3.
• The impacts of each project, on each site, in each locality, will vary. Therefore, the examples are illustrative i
have been offered as guidance. They do not constitute an exhaustive list of impacts and thresholds to answer each quest-:
• The number of examples per question does not indicate the importance of each question.
• In identifying impacts, consider long term, short term and cumlative effects.
Instructions (Read carefully)
a. Answer each of the 19 questions in PART 2. Answer Yes if there'will be any impact.
b. Maybe answers should be considered as Yes answers.
c. If answering Yes to a question then check the appropriate box (column 1 or 2) to indicate the potential size off
impact. If impact threshold equals or exceeds any example provided, check column 2. If impact will occur but threshc
is lower than example, check column 1.
d. If reviewer has doubt about size of the impact then consider the impact as potentially large and proceed to PARI
e. If a potentially large impact checked in column 2 can be mitigated by changes) in the project to a small to modern
impact, also check the Yes box in column 3. A No response indicates that such a reduction is not possible. V
must be explained in Part 3.

IMPACT ON LAND
1. Will the proposed action result in a physical change to the project site?
G9NO
DYES
Examples that would apply to column 2
• Any construction on slopes of 15% or greater, (15 foot rise per 100
foot of length), or where the general slopes in the project area exceed
10%.
• Construction on land where the depth to the water table is less than
3 feet.
• Construction of paved parking area for 1,000 or more vehicles.
• Construction on land where bedrock is exposed or generally within
3 feet of existing ground surface.
• Construction that will continue for more than 1 year or involve more
than one phase or stage.
• Excavation for mining purposes that would remove more than 1.000
tons of natural material (i.e., rock or soil) per year.
* Construction drlespaniion oi a ^anitaty-Undfilt- J * £ —
• Construction in a'designated floodway."^fS^%:icv:--:";;' ""£:
• Other'impacts •
"r&amp;lStqKr* - "

1

2

Small to
Moderate
Impact

Potential
Large
Impact

D

D

DYes

DNc

•

D

DYes

DNc

n

D
D

DYes

DNc

DYes

DNe

D

DYes

DNc

D
D
D

!

D
GYes

-rQ-

D

Can Impact E;
Mitigated By
Project Chang

•vG-

DNOJ

-G.Yes---{3Nc;

• D
DYes'"GNO

2. Will there be an effect V .iy uiii&lt;|ui&gt; or unusual land forms found on
the site? (i.e., cliffs, dunes, geological formations, etc.)ONO
DYES
•W*A
• Specific land forms: _.

D

—"Ves • GNo

�IMPACT O N WATER
WW proposed action affect any water body designated as protected?
(Under Articles 15. 24, 25 of the Environmental Conservation Law. ECU
KNO
DYES
Examples that would apply to column 2
elopable area of site contains a protected water body.
• Iging more than 100 cubic yards of material from channel of a
protected stream.
• Extension of utility distribution facilities through a protected water body.
1

Can Impact Be
Mitigated By
Project Change

Moderate
Impact

r oieMiai
Large
Impact

D
D

D
D

DYes

DNo

DYes

DNo

D
D
D

D
D
D

DYes

DNo

D

DYes

DNo

DYes

DNo

D

DYes

DNo

D
D

D
D

DYes
DYes

DNO

D
D

D
D

DYes

DNo

DYes

DNo

D

D

DYes

DNO

D

D

DYes

DNO

Proposed Action will adversely affect groundwater.
liquid effluent will be conveyed off the site to facilities which presently
do not exist or have inadequate capacity

D
D

D
D

DYes
DYes

DNO

Proposed Action would use water in excess of 20.000 gallons per
day.

D

D

DYes

DNO

Proposed Action will likely came siltation or other discharge into an
existing body of waier io tue extent that there will be an obvious visual
contrast to natural conditions.

D

D

DYes

DNO

Proposed Action will require the storage of petroleum or chemical
products greater than 1,100 gallons.

D

D

DYes

DNo

'Proposed Action will allow residential uses in areas without water
and/or sewer services.

D

D

DYes

DNo

Proposed Action locates commei_iai and/or industrial uses which may
require new or expansion of existing waste treatment and/or storage
facilities.

D

DYes

DNo

Other

D

QYes

DNo

DYes

DNo

Construction in a designated freshwater or tidal wetland.

•Other impacts:

( Will proposed action affect any non-protected existing or new body
of water?
UNO
DYES
Eiamples that would apply to column 2
• A10% increase or decrease in the surface area of any body of water
or more than a 10 acre increase or decrease.
Construction of a body of water that exceeds 10 acres of surface area.
Other impacts:

i Will Proposed Action affect surface or groundwater
quality or quantity?
QNO
Examples that would apply to column 2

DNO

DYES

Proposed Action will require a discharge permit.
Proposed Action requires use of a sburce of water that does not
have approval to serve proposed (project) action.

«

ed Action requires water supply from wells with greater than 45
s per minute pumping capacity

•Construction or operation causing any contamination ot a water
supply system

impacts:

roposed action alter drainage flow or patterns, or surface
d ^ P runoff?
ENO
DYES
Eiamples that would apply to column 2
Proposed Action would change flood water flows

D

D

DNO

�Small to
Moderate
Impact

2
Potential
Large
Impact

Can Impact Be
Mitigated By
Project Change

D
D
D
D

D
D
D

•

DYes
DYes
DYes
DYes

DNo
DNo
DNo
GNo

D

D

DYes

DNo

• Proposed Action will result in the incineration of more than 1 ton of
refuse per hour.

D

a

DYes

GNo

• Emission rate of total contaminants will exceed 5 lbs. per hour or a
heat source producing more than 10 million BTU's per hour.

D

D

DYes

DNO

• Proposed action will allow an increase in the amount of land committed
to industrial use.

D

a

DYes

GNO

• Proposed action will allow an increase in the density of industrial
development within existing industrial areas.

D

a

DYes

GNO

• Other impacts:

D

a

GYes

GNO

a
a
a
a

a
a
a
a

GYes

GNo

GYes
GYes

GNO

GYes

GNO

a
a

a

GYes

GNO

G

GYes

GNO

a

a

GYes

GNO

'Proposed Action may cause substantial erosion.
* Proposed Action is incompatible with existing drainage patterns.
* Proposed Action will allow development in a designated floodway.
* Other impacts:

IMPACT ON AIR
7. Will proposed action affect air quality?
BNO
DYES
Examples that would apply to column 2
• Proposed Action will induce 1,000 or more vehicle trips in any given
hour.

_,

IMPACT O N PLANTS A N D ANIMALS
8. Will Proposed Action affect any threatened or endangered
species?
El NO
Examples that would apply to column 2
•

DYES

Reduction of one or more species listed on the New York or Federal
list using the site, over or near site or found on the site.

• Removal of any portion of a critical or significant wildlife habitat.
• Application of pesticide or herbicide more than twice a year, other
than for agricultural purposes.
• Other

impacts:

9. Will Proposed Action substantially affect non-threatened or
non-endangered species?
E3NO
Examples that would apply to column 2

GNO

DYES

• Proposed Action would substantially interfere with any resident or
migratory fish, shellfish or wildlife species.
• Proposed Action requires the removal of more than 10 acres
of mature forest (over 100 years of age) or other locally important
vegetation.
I M P A C T O N AGRICULTURAL LAND RESOURCES
LO Will the Proposed Action affect agricultural land resources?
BNO
DYES
Examples that would apply to column 2
• The proposed action would sever, cross or limit access to agricultural
land (includes cropland, hayfields. pasture, vineyard, orchard, etc.)
8

• I

�»

struction activity would excavate or compact the soil profile of
iultural land.

• The proposed action would irreversibly convert more than 10 acres
of agricultural land or, if located in an Agricultutal District, more
than 2.5 acres of agricultural land.
1
The proposed action would disrupt or prevent installation of agricultural
land management systems (e.g.. subsurface drain lines, outlet ditches,
strip cropping); or create a need for such measures (e.g. cause a farm
field t o drain poorly due to increased runoff)
• Other impacts:

IMPACT O N AESTHETIC RESOURCES
11 W i l l proposed action affect aesthetic resources?
BONO
DYES
(If necessary, use the Visual EAF Addendum in Section 617.21,
Appendix B.)
Examples that would apply t o column 2
1
Proposed land uses, or project components obviously different f r o m
or in sharp contrast to current surrounding land use patterns, whether
man-made or natural.
Proposed land uses, or project components visible to users of
aesthetic resources which will eliminate or significantly reduce their
enjoyment of the aesthetic qualities of that resource.
ct components that w i l l result in the elimination or significant
ning of scenic views known to be important to the area
»Other impacts:

»

IMPACT O N HISTORIC A N D A R C H A E O L O G I C A L RESOURCES
12 W i l l Proposed Action impact any site or structure of historic, prehistoric or paleontological importance?
ENO
DYES
Examples that would apply t o column 2
• Proposed Action occurring wholly or partially within or substantially
contiguous to any facility or site listed on the State or National Register
of historic places.
• Any impact to an archaeological site or fossil bed located within the
project site.
&gt; Proposed Action will occur in an area designated as sensitive for
archaeological sites on the NYS Site Inventory
» Other impacts:
_____

IMPACT O N O P E N S P A C E A N D RECREATION
13 Witt Proposed Action affect the quantity or quality of existing or
future open spaces or recreational opportunities?
mples that would apply t o column 2
CD NO
DYES
ermanent foreclosure of a future recreational opportunity,
•
i A major reduction of an open space important to the community
• Other impacts:

9
#

•m

2

1
Small to
Moderate
Impact

Potential
Large
Impact

D

D

DYes

DNo

D

D

DYes

DNo

D

D

DYes

DNo

D

D

DYes

DNo

D

D

DYes

DNo

D

D

DYes

DNo

D

D

DYes

DNo

D

D

DYes

DNo

D

D

DYes

DNo

D

D

CYes

DNo

.DYes

DNo

D

Can Impact Be
Mitigated By
Project Change

D

D

DYes

DNo

D
D
D

D
D
D

DYes
DYes
DYes

DNo
DNo
DNo

�IMPACT ON TRANSPORTATION
14. Will there be an effect to existing transportation systems?
ENO
Examples that would apply to column 2

DYES

• Alteration of present patterns of movement of people and/or goods.

1
Small to
Moderate
Impact

2
Potential
Large
Impact

D

D
D
D

• Proposed Action will result in major traffic problems.

•

• Other impacts:

D

Can Impact Bt
Mitigated By
Project Change 18
DYes
DYes
DYes

DNe
DNJ
DNC

IMPACT ON ENERGY
15. Will proposed action affect the community's sources of fuel or
energy supply?
ENO^. DYES
Examples that would apply to column 2
• Proposed Action will cause a greater than 5% increase in the use of
any form of energy in the municipality.
• Proposed Action will require the creation or extension of an energy
transmission or supply system to serve more than 50 single or two family
residences or to serve a major commercial or industrial use.
• Other impacts:

• T
P
• T
w
• P
• P
• P
OI

D

D

DYes

D

D

DYes

• D
(e
DNe • P
• Pi

• O

D

D

DYes

DNo

•

D

DYes

DNo

D
D

D
D

DYes

DNo

DYes

DNo

•

•

DYes

DNO

D

D

DYes

DNO

NOISE AND ODOR IMPACTS
16. Will there be objectionable QfJors, noise, or vibration as a result
of the Proposed Action?
ENO
DYES
Examples that would apply to column 2
Hasting within 1,500 feet of a hospital, school or other sensitive
facility.
• Odors will occur routinely (more than one hour per day).
• Proposed Action will produce operating noise exceeding the local
ambient noise levels for noise outside of structures.
• Proposed Action will remove natural barriers that would act as a
noise screen.
• Other

impacts:
IMPACT ON PUBLIC HEALTH

17

Will Proposed Action affect public health and safety?
BNO
Examples that would apply to column 2

DYES

• Proposed Action may cause a risk of explosion or release of hazardous
substances (i.e. oil, pesticides, chemicals, radiation, etc.) in the event of
accident or upset conditions, or there may be a chronic low level
discharge or emission.
_
•-ProposedAction may result in^he burial x&gt;f "hazardous ^vastes- in any
form (i.e. toxic, poisonous, highly reactive, radioactive, irritating,
infectious, etc.)
^uStorage facilities for one million or more gallons of liquified natural
fleas or other flammable liquids.
• Proposed action may result in the excavation or other disturbance
within 2,000 feet of a site used for the disposal of solid or hazardous
waste.
• Other impacts:
_ _ _
_

D

:g;
D
D

a

D

DYes

Part
miti
Instr
Disc
1 F
2. C
DNo
3 t

B r — - © Y e s —QNo

•
C

DYes

DNo

DYes

Dm

DYes DN«

(C

�IMPACT O N GROWTH A N D CHARACTER
OF C O M M U N I T Y OR N E I G H B O R H O O D
,18 Will'proposed action affect the character of the existing community?
I
ENO
DYES
Examples that would apply to column 2

1
Small to
Moderate
Impact

Potential
Large
Impact

•

a

DYes

DNo

D

D

DYes

DNo

D
D
D

D
D

DYes
DYes
DYes

DNo
DNo
DNo

DYes

DNo

DYes
DYes
DYes

DNo
DNo
DNo

, ^ V permanent population of the city, town or village in which the
project is located is likely to grow by more than 5%.
• The municipal budget for capital expenditures or operating services
will increase by more than 5% per year as a result of this project.
• Proposed action will conflict with officially adopted plans or goals.
• Proposed action will cause a change in the density of land use.
• Proposed Action will replace or eliminate existing facilities, structures
or areas of historic importance to the community.

2

a
a

• Proposed Action will set an important precedent for future projects.

•
•

• Proposed Action will create or eliminate employment.

D

D
D

• Other

•

a

• Development will create a demand for additional community services
(e.g. schools, police and fire, etc.)

impacts:

i

3

i

Can Impact Be
Mitigated By
Project Change

19. Is there, or is there likely to be, public controversy related to
potential adverse environmental impacts?
El N O
DYES

Iff Any Action in Part 2 Is Identified as a Potential Large Impact or
If You Cannot Determine the Magnitude of Impact, Proceed to Part 3
l

Part 3—EVALUATION OF THE IMPORTANCE OF IMPACTS
Responsibility of Lead Agency
Part 3 must be prepared if one or more impact(s) is considered to be potentially large, even if the impact(s) may be
litigated.
Instructions
Discuss the following for each impact identified in Column 2 of Part 2:
jl Briefly describe the impact.
j! Describe (if applicable) how the impact could be mitigated or reduced to a small to moderate impact by project change(s).
J Based on the information available, decide if it is reasonable to conclude that this impact is important.
To answer the question of importance, consider:
• The probability of the impact occurring
• The duration of the impact
• Its irreversibility, including permanently lost resources of value
• Whether the impact can or will be controlled
• The regional consequence of the impact
• Its potential divergence from local needs and goals
• Whether known objections to the project relate to this impact.
^•totinue on attachments)

11

7 ? ~««^tmmm~*

~~

~^~^ ~:_T~__ir~

H

�&lt;

V

Approved/iwith r e s p e c t t o substance and form:

Vifllage Attorney
D&lt;Jited:

Approved^ by t h e planning Board

&gt; i&lt;
r Acting Chairroa

F i l e d with V i l l a g e Clerk

e%g£3T=e^- Deputy Clerk

D^ted: Ifajiy

�</text>
                  </elementText>
                </elementTextContainer>
              </element>
            </elementContainer>
          </elementSet>
        </elementSetContainer>
      </file>
    </fileContainer>
    <collection collectionId="135">
      <elementSetContainer>
        <elementSet elementSetId="1">
          <name>Dublin Core</name>
          <description>The Dublin Core metadata element set is common to all Omeka records, including items, files, and collections. For more information see, http://dublincore.org/documents/dces/.</description>
          <elementContainer>
            <element elementId="50">
              <name>Title</name>
              <description>A name given to the resource</description>
              <elementTextContainer>
                <elementText elementTextId="14838">
                  <text>Planning Board Minutes &amp; Resolutions-1994</text>
                </elementText>
              </elementTextContainer>
            </element>
          </elementContainer>
        </elementSet>
      </elementSetContainer>
    </collection>
    <itemType itemTypeId="1">
      <name>Text</name>
      <description>A resource consisting primarily of words for reading. Examples include books, letters, dissertations, poems, newspapers, articles, archives of mailing lists. Note that facsimiles or images of texts are still of the genre Text.</description>
    </itemType>
    <elementSetContainer>
      <elementSet elementSetId="1">
        <name>Dublin Core</name>
        <description>The Dublin Core metadata element set is common to all Omeka records, including items, files, and collections. For more information see, http://dublincore.org/documents/dces/.</description>
        <elementContainer>
          <element elementId="50">
            <name>Title</name>
            <description>A name given to the resource</description>
            <elementTextContainer>
              <elementText elementTextId="14193">
                <text>MINS_PLAN_1994-04-28</text>
              </elementText>
            </elementTextContainer>
          </element>
          <element elementId="49">
            <name>Subject</name>
            <description>The topic of the resource</description>
            <elementTextContainer>
              <elementText elementTextId="14194">
                <text>Planning Board Minutes &amp; Resolutions-1994</text>
              </elementText>
            </elementTextContainer>
          </element>
          <element elementId="40">
            <name>Date</name>
            <description>A point or period of time associated with an event in the lifecycle of the resource</description>
            <elementTextContainer>
              <elementText elementTextId="14195">
                <text>1994</text>
              </elementText>
            </elementTextContainer>
          </element>
        </elementContainer>
      </elementSet>
    </elementSetContainer>
  </item>
  <item itemId="2334" public="1" featured="0">
    <fileContainer>
      <file fileId="2334">
        <src>https://sleepyhollow.localarchives.org/files/original/29cd5099406655f3f400e64b68af4aba.pdf</src>
        <authentication>7f5385f0688020daeba09a170bba896c</authentication>
        <elementSetContainer>
          <elementSet elementSetId="4">
            <name>PDF Text</name>
            <description/>
            <elementContainer>
              <element elementId="52">
                <name>Text</name>
                <description/>
                <elementTextContainer>
                  <elementText elementTextId="20821">
                    <text>A regular meeting was held by the Planning Board on May 19, 1994
at 8:00 PM in Village Hall, 28 Beekman Avenue, North Tarry town,
New York 10591
Members Present:

Also Present:

Absent:

George Hritz, Chairman
Ellen Tsangaris
Donald Caetano
David Perlmutter
Edward McCarthy
Janet Gandolfo, Esq.
James Margotta, Building Inspector
Susan Portman, Frederick P. Clark Assoc.
Joseph Gulino, CAMCE
Steven Salman
James Donovan

Mr. Hritz called the meeting to order at 8:00 PM.
IN THE MATTER OF THE VISCOGLIOSI SUBDIVISION. NORTH TARRYTOWN.
NEW YORK.
Mr. John Hughes, Esq. has submitted a letter to the Building
Inspector requesting an adjournment of the public hearing.
(Letter attached in official minutes). Adjournment granted.
IN THE MATTER OF PHELPS MEMORIAL HOSPITAL. 701 NORTH BROADWAY.
NORTH TARRYTOWN. NEW YORK
Phelps Memorial Hospital will not be present at this meeting due
to a discussion of ongoing Planning Board fees owned to the
Village. They have requested a special meeting, but will most
likely be scheduled for next month's meeting.
IN THE MATTER OF THE ROCK OF SALVATION CHURCH. 131 CORTLANDT
STREET. NORTH TARRYTOWN. NEW YORK 10591
Mr. Turnquist who is the architect for the applicant stated that
there have been several meetings prior to this meeting. On May
16th there was a meeting which included all parties, the Fire
Department, Police Department and the Building Inspector. The
primary concern is about the Fire Departments safety, especially
double parking during a fire.
Mr. Turnquist stated that two
parking spaces would be eliminated and used as a drop-off for the
church and it could be used by the Fire Department.
At this
point the fireman do not have a place to park. The drop off
point would be a 15 minute parking zone.

�Reverend Santiago suggested creating another parking space in the
church's driveway. The gate could be moved back another 20 feet.
The Fire Department would have one more additional parking spot.
This would be taking a step towards accommodating Union Hose.
Kevin Stevens, Esq. from West Nyack, New York stated that the
church is in spirit of cooperation. The proposal for discussion
for a more final understanding of accommodations can be reached.
Mr. John Cellante, President of Union Hose and Deputy Chief of
the Training Department stated that there are issues of safety on
Cortlandt Street now with parking and traffic without the church.
Where the Church and day care center will be, vehicles will
constantly be coming in and out. Mr. Cellante said that it was
requested in the letter that a traffic impact study be completed
for the sake of safety. The Fire Department is not here to fight
the church.
Mr. Cellante stated that there is a safety issue.
The fire
apparatus does not belong near pedestrians.
Something will
happen sooner or later.
Ms. Nancy Vargas stated that she is a resident of Ossining and
has been a member of the congregation for 30 years. In Ossining
there is a day care center next to a fire house.
Out of 130
members only two need to be dropped off.
Mr. Miquel Valle stated that he is of Spanish decent. He has
lived on Cortlandt Street for 15 years and has lived in the
Village for 33 years. There is no place for the fireman to park
once things get started, there will be less places to park. The
fireman are here to serve the community. Now some of the fireman
park on the sidewalks.
Mr. Vargas stated that he worked for Federal Express and has been
driving for six years. He drives through Cortlandt Street all
the time and it is very packed with cars. He feels that this
issue should have been brought up years ago.
Mr. Richard Gross stated that he was the former Fire Chief and
also a member of the First Reformed Church. The church is well
aware that parking is not available on Cortlandt Street.
The
First Reformed church left Tarrytown because of the parking
situation.
The lot used was always filled.
Where would the
employees of the day care center park? A deeper investigation
should be done. This is not a paid fire department.
Reverend Santiago stated that they did not move because of a
traffic concern. There is a lot more traffic on Broadway than on
Cortlandt Street.

�Mr. Hritz stated that every Village should have our problems.
Many people are going to church and many people are volunteering
to fight fires.
Mr. Jose Chevere of 95 Beekman Avenue stated that whoever owns
the building the same traffic problem will exist and Union Hose
will have the same complaints.
There is a parking problem
Village wide.
Mr. Chevere asked if the architect could make
concessions to provide a space and a driveway which would be more
accommodating also if an alarm sounds people will move.
Mr. Richard Chulla is the First Assistant Chief. He is a 17 year
member of Union Hose and stated that it is almost impossible to
drive the truck up the street. There will be more of a problem
with a day care center being there. A traffic study should be
done.
Mr. Miquel Valle of 15 Chestnut Street works for the Tarrytown
School District. When driving a bus it is impossible to get up
and down the streets. Imagine a fire truck. How would a problem
be avoided if one should occur.
Ms. E. Santiago has been a member of the church for 20 years.
She stated that there are alternate exits perpendicular from
College Avenue. Deliveries are made on Cortlandt Street all the
time. She stated the members of the church are educated people.
The issue of a day care center would be brought out in later
stages. She stated that the church is not trying to cause caos
in the Village.
Mr. Jiminez stated that he is a member of the church and that
this is a tough problem. He has friends on both sides. There is
no parking in the Village at all.
He also apologized if he
offended anyone at an earlier meeting. The church is looking for
a solution. He and the church want to go by the book to go to
church in peace and worship. Also to make a better community.
He believes the Fire Department is fantastic. There needs to be
a solution for parking.
Mr. Hritz stated that with so much good will on both sides, we
should be albe to come up with a solution.
Mr. Caetano stated that with respect to the Fire Department, this
has been a problem for years. He stated that the complaints have
been heard and we are trying to come up with a solution. The
Fire Department and the church should cooperate and come up with
a solution. Since there is no solution now the problem should be
studied further. He suggested that the Reverend and the Board
should discuss the situation and come up with a solution in a
month or so.

-3-

l

�Mr. John Cappello who has been a member of Union Hose for 38
years stated that he has been attending the meeting and has never
heard a discriminatory remark about the church, the Fire
Department is only requesting an impact study.
Mr. Stevens, Esq. stated that according to the review of the
application, question 17 of the EAF asks if there an effect on
health and safety, the answer is no. Mr. Hritz stated the the
EAF is subject to the Planning Board's review and acceptance.
Frederick P. Clark Assoc, only makes recommendations to the
Board.
Mr. Cellante stated that maybe Clinton Street could be used for
parking.
Ms. J. Marab is glad to hear that there is no discrimination.
The obvious problem is parking maybe the Church could find
parking elsewhere. Right now the church is paying the mortgage
rental. The concerns of the Fire Department is understandable.
The apparatus should not be blocked.
There are not a lot of
member who drive and a reduction of the building will cause
problems.
Mr. George Samaras of Valley Street stated that this is a problem
for the Fire Department and the church. He asked why the Village
isn't spending the money so that both sides could be happy.
Mr. Richard Vargas stated that there are goals to be worked out
with the community to clean up the street. This can be worked
out with the community. We will pray that this will be worked
out.
Mr. Hritz stated that this is a public problem, not simply a
church-fire house problem. A public solution may solve a long
overdue problem.
Mr. Gonzolez showed the Board and Mr. Turnquist open space behind
the building that may or may not be used for parking.
Mr. John Morabito who was born on Cortlandt street and who is
also the Fire Chief stated that this is a problem for safety.
The fireman are only asking for a traffic study. Safety is a
concern for both the church and the fireman.
Mr. Miquel Valle stated that when Con Edison was there they only
did work on the driveway, they never worked on the street.
Mr. Cappello stated that at the Zoning Board meeting he saw the
plans and the driveway would be designated for buses.
Mr. Vargas said that the plan could change and their would be a
meeting for safety requirements which would alleviate any
accidents.

�Mr. Jose Chevere stated that there is illegal double parking in
the vicinity which may be caused by the three bars in the area.
This should not be a reflection on the church.
Mr. Turnquist stated that in addition to all the information,
Rev. Santiago has given a list of the meetings and services which
was requested by Frederick P. Clark Assoc. There are 41 members
in North Tarrytown, 18 in Ossining (5 cars), 8 in Tarrytown and
23 members from White Plains. (6 cars). The parishioners that
will be picked up by the mini bus will be determined at a later
date.
The day care center does not plan to open until 1997.
Meeting nights are on Wednesday and Friday from 7:30 to 9:00 Pm.
20 (+)(-) attend at this time. Youth services on Sunday usually
consist of 25 people from 10:00 AM to 12 Noon and 16( + ) (-)
attend between 4:30 and 6:00 PM. The day care center will begin
at 8:30 AM until 5:00PM.
Mr. Jiminez of 95 Beekman Avenue is a member of the church and
the Fire Department. He stated that both parties should work
together as friends. There is a God that will help.
Mr. Manvel Navlca has worked with the Fire Department and the
church and does not see a great problem in the future.
Mr. Caetano made a motion to close the Public Hearing, seconded
by Mr. Perlmutter. Motion carried unanimously.
Ms. Tsangaris made a motion to declare the Planning Board lead
agency, seconded by Mr. McCarthy. Motion carried unanimously.
Ms. Portman stated that this use will generate 11 additional cars
maximum. Peak hours are different. The traffic engineer feels
that this is not a significant impact.
Mr. McCarthy stated that there is a parking authority Committee
which may be able to help.
Mr. Hritz stated that an inquiry could be sent to the Board of
Trustees for ideas and comments.
Mr. Gulino stated that the water sewers should be checked.
Mr. Caetano stated that this is not an every day problem. Ms.
Tsangaris stated that this problem needs to be solved because in
the future it will come back to the Boards. Also she does not
know if a study is needed. Mr. McCarthy stated that maybe the
problem could be solved by a sub-committee.

-5-

�Mr. Caetano made a motion to have a sub-committee from the Boards
to meet with representatives from the church and the Fire
Department to discuss ideas and comments, in one month, seconded
by Mr. Perlmutter. Motion carried unanimously.
Mr. Perlmutter made a motion to have Mr. Caetano, Mr. Hritz and
Mr. McCarthy as a sub-committee, seconded by Ms. Tsangaris.
Motion carried unanimously.
IN THE MATTER OP PETRY. BEDFORD ROAD. NORTH TARRYTOWN. NEW YORK
Ms. Petry stated that the drawings are the same, and as for the
sub-divided property Mrs. Petry spoke with engineers and used the
engineers requests.
Mr. and Mrs. Weeks who reside at 174 Webber Avenue thanked the
Board for allowing them to speak.
Mr. Weaks stated that
according to Frederick P. Clarks memo of March 11, 1994 the
parking should exist on Amos street (not Webber Avenue). It was
stated at the March meeting the applicant wanted the parking on
Webber Avenue due to the type of construction. Mr. Ceconi the
executor of the property stated it would be more appealing to
have parking off Webber Avenue. Mr. Ceconi stated that it would
be in full compliance with the ordinance.
Mr. Weaks stated that by having the driveway on Webber off the
north sides allow accessibility to three entrances.
In regards to drainage there has not been a drainage problem.
There has not bee a drainage problem in 77 years. Mrs. Ceconi
has lived on Amos street for 65 year and has not had a drainage
problem.
Mr. Weeks showed the Board pictures of the drainage problem
through the property line. There are puddles in the center of
the sub-division which is referred to as lot 2.
Mr. Reilly the contractor for the applicant stated that by having
a driveway there would not be any more puddling. The Board has a
policy of zero net increase for run-off situations. There will
not be an increase in drainage.
Mr. Weaks state that back filling will change the elevation. He
does not want the run-off crossing the property line and going
into his basement, which is lower than grade.
Mr. Caetano asked if they have had water in their basement.
Weaks state there has not been any water yet.
-6-

Mr.

�Mr. Reilly stated that he hopes water does not go into the Week's
basement, but retaining wall is not needed. There will be hay
and silt that will take the water away during the construction.
Mr. Weaks asked if the hay collapses and the catch basins were
clogged there may be a problem. It was stated that dry walls
should solve the problem. Mrs. Weaks stated that more time was
needed for sufficient study.
A variance is needed concerning the parking space. There could
be a condition in the resolution concerning the locations of both
driveways. Placement of the driveway onto the property would be
up to the Planning board. Mr. Weaks stated that Frederick P.
Clarks recommendation should be used. Mr. Weaks also stated that
by having the catch basin on the corner of the property may not
solve the issue of water drainage to his property.
It was stated that this is just a subdivision plan for a variance
which is a zoning board issue and is premature at this point.
Mr. Brady, Esq. stated that there is a concern for traffic in the
cul-de-sac where kids play. It works better if a driveway was
put in the back. The Petry's are planning to put in a walking
path.
As for a sprinkler system, Mr. Gulino stated that this was a
manufactured house and a sprinkler system is not needed.
Mr. Weeks asked if the drainage issue could be a part of the
resolution to have solid concrete walls. Mrs. Weaks stated that
she would like more time to discuss the drainage issue.
Mr. Caetano made a motion to close the public hearing, seconded
by Mr. McCarthy. Motion carried unanimously.
DISCUSSION
Mr. Caetano stated that the dry well could be installed
needed.

if

Mr. Hritz stated that drainage condition could be put to the
Manganaro firm (Joe Gulino) for review.
Ms. Tsangaris made a motion to have a condition concerning the
drainage situation reviewed and that the applicant comply with
Joe Gulino's memorandum of March, 1994, seconded by Mr. Caetano.
Motion carried unanimously.
Mr. Perlmutter stated that it would not be realistic to have
parking on Webber Avenue because it is too far from the house.

�A motion was made by Mr. Perlmutter to include the conditions
that are stated in the Westchester County letter dated March 30,
1994 (attached in official minutes), seconded by Mr. McCarthy.
Ms. Tsangaris made a motion to approve the driveway with certain
conditions as stated in the above resolution, seconded by Mr.
Hritz.
VOTE:
Mr. Hritz
- Aye
Mr. Caetano
- Nay
Mr. McCarthy - Aye
Mr. Perlmutter - Nay
Ms. Tsangaris - Aye
Mr. Caetano made a motion to approve the sub-division subject to
the conditions discussed which will be made part of a formal
resolution, seconded by Mr. Perlmutter. Motion carried
unanimously.
MINUTES
Mr. Caetano made a motion to approve the minutes of July 16,
1993, seconded by Ms. Tsangaris. Motion carried unanimously.
There being no further business, the meeting was adjourned.
Respectfully submitted,

Christine A. Yurkovic u
Recording Secretary

-8-

�C H A R g . E S
A . M A N G A N A R O
C O N S U L T I N G
E N G I N E E R S

MEMORANDUM
TO:

Village of North Tarrytown Planning Board

FROM:

Mr. Joseph A. Gulino, P.E.
Project Engineer

DATE:

April 28, 1994

RE:

Rock of Salvation Church on Cortland Street
Village of North Tarrytown, NY
CAMCE No. 800-20

As requested, we have reviewed the proposed site plan (dated December 6, 1993) for
Rock of Salvation Church and offer the following comments or recommendations:

Court Plaza North. ^

Main Street

A)

The structure is existing and no addition or alteration to the surrounding
driveways are intended. Therefore, stormwater runoff from the site should not
be altered. To the best of our knowledge, there are no existing problems with
drainage in the immediate area.

B)

The existing water and sewer pipelines and house connections should be shown,
as well as all pertinent data to determine the capacity of the existing system.
An estimate on flow demand should be established and submitted for review.

C)

A fire flow test should be performed in the immediate vicinity to determine if
adequate fire flow exists for this structure.

Once the above information is submitted we can make final recommendations to the
Board. If you should have any questions, please let us know.

Hackensack. NJ O?"601-7O32
201 342.4200 lax 201342.0790

JAG/jr

120 E 75th St. Su «te8C
New York. NY 1 0 0 3 1
212 683 7712
P 0 Box 1007
East Stroudsburg. P A 18301
717 421 1499

cc:

Ms. Linda David, Village Administrator
Janet A. Gandolfo, Esq., Village Attorney
Mr. James T. Margotta, Building Inspector
Ms. Susan J. Portman, Associate, Frederick P. Clark Associates
Mr. Ronald E. Turnquist, Architect

VNT\80O-2OUC042WMJR I

�FREDERICK P. CLARK A S S O C I A T E S , I N C .
Planning/Development/Environment/Transportation
Rye, New York and Southport, Connecticut

David J. Portman, A,CP
Howard I. Reynolds, PE
David H. Stolman, AICP

350 Theodore Fremd Avenue
Rye, New York 10580
(914) 967-6540

Michael A. Galante
Joanne P. Meder, AICP
jjm Donovan, RLA. ASLA

MEMORANDUM
To:

Village of North Tarrytown Planning Board

Date:

April 22, 1994

Subject:

Review of Viscoaliosi Preliminary Subdivision

As requested, we have reviewed the subdivision application
submitted by Marcello Viscogliosi for a property which is
approximately 5,800 square feet in size, located at 176-178 North
Washington Street in the R-5 Residence District.
The site
presently contains a two and a half story one-family dwelling, a
two and a half story four-family dwelling and a detached concrete
garage. Lot 1 (176 Washington Street) would be 2,725 square feet
in size and would contain the existing one-family dwelling. Lot 2
(178 Washington Street) would be 3,083 square feet and would
contain the four-family residence and garage. The fact that the
property presently contains two principal buildings is a legal nonconformity, which non-conformity would be eliminated through the
subdivision of the property (the maximum of one principal building
per lot is required in Section 62-7.C of the Zoning Code).
The Applicant has submitted the following plan:
"Survey of Property Prepared For Marcello Viscogliosi, Situate
Village of North Tarrytown, Town of Mount Pleasant,
Westchester Co., New York," scale 1" = 10', dated June 12,
1990 and revised May 10, 1992, prepared by John J. Muldoon,
Professional Land Surveyor.

Connecticut • (203) 255 3100

FAX • (914) 967-6615

Long Island • (516) 364-4544

�FREDERICK P. CLARK ASSOCIATES, INC.
Planning/Development/Environment/Transportation

REVIEW COMMENTS
1.

Subdivision Regulation Compliance; We find that the proposed
subdivision line could be better located so that Lot 2 would
not have control over a portion (approximately 220 square
feet) of the front yard which is currently located behind a
chain link fence and would not be accessible to Lot 2. It is
possible that some of the area of Lot 2 that would be lost by
relocating the western 20 feet of the subdivision line to
coincide with the fence could be recaptured by moving the
central portion of the subdivision line about three feet to
the south.
The easements which were discussed in the July 21, 1993 Zoning
Board of Appeals1 (ZBA) minutes should be shown on the
subdivision plan. The easements should allow both driveway
access and parking for both lots.
An area map has not been provided for the proposed
subdivision. Other required information that was not shown on
the plan includes the location of all existing structures on
adjacent properties, names of adjoining property owners,
location of nearest fire hydrants, utility lines, sidewalks
and street width.
It is not clear why the application form states that the
property is approximately 15 acres in size.

2.

Zoning Compliance: In July 1993, the ZBA voted to approve all
of the variances it found were necessary for the proposed
subdivision, including variances for lot area, building
coverage and setback deficiencies.

3.

Referrals:
According to Section 239-n of the General
Municipal Law, if the subject property is located within 500
feet of a municipal boundary (Village of Tarrytown), the
Planning Board is required to refer the application to the
Westchester County Planning Board for its review. The County
Planning Board has a maximum of 30 days to comment.
If the subject property is located within 500 feet of a
municipal boundary, according to Section 452 of the
Westchester County Administrative Code and Section 6.B(l)(g)
of the Subdivision Regulations, the Planning Board is required
to give notice of a hearing on the application and send a copy
of the application at least ten days before the hearing date
to the Village of Tarrytown.

2

�FREDERICK P. CLARK ASSOCIATES, INC.
Planning/Development/Environment/Transportation

4.

Environmental Review; The Applicant has submitted a short
Environmental Assessment Form (EAF). According to Part 617 of
the State Environmental Quality Review Act (SEQR), the
proposed subdivision is a Type I action because the property
is located within the Hudson River Shoreline Critical
Environmental Area (CEA). The Applicant is required to submit
a full EAF for a Type I action.
Unless other involved
agencies can be identified (i.e., other agencies with approval
authority over this application), the Planning Board is the
lead agency in the review of this matter. After receipt and
review of the EAF, the Planning Board must make a
determination
of
significance
regarding
potential
environmental impacts of the proposed subdivision.
Susan J. Portman, AICP
Associate/Planning

cc:

Linda David, Village Administrator
Janet A. Gandolfo, Esq., Village Attorney
James T. Margotta, Building Inspector
Joseph A. Gulino, PE, Village Engineer
Marcello Viscogliosi
John J. Muldoon

500\not4-021.sjp

3

�C H A R L E S
A . M A N G A N A R O
C O N S U L T I N G
E N G I N E E R S

MEMORANDUM
TO:

Village of North Tarrytown Planning Board

FROM:

Mr. Joseph A. Gulino, P.E.
Project Engineer

DATE:

April 28, 1994

RE:

Viscogliosi Subdivision Located at 176-178 No. Washington Street
Village of North Tarrytown, New York
CAMCE No. 800-23

As requested, we have reviewed the subdivision map prepared by John J. Muldoon,
L.S., last revised June 12, 1992 and offer the following recommendations:

Court Plaza North, 25 Main Street

A)

The location of all existing structures and other man-made features of the site,
as well as those on adjacent properties, including existing utility lines (gas &amp;
electric) should be shown on the drawing.

B)

The location and design of the proposed water supply, sewerage, stormwater
drainage systems including the locations, sizes, invert, and rim elevations to the
existing water supply, sewage disposal, and storm water drainage systems
should be submitted.

C)

Existing and proposed topography map of the subdivision, extending at least
twenty (20) ft. beyond the site boundaries with contour intervals not greater
than five (5) ft. and referenced to USGS or other approved bench mark and
seals should be shown.

Hackensack NJ 07601-7032
201 342 4200 fax 201 342 0790
120 E 75th St. Suite 8C

The nature and location of all other existing site features, including wetlands,
water courses, wooded areas, and rock outcrops should be shown.

New York. NY 10021
212 683 7712
P 0 Box 1007

The plan shall clearly indicate which site features are existing and proposed,
and which will be removed.

East Stroucsourg. PA 18301
717 421 1499

Owner's endorsement should be shown.

�C H A R L E S
A . M A N G A N A R O
C O N S U L T I N G
E N G I N E E R S

G)

Planning Board Chairman's endorsement per subdivision regulations, Part IV, Page 7817 (14C)
should be shown.

H)

The locations of nearest fire hydrants should be shown.

J)

An area map showing all streets and property within one thousand (1,000) ft of the applicant's
property, at a scale of one (1) inch to four hundred (400) ft. should be shown. All property
owned by the applicant shall be clearly identified.

Once the above information is submitted, final recommendations will be made to the Board. If you
should have any questions or require additional information, please do not hesitate to contact us.
JAG/jr
cc:

Ms. Linda David, Village Administrator
Janet A. Gandolfo, Esq., Village Attorney
Mr. James T. Margotta, Building Inspector
Ms. Susan J. Portman, Associate, Frederick P. Clark Associates
Mr. John J. Muldoon, L.S.

VNT\80O-23VGO4284M JR1

�Phelps

Phelps
Memorial
Hospital
Center

/Oi Wort". Broadway .
North Tarryiown NY 10591-1096
914-366-3000

April 22, 1994

Mr. Joe Gulino
CAMCE
Court Plaza North
25 Main Street
Hackensack, NJ 07601-7032
Dear Mr. Gulino:'
We are pleased to inform you that we have negotiated the
reduction of flow from the IBM forced main at their World
Trade Center Pump Station.
In conjunction with this agreement, IBM is requesting
your written approval of this project. Specifically your
approval to the plans and specifications prepared by Chas
Sells, dated November, 1993, and marked final March,
1994, will be required before we can finalize our
agreement with IBM.
We must also confirm that your
approval will relieve both IBM and Phelps from any
further obligation respecting sewage modifications
related to the Medical Office Building project.
Thank you in advance for your cooperation in this matter.
Sincerely,

Bruce B. Dfcvidow, FACHE
Senior Vice President/
Chief Operating Officer
BBD:dg
MOB\CAMCE
cc:

Todd Jack
Vincent Del Bagno
Keith F. Safian
James Margotta

�FREDERICK P. CLARK ASSOCIATES, INC.
Planning/Development/Environment/Transportation

2.

Zoning Compliance:
The application meets the zoning
requirements of the R-3 Residence District with regard to
minimum lot size and minimum lot width.
Because of the
existing dwelling on Lot 1, that Lot has an existing nonconformity concerning the required minimum front yard. The
existing garage is non-conforming concerning the required
front and side yard setbacks. The existing garage is proposed
to be removed and a dwelling constructed on Lot 2 which would
not conform with the required minimum side and front yard
setbacks (a minimum total of 15 feet for both side yards and
a 20 foot front yard). It appears that a dwelling could be
situated on proposed Lot 2 and conform to the required
setbacks. However, it is not clear why the proposed dwelling
is not situated accordingly. It is our understanding that the
Zoning Code was amended a few years ago and, as a result, the
Planning Board does not have site plan approval for an
individual dwelling in a subdivision of fewer than three lots.
In that case, the variances for the setback deficiencies would
not be needed until after subdivision approval.
The only issue which would appear to require a variance in
order for the subdivision itself to be approved would be the
fact that the existing parking for the existing dwelling on
Lot 1 is being removed (the garage) and the parking as
required in Section 62-14E of the Code of the Village of North
Tarrytown (one space for each dwelling unit) is not being
provided. This issue should be resolved with either a shared
driveway, 18 feet in width, off of Amos Street (with the
appropriate easements) or the provision of separate driveways
off of Amos Street.

3»

Access: The Applicants have demonstrated that Amos Street has
a wider right-of-way than does Webber Avenue, presumably for
the purpose of using Amos Street as the location for
determining the front yard setback, as per Section 62-13A of
the Code. It appears, due to the proposed location of the
driveway, that the rear of the house is proposed to face Amos
Street. In any event, we find that the house should face Amos
Street and that the driveway access for both lots should be
off of Amos Street. Amos Street is a dead-end street with
slower traffic than Webber Avenue. Webber Avenue is a through
County road. Approval of curb-cuts along Webber Avenue would
be subject to the Westchester County Department of Public
Works while approval along Amos Street would be subject to the
approval of the Village. We advise against the provision of
additional curb cuts along Webber Avenue.

2

�FREDERICK P. CLARK ASSOCIATES, INC.
Planning- Deveiopment/Environment/Transportation

2.

Zoning Compliance:
The application meets the zoning
requirements of the R-3 Residence District with regard to
minimum lot size and minimum lot width.
Because of the
existing dwelling on Lot 1, that Lot has an existing nonconformity concerning the required minimum front yard. The
existing garage is non-conforming concerning the required
front and side yard setbacks. The existing garage is proposed
to be removed and a dwelling constructed on Lot 2 which would
not conform with the required minimum side and front yard
setbacks (a minimum total of 15 feet for both side yards and
a 20 foot front yard) . It appears that a dwelling could be
situated on proposed Lot 2 and conform to the required
setbacks. However, it is not clear why the proposed dwelling
is not situated accordingly. It is our understanding that the
Zoning Code was amended a few years ago and, as a result, the
Planning Board does not have site plan approval for an
individual dwelling in a subdivision of fewer than three lots.
In that case, the variances for the setback deficiencies would
not be needed until after subdivision approval.
The only issue which would appear to require a variance in
order for the subdivision itself to be approved would be the
fact that the existing parking for the existing dwelling on
Lot 1 is being removed (the garage) and the parking as
required in Section 62-14E of the Code of the Village of North
Tarrytown (one space for each dwelling unit) is not being
provided. This issue should be resolved with either a shared
driveway, 18 feet in width, off of Amos Street (with the
appropriate easements) or the provision of separate driveways
off of Amos Street.

3.

Access: The Applicants have demonstrated that Amos Street has
a wider right-of-way than does Webber Avenue, presumably for
the purpose of using Amos Street as the location for
determining the front yard setback, as per Section 62-13A of
the Code. It appears, due to the proposed location of the
driveway, that the rear of the house is proposed to face Amos
Street. In any event, we find that the house should face Amos
Street and that the driveway access for both lots should be
off of Amos Street. Amos Street is a dead-end street with
slower traffic than Webber Avenue. Webber Avenue is a through
County road. Approval of curb-cuts along Webber Avenue would
be subject to the Westchester County Department of Public
Works while approval along Amos Street would be subject to the
approval of the Village. We advise against the provision of
additional curb cuts along Webber Avenue.

2

�FREDERICK P. CLARK ASSOCIATES, INC.
Planning/ Development/Environment/Transportation

4.

Dedication; The Applicants1 drawing indicates that Webber
Avenue is 49.5 feet in width. As per Section 12B(2) (b) of the
Village Subdivision Regulations:
Subdivisions that adjoin or include existing streets that
do not conform to widths as shown on the Master Plan or
Official Map or the street width requirements of this
ordinance shall dedicate additional width along either
one (1) or both sides of said road. If . . . subdivision
is along one (1) side only, one-half (1/2) of the
required extra width shall be dedicated. . .[emphasis
added].
Assuming that Webber Avenue is a "local street" with a
required right-of-way width of 50 feet (see Section 12B(2)(a)
of the Regulations), both of the lots would need to dedicate
a strip of land three inches wide along Webber Avenue. This
should be shown on the plat.

5.

Referral: According to Section 239-n of the General Municipal
Law, since the subject property is located within 500 feet of
a State road (Bedford Road is State Route 448) and a County
Road (Webber Avenue), the Planning Board is required to refer
this application to the Westchester County Planning Board for
its review. The County Planning Board has a maximum of 30
days to comment.

6.

Environmental Review: The Applicants have submitted a short
Environmental Assessment Form (EAF). According to Part 617 of
the State Environmental Quality Review Act (SEQR), the
proposed subdivision is an Unlisted Action. As an Unlisted
Action, a coordinated review between agencies is not required.
We have completed the second page of the EAF and enclose it
for your consideration. Based on our review, we recommend
that the Planning Board declare itself the Lead Agency and
make a negative declaration finding of non-significance of
environmental impacts.
Susan J. Portman, AICP
Associate/Planning

Enclosure
cc:

Janet A. Gandolfo, Esq., Village Attorney
James T. Margotta, Building Inspector
Joseph A. Gulino, Village Engineer
John and Maureen Petry
John J. Muldoon
3

�I

/l

n'. M

**

SEQR

617.21
Appendix C
State Environmental Quality Review

.'ID NUMEF.R

/

SHORT ENVIRONMENTAL ASSESSMENT FORM
For UNLISTED ACTIONS Only

/

ART l—PROJECT INFORMATION (To be completed by Applicant or Project sponsor)

A

Jflhn 4 rrlftU&amp;frf, &gt; h '
3. PROJECT LOCATION:

/
/

2,. PROJECT NAME

1. APPLICANT/SPONSOR

Municipality

f

County

fry/(fS/O/£"£/&amp;/£_

4. PRECISE LOCATION (Street address and road Intersection!, prominent landmarks, etc., or provide map)

t / / 4/vlO-S S / "

5. IS PROPOSED ACTION:
L d New

D Expansion

D Modification/alteration

6. DESCRIBE PROJECT BRIEFLY:

7. AMOUNT OF LAND AFFECTED:
Initially

^

/

acres

^ /

Ultimately

8. WILL PROPOSED ACTION COMPLY WITH EXISTING ZONING OR^OTHER EXISTING LAND USE RESECTIONS? J2
DYes

Q^No

If No. describe briefly

^

.•

^

M

•\-\

A

- #^4-1

8 . WHAT, IS PRESENT LAND USE IN VICINITY OF PROJECT?
[^Residential
Describe:

LJ Industrial

[_) Commercial

D Agriculture

O Park/Forest'Open space

D Other

10. DOES ACTION INVOLVE A PERMIT APPROVAL, OR FUNDING, NOW OR ULTIMATELY FROM ANY OTHER GOVERNMENTAL AGENCY (FEDERAL,
STATE OR L O C A L ) ? ,
LiYes

11.

LJNO

If yes, list agency(s) and permit/approvals

DOES ANY ASPECT OF THE ACTIOS HAVE A CURRENTLY VALID PERMIT OR APPROVAL?
LJYes

LDNo

If yes, list agency name and permit/approval

12. AS A RESULT OF PROPOSED ACTION WILL EXISTING PERMIT/APPROVAL REOUIRE MODIFICATION?

DYes

BNO
I CERTIFY THAT THE INFORMATION PROVIDED ABOVE IS TRUE TO THE BEST OF MY KNOWLEDGE

Applicant/sponsor

Signature:

name:

&lt;foMtt ?ncsi

\?\\^ «*

^

quAU^

Dale

\6tT

j^2£=

^

If the action is in the Coastal Area, and you are a state agency, complete the
Coastal Assessment Form before proceeding with this assessment
OVER
1

�P«jfrBT H-ENVIRONMENTAL ASSESSMENT (To be completed by Agency)
A. DOES ACTION EXCEED ANY TYPE I THRESHOLD IN 6 NYCRR, PART 617.12?

D Yes

II yes, coordinate Ihe review process and use the FULL EAF.

S No

I

B. WILL ACTION RECEIVE COORDINATED REVIEW AS PROVIDED FOR UNLISTED ACTIONS IN 8 NYCRR, PART 617.6?
may be superseded by another involved agency.

D Yes

j

If No, • negative declaration

(S No

j
j

I

C. COULD ACTION RESULT IN ANY ADVERSE EFFECTS ASSOCIATED W I T H THE F O L L O W I N G : (Answers may be handwrllten, If legible)

C1. Existing air quality, surface or groundwater quality or quantity, noise levels, existing traffic patterns, solid waste production or disposal,
potential for erosion, drainage or flooding problems? Explain briefly:

Mo
C2. Aesthetic, agricultural, archaeological, historic, or other natural or cultural resources; or community or neighborhood character? Explain briefly:

Mo
C3. Vegetation or fauna, fish, shellfish or wildlife species, significant habitats, or threatened or endangered species? Explain briefly:

N6
C4. A community's existing plans or goals as officially adopted, or a change in use or intensity of use of land or other natural resources? Explain briefly.

Mo
C5. Growth, subsequent development, or related activities likely to be Induced by the proposed action? Explain briefly.

Mo

C6. Long term, short term, cumulative, or other effects not identified in C1-C5? Explain briefly.

C7. Other Impacts (including changes In use of either quantity or type of energy)? Explain briefly.

0. IS THERE, OR IS THERE LIKELY TO BE. CONTROVERSY RELATED TO POTENTIAL ADVERSE ENVIRONMENTAL IMPACTS?
D Yes

E No

If Yes, explain briefly

PART III—DETERMINATION OF SIGNIFICANCE (To be completed by Agency)
INSTRUCTIONS: For each adverse effect identified above, determine whether It Is substantial, large, Important or otherwise significant
Each effect should be assessed In connection with Its (a) setting (i.e. urban or rural); (b) probability of occurring; (c) duration; (d)
Irreversibility; (e) geographic scope; and (0 magnitude, if necessary, add attachments or reference supporting materials. Ensure that
explanations contain sufficient detail to show that all relevant adverse impacts have been identified and adequately addre^ed.
D

Check this box if you have Identified one or more potentially large or significant adverse impacts which MAY
occur. Then proceed directly to the FULL EAF and/or prepare a positive declaration.
D Check this box if you have determined, based on the Information and analysis above and any supporting
documentation, that the proposed action WILL NOT result in any significant adverse environmental Impacts
AND provide on attachments as necessary, the reasons supporting this determination:

U

Name of If ad Agency

r

/

^ ^

Print or Type r4*Vne of Responsible Officer in I ead Agency

Title of Responsible Officer

Signature of Responsible O/ficer in l e a d Agency

Signature of Prepare^ (If different from responsible officer)

Mw
Dale

2

�617.21
\

/•'

«

SEQR

Appendix A
State Environmental Quality Review

FULL ENVIRONMENTAL ASSESSMENT FORM

:: The full EAF is designed to help applicants and agencies determine, in an orderly manner, whether a project
n may be significant The question of whether an action may be significant is not always easy to answer. Frequenti are aspects of a project that are subjective or unmeasureable. It is also understood that those who determine
jnificance may have little or no formal knowledge of the environment or may be technically expert in environmental
•alysis In addition, many who have knowledge in one particular area may not be aware of the broader concerns affecting
'* question of significance.
The full EAF is intended to provide a method whereby applicants and agencies can be assured that the determination
ocess has been orderly, comprehensive in nature, yet flexible to allow introduction of information to fit a project or action.
id EAF Components: The full EAF is comprised of three parts:
Part 1: Provides objective data and information about a given project and its site. By identifying basic project
data, it assists a reviewer in the analysis that takes place in Parts 2 and 3.
"
Part 2: Focuses on identifying the range of possible impacts that may occur from a project or action. It provides
guidance as to whether an impact is likely to be considered small to moderate or whether it is a potentiallylarge impact. The form also identifies whether an impact can be mitigated or reduced.
Part 3: If any impact in Part 2 is identified as potentially-large, then Part 3 is used to evaluate whether or not the
impact is actually important.

DETERMINATION OF SIGNIFICANCE-Type 1 and Unlisted Actions
Identify the Portions of EAF complete* for this project:

«

B

Part 1

B

Part 2

DPart 3

eview of the information recorded on this EAF (Parts 1 and 2 and 3 if appropriate), and any other supporting
ation. and considering both the magitude and importance of each impact, it is reasonably determined by the
gency that:

Q

A. The project will not result in any large and important impacts) and, therefore, is one which will not
have a significant impact on the environment, therefore a negative declaration will be prepared.

0

B. Although the project could have a significant effect on the environment, there will not be a significant
effect for this Unlisted Action because the mitigation measures described in PART 3 have been required,
therefore a CONDITIONED negative declaration will be prepared.*

0

C. The project may result in one or more large and important impacts that may have a significant impact
on the environment, therefore a positive declaration will be prepared.
* A Conditioned Negative Declaration is only valid for Unlisted Actions

M a t t e r of V i s c o g l i o s i

Two

LOf

&gt;Iubd«VtlJQA

Name of Action

Planning Board - Village of North Tarrytown
Name of Lead Agency

HLJ

Fof
' Title
of Responsible Officer

ruicor Type Name of Responsible Officer in Lead Agency

reparer (If different from iresponsible officer)
Signature of Preparer
JOHN J . HUGHES» J R .

^nature of Responsible Officer in Lead Agency

May 1 6 , 1994
Date
1

�I Ar

PART 1—PROJECT INFORMATION
Prepared by Project Sponsor

Is
NOTICE: This document is designed to assist in determining whether the action proposed may have a significante) Re
on the environment. Please complete the entire form. Parts A through E. Answers to these questions will be consid
cons*
^ ^ s part of the application for approval and may be subject to further verification and public review. Provide any additff Is
^ B i f o r m a t i o n you believe will be needed to complete Parts 2 and 3.
Wl
lot inT
It is expected that completion of the full EAF will be dependent on information currently available a n d will not
new studies, research or investigation If information requiring such additional work is unavailable, so indicate andsp '• ' 5
each instance.
10 D
11. D

NAME OF ACTION

M a t t e r o f V i s c o g l i o s i TIAJO LO^ JobcWi'jiCio
LOCATION OF ACTION (Include Street Address. Municipality and County)
1 7 6 - 1 7 8 N o r t h Washington S t r e e t , N o r t h T a r r y t o w n , Westchester
NAME OF APPUCANT/SPONSOR

County
12. Ai

BUSINESS TELEPHONE

Marcello Visjrogliosi

(914)

631-8855

ADDRESS

c/o J. Hughes, Jr., Esq., 49 Beekman Avenue
CfTY/FO

STATE

N o r t h T a r r y t o w n , NY

ZIP CODE

10591

NY

14.

BUSINESS TELEPHONE

NAME OF OWNER (II different)
same as owner

&lt;

»

Is

t

• ) N/A

ADDRESS

15 St:

N/A
crrY/po
N/A

STATE

ZIP CODE

N/A

N/A
16. La

DESCRIPTION OF ACTION

Subdivision - 2 lots

17. Is
a)
b)
18 Is
Se

Please Complete Each Question—Indicate N.A. if not applicable

A. Site Description

19. Is
of

Physical setting of overall project, both developed and undeveloped areas.
1. Present land use:

OUrban

Olndustrial

DForest

DAgriculture

DCommercial

OResidential (suburban)

2. Total acreage of project area:

. acres.

APPROXIMATE ACREAGE
Meadow or Brushland (Non-agricultural)

PRESENTLY

j£L

acres
acres
acres
acres
acres
acres
^cres
acres

ttr)oAy\LA*d-(\\&lt;»&gt;f\ior\

(btvipleX

Forested
Agricultural (Includes orchards, cropland, pasture, etc )
Wetland (Freshwater or tidal as per Articles 24. 25 of ECL)
Water Surface Area
Unvegetated (Rock, earch or fill)
Roadsr-buildings and other paved "surJaces|fl.^iC^&gt;M|tw«OZii
U
nth^FJTnAi^tpr^^r Residential
_
t. W h a t ii predominant soil typeKs) on project site?
a. Soil drainage:

CD Well drained
DPoorly drained

DRural (non-fijjo. Ha

-OOther

100

% of site
% of site

Q.)S

DModerately well drained

AFTER COMPLETION B. Pr
awf
1 Phy&lt;
acre&lt;j
. acre;
. acre
. acre
.-acre

-fr-Q-

JSL

DYes
,in

o

f£'No
feet)

b.
c.
d

. acre

-e—

. acre

f.

% of site

b. If any agricultural land is involved, how many acres of soil are classified within soil group 1 through 4 of theK
Land Classification System'
acres (See 1 NYCRR 370) N/A
Are there bedrock outcroppmgs on project site?
What is depth to bedrock' Approx. 1 0 - 1 5

a

g

h
In

u:
i. :
i i

�slopes

7(t-l6%
Dl5%

iQb
or greater

ii project substantially contiguous to. or contain a building, site, or district, listed on the State or the National
DYes
©No

ni effo Registers of Historic Places?

nsiderf
Jditioru' Is project substantially contiguous to a site listed on the Register of National Natural Landmarks?
What is the depth of the water fahlp?APP.10- fin feet)
Folw
DYes
G5No
1 specif Is site located over a primary, principal, or sole source aquifer?
Do hunting, fishing or shell fishing opportunities presently exist in the project area?

DYes

DYes

IS No

QDNo

Does project site contain any species of plant or animal life that is identified as threatened or endangered?
DYes
EJNo
According to
Identify each species
Are there any unique or unusual land forms on the project site? (i.e.. cliffs, dunes, other geological formations)
DYes
©No
Describe
:

)E

) Is the project site presently used by the community or neighborhood as an open space or recreation area?
DYes
©No
If yes, explain
.
\ Does the present site include scenic views known to be important to the community?
DYes
©No

-&gt;E

5 Streams within or contiguous to project area: None
a. Name of Stream and name of River to which it is tributary
i Lakes, ponds, wetland areas within or contiguous to project area:
a. Name None

N/A

b. Size ( I n acres)

N/A

7 Is the site served by existing public utilities?
JSYes
DNo
DNo
a) If Yes, does sufficient capacity exist t o a l l o w connection?
{DYes
DNo
b) If Yes, w i l l i m p r o v e m e n t s be necessary t o allow connection?
©Yes
I Is the site located in an agricultural district certified pursuant to Agriculture and Markets Law, Article 25-AA.
Section 303 and 304?
DYes
E3No
i Is the site located in or substantially contiguous to a Critical Environmental Area designated pursuant to Article 8
of the ECL, and 6 NYCRR 617?
©Yes
DNo
Dn-farm j Has the site ever been used for the disposal of solid or hazardous wastes?

TION{
acres
acres
acres
acres
acres
acres
acres
3cres i

#

DYes

QJNo

Project Description
Physical d i m e n s i o n s and scale o f p r o j e c t (fill i n dimensions as appropriate)
a. Total contiguous acreage owned or controlled by project sponsor
&gt;J6 O* »£acres.
b. Project acreage to be developed:
•&amp; cO. 1$ acres initially;
' ^ O* '\Z acres ultimately.
c.'-Project acreage t o remain u n d e v e l o p e d
0
acres.
d. Length of project, in miles: N/A
(if appropriate)
e. If the project is an expansion, indicate percent of expansion proposed
%;
f. Number of off-street parking spaces existjnjg_
6
; proposed
6 ftfol
-jt^Maximum-vehtcular trips-generated-per^hour — -N/A - - (upon cpmplieUoh of project)? N^" CM&amp;W&amp;~;
k tf residential: Number and type of housing units: One Family
Two Family
Multiple Family
Condominium
1
Initially
_ 2

Ultimately

_

i

i Dimensions (in feet) of largest proposed structure
35
height;
20* width:
j. Linear feet of frontage along a public thoroughfare project will occupy u?APP ^(sbi\

length.

�2. How much natural material (i.e.. rock, earth, etc.) will be removed from the site?
3. Will disturbed areas be reclaimed?

DYes

DNo

N/A

tons/cub

EN/A

a. If yes, for what intend .* purpose is the site being reclaimed?
b. Will topsoil be stockpiled for reclamation?

DYes

:

©No

c. Will upper subsoil be stockpiled for reclamation?

DYes

(SNo

4. How many acres of vegetation (trees, shrubs, ground covers) will be removed from site? None

a,

5. Will any mature forest (over 100 years old) or other locally-important vegetation be removed by this pre
DYes
0No
6. If single phase project: Anticipated period of construction

N/A

months, (including demolition).

7. If multi-phased:
a. Total number of phases anticipated

^'

(number).

b. Anticipated date of commencement phase 1

^/A

c. Approximate completion date of final phase

N

A

'

month

d. Is phase 1 functionally dependent on subsequent phases?
8. Will blasting occur during construction?

DYes

9. Number of jobs generated: during construction
.10. Number of jobs eliminated by this project

N

month

'A

y&amp; ,r, (including den

N/A

DYes

year.

QlNo

EJNo
N/A

; after project is complete

12. Is surface liquid waste disposal involved?

DYes

DYes

ONo

b. Name of water body into which effluent will be discharged
13. Is subsurface liquid waste disposal involved?

I' yes, explain

(SNo

a. If yes, indicate type of waste (sewage, industrial, etc.) and amount

DYes

N/A

N/A

QlNo

Type

14. Will surface area of an existing water body increase or decrease by proposal?
Explain
15. Is project or any portion of project located in a 100 year flood plain?
DYes

a. If yes, what is the amount per month

DV-ss

DYes

l&amp;No

CSNo

©No

N/A

tons

b. If yes, will an existing solid waste facility be used?
c. If yes, give name

/A

N/A

11. Will project require relocation of any projects or facilities?

16. Will the project generate solid waste?

N

No a d d i t i o n a l waste

QQYes

N/A

;

DNo
N

location

'A

d. Will any wastes not go into a sewa'ge disposal system or into a sanitary landfill?

LYes

_-N&lt;

e. If Yes, explain
17. Will the project involve the disposal of solid waste?

DYes

a. If yes. what is the anticipated rate of disposal?
b. If yes, what is the anticipated site life?
18. Will project use herbicides or pesticides?

ENo

N/A

N/A

NO a d d i t i o n a l

tons/month.
years.

DYes

CSNo

19. Will project routinely produce odors (more than one hour per day)? DYes

__Q_No_

-20^-Will-project produce operating noise exceeding the local ambient noise levels?
21. Will project result in an increase in energy use?
If yes . indicate type{s)

DYes

Total anticipated water usage per day

______________

N/A

N/A

gallons/minute.

gallons/day

24 Does project involve Local, State or Federal funding?
If Yes. explain

QENo

KJNo

N/A

22. If water supply is from wells, indicate pumping capacity
23.

DYes

—

DYes

N/A

29No
.

4

I

�City.'^own Village Board

DYes

ENo

City. Town. Village Planning Board

3
Yes
3Yes

D
No
DNo

Subdivision

C«ty.*Town Zoning Board

QlYes

D
No
DNo

Variances - already granted

City. County Health Department

DYes

KJNo

DYes

IS No

Other Regional Agencies

DYes

ffiNo

State Agencies

DYes

®No

federal Agencies

DYes

ENo

her Local Agencies

4/94

C. Zoning and Planning Information
1 Does proposed action involve a planning or zoning decision?

®Yes

DNo

If Yes. indicate decision required:
Dzoning amendment

Bzoning variance

Dnew/revision of master plan

Dspecial use permit

Dresource management plan
R

2 What is the zoning classification(s)of the site?

^subdivision

Dsite plan

Dother

~5

3 What is the maximum potential development of the site if developed as permitted by the present zoning?
Five ( 5 ) r e s i d e n t i a l u n i t s

feiiflMQ

4 What is the proposed zoning of the site?

u),ffr V&amp;fi&amp;Hces)'
R-5

TyuO hQi-2'fMilu

J)|^/|IVKS

Nft G k a v ^ g .

p€.r

&amp;**&amp;
h~h}

5 What is the maximum potential development of the site if developed as permitted by the proposed zoning?

5 residential units

rVJ A

i Is the proposed action consistentrwith the recommended uses in adopted local land use plans?

BYes

DNo

7 What are the predominant land use(s) and zoning classifications within a V* mile radius of proposed action?

__ R e s i d e n t i a l - m u l t i - f a m i l y . Cfn&lt;fr--fa*ti'/l4'. CCmmGK id I Cfrrfci irtJ-Hmftd/lflJ, AIAH«C/$&amp;»&gt;''"P*k J)C
p
n
W R.-j t p-a p-^- £_£ ^ l | C - i
^
I Is the proposed action compatible with adjoining/surrounding land uses within a Vi mile?

J If the proposed action is the subdivision of land, how many lots are proposed?
a. What is the minimum lot size proposed?

EYes

DNo

L-.-,--..^^,.^—.—

P l e a s e see a t t a c h e d feey. ApprflX- 2y7flQ

K) Will proposed action require any authorization(s) for the formation of sewer or water districts?

S^.ffc
DYes

ENo

11 Will the proposed action create a demand for any community provided services (recreation, education, police,
fire protection)?
DYes
G9No
HAr
a. If yes, is existing capacity sufficient to handle projected demand?

SYes

DNo

12 Will the proposed action result in the generation of traffic significantly above present levels? A/A DYes
a. If yes. is the existing road network adequate to handle the additional traffic?

®Yes

0No

DNo

D. Informational Details
Attach any additional information as may be needed to clarify your project. If there are or may be any adverse
mpacts associated with your proposal, please discuss such impacts and the measures which you propose to mitigate or
jvoid them

Oerfticatiou

—

I certify that the information provided above is true to the best of my knowledge
UppKcant/Sponsor Name
^r..r^-./,^

Marcello Viscogliosi

ULJ ,£1^

m

J*.M*:«j fc. N*** III

'
Title

Date

5/16/94

2-_H

M e action is in the Coastal Area, and you are a state agency, complete the Coastal Assessment Form before proceeding
•ilk this assessment.
5

�i &lt;.: - &lt;. — r h O J E G l

i t i ( * r A O ' i w A U U ~lhc.iri U'nkCai*i t u u t -

Responsibility of Lead Agency
General Information (Read Carefully)
• In completing the form the reviewer should be guided by the question: Have my responses and determinations b»
reasonable? The reviewer is not expected to be an expert environmental analyst.
• Identifying that an impact will be potentially large (column 2) does not mean that it is also necessarily signifies
Any large impact must be evaluated in PART 3 to determine significance. Identifying an impact in column 2 sirr.:
asks that it be looked at further.
• The Examples provided are to assist the reviewer by showing types of impacts and wherever possible the threshol:
magnitude that would trigger a response in column 2. The examples are generally applicable throughout the Stat?;
for most situations. But, for any specific project or site other examples and/or lower thresholds may be appropm
for a Potential Large Impact response, thus requiring evaluation in Part 3.
• The impacts of each project, on each site, in each locality, will vary. Therefore, the examples are illustrative:
have been offered as guidance. They do not constitute an exhaustive list of impacts and thresholds to answer each quest"
• The number of examples per question does not indicate the importance of each question.
• In identifying impacts, consider long term, short term and cumlative effects.
Instructions (Read carefully)
a. Answer each of the 19 questions in PART 2. Answer Yes if there-will be any impact.
b. Maybe answers should be considered as Yes answers.
c. If answering Yes to a question then check the appropriate box (column 1 or 2) to indicate the potential size of*
impact. If impact threshold equals or exceeds any example provided, check column 2. If impact will occur but thresh;
is lower than example, check column 1 .
d. If reviewer has doubt about size of the impact then consider the impact as potentially large and proceed to PARI
e. If a potentially large impact checked in column 2 can be mitigated by changes) in the project to a small to mode;impact also check the Yes box in column 3. A No response indicates that such a reduction is not possible Tl
must be explained in Part J.

2
Small to
Moderate
Impact

Potential
Large
Impact

•

D

G Yes

DNC

• Construction on land where the depth to the water table is less than
3 feet.

D

D

GYes

DNC

• Construction of paved parking area for 1,000 or more vehicles.

G
D

D
D

GYes

DNC

GYes

Cvj

• Construction that will continue for more than 1 year or involve more
than one phase or stage.

D

D

GYes

DNC!

• Excavation for mining purposes that would remove more than 1.000
tons of natural material (i.e.. rock or soil) per year.

D

D

GYes

DNCI

S-

-G
O.
G

-l-S^es-

GNC'

IMPACT ON LAND
1 . Will the proposed action result in a physical change to the project site?
ENO
DYES
Examples that would apply to column 2
• Any construction on slopes of 15% or greater, (15 foot rise per 100
foot of length), or where the general slopes in the project area exceed
10%.

• Construction on land where bedrock is exposed or generally within
3 feet of existing ground surface.

• Construction, orlexpaosion oi a sanitary landfill.

— --—

•Construction in a designated flood way. '~^4y~-y-S. •'
• Other impacts __:

" ^ •-"'•' -

Can Impact •:
Mitigated 6)
Project Chanc

I
i

D
D

GYes

GNci

GYes

GNc
I

2. Will there be an effect t- . .iy uii.ijuc or unusual land forms found on
the site? (i.e.. cliffs, dunes, geological formations. etc.)ONO
DYES
• Specific land forms:

tf

G

— Nes

.NC

�Moderate
Impact

rc;ei.;iai
Large
Impact

D
D

D
D

DYes
DYes

DNo
DNo

D
D
D

D
D
D

DYes
DYes
DYes

DNo
DNo
DNo

D

D

DYes

DNo

D
D

D
D

DYes
DYes

DNo
DNo

D
D

D
D

DYes
DYes

DNo
DNo

l&gt;sed Action requires water supply from wells with greater than 45
_ ons per minute pumping capacity

D

D

DYes

DNo

Construction or operation causing any contamination ot a water
supply system.

D

D

DYes

DNo

Proposed Action will adversely affect groundwater.
.iquid effluent will be conveyed off the site to facilities which presently
to not exist or have inadequate capacity.

D
D

D
D

DYes
DYes

DNo
DNo

Roposed Action would use water in excess of 20.000 gallons per

D

D

DYes

DNo

Proposed Action will likely caum siltation or other discharge into an
xisting body of water to tue extent that there will be an obvious visual
ontrast to natural conditions.

D

D

DYes

DNo

roposed Action will require the storage of petroleum or chemical
roducts greater than 1,100 gallons.

D .

D

DYes

DNo

roposed Action will allow residential uses in areas without water
r.oVor sewer services.

D

D

DYes

DNo

roposed Action locates comma J a i and/or industrial uses which may
&gt;quire new or expansion of existing waste treatment and/or storage

D

D

DYes

DNo

D

D

DYes

DNo

D

r-i

DYes

DNo

Ot i i b i i

,

.
IMPACT ON WATER
.Will proposed action affect any water body designated as protected?
(Under Articles 15, 24, 25 of the Environmental Conservation Law, ECL)
KNO
DYES
Examples that would apply to column 2
Q^elopable area of site contains a protected water body.
t^Pging more than 100 cubic yards of material from channel of a
protected stream
Extension of utility distribution facilities through a protected water body.
Construction in a designated freshwater or tidal wetland.
Other impacts:

Will proposed action affect any non-protected existing or new body
of water?
ONO
DYES
Examples that would apply to column 2
A10% increase or decrease in the surface area of any body of water
or more than a 10 acre increase or decrease.
Construction of a body of water that exceeds 10 acres of surface area.
Other impacts:

Will Proposed Action affect surface or groundwater
quality or quantity?
BNO
Examples that would apply to column 2

Can Impact Be
Mitigated By
Project Change

DYES

Proposed Action will require a discharge permit.
Proposed Action requires use of a sburce of water that does not
*iave approval to serve proposed (project) action.

«

crti^
&gt;ther impacts:
proposed action alter drainage flow or patterns, or surface
i
runoff?
BNO
DYES
•
samples that would apply to column 2
oposed Action would change flood water flows.
7

f

it

�^ ^ &gt; r o p o s e d Action may cause substantial erosion.

2

Small to
Moderate
Impact

Potential
Large
Impact

D
D
D
D

•
D
•

Can Impact Be
Mitigated By
Project Change,
DYes

ONo

DYes

DNo

DYes

DNo

D

DYes

DNo

D

D

DYes

DNo

• Proposed Action will result in the incineration of more than 1 ton of
refuse per hour.

D

a

DYes

DNo

• Emission rate of total contaminants will exceed 5 lbs. per hour or a
heat source producing more than 10 million BTU's per hour.

D

D

DYes

DNo

• Proposed action will allow an increase in the amount of land committed
to industrial use.

D

D

DYes

DNo

• Proposed action will allow an increase in the density of industrial
development within existing industrial areas.

D

D

DYes

DNo

• Other impacts:

D

D

DYes

DNo

a

D

D Y es

ONc

•

•

DYes

DNo

• Application of pesticide or herbicide more than twice a year, other
than for agricultural purposes.

D

D

DYes

DNo

• Other

D

D

DYes

DNo

• Proposed Action would substantially interfere with any resident or
migratory fish, shellfish or wildlife species.

D

D

DYes

DNo

• Proposed Action requires the removal of more than 10 acres
— o f - m a t u r e forest (over~100 yea r s o f age) or other locally important
vegetation.

D

G

DYes

DNo

a

D

DYes

DNo

• Proposed Action is incompatible with existing drainage patterns.
• Proposed Action will allow development in a designated floodway.
• Other impacts:

IMPACT ON AIR
ENO
DYES
7. Will proposed action affect air quality?
Examples that would apply to column 2
• Proposed Action will induce 1,000 or more vehicle trips in any given
hour.

,

IMPACT O N PLANTS A N D ANIMALS
8. Will Proposed Action affect any threatened or endangered
species?
ENO
Examples that would apply to column 2

DYES

••• Reduction of one or more species listed on the New York or Federal
list using the site, over or near site or found on the site.
• Removal of any portion of a critical or significant wildlife habitat.

impacts.

9. Will Proposed Action substantially affect non-threatened or
non-endangered species?
ENO
Examples that would apply to column 2

DYES

I M P A C T ON AGRICULTURAL LAND RESOURCES
3

Will the Proposed Action affect agricultural land resources?
©NO
DYES
Examples that would apply to column 2
• The proposed action would sever, cross or limit access to agricultural
land (includes cropland, hayfields. pasture, vineyard, orchard, etc.)
8
NMHT

�struction activity would excavate or compact the soil profile of
ultural land.
The proposed action would irreversibly convert more than 10 acres
of agricultural land or, if located in an Agricultutal District, more
than 2.5 acres of agricultural land.
The proposed action would disrupt or prevent installation of agricultural
land management systems (e.g.. subsurface drain lines, outlet ditches,
strip cropping); or create a need for such measures (e.g. cause a farm
field to drain poorly due to increased runoff)
Other impacts:

IMPACT O N A E S T H E T I C RESOURCES
Will proposed action affect aesthetic resources?
ENO
DYES
(If necessary, use the Visual EAF Addendum in Section 617.21,
Appendix B.)
Examples that would apply to column 2
Proposed land uses, or project components obviously different from
or in sharp contrast to current surrounding land use patterns, whether
man-made or natural.
Proposed land uses, or project components visible to users of
aesthetic resources which will eliminate or significantly reduce their
enjoyment of the aesthetic qualities of that resource.
jBuect components that will result in the elimination or significant
l ^ ^ n i n g of scenic views known to be important to the area
Other impacts:

MPACT O N HISTORIC A N D A R C H A E O L O G I C A L RESOURCES
Will Proposed Action impact any site or structure of historic, prehistoric or paleontological importance?
K)NO
DYES
Examples that would apply to column 2
Proposed Action occurring wholly or partially within or substantially
contiguous to any facility or site listed on the State or National Register
}f historic places.
\ny impact to an archaeological site or fossil bed located within the
oroject site.
Proposed Action will occur in an area designated as sensitive for
archaeological sites on the NYS Site Inventory.
Other impacts:

IMPACT O N O P E N S P A C E A N D RECREATION
Wifl Proposed Action affect the quantity or quality of existing or
future open spaces or recreational opportunities?
^ b a m p l e s that would apply to column 2
El NO
DYES
^^^&gt;ermanent foreclosure of a future recreational opportunity.
\ major reduction of an open space important to the community.
J)ther impacts:

f

1

2

Small to
Moderate
Impact

Potential
Large
Impact

D

D

DYes

DNo

D

D

DYes

DNo

D

D

DYes

DNo

D

D

DYes

DNo

D

D

DYes

DNo

D

D

DYes

DNo

D

D

DYes

DNo

D

D

DYes

DNo

D

D

DY es

DNO

D

D

CYes

DNo

D

D

DYes

DNO

D

D

DYes

DNO

D
D
D

D
D
D

DYes
DYes
DYes

DNo
DNo
ONo

Can Impact Be
Mitigated By
Project Change

�1
Small to
Moderate
Impact

2

3

Potential
Large
Impact

Can Impact Bi
Mitigated ^ y
Project Char-ngi

• Alteration of present patterns of movement of people and/or goods

D

a

• Proposed Action will result in major traffic problems.

a

D
D

GYes
GYes
GYes

D^o
Dtr^o
D»o

a
a

D

GYes

G i flo

D

GYes

D No

D

D

GYes

G NO

a

a
a

GYes

O f No

D

GYes
GYes

CUNo
DUNo

IMPACT ON TRANSPORTATION
1 4 . Will there be an effect to existing transportation systems?
KINO
Examples that would apply to column 2

DYES

D

• Other impacts:

IMPACT O N ENERGY
1 5 . Will proposed action affect the community's sources of fuel or
energy supply?
S N O ^ DYES
Examples that would apply to column 2
• Proposed Action will cause a greater than 5% increase in the use of
any form of energy in the municipality.
• Proposed Action will require the creation or extension of an energy
transmission or supply system to serve more than 50 single or two family
residences or to serve a major commercial or industrial use.
• Other impacts:

N O I S E A N D ODOR IMPACTS
1 6 . Will there be objectionable op*ors, noise, or vibration as a result
of the Proposed Action?
ENO
DYES
Examples that would apply to column 2

• b

lasting within 1,500 feet of a hospital, school or other sensitive
facility.

D
D

• Odors will occur routinely (more than one hour per day).
• Proposed Action will produce operating noise exceeding the local
ambient noise levels for noise outside of structures.
• Proposed Action will remove natural barriers that would act as a
noise screen.

D

•

GYes

CONo

• Other

D

D

GYes

QNo

•

D

GYes

O

-GYes

- - O

impacts:

IMPACT O N PUBLIC HEALTH
1 7 . Will Proposed Action affect public health and safety?
BNO
Examples that would apply to column 2

DYES

• Proposed Action may cause a risk of explosion or release of hazardous
substances (i.e. oil. pesticides, chemicals, radiation, etc.) in the event of
accident or upset conditions, or there may be a chronic low level
discharge or emission.
• Proposed Action tnay-restHt4n^the burial^&gt;f "hazardous wastes'- in any
form. (i.e. toxic, poisonous, highly reactive, radioactive, irritating.
infectious, etc.)
Storage facilities for one million or more gallons of liquified natural
fgas or other flammable liquids.
• Proposed action may result in the excavation or other disturbance
within 2.000 feet of a site used for the disposal of solid or hazardous
waste.
Other impacts:
m

'

D

-

Q

•'••-

G

G

GYes

C3o

D

C

GYes

C3

GYes

O

a

�-'•

IMPACT ON GROWTH AND CHARACTER
OF C O M M U N I T Y OR N E I G H B O R H O O D
WiU'propos'ed action affect the character of the existing community?

ENO

DYES

1
Small to
Moderate
Impact

2
Potential
Large
Impact

D

D

DYes

DNO

•

D

DYes

DNo

D
D
D

D
D
D

DYes
DYes
DYes

DNo
DNo
DNo

•

DYes

DNo

DYes
DYes
DYes

DNo
DNo
DNo

3
Can Impact Be
Mitigated By
Project Change

Examples that would apply to column 2
permanent population of the city, town or village in which the
project is located is likely to grow by more than 5%.
The municipal budget for capital expenditures or operating services
will increase by more than 5% per year as a result of this project.
Proposed action will conflict with officially adopted plans or goals.
Proposed action will cause a change in the density of land use.
Proposed Action will replace or eliminate existing facilities, structures
or areas of historic importance to the community.
Development will create a demand for additional community services
[e.g. schools, police and fire, etc.)
Proposed Action will set an important precedent for future projects.

D

•
•

Proposed Action will create or eliminate employment.

•D

D
D

Other

impacts:

19. Is there, or is there likely to be, public controversy related to
potential adverse environmental impacts?
El N O
DYES

If Any Action in Part 2 Is Identified as a Potential Large Impact or
If You Cannot Determine the Magnitude of Impact, Proceed to Part 3

Part 3—EVALUATION OF THE IMPORTANCE OF IMPACTS
Responsibility of Lead Agency
rt 3 must be prepared if one or more impact(s) is considered to be potentially large, even if the impact(s) may be
itigated.
structions
scuss the following for each impact identified in Column 2 of Part 2:
Briefly describe the impact.
Describe (if applicable) how the impact could be mitigated or reduced to a small to moderate impact by project changes).
Based on the information available, decide if it is reasonable to conclude that this impact is important.
To answer the question of importance, consider:
• The probability of the impact occurring
• The duration of the impact
• Its irreversibility, including permanently lost resources of value
—
— • Whether the impact can or will be controlled
— —
~ &gt; The regional corisequence~6f t H e l m p a c t ~
. " • Its potential divergence from local needs and goals
• Whether known objections to the project relate to this impact.
ttinue on attachments)

11

&amp;

iai

.-

�Approved/)with respect to substance and form:

Village Attorn*
Dated:

Approved by the Planning Board

rvi;

lairman ^ r Acting Chainua
lated:

F i l e d with V i l l a g e Clerk

e±GT%r-or Deputy Clerk

Dated: ^£?J y W

�</text>
                  </elementText>
                </elementTextContainer>
              </element>
            </elementContainer>
          </elementSet>
        </elementSetContainer>
      </file>
    </fileContainer>
    <collection collectionId="135">
      <elementSetContainer>
        <elementSet elementSetId="1">
          <name>Dublin Core</name>
          <description>The Dublin Core metadata element set is common to all Omeka records, including items, files, and collections. For more information see, http://dublincore.org/documents/dces/.</description>
          <elementContainer>
            <element elementId="50">
              <name>Title</name>
              <description>A name given to the resource</description>
              <elementTextContainer>
                <elementText elementTextId="14838">
                  <text>Planning Board Minutes &amp; Resolutions-1994</text>
                </elementText>
              </elementTextContainer>
            </element>
          </elementContainer>
        </elementSet>
      </elementSetContainer>
    </collection>
    <itemType itemTypeId="1">
      <name>Text</name>
      <description>A resource consisting primarily of words for reading. Examples include books, letters, dissertations, poems, newspapers, articles, archives of mailing lists. Note that facsimiles or images of texts are still of the genre Text.</description>
    </itemType>
    <elementSetContainer>
      <elementSet elementSetId="1">
        <name>Dublin Core</name>
        <description>The Dublin Core metadata element set is common to all Omeka records, including items, files, and collections. For more information see, http://dublincore.org/documents/dces/.</description>
        <elementContainer>
          <element elementId="50">
            <name>Title</name>
            <description>A name given to the resource</description>
            <elementTextContainer>
              <elementText elementTextId="14189">
                <text>MINS_PLAN_1994-05-19</text>
              </elementText>
            </elementTextContainer>
          </element>
          <element elementId="49">
            <name>Subject</name>
            <description>The topic of the resource</description>
            <elementTextContainer>
              <elementText elementTextId="14190">
                <text>Planning Board Minutes &amp; Resolutions-1994</text>
              </elementText>
            </elementTextContainer>
          </element>
          <element elementId="40">
            <name>Date</name>
            <description>A point or period of time associated with an event in the lifecycle of the resource</description>
            <elementTextContainer>
              <elementText elementTextId="14191">
                <text>1994</text>
              </elementText>
            </elementTextContainer>
          </element>
        </elementContainer>
      </elementSet>
    </elementSetContainer>
  </item>
  <item itemId="2333" public="1" featured="0">
    <fileContainer>
      <file fileId="2333">
        <src>https://sleepyhollow.localarchives.org/files/original/ef65038f1f133275563b0fba15675160.pdf</src>
        <authentication>2031c41378c4ba535a6e41674e28658a</authentication>
        <elementSetContainer>
          <elementSet elementSetId="4">
            <name>PDF Text</name>
            <description/>
            <elementContainer>
              <element elementId="52">
                <name>Text</name>
                <description/>
                <elementTextContainer>
                  <elementText elementTextId="20820">
                    <text>REGULAR MEETING

NORTH TARRYTOWN, NEW YORK
JUNE 16,1994

A regular meeting of the North Tarrytown Planning Board was held on June
16,1994 at 8:00 P.M. in the Village Hall, 28 Beekman Avenue, North Tarrytown,
New York.

PRESENT: George Hritz, Chairman
Donald Caetano
Ellen Tsangaris
Steven Salman
James Donovan
Edward McCarthy
David Perlmutter
ALSO PRESENT: Janet Gandolfo, Attorney
James Margotta, Building Inspector
Joseph Gulino, CAMCE
Susan J. Portman, Assoc/Planning
Jose Blanco, Trustee

Chairman Hritz called the meeting to order at 8:00 P.M.
1.

176-178 North Washington Street - Subdivision.

Mr. Hughes: "May 1, Mr. Chairman, pass out these revised plans to show you
what I'm talking about" The plans were passed out. "We discussed this the last
time, it's a minor subdivision. We bad some delays here, we continue to have
delays. But anyway, there are a few items remaining to be done. I'm going to ask
you tonight to consider giving my client conditional approval to sub-divide this
properly. Only because it's such minor subdivision. These are two nonconforming structures owned by the same family. If you recall, one is a 4-famiIy
and a 1-family structure. They're non-conforming pieces. They have existed there
for many, many years and the only purpose of this is to allow this application, this
one family home to be sold separately. Nothing is to be changed in structure or
building by this application."
Chairman Hritz: "What about the driveways - are they both on Washington
Street?"
Mr. Hughes: "There's only one driveway".

�PAGE # 2

Chairman Hritz: "Are there any members of the public here for this matter
other than the applicant?"
No members of the public addressed the board.
Chairman Hritz: "There is one thing we need to do. We have a short form
EAF here available to members. Do we have a motion to make a negative
declaration."
Don Caetano: "So moved."
Ellen Tsangaris: "Second."
Chairman Hritz: "All in favor."
Motion carried unanimously.
Mr. Hughes: "There are two memorandaums which I have that both
consultants have agreed upon with minor changes."
Chairman Hritz: "Can you summarize them for us quickly, Susan?"
Susan Portman: "I think the two main comments that we had were to move
the subdivision line so as to divide the driveway without dividing up the front yard
of the single family house. Also, the plan should be revised to show the casements.
There was a discussion regarding the driveway between board and Mr.
Hughes.
Chairman Hritz: "Do we have a motion to make a negative declaration and
to grant conditional approval of the subdivision."
Edward McCarthy: "So moved."
Don Caetano: "Second."
Chairman Hritz: "AH in favor."
Motion carried unanimously.
2.

Application of Phelps Memorial Hospital Center for Site Plan Approval.

�PAGE # 3

The Chairman asked if there was any member of the public who wished to
address the Board. Todd Jack, site manager for the project was present on behalf
of the applicant.
Todd Jack: "Here's the site plans you requested for the fence."
Chairman Hritz: "Let me see that."
Todd Jack: "I'm presenting two documents. One is the site plan showing the
construction of the fence and the second one is the West parking lot.
Chairman Hritz: "Now, let me make a couple things clear. Has the distance
of the fence changed at all?"
Todd Jack: "No, it hasn't."
Chairman Hritz: "Has the configuration of the parking lot changed at all?"
Todd Jack: "No, it hasn't."
Chairman Hritz: "And the size is the same. This is just a specification of
what was previously discussed.?"
Todd Jack: "Correct."
Janet Gandolfo: "Are these the revised plans?" Does the building
department have a complete set of the revised plans?"
James Margotta: "This is what we have right now&gt;"
Chairman Hritz: "And this is a plan for a six foot fence?"
Todd Jack: "Correct."
Chairman Hritz: "If I could ask this council to discuss an idea that we had
on how to expedite the approval of a six foot fence. Phelps did not want to build a
six foot fence but we are reguesting this as an accommodatiom to the neighbors.
The fence is in the middle of the project, not along the outside of the property line.
If this board approves it, it isn't necessary to go back and forth to the Zoning
Board."
Attorney Gandolfo stated that the applicant would not need a variance. The
Planning Board can make this a requirement of the site plan approval.

T*

�PAGE #4

Chairman Hritz: And I understand the hospital has paid all the fees it owes
to date. Are there any further questions from any of the members of the board?
Any further comments.?
Attorney Gandolfo stated that she was concerned about the sewer hook-up
agreement between IBM, Phelps and the Village. They have had several meetings
regarding this issue and to date, the Village has not received a written proposal for
the terms of the agreement. She stated that this site plan approval would be
conditional upon the Village's engineer and counsel reviewing any agreement and
approving same. Phelps should understand that no Certificate of Occupancy
would be granted unless this agreement is executed.
Discussion continued about the hook-up between IBM and Phelps.
Chairman Hirtz: "Subject to these conditions, do we have a motion to
approve these plans."
Donald Caetano: "I make a motion to make a negative declaration and to
approve the plans according to the conditions stipulated by the board."
David Perlmutter: "Second."
Chairman Hritz: "All in favor?"
Motion carried unanimously.
3.

John and Maureen Petry - 41 Amos Street - Subdivision.

Chairman Hritz: "This next matter is John and Maureen Petry - 41 Amos
Street. This matter has been previously approved. What we're back here for the
approval of a resolution, which we had amended at our last meeting." He went on
to read the resolution.
Steven Salman: "I've got a question - when this lot is sold, do these
stipulations and conditions go along with the deed?"
Chairman Hritz: "Yes, this is the resolution adopted by the planning board
and any title the lawyer looking at the history of the property is going to discover
that there are restrictions and conditions of record."
Steven Salman: "We have seen it before where people come up to Jim
Margotta and they don't know about the conditions and then there is a problem."

�PAGE #5

Chairman Hritz: "That's their problem. When a person buys property he
should do a thorough search."
Steven Salman: "Does this go along with the deed when it's sold?"
Janet Gandolfo: "If a proper title search is done before purchase, the
Building Department is contacted and this file remains a record of the Building
Department."
Discussion continued about the resolution - the possible sale of the house and
the conditions being met.
Chairman Hritz: "As amended, is there a motion to approve the resolution?'
Don Caetano: "So moved."
Steven Salman: "Second"
Motion carried unanimously.
4.
Rock of Salvation, Cortlandt Street - Continuation of Public Hearing for Site
Plan Approval.
Chairman Hritz: "I can report that the sub-committee and representatives of
the Church and members of the Union Hose Fire Company met a few weeks ago to
discuss possible remedies to the vehicular and pedestrian traffic, as well as looking
at possible remedies for the parking problem. Also attending the meeting was Mr.
Jose Blanco, as a representative of the Board of Trustees. He is here with us
tonight. In order to expedite this matter, I took the liberty of suggesting to Mr.
Blanco that he raise a number of issues with the board in the work-section for
discussion. Those issues will be dealt with at a public hearing of the Board of
Trustees to be held on July 19. I would like to ask Mr. Blanco if he could report to
the board and the public as to the position of the Board of Trustees."
Mr. Jose Blanco: "I think basically the Board of Trustees discussed some
ideas - 1 made a sketch of them. I think I gave copies to everybody here. The idea
of the traffic light being by the firehouse went over well. Also, the yellow zone on
the curve, all the way around the Firehouse went well. Keep in mind that both of
these are still open for public hearing. We'll have to see what the public has to say
about this."

ft

Chairman Hritz: "Thank you." The chairman went on to discuss the ideas of
the sub-committee. What the sub-committee already did, based on the discussion at
the time, was to put everything on the table, including pre-existing situations.

i

�Trying to come up with some ideas on how to deal with problems that exist
presently with the Fire Department and also to explore further what additional
problems might arise as a result of site plan approval. The idea of the traffic light
being installed, Mr. McCathy's idea, right at the intersection of College Avenue Cedar Street - Cortlandt Street, which light could be activated from the Firehouse
so that the Police Department won't have to be called upon, was generally thought
to be a good idea.
Chairman Hritz went on to read other options being considered. He stated
that no solutions at this point have been made. He then asked if there were any
comments from the public.
Mr. Miguel Jimenez: "I'm resident of North Tarrytown and a member of the
Rock of Salvation Church. I don't know the intention of this board tonight. If they
going to take a vote or not on the Church. I know the public hearing takes 3
months before they make any kind of decision and I know the Church doesn't have
the resources in order to wait such a long period. We been waiting more than 3 or
4 months already. I know the board is considered this project very deep. As a
person, a community person, I implore to this board tonight to take a vote and to
grant a variance to the Rock of Salvation Church. Thank you."
Chairman Hritz: "Trustee Blanco, can you tell us what your best guess is of
when the parking and traffic light issues could be resolved by the Trustees."
Jose Blanco: "The first thing with the traffic light issue is to find out the
cost. At that point, prepare a resolution for the public hearing at a later date. For
the summer, we only have one official board meeting. So we may be looking for that
meeting in July."
Chairman Hritz: "What part of July is it?"
Jose Blanco: "Mid-July."
Chairman Hritz: "Before the 3rd Thursday in July?"
Jose Blanco: "I believe the meeting is going to be actually on July 19."
Discussion between Chairman Hritz and Jose Blanco continued about the
parking and the traffic light and the approval by the Board of Trustees.
Donald Caetano: "I don't feel that we should discuss anything further. I feel
that we should table it. We have to know what the Board of Trustees action is
going to be. I don't care what the lawyer says. We have to do this in a proper
manner so that the Village won't be liable in any way. I wish to make a motion on
the floor that this be tabled until further notification from our Board of Trustees

�about the traffic light. Whether it's going to be put in after the job is completed and
that they give their approval. I would like to have it clarified in all ways."
Chairman Hritz: "May i suggest that you hold your motion. There are a
couple of members who may want to speak."
Discussion continued about the traffic light and parking. Some members of
the audience stated their views.
Chairman Hritz stated that he felt that the general consensus of the Planning
Board was to approve the application but that they would like to work out these
issues prior to a vote. He indicated that a vote should be taken at the July meeting.
He attempted to assure the church that matters were being handled as expeditiously
as possible but that they did have to consider the concerns raised by the Fire
Department.
David Perlmutter: "We are going from a very low density use to a high
density use and I think that it behooves the Village to move slowly to make sure that
all concerns are addressed."
Donald Caetano: "I move to table this approval."
David Perlmutter: "Second."
Chairman Hritz: "All in favor?"
Motion carried unanimously.

5.

Prelimary discussion re: Philips Plaza, North Broadway

Antonio Rodriquez gave the board a brief overview of his project.
Adjourned to July meeting for further discussion.
The Planning Board confirmed that all previous Planning Board minutes
have been approved as amended and corrected and submitted to the Village Clerk.
There being no further business, the meeting was adjourned.
Respectfully submitted,
Carmen G. Mariano
Recording Secretary

_

�D R A F T
RESOLUTION
Adopted at the June 16, 1994 Meeting
of the Village of North Tarrytown Planning Board
RESOLUTION:

SUBDIVISION APPROVAL
PROPOSED ACTION: SUBDIVISION OF PROPERTY INTO TWO
(2) LOTS
OWNER AND APPLICANT: MARCELLO VISCOGLIOSI
LOCATION: 176-178 NORTH WASHINGTON STREET
TAX DESIGNATION: SECTION 16, BLOCK 8A, LOT 15
ZONING: R-5 RESIDENTIAL

�RESOLUTION
Adopted at the June 16, 1994 Meeting
of the Village of North Tarrytown Planning Board
RESOLUTION:

SUBDIVISION APPROVAL
PROPOSED ACTION: SUBDIVISION OF PROPERTY INTO TWO
(2) LOTS
OWNER AND APPLICANT: MARCELLO VISCOGLIOSI
LOCATION: 176-178 NORTH WASHINGTON STREET
TAX DESIGNATION: SECTION 16, BLOCK 8A, LOT 15
ZONING: R-5 RESIDENTIAL

WHEREAS, the Planning Board of the Village of North Tarrytown
has reviewed an application for subdivision approval (the
Application) pursuant to the Subdivision Regulations of the Village
of North Tarrytown, Chapter 62, Zoning, of the Code of the Village
of North Tarrytown and other requirements of the Village Code
considered pertinent to the application, which application is to
subdivide a property which is approximately 5,800 square feet in
size and is located on the east side of North Washington Street
into two (2) lots for residential development; and
WHEREAS, Lot 1 would be approximately 2,726 square feet in
size and would contain the existing single-family dwelling (176
North Washington Street) and Lot 2 would be approximately 3,082
square feet in size and would contain the existing four-family
dwelling and garage (178 North Washington Street), as shown on the
drawing originally prepared by John J. Muldoon, Professional Land
Surveyor, and further identified as follows:
"Subdivision Map Prepared For Marcello Viscogliosi &amp; Ellen
Balea, Situate Village of No. Tarrytown, Town of Mt. Pleasant,
Westchester Co., N.Y.," scale 1" = 10', dated January 20,
1994; and
WHEREAS, the presence of two (2) principal buildings on one
(1) lot is an existing non-conformity, which non-conformity will be
eliminated by this subdivision; and
WHEREAS, all references to the "Applicant" shall include the
Applicant's successor and assigns; and
WHEREAS, in July 1993, the Zoning Board of Appeals granted all
variances which that Board determined were necessary for this
subdivision application; and
WHEREAS, easements will be provided for the use of and access
to the common driveway and parking area; and

�WHEREAS, the Applicant has revised the location of the
proposed subdivision line on the plat, as requested by the Planning
Board; and
WHEREAS, the site has been visited by the Village's Planning
Consultant, Engineering Consultant and the Planning Board is
thoroughly familiar with the site and all aspects of the proposed
subdivision; and
WHEREAS, a duly advertised public hearing was held at the
Village Hall on May 19, 1994 and continued through June 16, 1994,
at which time those wishing to be heard were given the opportunity
to be heard; and
WHEREAS, in the course of this review and acting as Lead
Agency pursuant to Part 617 of the implementing regulations
pertaining to Article 8 of the Environmental Conservation Law, the
Planning Board has made the following findings and caused, noted or
conducted the following activities:
1.

Received an application fee of $250;

2.

Caused field inspections to be made of the property and of the
surrounding area;

3.

Referred the application to the Village of Tarrytown, pursuant
to Section 452 of the Westchester County Administrative Code
and the Village of North Tarrytown Subdivision Regulations,
and to the Westchester County Planning Board, pursuant to
Section 239-n of the General Municipal Law, because the
subject property is located within 500 feet of the municipal
boundary with the Village of Tarrytown;

4.

Requested, received and considered comments from the Village
Planning Consultant, the Village Engineering Consultant and
the Building Inspector;

5.

Requested, received and reviewed a full Environmental
Assessment Form (EAF) in compliance with the New York State
Environmental Quality Review Act (SEQRA);

6.

After review of said field conditions, recommendations and
EAF, as well as other materials and matters noted above, the
Planning Board declared itself the Lead Agency and issued a
"Negative Declaration" determination of non-significance of
environmental impact for this Type I Action on June 16, 1994.

NOW, THEREFORE, BE IT RESOLVED, that said application for
subdivision approval for a two (2) lot subdivision, as shown on the
drawing, "Subdivision Map Prepared For Marcello Viscogliosi &amp; Ellen
Balea, Situate Village of No. Tarrytown, Town of Mt. Pleasant,
Westchester Co., N.Y.," scale 1" = 10', dated January 20, 1994,
2

�prepared by John J. Muldoon, be and is hereby granted subdivision
approval and that the Applicant may obtain the endorsed approval of
the Planning Board Chairman or, as an alternate, the Village
Administrator, on a copy of this subdivision resolution and upon
the final mylar copy of the subdivision plat drawing revised as
necessary to show compliance with the following conditions, and the
Applicant may obtain the endorsement of the Westchester County
Department of Health on the final mylar subdivision plat which
endorsements shall permit filing in the offices of the Westchester
County Clerk, provided, however, that this subdivision approval
shall expire within one hundred eighty (180) days from the date of
this resolution if the following conditions have not been completed
to the satisfaction of the Planning Board:
1.

The Applicant shall pay to the Village of North Tarrytown the
reimbursement of all application review fees as noted and
required in Section 62-30(f) of the Village Zoning Code.

2.

Revision of the above noted plat to demonstrate the following:

3.

2.1

The plat shall be revised and titled "Final Subdivision
Plat;"

2.2

The plat shall be revised to show the correct street
addresses of the existing buildings;

2.3

The final plat shall comply with the requirements of
Section 11 of the Village of North Tarrytown Subdivision
Regulations;

2.4

The signature block for the endorsement of the Planning
Board Chairman shall be revised to comply with Section
ll.A(l)(c)(14c);

2.5

The parking and driveway easements shall be shown on the
plat;

2.6

The date of this resolution shall be noted on the final
subdivision plat.

The Applicant shall comply with the requests of the Village
Engineering Consultant in his memorandum dated April 28, 1994.

PLANNING BOARD
VILLAGE OF NORTH TARRYTOWN

500\not4-044.sjp.crc

3

�FREDERICK P. CLARK A S S O C I A T E S , I N C .
Planning/Development/Environment/Transportation
Rye, New York and Southport, Connecticut

David J. Portman, AICP
Howard I. Reynolds, PE
David H. Stolman, AICP

350 Theodore Fremd Avenue
Rye, New York 10580
(914) 967-6540

Michael A. Galante
Joanne P Meder, AICP
Jim Donovan, RLA, ASLA

MEMORANDUM
To:

Village of North Tarrytown Planning Board

Date:

June 10, 1994

Subject:

Review of Philipse Plaza Site Plan

As requested, we have reviewed the site plan application known as
"Philipse Plaza" for a property approximately 42,800 square feet in
size located along the east side of North Broadway, opposite
Philipsburg Manor and the intersection of North Broadway and
Pocantico Street, in the C-l Highway Commercial District.
The
Philipse Plaza site plan application was originally submitted to
the Planning Board in February 1993 and was reviewed through June
1993, at which time the Applicant requested the deferral of the
review until this recent submission. This site plan submission is
slightly different from the version of the plan the Board reviewed
last spring.
The property currently contains two buildings. One building houses
Antonio Cabinetry (a manufacturing use) and the other contains
Uncle Jerry's Italian Deli (a delicatessen use). Antonio Cabinetry
was the subject of a site plan application which was approved
February 20, 1992, and received use and area variances.
The Applicant is proposing to remove the existing delicatessen
building, replace it with a two-story commercial building
(containing retail uses on the first floor and office on the
second) and continue the manufacturing use of the Antonio Cabinetry
building. The proposed building will contain 11,680 square feet of
floor area, including 5,040 square feet of retail space and 6,640
square feet of office space. This is an increase of 1,280 square
feet from the plan drawings submitted previously. The Applicant
has proposed that the delicatessen building remain standing and in
operation until the new building is complete. Part of the site is
steep and much of it is proposed to be regraded.
The Applicant has submitted the following plans:
1.

Sheet CA, Sketch of Proposed Facade, "Philipse Plaza, Village
of North Tarrytown, New York," dated February 22, 1993 and
most recently revised April 26, 1994, prepared by Contadino
Architects;

Connecticut • (203) 255-3100

FAX • (914) 967-6615

Long Island • (516) 364-4544

�FREDERICK P. CLARK ASSOCIATES, INC.
Planning/Development/Environment/Transportation

2.

Sheet 1, "Site Survey, Topographic Map Prepared For Antonio &amp;
Linda Rodrigues, Situate Village of No. Tarrytown, Town of Mt.
Pleasant, Westchester Co., New York," scale 1" = 20*, dated
April 5, 1993 and most recently revised April 26, 1994,
prepared by Contadino Architects and John J. Muldoon;

3.

Sheet 2, "Area Map, Site Plan, Philipse Plaza, Village of
North Tarrytown, New York," scale 1" = 2 0 ' , dated April 26,
1994, prepared by Contadino Architects;

4.

Sheet 3, "Site Grading Plan, Philipse Plaza, Village of North
Tarrytown, New York," scale 1" = 20', dated April 26, 1994,
prepared by Contadino Architects;

5.

Sheet 4, "Deli Operation Plan, Philipse Plaza, Village of
North Tarrytown, New York," scale 1" = 2 0 ' , dated April 26,
1994, prepared by Contadino Architects;

6.

Sheet 5, Visual Impact, "Philipse Plaza, Village of North
Tarrytown, New York," scale 1" = 10', dated April 26, 1994,
prepared by Contadino Architects;

7.

Sheet 6, "Ground Floor Plan, Second Floor Plan, Philipse
Plaza, Village of North Tarrytown, New York," scale 1/8" = 1',
dated April 26, 1994, prepared by Contadino Architects; and

8.

Sheet 7, Elevations, "Philipse Plaza, Village of North
Tarrytown, New York," dated February 22, 1993 and most
recently revised April 26, 1994, prepared by Contadino
Architects.

REVIEW COMMENTS
1.

Antonio Cabinetry:
The site plan approval for Antonio
Cabinetry was for the conversion of an existing 8,800 square
foot building. The Applicant received the necessary area and
use variances to operate a light manufacturing use in the C-l
District. In its January 7, 1991 review of the variances, the
Westchester County Planning Board recommended:
"The Village should consider the practicality of the
proposed parking layout. The current plan appears to
have limited turnaround and aisle areas. The plan should
be reviewed to ensure that cars will not be required to
back out onto the State highway."

2

�FREDERICK P. CLARK ASSOCIATES, INC.
Planning/Development/Environment/Transportation

Recognizing the limitations of the parking design, in a
February 20, 1992 memorandum to the Village of North Tarrytown
Planning Board, our firm recommended that:
" . . . any approvals that may be forthcoming with regard
to the cabinetry shop application be conditioned upon a
requirement that the cabinet shop's parking area be
reexamined whenever an application is made for the
redevelopment of the remainder of the property. In this
way, at some point in the future, it may be possible to
improve upon the type parking and circulation area shown
on this plan."
The resolution of site plan approval, dated February 22, 1992,
included the following condition:
"2.

The applicant shall apply for amended site plan approval
so as to revise his parking and circulation plan to the
satisfaction of the Planning Board at the time of
application for any site plan approval, subdivision
approval or building permit that affects the remaining
portion of the property . . . located immediately to the
north of the proposed kitchen cabinet manufacturing shop
and associated parking area."

The Code will only allow more than one principal building on
a property when it is designed as a "planned development
group." The parking and loading area for Antonio Cabinetry
should be redesigned and coordinated with that which is being
proposed on the remainder of the site. The entire site should
be shown on the proposed site plan and this application should
then be considered an application for amended site plan
approval affecting all uses on the entire lot.
2.

Zoning Compliance: The proposed retail and office uses are
consistent with the Village's plans, including the December
1993 "C-l Highway Commercial District Planning and Zoning
Study," and the principal uses permitted by the Zoning Code in
the C-l District.
The C-l District does not require a minimum lot size, minimum
lot width or minimum side yard setbacks for the proposed uses.
The site appears to comply with the maximum lot coverage for
a planned development group of 35%. The proposed building
complies with the required minimum front yard setback. The
proposed building does not comply with the required minimum
rear yard setback of 2 0 feet as only 15 feet is provided. The
plan will either need to be revised or a variance obtained
from the Zoning Board of Appeals (ZBA) .

3

�FREDERICK P. CLARK ASSOCIATES, INC.
Planning/Development/Environment/Transportation

The maximum building height permitted is 35 feet and the
proposed building is 35 feet at its highest point. (However,
according to the Code, building height for a sloped roof is
measured as the average of the slope, which would probably be
about 31 feet in the case of the proposed building.)
3.

Parking and Loading: We assume that the entire first floor
will be retail and service business uses and not contain other
uses (such as a restaurant with seats, which has a different
parking standard). Based on the parking standards for office
and retail uses, a minimum of 47 parking spaces are required.
However, only 40 spaces are shown on the plan. Also, the plan
notes that 32%, or 13, of the spaces are designed for compact
cars. The Zoning Code requires spaces to be 9' X 20' and
those spaces which are not designated "compact" on the plan
are shown as 10' X 18'. The reduction in number of parking
spaces and the change in size of the parking space should
either be revised or variances obtained from the ZBA. In
addition, the eight spaces required for the Cabinetry building
should be shown on the plan.
The aisle shown on the site plan is 20 feet wide.
We
recommend a 24-foot wide aisle. However, if the aisle is
widened, the extra few feet will have to be taken from the
building and/or the rear yard. The Applicant should consider
using angled parking and one-way traffic flow. Also, the site
plan should try to incorporate a continuous sidewalk along its
frontage.
Two handicap spaces are shown on the plan. However, including
the required parking for Antonio Cabinetry, the total number
of required parking spaces on the site would be 55. Three of
the 55 required spaces must be designed for handicapped use.
A handicapped-accessible ramp from the parking area to the
walkway arcade should also be provided.
One loading space is shown on the plan. Because the total
floor area of the buildings on the site would exceed 20,000
square feet, two loading spaces may be required.

4.

Circulation and Traffic:
The site is located on North
Broadway (Route 9) opposite the intersection of Pocantico
Street and the entrance to Philipsburg Manor. It is proposed
that two access drives be provided with one directly to North
Broadway and, to the north, an access drive located on the
portion of North Broadway to the east of the "grass island."
The existing use has an almost continuous curb cut along North
Broadway, and a traffic signal facing the driveway opposite
4

�FREDERICK P. CLARK ASSOCIATES, INC.
Planning/Development/Environment/Transportation

Pocantico Street. With the proposed redevelopment of the
site, the Applicant would restrict access to two drives and,
therefore, the existing traffic signal at North Broadway and
Pocantico Street would no longer control access to this site.
We recommend that a limited traffic study be prepared to
evaluate impact of this development on North Broadway in the
vicinity of the site. It is recommended that the traffic
study be conducted during weekday morning and afternoon peak
hours and the Saturday midday peak hour at the intersection of
North Broadway and Pocantico Street/Philipsburg Manor
(including the intersection with the portion of North Broadway
located to the east of the southern end of the grass island)
and the North Broadway intersection at East Gordon
Avenue/Pierson Avenue, located north of the Pocantico Street
intersection. In addition, the two proposed access drives
should be evaluated during the same time periods with a oneway concept plan and with two-way access drive traffic flow,
for comparison purposes.
5.

Landscaping and Buffers; To the east of the property is an R4 Residence District. Section 62-9C(2) of the Code states
that the required five-foot wide buffer strip between nonresidential uses and residential districts, "shall be in
addition to any side or rear yard measurements." The plan
does not show the required buffer area, which would increase
the aggregate rear yard setback requirement to 2 5 feet as
compared with the 15 feet proposed by the Applicant. The
Applicant should either revise the plan to include the
required buffer or try to obtain a variance from the Zoning
Board of Appeals. That section of the Code also allows the
Planning Board to require a fence to be provided in the buffer
strip. However, due to the change in grade, it is not clear
that a five-foot high fence would block the view of the nonresidential use from the residences above. In combination
with the regrading and the removal of existing landscaping and
trees, the plan proposes to terrace the rear of the property.
We recommend increasing the amount of landscaping in this area
in order to replace the existing vegetation that will be
removed and as an added buffer for the houses to the east,
particularly if the variances are granted.
The current site plan does not show landscaping.
A
landscaping plan should be submitted to the Board which will
include a plant list containing plant species, number and
size.

6.

Environmental Review: According to Part 617.12 of the State
Environmental Quality Review Act (SEQR), the site plan and
5

�FREDERICK P. CLARK ASSOCIATES, INC.
Planning/Development/Environment/Transportation

variances for the subject property constitute a Type I action.
The reasons for this determination are that the action is
located "substantially contiguous to" Philipsburg Manor (which
is listed on the National Register of Historic Places and is
also a National Historic Landmark) and the Hudson River
Shoreline Critical Environmental Area.
The Applicant is
required to submit a full Environmental Assessment Form (EAF).
We understand that this is being prepared.
A Type I action is required to undergo a "coordinated review"
by the involved agencies. After review of the full EAF, the
Planning Board may declare its intent to be Lead Agency in the
review of this action. A notice of intent to be Lead Agency
should then be circulated to the involved agencies (i.e.,
agencies with approval authority, including the ZBA) and
interested agencies (e.g., agencies, such as the New York
State Department of Environmental Conservation, which maintain
an interest in the application but do not have direct approval
authority). After 30 days or receipt of the responses from
the other agencies, whichever comes first, the Planning Board
may declare itself Lead Agency, provided no other involved
agency objects, and make a Determination of Significance.
The Lead Agency's preparation of a Negative Declaration or a
Findings Statement (following a Positive Declaration and the
preparation of an Environmental Impact Statement) will
complete the SEQR review process. We would recommend that the
ZBA defer its final decision until the SEQR process is
completed.
7.

Referral:
Section 239-m of the New York State General
Municipal Law requires the referral to the Westchester County
Planning Board of actions including review of site plans and
variances within 500 feet of any State highway (North Broadway
is a State highway). However, as this was done about a year
ago and as the site plan has not been changed substantially,
it is our opinion that it would not be necessary to forward
the application again. The following are the comments that
the County had provided in a letter dated April 21, 1993 from
Joseph Potenza to James Margotta:
The proposed plan should be submitted to the New York
State Department of Transportation (NYSDOT) for their
review and approval.
The proposed number of on-site parking spaces is
consistent with the benchmark standards for off-street
parking recommended in the County Planning Department's
publication on Off-Street Parking.
6

�FREDERICK P. CLARK ASSOCIATES, INC.
Planning/Development/Environment/Transportation

Mixed use development at this location in the village, as
proposed, is consistent with the principles of the County
Planning Board's proposed Patterns For Westchester: The
Land and the People.
The general appearance of this area as viewed from the
state highway would be improved by the proposed
development. Comments more specifically relating to the
potential impacts on the nearby Philipsburg Manor have
been provided by the County's Historic Preservation
Planner and are enclosed.
In the attachment to that letter from Karen Kennedy, Historic
Preservation Planner, Kennedy recommends specific building
materials and that the Village communicate with the State
Historic Preservation Office (SHPO) for comment on the
proposed building due to its proximity to Philipsburg Manor.
8.

Further Information: The plan should be revised to show the
entire lot, including the Antonio Cabinetry building and
parking area, as well as to respond to the above comments. If
any freestanding signs are proposed, information regarding the
dimensions and locations of the signs should also be provided.
Michael A. Galante, Vice President/Transportation
Susan J. Portman, AICP, Associate/Planning

cc:

Linda E. David, Village Administrator
Janet A. Gandolfo, Esq., Village Attorney
James T. Margotta, Building Inspector
Joseph A. Gulino, PE, Village Engineer
Louis Contadino, AIA

500\not4-039.sjp.crc

7

�FREDERICK P. CLARK ASSOCIATES, I N C .
Planning/Development/Environment/Transportation
Rye, New York and Southport, Connecticut

David J. Portman, AICP
Howard I. Reynolds, PE
David H. Stolman, AICP

350 Theodore Fremd Avenue
Rye, New York 10580
(914) 967-6540

Michael A. Galante
Joanne P. Meder, AICP
Jim Donovan, RLA, ASLA

MEMORANDUM
To:

Village of North Tarrytown Planning Board

Date:

June 10, 1994

Subject:

Planning Board Meeting, June 16, 1994.

As requested, I have enclosed the following materials for your
consideration:
1.

Draft Resolution of Subdivision Approval for the Petry/DeCarlo
Subdivision Application

2.

Memorandum Regarding the Philipse Plaza Site Plan Application

3.

Parts l and 2 of the Environmental Assessment Form for the
Viscogliosi Subdivision (176-178 North Washington Street).
Susan J. Portman, AICP, Associate/Planning

Enclosures
cc:

Linda E. David, Village Administrator
Janet A. Gandolfo, Esq., Village Attorney
James T. Margotta, Building Inspector
Joseph A. Gulino, PE, Village Engineer

500\not4-040.sjp

Connecticut • (203) 255-3100

FAX • (914) 967-6615

Long Island • (516) 364-4544

�D R A F T
RESOLUTION
Adopted at the May 19, 1994 Meeting
of the Village of North Tarrytown Planning Board
RESOLUTION:

SUBDIVISION APPROVAL
PROPOSED ACTION: SUBDIVISION OF PROPERTY INTO TWO
(2) LOTS
OWNER: ESTATE OF ANNA DE CARLO
APPLICANT: JOHN AND MAUREEN PETRY
LOCATION: 41 AMOS STREET AND THE EASTERN SIDE OF
WEBBER AVENUE
TAX DESIGNATION: SECTION 17, BLOCK 7, LOT 18
ZONING: R-3 RESIDENTIAL

�V

RESOLUTION
Adopted at the May 19, 1994 Meeting
of the Village of North Tarrytown Planning Board
RESOLUTION:

SUBDIVISION APPROVAL
PROPOSED ACTION: SUBDIVISION OF PROPERTY INTO TWO
(2) LOTS
OWNER: ESTATE OF ANNA DE CARLO
APPLICANT: JOHN AND MAUREEN PETRY
LOCATION: 41 AMOS STREET AND THE EASTERN SIDE OF
WEBBER AVENUE
TAX DESIGNATION: SECTION 17, BLOCK 7, LOT 18
ZONING: R-3 RESIDENTIAL
WHEREAS, the Planning Board of the Village of North Tarrytown
has reviewed an application for subdivision approval (the
Application) pursuant to the Subdivision Regulations of the Village
of North Tarrytown, Chapter 62, Zoning, of the Code of the Village
of North Tarrytown and other requirements of the Village Code
considered pertinent to the application, which application is to
subdivide property located on the western side of Amos Street and
the eastern side of Webber Avenue at 41 Amos Street into two (2)
lots for single-family residential development; and
WHEREAS, Lot 1 would be approximately 6,554.4 square feet in
size and would contain the existing dwelling and Lot 2 would be
approximately 5,999.7 square feet in size, as shown on the drawing
prepared by John J. Muldoon, Professional Land Surveyor, and
further identified as follows:
"Subdivision of Lands of the Estate of Anna DeCarlo, Situate
at North Tarrytown, Town of Mount Pleasant, Westchester
County, N.Y.," scale 1" = 20', dated April 7, 1994; and
WHEREAS, the Applicant proposes to remove the existing garage
and driveway from Lot 2; and
WHEREAS, the Applicant will provide a driveway and a parking
space for the existing house on Lot 1 off of Webber Avenue; and
WHEREAS, as per Section 12B(2)(b) of the Subdivision
Regulations, the Applicant has shown on the plat a strip of land to
be dedicated which is 0.25 feet wide extending along the entire
frontage of both Lots 1 and 2 along Webber Avenue; and
WHEREAS, the site has been visited by the Village's Planning
Consultant, Engineering Consultant and the Planning Board is
thoroughly familiar with the site and all aspects of the proposed
subdivision; and

�WHEREAS, a duly advertised public hearing was held at the
Village Hall on May 19, 1994, at which time those wishing to be
heard were given the opportunity to be heard; and
WHEREAS, in the course of this review and acting as Lead
Agency pursuant to Part 617 of the implementing regulations
pertaining to Article 8 of the Environmental Conservation Law, the
Planning Board has made the following findings and caused, noted or
conducted the following activities:
1.

Received an application fee of $2,510;

2.

Caused field inspections to be made of the property and of the
surrounding area;

3.

Referred the application to the Westchester County Planning
Board pursuant to Sections 239-1, m and n of the General
Municipal Law because the subject property is located on a
County road (Webber Avenue);

4.

Requested, received and considered comments from the Village
Planning Consultant, the Village Engineering Consultant and
the Building Inspector;

5.

Requested, received and reviewed a short Environmental
Assessment Form (EAF) in compliance with the New York State
Environmental Quality Review Act (SEQRA) ;

6.

After review of said field conditions, recommendations and
EAF, as well as other materials and matters noted above, the
Planning Board has determined that the proposed action is an
Unlisted Action and made a Negative Declaration on March 17,
1994, and noted on the EAF its determination of nonsignificance of environmental impact.

NOW, THEREFORE, BE IT RESOLVED, that said application for
subdivision approval for a two (2) lot subdivision, as shown on the
drawing entitled "Subdivision of Lands of the Estate of Anna
DeCarlo Situate at North Tarrytown, Town of Mount Pleasant,
Westchester County, N.Y.", scale 1" - 20', dated April 7, 1994,
prepared by John J. Muldoon, Professional Land Surveyor, be and is
hereby granted subdivision approval and that the Applicant may
obtain the endorsed approval of the Planning Board Chairman or, as
an alternate, the Village Administrator, on a copy of this
subdivision resolution and upon the final mylar copy of the
subdivision plat drawing revised as necessary to show compliance
with the following conditions, and the Applicant may obtain the
endorsement of the Westchester County Department of Health on the
final subdivision plat which endorsements shall permit filing in
the offices of the Village Building Department, for purposes of
obtaining a building permit in accordance with this resolution and
all building code requirements, and the offices of the Westchester

2

�County Clerk, provided, however, that this subdivision approval
shall expire within one hundred eighty (180) days from the date of
this resolution if the following conditions have not been completed
to the satisfaction of the Planning Board and the Applicant has not
obtained a building permit for construction of the driveway and
parking space on Lot 1:
1.

All references to the "Applicant"
Applicant's successor and assigns.

2.

The Applicant shall pay to the Village of North Tarrytown:

3.

shall

include

the

2.1

An inspection fee for construction inspection of the
property for compliance with this resolution, including
the provision of a driveway and parking space on Lot 1,
in accordance with the Village of North Tarrytown Zoning
Code;

2.2

The reimbursement of all application review fees as noted
and required in Section 62-30(f) of the Village Zoning
Code.

Revision of the above noted plat to demonstrate the following:
3.1

The plat shall be revised and titled "Final Subdivision
Plat;"

3.2

The dimensions of the parking space and driveway for Lot
1 shall be shown on the plat;

3.3

A line shall be provided for the endorsement of the
Westchester County Department of Health;

3.4

The date of this resolution shall be noted on the final
subdivision plat.

4.

The Applicant shall obtain all necessary approvals being
granted by the appropriate Westchester County approval
authorities with regard to the driveway to be constructed on
Lot 1 off of Webber Avenue.

5.

The Applicant shall comply with the requests of the
Westchester County Department of Public Works as described in
the letter from the Westchester County Planning Board to James
T. Margotta dated March 30, 1994.

6.

The Applicant shall comply with the requests of the Village
Engineering Consultant as described in his memorandum to the
North Tarrytown Planning Board dated April 28, 1994.

3

�7.

The owners of the adjacent property shall be permitted to
submit a report prepared by their consultant for review by the
Village Engineering Consultant.

8.

The driveway and parking space on Lot 1 and any future
improvements on Lot 2 shall be constructed so as to yield no
net increase in stormwater runoff. The drainage plan for Lot
1 and, at that time that a house and driveway may be proposed
for construction on Lot 2, the drainage plan for Lot 2 shall
be prepared to the satisfaction of the Village Engineering
Consultant. The driveway for Lot 2 shall be graded so as to
slope towards the south, away from the neighboring property to
the north.

9.

Prior to the issuance of a certificate of occupancy for the
driveway and parking space on Lot 1, the Applicant shall
submit to the Village Building Inspector a mylar reproduction
of the plat complete with the certification of a professional
architect
and/or
professional
engineer
attesting
to
construction of the site improvements as shown thereon.

10.

The driveway and parking space on Lot 1 shall be completed to
the satisfaction of the Village Building Inspector within
eighteen (18) months from the date of the issuance of a
building permit and prior to the issuance of a certificate of
occupancy. The Planning Board may issue an extension on this
time limit, or may modify any of the above conditions with
respect thereto, for good cause.

11.

The Planning Board reserves the right to make a final field
inspection of the project after construction of the
improvements, upon notice of the Building Inspector, and
before the issuance of a certificate of occupancy.
The
purpose of this final inspection is to review the development
and to require any modifications to parking, drainage, access,
paving and other details, which do not comply with the
approved plat and the interest of safety, convenience,
aesthetics and the enjoyment and peace and quiet of adjacent
neighbors.

PLANNING BOARD
VILLAGE OF NORTH TARRYTOWN
By:

Date:
George F. Hritz, Chairman
Village of North Tarrytown Planning Board

500\not4-012.sjp.crc

4

�J

Approved w i t h r e s p e c t t o s u b s t a n c e and form:

Viljlage A t t o r n
Dailed:

Approved by the Planning Board

Filed with Village Clerk

-Clerk or- Deputy Clerk
Dated:

Date of (Meeting

�</text>
                  </elementText>
                </elementTextContainer>
              </element>
            </elementContainer>
          </elementSet>
        </elementSetContainer>
      </file>
    </fileContainer>
    <collection collectionId="135">
      <elementSetContainer>
        <elementSet elementSetId="1">
          <name>Dublin Core</name>
          <description>The Dublin Core metadata element set is common to all Omeka records, including items, files, and collections. For more information see, http://dublincore.org/documents/dces/.</description>
          <elementContainer>
            <element elementId="50">
              <name>Title</name>
              <description>A name given to the resource</description>
              <elementTextContainer>
                <elementText elementTextId="14838">
                  <text>Planning Board Minutes &amp; Resolutions-1994</text>
                </elementText>
              </elementTextContainer>
            </element>
          </elementContainer>
        </elementSet>
      </elementSetContainer>
    </collection>
    <itemType itemTypeId="1">
      <name>Text</name>
      <description>A resource consisting primarily of words for reading. Examples include books, letters, dissertations, poems, newspapers, articles, archives of mailing lists. Note that facsimiles or images of texts are still of the genre Text.</description>
    </itemType>
    <elementSetContainer>
      <elementSet elementSetId="1">
        <name>Dublin Core</name>
        <description>The Dublin Core metadata element set is common to all Omeka records, including items, files, and collections. For more information see, http://dublincore.org/documents/dces/.</description>
        <elementContainer>
          <element elementId="50">
            <name>Title</name>
            <description>A name given to the resource</description>
            <elementTextContainer>
              <elementText elementTextId="14185">
                <text>MINS_PLAN_1994-06-16</text>
              </elementText>
            </elementTextContainer>
          </element>
          <element elementId="49">
            <name>Subject</name>
            <description>The topic of the resource</description>
            <elementTextContainer>
              <elementText elementTextId="14186">
                <text>Planning Board Minutes &amp; Resolutions-1994</text>
              </elementText>
            </elementTextContainer>
          </element>
          <element elementId="40">
            <name>Date</name>
            <description>A point or period of time associated with an event in the lifecycle of the resource</description>
            <elementTextContainer>
              <elementText elementTextId="14187">
                <text>1994</text>
              </elementText>
            </elementTextContainer>
          </element>
        </elementContainer>
      </elementSet>
    </elementSetContainer>
  </item>
  <item itemId="2282" public="1" featured="0">
    <fileContainer>
      <file fileId="2282">
        <src>https://sleepyhollow.localarchives.org/files/original/bd4c86e2bc1b2287d485cd4a0ddf5faa.pdf</src>
        <authentication>0d3c332ce6d2376f910c9e1e76024f35</authentication>
        <elementSetContainer>
          <elementSet elementSetId="4">
            <name>PDF Text</name>
            <description/>
            <elementContainer>
              <element elementId="52">
                <name>Text</name>
                <description/>
                <elementTextContainer>
                  <elementText elementTextId="20769">
                    <text>REGULAR MEETING
~"~

NORTH TARRYTOWN, NEW YORK
JANUARY 20th, 1994

A regular meeting of the North Tarrytown Planning
Board was held on January 20th, 1994 at 8:00 P.M. In the
Village Hall, 28 Beekman Avenue, North Tarrytown, New York.
PRESENT:

George H r l t z , Chairman
Steve Salman
Ellen Tsangarls
Donald Caetano

James Donovan
Roman Windas
Edward McCarthy
ALSO PRESENT: Janet Gandolfo, Attorney
Susan Portman, Clark Associates
Joe Gulino, CAMCE
James Margotta, Building Inspector
Chairman Hritz called the meeting to order at 8:05 P.M.
1.

Phelps Memorial Hospital Medical Office Building-Fence.

Mr. Todd Jack, representing Phelps Memorial Hospital
presented changes to draft resolution dated December 16th, 1993
asking for approval of the Board, in order to proceed with the
installation of the fencing. (Copy in official minutes).
Discussion followed regarding the height of the fence
to be installed and it was determined that a six foot fence would
need a variance from the Zoning Board. The matter was referred to
the Zoning Board with the Planning Board urging the Zoning Board
to grant a variance allowing a six foot fence to be installed.
After a discussion it was agreed that Items 2.4
and 2.5 were agreeable to the Board.
Due to the matter being referred to the Zoning Board
Chairman Hritz stated that no action would be taken on the proposed
amendments until the February meeting of the Board.
2.

Route 9 Corridor (C-l District) Zone Changes.

Chairman Hritz stated that the members of the Board had
received correspondence regarding the zoning changes of Route 9.
He stated the Board of Trustees has referred the matter to the
Board to consider.
Susan Portman outlined the proposed zoning text
amendements as submitted in her memorandum to the Board of Trustees
dated December 31st, 1993. (Copy in official minutes).
Ms. Gandolfo stated that any present use that does not
conform to the new code will be allowed to continue, unless it
is abandoned for more than one year.

�-2Mr. Hritz stated the. Board is interested in reviewing
the zoning changes proposed and their job is to make recommendations to the Board of Trustees.
Discussion followed regarding enforcement of the code,
the defining the definition of "junked cars", complaints whether
oral or written. It was also recommended that "Commercial" or
"Highway Commercial" be changed to "Historic Preservation".
Mr. Salman moved, seconded by Mr. Donovan that the
Planning Board accede to the Board of Trustees and that the
Board of Trustees be the Lead Agency. Carried.
Chairman Hritz asked if there was anyone present who
would like to address the Board.
Mr. Emil Frandsen, 162 Highland Avenue, stated he was
the owner of property on Route 9 which houses an Animal Hospital,
and Auto Body Repair Shop and a Meinke Muffler Shop. He would
like to know if the new zoning would have any effect on this type
of business.
Ms. Gandolfo stated that the mentioned businesses would
continue to be non-conforming.
Mr. Donovan stated if the code was too restrictive
businesses would not want to come into North Tarrytown.
Mr. Eddie Keegan, 285 North Broadway informed the Board
he has been in business in North Tarrytown for over fourteen
years and prior to that in business in White Plains for over
forty-two years. He feels that changing the zoning would not
be in the best interest of the business people.
Mr. Hritz stated he would draft a letter to be sent to
the Board of Trustees urging them to take into consideration
the issues raised and asking them to improve the appearances
of the area to prepare for the increased tourism.
3.

Gerald Bregman-185 Valley Street-Stores and Apartments.

Mr. Ron Turnquist, Architect for the project presented
plans and model of proposed project. Mr. Turnquist stated that
there will be five retail st&amp;res and five apartments facing
Chestnut Street. He stated the project has received the various
variances for sideyards, rear yards and parking. Mr. Turnquist
stated that parking will be provided for the apartments on the
property at 76 Chestnut Street. Mr. Turnquist stated that Mr.
Rodrigues is in the process of purchasing 76 Chestnut Street
and will create 18 parking spaces, of which 8 parking spaces
will be for the project and 10 will be dedicated to the village
for off-street parking. He stated that the Zoning Board oi
Appeals did stipulate that the parking will have to be constructed

�-3at the same time as the dwelling units, and before a Certificate
of Occupancy was issued.
Mr. Turnquist stated that the roof area of the building
was turned into a sitting area and will be landscaped and paved,
with benches to be installed for resting.
Susan Portman, Clark Associates presented memorandum
dated January 13th, 1994 reviewing the Site Plan. (Copy in
official minutes).
Mr. Joe Gulino, CAMCE Engineer stated they have reviewe
the revised site plan dated December 10th, 1993 and offered a
memorandum dated January 17th, 1994 outlining their comments
regarding foundation of present building, located and design of
proposed water supply, sewage disposal and drainage systems.
(Copy in official minutes).
Ms. Portman stated that Mr. Turnquist has submitted
a long form EAF which will be reviewed.
After a discussion, Mr. Caetano moved, seconded by
Mr. Donovan that this is a Type I Action and will have no
significant effect on the environment and that the Board accept
the plans as submitted and allow the applicant to proceed with
the project. Carried.
Mr. Caetano moved, seconded by Mr. Donovan that the
Planning Board be declared the lead Agency for this action.
Carried.
Mr. Caetano moved to approve the Site Plan in order
to allow Mr. Rodrigues to proceed with the parking lot and that
Mr. Rodrigues comply with the suggestions made by CAMCE and
Clark Associates and that the Building Inspector review the
final drawings on the parking lot prior to the issuance of a
building permit. Seconded by Mr. Donovan. Carried.
Mr. Rodrigues was informed that the Recreation fee
would be approximately $9600. and must be paid before a building
permit could be issued.
Mr. Rodrigues stated that the building was an existing
building and felt that the recreation fee should not have to be
paid .
Ms. Gandolfo stated the Planning Board did not have the
power to waive the fee.
NEW BUSINESS
Ms. Gandolfo presented a list of Unpaid Fees for
projects previously approved. (Copy in official minutes).

�&amp;

.*+
-4Mr. Margotta stated that a fee of $2,500. was imposed
when the application is submitted. The money is held in escrow
and drawn upon as bills from consultants are received. When the
money is exhausted the applicant must replenish the account.
He stated if the account is not replenished the matter will not
be put on the agenda.
After a discussion it was decided that an attempt
will be made to collect the long overdue accounts.
MINUTES
Mr. Windas moved seconded, by Mr. Caetano that the
minutes of the September, 1993 and the October, 1993 minutes
be approved as submitted.
Carried.
There being no further business to come before the
meeting Mr. Caetano moved, seconded by Mr. Salman that the same
be duly adjourned. Carried.
Respectfully submitted,
»—»-

;re&gt;ie Amato
Acting Clerk

&amp;d

�D

n ft P f

RESOLUTION
Adopted at the Jfctt •
? 6 , 1994 Meeting of the
Village of North Tarrytown Planning Board
RESOLUTION:

SITE PLAN APPROVAL FOR CONSTRUCTION OF MIXED USE
BUILDING.
PROPOSED: FIVE APARTMENTS, FIVE RETAIL SPACES AND
ONE OFFICE IN TWO-STORY BUILDING (PLUS LOFT).
OWNER: GERALD BREGMAN
LOCATION: 185 VALLEY STREET
TAX DESIGNATION: SECTION 16, BLOCK 1, LOT 11
ZONING: C-2 GENERAL COMMERCIAL

WHEREAS, the Planning Board of the Village of North Tarrytown
has reviewed an application for site plan approval pursuant to
Article VIII of the Zoning Code of the Village of North Tarrytown
for the redevelopment of an existing one-story building to create
a two-story (plus third story loft) retail and residential
apartment building with an office, and an outdoor sitting area on
a property that is approximately 4,900 square feet in size and is
located in the northwest quadrant of the intersection of Chestnut
Street and Valley Street, as shown on the drawings prepared in the
office of Ronald E. Turnquist, Architects, and further identified
as follows:
"1, Proposed Valley Plaza, 185 Valley Street, North Tarrytown,
New York 10591, Owner: Gerald Bregman, Lower Level Plan, Site
Plan and Locations Map," scale as noted, dated November 30,
1993, and last revised December 10, 1993; and
"2, Proposed Valley Plaza, 185 Valley Street, North Tarrytown,
New York 10591, Owner: Gerald Bregman, Upper Level and Loft
Plans, Data and Symbols," scale 1/4" = 1 ' , dated November 30,
1993, and last revised December 10, 1993; and
WHEREAS, the site plan proposes the redevelopment of an
existing one-story building to create a two-story building plus a
third story loft (33 feet in height) , with five retail spaces on
the first level to be accessible from Valley Street, five onebedroom apartments on the second level to be accessible from
Chestnut Street and an office on the second level and loft level,
for a total addition of 2,980 square feet in floor area, and an
outdoor sitting area with planters on the second level
(approximately 500 square feet in size); and
WHEREAS, the site has been visited by the Village's planning
consultant and the Planning Board is thoroughly familiar with the
site and all aspects of the proposed project; and

�WHEREAS, the Building Inspector has determined that the
Applicant has received all necessary variances from the Zoning
Board of Appeals of the Village of North Tarrytown for the proposed
site plan, conditioned on the Applicant's agreement to provide, in
perpetuity, at least eight (8) nearby, off-site, off-street parking
spaces at 76 Chestnut Street; and
WHEREAS, the Zoning Board has conditioned the approval of the
variance regarding parking on the Planning Board's approval of a
site plan for the parking area at 76 Chestnut Street; and
WHEREAS, a duly advertised public hearing was held by the
Planning Board at the Village Hall on January 20, 1994, at which
time those wishing to be heard were given the opportunity to be
heard; and
WHEREAS, in the course of its review and acting as Lead Agency
pursuant to Part 617 of the implementing regulations pertaining to
Article 8 of the Environmental Conservation Law, the Planning Board
has made the following findings and caused, noted, or conducted the
following activities:
1.

Received an application fee of $250;

2.

Caused field inspections to be made of the property and of the
surrounding areas;

3.

Received and reviewed an elevations drawing of the proposed
development, dated December 10, 1993, prepared by Ronald E.
Turnquist;

4.

Requested, received and considered comments from the Village
planning consultant, the Village engineering consultant and
the Building Inspector;

5.

Acting as Lead Agency, requested, received and reviewed a Full
Environmental Assessment Form (EAF) in compliance with the New
York State Environmental Quality Review Act (SEQRA); and

6.

After review of the property, the EAF and public comments, as
well as other items noted above, the Planning Board declared
itself the Lead Agency and issued a "Negative Declaration,"
dated January 20, 1994, in which the Planning Board stated its
determination of non-significance of environmental impact for
this Type I action.

NOW, THEREFORE, BE IT RESOLVED, that said site plan
application and plan noted above be and hereby are granted site
plan approval and that the Applicant may obtain the endorsed
approval of the Planning Board Chairman or, as an alternate, the
Village Administrator, on a copy of this site plan resolution and
upon the final mylar copy of the site plan drawing revised as
2

�necessary to show compliance with the following conditions, which
endorsement shall permit filing in the offices of the Village
Building Department for purposes of obtaining a building permit in
accordance with this resolution and all building code requirements,
provided, however, that this approval shall expire twelve (12)
months from the date of this resolution if the following
modifications and conditions have not been completed to the
satisfaction of the Planning Board and/or the Applicant has not
obtained a building permit:
1.

2.

Fees - The Applicant shall pay to the Village of North
Tarrytown:
1.1

An inspection fee for construction inspection of the
property for compliance with the approved site plan in
accordance with the Village of North Tarrytown Zoning
Code.

1.2

The required recreation fees in the amount of jtoQQ
approved by the Village Attorney.

1.3

The reimbursement of all remaining application review
costs as noted and required in Section 62-30 (f) of the
Village Zoning Code, as approved by the Village Attorney.

as

Revision of the above noted plan, to the satisfaction of the
planning and engineering consultants, to demonstrate the
following:
2.1

Additional information shall be provided on the plan
regarding landscaping, including the sizes and species of
plantings.

2.2

The plan drawing shall be revised and titled, "Final Site
Plan."

2.3

A signature block should be added to the site plan for
the signature of the Planning Board Chairman or, as an
alternate, the Village Administrator.

3.

The structure and foundation shall be investigated by a
structural engineer to determine its adequacy in supporting
the proposed additional floors, to the satisfaction of the
Village engineering consultant.

4.

The location of the nearest fire hydrants and the location and
design of the proposed water supply, sewage disposal and
stormwater drainage systems, including the locations, sizes,
invert and rim elevations to the existing systems, shall be
provided, to the satisfaction of the Village engineering
consultant.
3

�5.

All exterior light fixtures shall be positioned so as to
prevent glare upon adjacent properties.

6.

The Applicant shall submit an application to the Planning
Board for site plan approval and receive site plan approval
for the proposed parking lot at 76 Chestnut Street.

7.

Prior to the issuance of a Certificate of Occupancy, the
Applicant shall submit to the Village Building Inspector a
mylar reproduction of the site plan complete with the
certification
of a professional
architect
and/or a
professional engineer attesting to the construction of the
site plan and its improvements as shown thereon.

8.

All elements of this approved site plan shall be completed to
the satisfaction of the Village Building Inspector within a
period of eighteen (18) months from the date of the issuance
of the building permit and prior to the issuance of a
Certificate of Occupancy. The Planning Board may issue an
extension of this time limit, or may modify any of the above
condition's with respect thereto for a good cause.

9.

The Planning Board reserves the right to make a final field
inspection of the project after construction of the
facilities, upon notice of the Building Inspector, and before
the issuance of a Certificate of Occupancy. The purpose of
this final inspection is to review the development and to
require any modifications to site plan details, which do not
comply with the approved plan in the interest of safety,
convenience, aesthetics and the enjoyment and peace and quiet
of adjacent neighbors.

PLANNING BOARD
VILLAGE OF NORTH TARRYTOWN

500\not4-OK.sjp:ev

4

�FREDERICK P. CLARK A S S O C I A T E S , I N C .
Planning/Development/Environment/Transportation
Rye, New York and Southport, Connecticut

David J. Portman, A,CP
Howard I. Reynolds, PE
David H, Stolman, AICP

350 Theodore Fremd Avenue
Rye, New York 10580
(914) 967-6540

Michael A. Galante
Joanne P. Meder, AICP
Jim Donovan, RLA. ASLA

MEMORANDUM
To:

Village of North Tarrytown Planning Board

Date:

January 13, 1994

Subject:

Review of Valley Plaza Site Plan

As requested, we have reviewed the revised site plan and full
Environmental Assessment Form (EAF) which have been submitted for
the Valley Plaza property, located in the northwest quadrant of the
intersection of Chestnut Street and Valley Street in the C-2
General Commercial District. The proposed building will have an
additional 2,980 square feet of floor area.
The Applicant has submitted the following plans and documents:
1.

"1, Proposed Valley Plaza, 185 Valley Street, North Tarrytown,
New York 10591, Owner: Gerald Bregman, Lower Level Plan, Site
Plan and Location Map," scale as noted, dated November 30,
1993, and most recently revised December 10, 1993, prepared by
Ronald E. Turnquist, Architects;

2.

" 2 , Proposed Valley Plaza, 185 Valley Street, North Tarrytown,
New York 10591, Owner: Gerald Bregman, Upper Level and Loft
Plans, Data and Symbols," scale:
1/4" = 1', dated
November 30, 1993 and most recently revised December 10, 1993,
prepared by Ronald E. Turnquist, Architects;

3.

"3, Proposed Valley Plaza, 185 Valley Street, North Tarrytown,
New York 10591, Owner: Gerald Bregman, Elevations," scale
1/4" = l 1 , dated December 10, 1993, prepared by Ronald E.
Turnquist, Architects; and

4.

Full Environmental Assessment Form, dated December 24, 1993,
prepared by Ronald E. Turnquist, Architects.

Connecticut -(203)255-3100

FAX • (914)967-6615

Long Island -(516)364-4544

�FREDERICK P. CLARK ASSOCIATES, INC.
Planning/Development/Environment/Transportation

REVIEW COMMENTS
1.

Open Space Requirement: In the Village of North Tarrytown
Zoning Code, Schedule of Regulations, Part I, multiple
dwellings are identified as a permitted use in the C-2
District by reference to all permitted uses in the R-5
District. However, under the R-5 District standards, there is
a requirement that 100 square feet of "usable open space" be
provided for each multiple dwelling unit. The revised site
plan shows a proposed outdoor sitting area, approximately 500
square feet in size. This sitting area would be an attractive
addition to the proposed building and, although the term "open
space" may be argued, this is more usable passive recreation
space than currently exists on the property. The Building
Inspector, and if necessary the Zoning Board of Appeals,
should determine whether this satisfies the usable open space
requirement (and whether the requirement applies to R-5
District uses in the C-2 District).
The sitting area includes four benches, three lamp posts and
six trees in planters (see elevation drawings). In a rooftop
setting, the main concerns for planting involve the weight and
water issues.
The plantings should be irrigated.
The
Applicant's architect and/or engineer should be certain that
the planters will drain property. The Applicant's architect
should also be certain to select a tree species which is
suitable for planting in a container and which will not be
exceedingly heavy. As well, a "soil-less" soil mixture is
recommended for planting. In addition, care should be taken
in the lighting of the sitting area so as not to direct light
or glare onto neighboring properties and into the proposed
dwelling units.

2.

Environmental Assessment Form: We have revised a few of the
answers provided on the EAF (see enclosed).

3.

Environmental Review Status: According to Part 617.12 of the
State Environmental Quality Review Act (SEQRA) , this is a Type
I action because the property is located within the Hudson
River Shoreline Critical Environmental Area (CEA). At this
time, the Planning Board may declare its intent to be the Lead
Agency. The notice of intent to be Lead Agency and the EAF
should then be circulated to the involved and interested
agencies. We have prepared a draft notice for circulation
(see enclosed). After 30 days or receipt of responses from
the other agencies, whichever comes first, the Planning Board

2

�FREDERICK P. CLARK ASSOCIATES, INC.
Planning/Development/Environment/Transportation

may declare itself Lead Agency, provided no other involved
agency objects, and the Planning Board may then make a
determination of significance.
Susan J. Portman, AICP
Associate/Planning
Enclosures
cc:

Linda David, Village Administrator
Janet A. Gandolfo, Esq., Village Attorney
James T. Margotta, Building Inspector
Joseph A. Gulino, Village Engineer
Gerald Bregman
Ronald E. Turnquist

500\not4-000.sjp:ev

3

�VILLAGE OF NORTH TARRYTOWN
WESTCHESTER COUNTY, NEW YORK
LEAD AGENCY SELECTION FORM

Project Name or Description

V a l l e y Plaza

Proposed second s t o r y and loft addition t o e x i s t i n g 1-story building t o
contain five r e t a i l spaces, five dwelling u n i t s and one o f f i c e .
Project Location

185 V a l l e y Street

Name of Applicant

Gerald Bregman

Village Agency Intending to Act as Lead Agency
Address

28 Beekman Avenue, North Tarrytown, New York 10591

Contact Person
Date Mailed

I.

Planning Board

Linda David, V i l l a g e A d m i n i s t r a t o r
Telephone Number
(914) 631-0533

Type of Action (Check A or B)
M A.
•

B.

TYPE I
UNUSTED

Lead agency must be chosen within 30 days of above date.
Deadline Reply Date

II.

Required Approvals and Reviews (Check all permits, waivers, or other actions which may be
required)
•

Rezoning

a

Subdivision Approval

XX

Site Development Plan Approval

•

Special Permit

XX

Variance

•

Wetlands Permit

•

Stream Discharge Permit - New York State Department of Environmental Conservation

X£

Area

Sewage Disposal/Water Supply Approval - Westchester County Health Department

Review

•

Review by Westchester County Department of Planning

•

Curb Cut Approval - New York State Department of Transportation/Westchester County
Department of Public Works

•

Other. Specify:

�VILLAGE OF NORTH TARRYTOWN
WESTCHESTER COUNTY, NEW YORK
LEAD AGENCY SELECTION FORM - PAGE 2

III.

Environmental Significance of Action: Initial Review of Environmental Assessment Form
indicates that: (Check A, B, or C - To be done by Initiating agency)
•

A.

The proposed action appears likely to have a significant effect on the environment; a
positive declaration is likely.

^

B.

The proposed action appears not likely to have a significant effect on the environment;
a negative declaration is likely.

•

C.

No opinion has been made yet as to whether a positive or negative declaration is likely

for this action.
Valley Plaza Site Plan and Variance Applications
IV.

A Copy of this Form and the Environmental Assessment Form Has Been Sent to the Agencies
Indicated on the Attached Ust.

Attachments:

Lead Agency Selection Reply Form
List of Involved or Interested Agencies
Environmental Assessment Form

�VILLAGE OF NORTH TARRYTOWN
WESTCHESTER COUNTY, NEW YORK
LEAD AGENCY SELECTION REPLY FORM

Reply Form to be Filled Out by Involved Agencies

The _____

(list agency) has examined this form and

accompanying documentation for the application known as
Vallev Plaza S i t e Plan and Variance Applications and: (Check A or B)
D A. Does not want to be Lead Agency.
EK B. Wants to b e Lead Agency for this action.
Additional comments or concerns (Attach additional pages if necessary):

Reviewed by:

Signature

Name

Title

Date

PLEASE RETURN TO THE AGENCY INITIATING THIS PROCESS (USTED ON THE FIRST PAGE O F
THIS FORM) BY THE DATE INDICATED. IF NO REPLY IS RECEIVED BY THE DATE INDICATED, THE
VILLAGE AGENCY INDICATED WILL ASSUME THAT YOU CONCUR WITH ITS DESIGNATION AS LEAD
AGENCY.
800/not3-030,Jd

�LIST OF INVOLVED OR INTERESTED AGENCIES

BPC

Planning Board
Village of North Tarrytown
28 Beekman Avenue
North Tarrytown, New York 10591

D

Westchester County Department
of Planning
432 County Office Building
White Plains, New York 10601

EK

Zoning Board of Appeals
Village of North Tarrytown
28 Beekman Avenue
North Tarrytown, New York 10591

0X

Westchester County Department
of Health
112 East Post Road
White Plains, New York 10601

EK

New York State Department of
Environmental Conservation
21 South Putt Corners Road
New Paltz, New York 12561

•

New York State Department of
transportation
4 Burnett Boulevard, Region 8
Poughkeepsie, New York 12603

D

New York State Department of
Environmental Conservation
50 Wolf Road
Albany, New York 12233-0001

D

New York State Department of
Transportation
Saw Mill River Road
Valhalla, New York 10595

(Other Agencies)

5O0\noO43O.Jd

�i4-ie*2 (2'67)~7c
617.21
Appendix A
State Environmental Quality Review

SEQF4

FULL ENVIRONMENTAL ASSESSMENT FORM
Ipose: The full EAF is designed to help applicants and agencies determine. In an orderly manner, whether a project
or action may be significant. The question of whether an action may be significant is not always easy to answer. Frequent*
\y, there are aspects of a project that are subjective or unmeasureable It is also understood that those who determine
significance may have little or n&lt;&gt; formal knowledge of the environment or may be technically expert In environmental
analysis. In addition, many who hrve knowledge in one particular area may not be aware of the broader concerns affecting
the question of significance.
The full EAF is intended to p ovide a method whereby applicants and agencies can be assured that the determination
process has been orderly, comprehensive in nature, yet flexible to allow introduction of information to fit a project or action.
Full EAF Components: The full I \ F is comprised of three parts:
Part 1: Provides objective data and Information about a given project and Its site. By Identifying basic project
data, it assists a n.viewer in the analysis that takes place In Parts 2 and 3.
Part 2: Focuses on identifying the range of possible impacts that may occur from a project or action. It provides
guidance as to writ iher an impact is likely to be considered small t o moderate or whether It is a potentiallylarge impact. The form also identifies whether an impact can be mitigated or reduced.
Part 3: If any impact in Prrt 2 is identified as potentially-large, then Part 3 is used to evaluate whether or not the
impact is actually important.

DETERMINATION OF SIGNIFICANCE-Type 1 and Unlisted Actions
Identify the Portions of EAF cc mpleled for this project:

D

Part 1

D

Part 2

DPart 3

pon review of the information recorded on this EAF (Parts 1 and 2 and 3 if appropriate), and any other supporting
formation, and considering bcth the magitude and Importance of each impact, It is reasonably determined by the
ead agency that:

4

D

A. The project will net result in any large and Important impact(s) and, therefore, Is one which w i l l not
have a significant impact on the environment, therefore a negative declaration will be prepared.

D

B, Although the projec t could have a significant effect on the environment, there will not be a significant
e'ffect f o r this Unlisled Action because the mitigation measures described in PART 3 have been required,
therefore a CONDITIONED negative declaration w i l l be prepared.*

D

C. The project may result In one or-more large and important impacts that may have a significant Impact
on the environment, therefore a positive declaration will be prepared,
* A Conditioned Negative Declaration Is only valid for Unlisted Actions

V a l l e y Plaza (185 Valley S t r e e t , North Tarrytown, NY)
Name of Action

Name of Lead Agency

Print or Type Name of Responsible Officer In Lead Agency

Title of Responsible Officer

Signature of Responsible Officer In Lead Agency

Signature of Preparer (If different from responsible officer)

Date

�PART 1-PROJECT INFORMATION
Prepared by Project Sponsor
NOTICE; this document is d c gnrd to assist In determining \shether the action proposed may have a significant effect]
ect.
on the environment Please complete the entire form, Parts A through E. Answers to these questions will be conside
^js part of the application for approval and maybe subject to further verification and public review. Provide any addition
rnfoimation you believe will b&gt;* needed to complete Parts 2 and 3.
It is expected that completion of the full EAF will be dependent on Information currently available and will not Involve
new studies, research or investigation If Information requiring such additional work is unavailable, so indicate and specify
each instance.

5

NAME OF ACTION

_______ V a l l e y Plaz• t
LOCATION OF ACTION (Include Stfoet redress, Municipality wid County)

185 V a l l e y : ' t r e e t , North T a r r y t o w n , KY 10591 (Westchester Co.)
NAME OF ArruCANTJSPONSOR

Turnquist

|

BUSINESS TELEPHONE

(914) 631-9107

Architects

ADDRESS

95 BeeJqnan .'.venue
STATE

CITY/PO

NY- : .::

North Tarry'.own
NAME OF OWNER (H different)

Gerald

2IP CODE

10591

BUSINESS TELEPHONE

Bregrran

(914) 631-0287

r

ADDRESS

17 7 C r e s t D r i v e
CITY/PO

STATE

Tarrytown

NY:

ZIP CODE

10591

DESCniPTfOf. OF ACTION

R e h a b i l i t a t i o n of; 1 s t o r y r e t a i l s p a c e and a d d i t i o n
of 5 second f l o o r d w e l l i n g u n i t s ,

¥

Please Complete Each Question-* Indicate N,A. If not applicable

A. Site Description
Physical setting of overall project, both developed and undeveloped areas.
1, Present land use:
EDUrban
Dlndustrlal
DComrnerclal
DResldential (suburban)
DForest
DAgriculture
DOthct
;
_
0*11
, acrp&lt;;
2, Tot.il acreage of project area:
APPROXIMATE ACREAGE
Meadow or Brushland (Non-agricultural)
. Forested
Agricultural (Includes orcftaid$. cropland, pasture, etc)
Wetland (freshwater or tlda! as per Articles 24, 25 of fci I
Water Surface Area
Unvegetated (Rock, earth or fill)
Ro?ds, buildings and other { aved surfaces
Other i n d i c a t e type)
..,,...,

PRESENTLY
acres
acres
acres
..,.v,
acres
~+ , acres
»,^^- r . acres
Li„
acres
acres

• Rural (non«farm]

AFTER COMPLETION
, ,
acres
—«—&gt;
acres
'
acres
, acres
.
acres
acres
"
acres
acres

• , What Is predominant soil type 0 on project site? ^ . J j l / . / i L « .
% of site'
a Soil drainage!
DVVell &lt; rained w
% of site
DModeratoly well difllned _
• Poo»l&gt; drained ,
^ % of site
.b. II any .^rlcultural land Is I volved, hqw many acres of sHLare classified within soil group 1 through 4 of the NY!'
land Classification Syston »
, _ acres (Sao 1 Nyc.RR 3?'0),
'
,
•
s
Are there M f o c k outcropping on project site?
OY.eV/- OHo
a, What i&lt; depth to bedrocM
Ij/ft,,
„„(tiH&lt;'"0

;:v,i ,

�5. Appro* "•••ale percentage of " o p c w d project site with slept s
6

DO-10^
N/A
D 1 5 % or Rreater

*;

• fhrvi59»
','•**

,

^

Is pro/r't substantially co li^uous t o , 01 contain a building, site, or district, listed on the State or the National
Register* of Historic Places *
DVes
©No

7. Is projer t substantially con' guouv'lo a site listed on the Register of National Natural Landmarks?
N /

'e. What is the depth of the water i,-»Me?

DYes

J&amp;No

^ . (in'feetl

9. Is site lecnted over a ' p r i m r r y , principal, or sole sourer r&lt;cit.'ifer?

DYes

CSNo

10. Ho hunting, fishing o r shc'l fishing opportunities presently exist i n the project area?

DYes

©No

11. Does project site c o n t a i n a n y species of plant or animnl life'' that is identified as threatened or endangered?
IJYes
D3No
According to
-j.
;
»
,
Identify each spores
', '"";• •
'
12. Are thrrr. a n y unique or c uisual l a n d forms' on t h e project site? (i.e., cliffs, dunes; other geological formations)
:
DYes
CSNo
Describe
„
•• '
-'
''
• ' ' • &gt; : . \ ' •
13. Is the project site present y used b y the c o m m u n i t y or neighborhood as an open space o r recreation area?
DVes
CSNo
f yes, explain „ _
..,_ . _ - _ _ u
•
_»__«_--.
14.

Does tlrf? present site i n c l ' d e scenic views known t o be i m p o r t a n t to the community?
I !Yes
SNo
';

15. Streams within o r c o n t i g u o . s t o project area:
Nona
.,
f . Name of Stream i n d name o f River to w h i c h it is tributary
16, Lakes, p-nds, wetland area; within or contiguous to projoi. t area:
p Name
None
„ _ ^
L

_

•

h Size (In acres) — _

17, Is the s i " served by existing public utilities?
KJYes
UNo
a) If Yes. does sufficient cavacity f»lst tO'allp'w c o n n r , c i i " ' , ; '
CSYes
DNo
b) If Ye&lt; '••••ill I m p r o v e m e n t 1 b r necessary to allow c o n n f ion?
DYes
ENo
18, Is the s»" located in a n jig-ici/lli'ial district certified p u n u a n t t o Agriculture a n d Markets L a w , Article 25&lt;AA,
Section .•.'&lt;* and 304?'
Hies
IS N o
19, Is the sit-:- located In or s u f ^ ' a n t i a l l v contiguous to a O i l 1 ' •' Environmental Area designated pursuant t o Article 8
of the EC I , and 6 NYCRR M,7
j^Yes
^ ^
20, Has the '.ite ever been used for the disposal o f solid or h.vardous wastes?

DNes

KINo
'' '

*

*

l'

'

B. Projecl Description
1 . Physical dimensions and scale of project (fill In dimensions /«&lt; appropriate)
a. Total " w i t l g u o u s acreage o w n e d or c o n t r o l l e d b y ' p r o j f i sponsor
Q..-..A.1
b. P r o j e u acreage t o be deselopedN / A , 0 &lt; l ( , acres l u i i i a l l y ;
QA\.~

-, acres,
, acres ultimately.

c. ProjerM acreage t o remain u n d e v e l o p e d „ D _ . J i Z A — . . «i' "vs.
d. Length " f project, In m i l e - : „

M/A

, (I( approprlat'')

,•

e. If the project Is an expaiHon, Indicate percent of e&gt;.p^ , " | on proposed
(. Numb- of ofr-t,... p . , H , „ , , , „ .xblin, ^
g

M a x i m u m vehicular t r i p * i eneraled per hour ,*T&amp;S9t..&gt;

,—„„..

.

•^Ultimately
^P,

,

%i

.^ p o s e d ^ ^

h. If residential; Number anr" t y p * of housing units:
One Fam ly
Two Family
Initially

7-0

_,..
„ „ . . ,

Dlmensi-'iij (in feet) of Inn \&lt;i proposed structure? J L L ,

^

(

^h^r\y

(upon c o m p l e t i o n o f project)?

„

u_

,

§

'„ "„i

/&gt; '" •

(

..
''Condominium

Multiple Fflmlly, ,
,Q„„,,,..

'

,

• !, ,,,&gt;
,•

', „,
L ,,,«. :

„„ „ *

height; _JLP. . , „ width; „ 1 &amp; C U , length, "''

••i-j, I inear f ' " I of frontarje ai&lt;- g fl public thoroughfare pfV«|&lt; &lt; will occupy is? J &amp; P
3

••''|-

, ft

' M1",,,:,

' . ' . , . » '

'• &lt;W,'
w

1 (

• • • • • ; &gt; ! ' ' '

'

•

•

'

•

!

•

'

i

'

'

;

'

f

" '

:

' " '

' '

'

i

k

'

"

'

'

"

'

'

'

'

"

"

'

i /

'

w

'

'

^

i!

"

^

'

»•' '

'

:

^

'

1

'

'

1

—

�2. How much natural n.atpfiJ (t »• 'uck, earth, cr11 j .,dl U removed from the sn •'

N/A

xoni/cutic ydrd&gt;

3. Will disturbed areav he reclaimf*i&gt;
DYes
-l"J.No fcDN/A
a. K yes, for vshai intend . purpose Is the site being reclaimed?
b. Will topsoil be stockpiled lor reclamation'
DYes
DNo
c. Will upper subsoil be stockpiled (or reclamation?
DYes
Of Jo

'

4. How many acres of vegetaiion (trees, shrubs, gruund covers) will be removed fr.Jin site?

N/Af

acres.

5. Will any mature forest (over 100 years old) or other locally-important vegetatio . be removed by this project?
r
DYes
BNo
6. If single phase project: Anticipated period of construction

6

_ month-, (including demolition).,

7. If multi-phased:
a, Total number of phases anticipated __J1L!*.
.1 (number),
b, Anticipated date of commencement phase I
month
c, Approximate completion date of final phase
month
d, Is phase 1 functionally dependent on subsequent phases?
DYes
8. Will blasting occur during construction?

DYo

,.

. _ year, (Including demolition).
year.
Dl v.&gt;

K)No

9. Number of jobs generated during construction .. &gt;u'i

-,

; after project is c .mplete

15+

10. Number of jobs eliminated by this project ft
11. Will project require relocation ot any projects wi lacilities?

DYes

(}3Nv

If yes, explain

12. Is surface liquid waste disposal involved?
Du*&gt;
K3No
a, If yes, Indicate type of waste (sewage, indu:tiial, etc.) and amount
b, Name of water body into which effluent will be discharged
'
13. Is subsurface liquid waste disposal involved?

il-DYes

DNo

Type

Sewage

14. Will surface area of an existing \w,ter body Include or decrease by proposal?
Explain
15. Is project or any poition of project located in a mO year flood plain?
DYi-.

DYes

18, Will project use herbicides or pesticides?

DYes

IS)No

20, Will project produce operating noise exceeding (he lucal ambient noise levels?

if vat . inHir.atft tvnt.M

PeeUt&lt;l\
DYes
$No

GDNo
tons/month

19, Will project routinely produce odors (more than one hour per day)? DYes

21, Will project result In an Increase In energy use?

_

:

C3No

16. Will the project generate solid waste?
EDYes
DNo
a. If yes, what Is the amount per month
Z.i0
tons
b. If yes, will an existing solid \saste facility be UM/&lt;J?
KlYes , DNo
c. If yes, give name « J ^ C S n 2 m z n 3 £ = 8 t o « ^
-f.^aafc
d Will any wastes not go Into a sewage disposal system or into a sanitary Luinll?
e. If Yes, explain
17, Will the project Involve the disposal of solid wasiu? , DYes
a, If yes, what is the anticipated rate of disposal'
b. If yes, what is the anticipated site life?
_ . years,

JflNo

tSIYus

LjNo
DYes

1S3N*.

DNo

a l e c t r i a a l &amp; Qvui £or ho.abincr and ) ah tine?

22, If water supply Is from wells, Indicate pumping &lt; ap.icily
23, Total anticipated water usage pel day MQ±^

lllh

, (jallons/i iriute, &lt;

,.. ^lions/day, a p p r o * , f &amp;O0 ^ f&gt;6

24, Does project Involve local, State or federal furulinu?

DYes

$No

' -

•r*

�y

2*&gt;. A p p r o \ a l i Required:

\

.

Ciiv, Town, Village Board

CS.Ye$

DNo

building permit

City, Town, Village Plannhi Board

ESYes

DNo

p i qtl.P ^ nrJf b)nnr&lt;^

City, Town Zoning Board

KJYes

PNC

zrmipg

City, County Health Department

DYes

CvJNo

Of dor Local Agencies

IS Yes

DNo

Other Regional Agencies

DYes

K-No

, DYes

$No

DYes

©No

•

»

m
WF

Submittal
Date

Type

Stflio Agencies
Federal Agencies

hoard

flpp^nyq

1

variannp

arnfr-i f f t n t - n r n l

rpvipw

hnard

C. Zoning and Plannltg Information
1 . Hoes proposed action i n o h e a planning or zoning decision?

DNo

RYes.

If Yes, Indicate decision requiredDzonlng amendment

Rzdnln'g variance

Dnew/revlsion of m.-" or p h n

Dspc-clal use permit

'.DreKui'co mnnnR'-ment plan..;

2. What Is the zoning class* -r.ationf.0of the site? J ^ L i H l ^ n f e i l q

Dsubdivislon

Klsite plan

Dother .______»___«««»«»«__«___»___.
6&amp;\€Vftl G M J A ^ C . V J

What Is the maximum po Mitlnl development of the* she if developed 'as permitted by the present zoning?

..presently .noiir uiiXcumi ng„.r Laxil -J*...;J•:irking,f p.t;a-—r'.na .expansion pprm.ittei%.
4. What is the proposed zo- ng of the site? — e x i s t i n g . . &amp; m u l t i p l e

dw»I3.i.ng.

5. What is the maximum po ntlal development of the site if developed as permitted by the,proposed zoning?

6. Is the proposed action c c Ustent vs 1th the recommend*-'! uses In adopted local land use plans?

, •'

KJYes

DNo

|7, What are the predominate land use(s) and zoning cl.i.'f-ifc ntlons within a V* mile radius of proposed action?
8, l&lt; the proposed action compatible with ad|olnlnB ; s'Mfn'indlng land uses within a V&lt; mile?

KJYes

9. If the proposed action is 'he subdivision of land, boss tunny lots are proposed?'

,

lil&amp;

DNo
,

a. What is the mlnmum lot size proposed?
10

Will proposed action reqi1 -e any authorlzatlon(s) for the formation of sewer or water, districts?

Kpr^s

iONo

11, Will the proposed action -rcntr? a demand.for rny community provided services (recreation, education, police,
fire protection)?
B3Yc'
DNo
a. If yes, is existing &lt; -pacify sufficient to handle* piojected demand?

Ds)Yes

DNo

12 AS ill the proposed action i suit In the generation of tialfic significantly above present levels?
a, If yes, is the exist' t\ road network adequate to handle the additional traffic?

DYes

DYes

GJN'o

DNo

D. Informational Details
Attach any additional Inf^matlon as may be r w d r d \o &lt; larlfy your pio|c&lt;t. If thete are or may be any adverse
Impact.', associated with your p iposnl, piease discuss such impacts and the Measures which you propose to mitigate or
avoid them.

E. Verification
l certify that the Informal! n provided above Is true Vi I ho best of my knowledge,

Date

App!lr*MtKfoj

nature

lltM* Wv^IIZl

' • lthe *&gt; Hon Isjln the CoaiFal An'.rJ and )tm m
with till* assessment,

•.

12/24/93

lie .J&amp;flW t-ejai

a Male w w v , n»mplet« th&lt;? C o i t a l AMeiimenl Form before proceeding
'

..'•^....i:.

MMatia^IMIM,

�Part ' - P R O J E C T IMPACTS AND THEIR MAGNITUDE

f

Reipomibllii) nl lead Agency

(

Genrt*! Information (Read C*1 lully)
• In ' "mpleting the form the ' vi^vct .should be guided b\ the question- Have my responses and determinations been '
ro'^nableT The reviewer is -M expected to be an expert onvironrnentalanalyst,
£ /
Identifying that an impact v 'I br potentially large (column 2) does not mean that it is also necessarily significant. [*
An\ large impact must be c&gt; Muatcd in PART 3 to determine significance. Identifying an Impact In column 2$lmply p
asH that it be looked at fur' &gt;or
• Thf rxamples provided are t&lt; asMst the reviewer by showing types of impacts and wherever possible the threshold of
nvriitude that would trigger a response in column 2Thr examples are generally applicable throughout the State and
for mo$t situations. But, for my spc'cific project or site otlinr examples and/or lower thresholds may be appropriate
for ^ Potential Large Impact response, thus requiring evaluation in Part 3.
',
• J V impacts of each project, on each site, in each locality,-will vary. Therefore) the examples are Illustrative and.
ha\r been offered as guidance. 1lt?&gt; do not constitute an exhaustive list of impacts and thresholds to answer each question, '
• Tlv "umber of examples per n a t i o n does not indicate the importance of each question,
»
• In identifying impacts, cons'ir' T ionp, term, short term and cumlative effects,
'
I
Jnstrn&lt; "ons (Read carefully)
a. Answer each of the 19 quesi -ms in PART 2. Answer Yes if there will be any impact.
b. M*&gt;he answers should be cc 'sidered as Yes answers,
c. If answering Yes to a questio \ then check the appropriate box (column 1 or 2) to indicate; the potential size of the,
Impact. If Impact threshold c -als or exceeds any example provided, check column 2, If Impact will occur but threshold
is lover than example, cheel column 1,.,
d. If maower has doubt about s r.e of the Impact then consider the impact as potentially large and proceed to PART 3.
e. If a potentially large Impact &lt; &gt;eck&lt;?d in column 2 can be mlt'nated by changr(s) In the project to a small to moderate
Imp^t, also check the Yes Ivx in column 3, A No response indicates that,such a reduction is not possible, This
must be explained in Part 3

IMPACT ON LAND
1 , Will 'he proposed action resul in a ph\ «lcal change to llm ptf-cct site?
KINO
DYES
Examples that would apply to column 2
* Any &lt; wislruction on slopes of ''5% oi greater, (15 foot ri.'f p'&lt;r 100
foot of length), or where the gf.eral slopes in the project a m exceed
10?(&lt;
* Conjunction on land where th;- depth tathe water table is less than
3 feet
« Construction of paved parking area for 1,000 or more vehicles
* Construction on land where bedrock Is exposed or generally within
3 feet r'i existing ground surfm*.
* Connection that will continue for more than 1 year or Involve more,
than "lift phase or stage,
* Exc»v.*Mon for mining purpose that would remove more tli.m 1,000
tons " ' natural material (I e., ff.ik or soil) per year,
* Con.s'"".tlon or expansion of n unitary landfill,
%
Construction In a designated 11 odway
* Other impacts ,
_-—...*...
*

1
Small to
Moderate
Impact

2
Potential
Large
Impact

a

D

DVes

DNo

a

a

DYes

DNo

D

D
D

DYes
DYes

DNo
DNo'

•
a
a
a
a

DYes

DNo

DVes

DNo

DYes
• Yes
DYes

DNO

i.i

Can Impaot Be
Mitigated By
Projeot Change

r
r.

N

DNo
DNO

L
|(

j ^ W I I I i «?fe be an effect &lt;-'• „.i\ " .«&lt;i«»n n» unusual land fomx found on
..^fciesh'MI.e., cliffs, dune?., 8c«-«i rjlt al formations, ctc.JW'N'^
OYES
'^?peclfi- land forms:
_
...
„..„„,J^^,.^
«.*

n

13

DYes

DNo

�IMPACT O N WATER
V&gt; ill proposed action affec« any %s ater body designated as protected'
(l'"&gt;der Articles 15, 24, 25 of he f nvirpnmental Conservation Law, ECU
E3NO
DYES
f »»rnpl(»» that would appl*. &lt;o column 2
T&gt; .olopable area of site cc t?ins a protected water body

1
Small to
Moderate
Impact

2
Potential
LarQe
Impact

D

•

D i g g i n g more than 100 c u ' i c Nards of material from 1 channel of a
protected stream.

•

D

t e n s i o n of utility distribute • facilities through a protected svater body.

D
D
D

D
D

•
•

O»»'truction in a designate &lt; f t ^ l m a t e r or tidal wetland
O0''-r impacts:

L

.

4 . Will proposed action affec' any non-protected existing or new body
of water?
'
.
GO NO
DYES
Samples that would apply 'o column 2
• A V i % increase or decrease, -u the surface area of any body of water
or n ore than a 10 acre Increase or decrease.
• Coivtructlon of a body of wa*er that exceeds 10 acres of surface area.
• O i l " r Impacts:

.

;

. Will Proposed Action affect surface or groundsvater
quality or quantity?
K)NO
E^'Mples that would apply o column 2'

•Yes
DYes

DNo
DNo

•Yes
•Yes
•Yes

DNo
ONo
DNo

D

•Yes

ONo

Q

D
D

•Yes
•Yes

DNo
DNo

D
D

D
D

•Yes
•Yes

ONo
DNo

D

D

• Yes

DNo

a

D

•Yes

DNo

D

D
D

• Yes
• Yes

DNo
DNo

D

D

• Yes,

DNo;

a

°

•Yes

EJNo

•

D

• Yes

DNo

a
a

O

• Yes .-DNo•'.

D

• Yes

DNo

a

' •

. DYes

DNo

D

• YOI

QNO"

•

DYES

Prt'!"'sed Action will requite i discharge permit.
r

Prc'f e d Action requires us • of a source of wakv th.-'t does not
ha\&lt;- approval to serve prop' •ed Ipf-'ject) action
Pre: ' e d Action requires wa«- r Mipp'v from svclh with nt'" 1 '' i than 45
gal' its per minute pumplnp •ap«c it-,
Co/i"fuctlon or operation cr&lt; -inn any contamination of a '•• nter
supp'v system.
a f f f t groundwater.
Prcf-'-ed Action will advers'
Liqi" • effluent will be comes • • off the site t o facilities \shk h presently
do n -i exist or have Inadequ.' e capacity,
Propped Action would use ••ater in excess of 20.000 gallons per
day.
Prop' 'ed Action will likely c«- &lt;s&lt;? slltntlon or other dijehativ' Into an
exls'.i'-n body of water t o the &lt;• ent that there will be an ol\ lews visual
coninM t o natural conditions
P r o i " " e d Action will requif the storage of petroleum at chemical
p r e ' " ' ts greater than 1,100 R&lt; lions
Prop' ,r&gt;d Action will allow ic idential uses In areas without water
and,'' * sewer services,
Proi , f , d Action locates camp • -fdal and/or industrial uses v, filch may
fequi'" new or expansion of e - stlnii waste'treatment and.'oi storage
facllif'"s,
Other

1

3
Can Impact Be
Mitigated By
Project Change

Impacts'

j ^ W i l l proposed action alter &gt;' a'mtv* flow or paltenn, r&lt;» nifface
^ A v o t " runoff
I^MO
DYES
^ ^ E x a m r l e s thai would apply tf -OIUIMM ;
• P r o f " ''d Action would c h a w flood v,aler flosvs
7

a

O

\

�1
Small to
Moderate
Impact
• Proposed Action may cause substantial erosion
oposed Action is Incompatible with existing drainage patterns,
oposed Action will allow development in a designated floodway.
• Other impacts:
«__»_«-____--»____«____---«-^^

t

D
D
D
D

2
3
Potential Can Impact Be
Urge
Mitigated By
Impact Project Change
D
DYes DNo
D
DYes DNo
D
DYe$ DNo
D
DYe$ DNo
*

IMPACT ON AIR
RPNO DYES
7.-Will proposed action affect a r quality?
Examples that would apply t( column 2
• Proposed Action will induce 1, XX) or more vehicle trips In any ifTven
hour,
• Proposed Action will result in he Incineration of more than 1 tpn of
refuse per hour.
• Emission rate of total contami lants will exceed 5 lbs, per hour or a
heat source producing more thjn 10 million BTU's per hour. /
• Proposed action will allow an increase In the amount of land committed
to industrial use.
• Proposed action will allow an increase In the density of industrial
development within existing industrial areas.
• Other Impacts:
__

D

D ... ' DYes

DNo

D.

O

DYes

DNo

D

D

DYes

DNo

D

O .'"'

DYes

DNo

D

D

DYes

DNo

D

D

DYes

DNo

D

D

DYes

DNo

D
D

D
D

DYes
DYes

DNo
DNo

D

D

DYes

DNo

D

D

DYes

DNo

°

°

DYes

DNo

ri

a

•Ves

DNo

IMPACT ON PLANTS AND ANIMALS
8. Will Proposed Action affect a iy threatened or endangered
Apecles?
D3NO
DYES
^rxamples that would apply to column 2
• Reduction of one or more species listed on the New York or Federal
list, using the site, over or near He or found on the site,
• Removal of any portion of a &lt; Itlcal of significant wildlife habitat.
• Application of pesticide or herb clde more than twice a year, other
than for agricultural purposes.
• Other Impacts:
'
3, Will Proposed Action substant1, lly affect non-threatened or
non-endangered species?
K3N6
DYES
Examples that would apply to-olumn 2
• Proposed Action would substai 'tally interfere with any resident or
migratory fish, shellfish or wlldM? &lt;p^cics.
1
Proposed Action requires the removal of more than 10 acres
of mature forest (over 100 year • of age) of other locally Important
vegetation.
IMPACT ON AGRICULTURAL LAND RESOURCES
0, Will the Proposed Action affe^.t anrlcultural land resources?
C3NO
DYES
Examples that would apply to column 2
The proposed action would sever c»o&lt;* or limit access to agricultural
IjaL (Includes cropland, hayfleld', pasture, vineyard, orchard, etc)
8

0

�1 -V

•

onstruction activity would txcavate or compact the soil profile'of
agricultural land.
• The proposed action would irreversibly convert more than 10 acres
of agricultural land or, If Ic ated in an Agricultutal District, more
than 2.5 acres of agricultural land.
• The proposed action would db upt or prevent installation of agricultural
land management systems (e,$, subsurface drain lines, outlet ditches,
••trip cropping); or create a nei.'d for such measures (e.g. cause a farm
field to drain poorly due to I creased runoff)
• Other impacts:
_______»_____-«__-.

IMPACT ON AESTHETIC RESOURCES
11. Will proposed action affec' aesthetic resources?
KJNQ
DYES
(If necessary, use the Visual EAF Addendum In.Section 617.21,
Appendix B.)
Examples that would apply to column 2
• Proposed land uses, or project components obviously different from
or in sharp contrast to current surrounding land use patterns, whether
marvmade or natural.
• Proposed land uses, or project components visible -to users of
aesthetic resources which vvlh eliminate or significantly reduce their
enjoyment of the aesthetic qualities of that resource.
roject components that will result In the elimination or significant
!reenlng of scenic views kno &lt;n to be important to the area.
•
• Other Impacts;
_~_&gt;-._«^»-_»___-____~__~.

IMPACT ON' HISTORIC AND ARCHAEOLOGICAL RESOURCES
12, Will Proposed Action lmpa&lt; t nny site or structure of historic, pre«
historic or paleontologlcal nnortance?
GDNO DYES
Examples that would apply {•&gt; column 2
• Propped Action occurring wh -lly or nar'tfally within or substantially
continuous to any facility or jH li«»"H *-&lt;n the State or National Register
of Imiorlc places.
• Any impact to an archaeolopi' il site or fossil bed located within the
projf ' site.
« Prof *'d Action will occur I an moa designated as sensitive for
arch." logical sites on the N'i Site Inventory,
» Othfi Impacts:
.

IMPACT ON OPEN f WOE AND RECREATION
13. Will Proposed Action affect the quantity or quality of existing or
fu!""? open spaces or recrc (lonnl opportunities? '
Examples that would apply "&gt; column 2
ISjNO
DYES
«^3e p« imanent foreclosure of * future recreational'opportunity,
t^^mfli'-w reduction of an ope*' siwe Important to the community.
* Oth«."' impacts:
,
,,. ,
. ,
..'. ',,

. 3 \ &gt;/
Can Impact Be
Mitigated By
Project Change

•
•

D

•Yes

QNo

D

•Yes

DNo

D

D

•Yes

ONo

D

•

•Yes

DNo

D

•

•Yes

DNo

D

•

•Yes

ONo

D

D

•Yes

D'No

D

D

•Yes

•DNo

D

D

•Yes

DNo

D

D"

•Yes

DNo

D

a

•Yes

DNo

a

0

•Yes

ONo ,

GQO

Small to
Moderate
Impact

2
(Potential
Large
Impact

D

•Yes
•Yes
•Yes

DNo
DNo
DNo

D

�1
Small to
Moderate
Impact

2
Potential
Large
Impact

Q
D
D

D
D
D

DYes
DYes

'DNo
DNo

PX«*

DNo

D

D

DYes

DNo

a

D'

DYes

DNo

a

D

DYes

DNo

• Blasting within 1,500 feet r. a hospital, school or othe,r sensitive
facility.
' o d d s will occur routinely (i* ore than one hour per day).

D

D

DYes

DNo (

D

a

• Proposed Action will produ* e operating noise exceeding the local
ambient noise levels for nols- outside of structures

a

D

DYes
DYes

DNo
DNo

• Proposed Action will remov- natural barriers that would act as a
noise screen.

D

D

DYes

DNo

• Othf i

D

D

DYes

DNo

D

•

DYes

DNo

a

a

DYes

DNq

• Storap.c facilities for one mllli n or more gallons of liquified natural
gas or other flammable liquid 1

D

a

DYes

DNo

« pfop'vod action may result i the excavation or other disturbance
^ v l t h m ?,000 feet of a site use' for ih* disposal of solid ot hazardous

D

D

DYes

DNO

a ,

b

DYes

D No

IMPACT ON TRANSPORTATION
14

Will there be an effect to ousting transportation systems?
KJNO
Example* that would appis to column 2

DYES

w

* Alteration of present p a t t e r n of movement of people and/or goods.

• Proposed Action will result in major traffic problems.
• Other impacts:

3
Can Impact Be
Mitigated By
Project Changer

IMPACT ON ENERGY
1S. Will proposed action affoct the community's sources of fuel or
energy supply?
_
$NO
DYES
ftamples that would app!y to column 2
• Proposed Action will cause i greater than 5% increase in the use of
any form of energy in. the m jnlclpallty.
• Proposed Action will require the creation or extension of an energy
transmission or supply systeir to ser\e more than 50 single or two family
residences or to serve a m a j ' i commercial or industrial use.
• Other Impacts:

«

NOISE Al 1 ODOR IMPACTS
16. Will there be objectionab ? odors, noise, or vibration as a result
of the Proposed Action?
KNO
DYES
Examples that would applv o column 2

impacts:

__^

IMPACT Of

PUBLIC-HEALTH

17. Will Proposed Action affer

public health and safety?
13NO
Examples that would apply o column 2

DYES,

• Propped Action may cause a si' of explosion or release of hazardous
substances (I.e. oil, pesticides, • lemlcals, radiation, etc) in the event of
accident or upset conditions, or there may be a chronic losv level
discharge or emission,
• Proposed Action may result In • he burial of "hazardous wastes" In any
form (I e, toxic, poisonous, l ghly reactive, radioactive, Irritating,
Infectious, etc.)

' &gt; O l h * " impacts: _~

_.

10

�IMPACT ON GP JWTH AND CHARACTER
OF COMMUNI Y OR NEIGHBORHOOD
18 Wj|| proposed action affe&lt; the cliaracter of the existing community?
59 NO DYES
rumples that would app1 to column 2

1

2

Small to
Moderate
Impact

Potential
Large
Impact

• The permanent population f the city, town or village in vshich the
project is located is likely t' grow by more than S%,
• Th* municipal budget for c nitfil expenditures or operating services
will increase by more than Ho per year as a result of this project,
• Proposed action will conflie' with officially adopted pl«\ns or goals,
• Proposed action will cause r change in the density of land use.
•"Proposed Action will replace or eliminate existing facilities, structures
or .-uoas of historic importance to the community.
• Development will create a dr nand for additional community services
(e R schools, police and fire, Ac )
• Proposed Action will set an • nportant precedent for future projects.
• Proposed Action will create r eliminate employment
• Otb r r impacts:
;
.

D

,'

&gt;n

:

3
Can Impact Be
Mitigated By
Project Change
DYe*

Ohio

D

D

DYes

DNo

a
D
D

D
D
D

DYes
DYe$
DYes

DNo
DNo
DNo

D

D

DYes D M O

D

D
D
D

DYes
DYes
DYes

a
D

DNo
DNo
DNo

19. Is ^rc, or Is there likely to bo, public controversy related to
po* ntial adverse environmental Impacts?
G3NO
DYES

If Any Actio In Part 2 Is Identified as a Potential Large Impact or
If You Cannoi Determine the Magnitude of Impact, Proceed to Part 3

Part 3-EVALUATION OF THE IMPORTANCE OF IMPACTS
Responsibility of l.ond Agency
Part 3 &lt;"ijst be preparedlf one :r m«»re Impact(s) is considered to be potentially large, even If the Impact(s) may be
mitigated.
Instructions
** "
Discus* the following for each Impact identified In Column 2 of Part 2:
1 . Briefly describe the Impact
2. Desr rlbe (If applicable) how thr Impact could be mitigated or reduced to a small to moderate Impact by project changes).
3. Bas'-' on the Information av/» lablt\ decide If It is reason*!'!** to conclude that this Impact is Important,
1 " answer the question of Impottance, consider:
* The probability of t l f Impact occurring
* The duration of the Impact
* Its Irreversibility, lncli'dln« permanently lost resound of value
" Whelher the Impact c in or will be controlled
;
&lt;
* The regional consequ'nee M the Impact
$'
&lt; " Its potential dlvergenr? ffrMii local neods and nO'iN
* Whether known obJcUon* to the project folate H- diU Impact.
(Continue on attachments)

11

�PREVIOUS
DOCUMENTS
IN POOR
ORIGINAL
CONDITION

�David J. Portman, AICP
Howard I. Reynolds, PE
David H. Stolman, AICP

FREDERICK P. CLARK ASSOCIATES, INC.
Planning/Development/Environment/Transportation
Rye, New York and Southport, Connecticut
350 Theodore Fremd Avenue
Rye, New York 10580
(914)967-6540

Michael A. Galante
Joanne P. Meder, AICP
Jim Donovan, RLA, ASLA

MEMORANDUM
To:

Village of North Tarrytown Planning Board

Date:

December 10, 1S93

Subject:

Preliminary Review of Valley Plaza Site Plan

As requested, we have reviewed the site plan application for a
property which is approximately 4,900 square feet in size,
triangular in shape and located in the northwest quadrant of the
intersection of Chestnut Street and Valley Street in the C-2
General Commercial District. The site presently contains a onestory building (including a garage) which covers practically the
entire lot.
The Applicant is proposing the renovation of the
existing first floor for retail use and the construction of a
second floor for residential apartments and an office and a third
floor loft for that office. The building permit application states
that the proposed building will have a total floor area of 2,980
square feet and be 33 feet in height.
Five retail spaces are
proposed and five one-bedroom dwelling units are proposed.
The Applicant has submitted the following plans:
1.

"1, Proposed Valley Plaza, 185 Valley Street, North Tarrytown,
New York 10591, Owner: Gerald Bregman, Lower Level Plan,
Site Plan and Location Map," scale as noted, dated
November 30, 1993, prepared by Ronald E. Turnquist Architects;

2.

"2, Proposed Valley Plaza, 185 Valley Street, North Tarrytown,
New York 10591, Owner: Gerald Bregman, Upper Level and Loft
Plans, Data and Symbols," scale as noted, dated November 30,
1993, prepared by Ronald E. Turnquist Architects.

REVIEW COMMENTS
1.

Zoning Compliance: The proposed uses are permitted in the C-2
District. The proposed 'project complies with the permitted
maximum building height and appears to comply with the
required minimum lot width.
The proposed project will exacerbate any existing nonconformities although it will be an aesthetic and economic

Connecticut • (203) 255-3100

FAX • (914) 967-6615

Long Island • (516) 364-4544

�FREDERICK P. CLARK ASSOCIATES, INC.
Planning/Development/Environment/Transportation

improvement to the property and the surrounding area. Several
variances will be needed for its approval. The only way to
avoid the need for many or all of the variances would be by
demolition of the existing building and redesign of the site.
The minimum required lot size for five dwelling units is 8,000
square feet and the lot is only 4,900 square feet in size. A
variance for lot size will be needed from the Zoning Board of
Appeals (ZBA). The maximum permitted lot coverage for the
residential use is 35%. The actual building lot coverage is
nearly 100% and since the residential portion of the coverage
is certainly more than 35% a variance will be needed. (If the
Applicant is proposing a building which will contain more than
two stories on a lot which is 4,900 square feet in size and
the building covers nearly 100% of the lot, the floor area
figure given in the application does not make sense. The
Applicant should clarify whether the 2,980 square feet means
that there will be 2,980 additional square feet of floor area
and what the total floor area will be.) For a residential
use, the required minimum front yard is 2 0 feet, the minimum
side yard is three feet for one side and 12 feet for both and
the minimum rear yard is 25 feet. None of these setbacks has
been provided and variances will be needed.
2.

Parking. Loading and Circulation: No parking is proposed to
be provided on the property and the existing garage space is
proposed to be removed. No loading is provided for the retail
uses. It is not clear whether the existing garage was used
for parking, loading or both and what its capacity is. Still,
the removal of this parking opportunity is aggravated by the
addition of parking demand to the site. It is assumed that
loading will occur in the on-street parking spaces and the
vehicular travel lanes on Valley Street. This is not an ideal
situation as far as safety and convenience.
Eight parking
spaces are required for the dwelling units and, as none are
proposed to be provided, a variance will be needed.
Residential parking would have to be through private
individual rental of parking spaces on another property or onstreet parking on Chestnut Street. Valley Street has metered
parking. There are a few restrictions for parking on Chestnut
Street for certain hours during the week.

3.

Environmental Review: The Applicant has submitted a short
Environmental Assessment Form (EAF). According to Part 617.12
of the State Environmental Quality Review Act (SEQR), this is
a Type I Action because the property is located within the
Hudson River Shoreline Critical Environmental Area (CEA). The
Applicant is required to submit a full (long form) EAF for a
Type I Action. After review of the full EAF, the Planning
Board may declare its intent to be Lead Agency in the review
2

�FREDERICK P. CLARK ASSOCIATES, INC.
Planning/Development/Environment/Transportation

of this action. A notice of intent to be Lead Agency should
then be circulated to the involved (i.e. ZBA) and interested
(e.g. New York State Department of Environmental Conservation)
agencies. After 30 days or receipt of the responses from the
other agencies, whichever comes first, the Planning Board may
declare itself Lead Agency, provided no other involved agency
(i.e. ZBA) objects, and make a determination of significance.
The Lead Agency's preparation of a Negative Declaration or a
findings statement (following a Positive Declaration and the
preparation of an Environmental Impact Statement) would
complete the SEQR review process. We would recommend that the
ZBA defer its final decision until the SEQR process is
completed.
Although based on preliminary review it does not appear that
the project will adversely impact the critical environmental
area, compliance with this process is required by State law.
Susan J. Portman, AICP
Associate/Planning
cc:

Janet A. Gandolfo, Esq., Village Attorney
James T. Margotta, Building Inspector
Joseph A. Gulino, Village Engineer
Gerald Bregman
Ronald E. Turnquist

500\not3-009.sjp:aj

3

�FREDERICK P. CLARK A S S O C I A T E S , I N C .
Planning/Development/Environment/Transportation
Rye, New York and Southport, Connecticut

David J. Portman, A,CP
Howard I. Reynolds, PE
David H. Stolman, AICP

350 Theodore Fremd Avenue
Rye, New York 10580
(914) 967-6540

Michael A. Galante
Joanne P. Meder, AICP
Jim Donovan, RLA. ASLA

MEMORANDUM
To:

Village of North Tarrytown Planning Board

Date:

December 16, 1993

Subject:

Preliminary Review of Rock of Salvation Church Site Plan

The Applicant and the Building Inspector have determined that site
plan approval is needed for the conversion of this building and, as
requested, we have reviewed the submitted site plan consistent with
that determination. The site plan application is for a property
which is approximately 11,320 square feet in size and located at
131 Cortlandt Street in the C-2 General Commercial District. The
site presently contains a one-story brick building with a side
loading area and a concrete driveway. The Applicant is proposing
the conversion of the building from its former use as a Con Edison
Company electrical sub-station to a church with 300 permanent
seats, an approximately 170 square foot day care center, 13
classrooms (one of which is proposed to double as a children's
nursery during services), four meeting rooms, two offices and a
kitchen. The first floor of the building is 7,867 square feet in
floor area and the proposed mezzanine is proposed to be an
additional 3,150 square feet.
The Applicant has submitted the following plans:
1.

"1, Rock of Salvation Church, Rev. Christian Santiago, Pastor,
131 Cortlandt Street, North Tarrytown, N.Y., Site Location,
Site Plan and Data," scale as noted, dated December 6, 1993,
prepared by Ronald E. Turnquist Architects;

2.

"2, Rock of Salvation Church, Rev. Christian Santiago, Pastor,
131 Cortlandt Street, North Tarrytown, N.Y., Schematic Plan of
First Floor," scale as noted, dated December 6, 1993, prepared
by Ronald E. Turnquist Architects;

3.

"3,
Rock of Salvation Church, Rev. Christian Santiago,
Pastor, 131 Cortlandt Street, North Tarrytown, N.Y., Schematic
Plan of Mezzanine," scale as noted, dated December 6, 1993,
prepared by Ronald E. Turnquist Architects.

Connecticut • (203) 255-3100

FAX • (914) 967-6615

Long Island • (516) 364-4544

�FREDERICK P. CLARK ASSOCIATES, INC.
Planning/Development/Environment/Transportation

REVIEW COMMENTS
1.

Zoning Compliance: The proposed church use is permitted in
the C-2 District. The building and the lot comply with the
permitted maximum building height (no change from the existing
is proposed), minimum lot area, minimum lot width and minimum
rear yard and one of the required minimum side yards complies.
The existing building does not comply with the required
maximum lot coverage, minimum front yard and minimum combined
side yards. Still, it does not appear that the Applicant will
need any variances from the Zoning Board of Appeals (ZBA) for
lot coverage and front and side yard setbacks because there is
not a proposal to modify the outside of the existing building
in such a way as to aggravate those preexisting nonconformities and because the change in use from the substation to the church also will not aggravate them.
As per Section 62-15D and 62-15E, the Church is allowed one
sign, which shall not exceed 2 0 square feet in area. No sign
details have been provided at this time.

2.

Parking and Circulation:
No parking is proposed to be
provided on the property other than on the existing driveway
(which is too narrow to allow cars to pass). The lack of
parking on the site is aggravated by the additional parking
demand generated by the proposed use. The previous use of the
building, based on existing floor area, probably only would
have been required to provide eight off-street parking spaces
(this does not account for the parking requirement based on
the maximum number of employees). With the proposed use, at
least 38 parking spaces (based only on the number of permanent
seats) or 73 spaces (based on total floor area) are required.
Usually the greater number, or 7 3 spaces, is that which is
required in a situation in which two standards are provided in
the Code. Since the proposed use will increase the parking
demand from the previous use and will aggravate the existing
non-conformity, a variance will be needed from the ZBA.
Required handicap parking also has not been provided on this
site.

3.

Proposed Day Care Use: Unlike the H Hospital District, none
of the other zoning districts specifically permit day care
centers as an accessory use. The question of whether a day
care center is a permitted accessory or ancillary use to a
church in the C-2 District is for the Building Inspector to
decide.
If it is determined that it is not a permitted
accessory use, a use variance will be needed from the ZBA.
2

�FREDERICK P. CLARK ASSOCIATES, INC.
Planning/Development/Environment/Transportation

The day care use is proposed to operate five days per week and
to occur throughout the building (i.e. the first floor
classrooms), not simply to be limited to the space designated
on the plan. The Applicant should provide more information
concerning the number of children and day care employees which
are anticipated. If the Applicant does not want to provide
the day care center at this time the designation of that use
should not be included on the plan. If a day care center is
determined to be permitted by the Zoning Code, the center
should adhere to any and all New York State licensing and
design requirements for day care centers (we would need to
check whether a day care center in connection with a religious
use would be exempt from those regulations).
4.

Environmental Review: The Applicant has submitted a short
Environmental Assessment Form (EAF). According to Part 617.12
of the State Environmental Quality Review Act (SEQR), this is
a Type I Action because the property is located within the
Hudson River Shoreline Critical Environmental Area (CEA). The
Applicant is required to submit a full (long form) EAF for a
Type I Action. After review of the full EAF, the Planning
Board may declare its intent to be Lead Agency in the review
of this action. A notice of intent to be Lead Agency should
then be circulated to the involved (i.e. ZBA) and interested
(e.g. New York State Department of Environmental Conservation)
agencies. After 3 0 days or receipt of the responses from the
other agencies, whichever comes first, the Planning Board may
declare itself Lead Agency, provided no other involved agency
(i.e. ZBA) objects, and make a determination of significance.
The Lead Agency's preparation of a Negative Declaration or a
findings statement (following a Positive Declaration and the
preparation of an Environmental Impact Statement) would
complete the SEQR review process. We would recommend that the
ZBA defer its final decision until the SEQR process is
completed.
Susan J. Portman, AICP
Associate/Planning

cc:

Janet A. Gandolfo, Esq., Village Attorney
James T. Margotta, Building Inspector
Joseph A. Gulino, Village Engineer
Ronald E. Turnquist

500\not3-023.sjp

3

�CHANGES TO DRAFT RESOLOTIOM DATED 12/16/93

2.4

A fence shall be shown on the plan located, whenever possible,
approximately 2-4 feet back from the curb along the south side
of the southeast driveway approximately 25 feet from the maple
tree located to the south of the 62 spot accessory lot to the
south where the existing hedge begins. This fence shall be
six feet in height and composed of spruce wood set in concrete
and the style of fence and construction of the fence shall be
to the satisfaction of the Planning Board, Building Inspector
and Hospital in order to screen all headlights coming from the
Hospital driveway and parking area to the east in order to
protect the adjacent residential district.
The Hospital will pay up to $7,000 for this fence and the
Village will pay up to $1,000, for a total cost not to exceed
$8,000.

2.5

In addition, the Hospital shall spend $2,000 for landscaping
by the new accessory lot. This landscaping will be mutually
agreed to by the Planning Board and Hospital.
Total cost to the Hospital for the fence and landscaping will
be approximately $9,000 tjut need not exceed $9,000.

2.6

The handicap parking spaces shall be shown on the plan and
constructed and designated in a manner consistent with the
requirements of the Americans with Disabilities Act (ADA).

BBD\RES0L

£^Z_js^

^&gt;^-

^^-

�»«-•

-&lt;%F

C H A R L E S
A . M A N G A N A R O
C O N S U L T I N G
E N G I N E E R S
•

MEMORANDUM
TO

Village of North Tarrytown Planning Board

FROM

Joseph A. Gulino, Project Engineer

DATE

January 17, 1994

RE

Phelps Memorial Hospital
Village of North Tarrytown, NY
CAMCE No. 800-17

In accordance with your request, we have reviewed the site plans and reports submitted
by the Applicant's Engineer. The Applicant to date has not yet submitted information
concerning the sewer force main located between IBM and Sleepy Hollow Manor.
The Applicant's Engineer had indicated that his report would be revised to include the
following:
A.

Force main size, length and material type; and

B.

A headloss calculation for the Force main based on a flow of 400 gpm,
225 gpm and 190 gpm.

Once the above information is submitted and reviewed, final recommendations will be
made to the Board.
court piaza North. 25 Main streei
Hackensack, NJ 07601-7032
201.342.4200 fax 201.342.0790
120 E. 75th St. Suite 8C
New York. NY 10021
212.683.7712
P.O Box 1007
East Stroudsburg, PA 18301
717.421.1499

if you should have any questions or require further information, please let us know.

JAG/11
cc:

Ms. Linda David, Administrator
Mr. James T. Margotta, Building Inspector
Janet A. Gandolfo, Attorney
Ms. Susan J. Portman, AICP
Mr. Edward Gonsalves, P.E.

VNPV800-I7\JGOII74M.LL

#

�-«p-

. ~H&gt;

C H A R L E S
A . M A N G A N A R O
CONSULTING
ENGINEERS

«pf

MEMORANDUM
TO:

Village o f North Tarrytown Planning Board

FROM:

Mr. Joseph A . Gulino
Project Engineer

DATE:

January 17, 1994

RE:

Preliminary Review o f the Proposed
Valley Plaza, 185 Valley Street
Village of North Tarrytown, N Y
C A M C E N o . 800-19

In accordance with your request, w e have reviewed the latest revised site plan dated
December 10, 1993. Our comments concerning this project are as follows:
#

A.

The structure and foundation should be investigated b y a Structural Engineer
' to determine its adequacy in supporting additional floors above it.

B.

The location and design o f the proposed water supply, sewage disposal, and
stormwater drainage systems including the locations, sizes, invert, and rim
elevations to the existing systems, should be submitted for review.

C.

The location o f the nearest fire hydrants should be shown on the drawings.

Once the above information is submitted and reviewed, final recommendations will be
made to the Board.
Court Plaza North, 25 Main Street

Hackensack, NJ 07601-7032

j f v o u should have any questions or require further information, please let u s know.

201.342.4200 lax 201.342.0790
120 E 75th St., Suite 8C
New York, NY 10021

JAG/11

212.683.7712
PO BOX 1007
East stroudsburg, PA 18301

cc.

717421 m

y n d a ^ ^ Administrator
Mr* James T. Margotta, Building Inspector
Janet A . Gandolfo, Attorney
Ms. Susan J. Portman, AICP
Mr. Ronald E . Tumquist, R.A.

Ms

VNPU00-I9MO0II74M.LLI

�David J. Portman, AICP
Howard I. Reynolds, PE
David H. Stolman, AICP

FREDERICK P. CLARK ASSOCIATES, INC.
Planning/Development/Environment/Transportation
Rye, New York and Southport, Connecticut

Michael A. Galante
Joanne P. Meder, AICP

350 Theodore Fremd Avenue
Rye, New York 10580
(914)967-6540

Jim Donovan, RLA. ASLA

Village of North Tarrytown Planning Board DATE: January 21, 1994

TO:

Linda David, Village Administrator

PROJECT: 520.032/Valley Plaza

Janet A. Gandolfo, Esq.

FAX NO.:

James T. Margotta, Building Inspector
Joseph A. Gulino, Village Engineer
W E TRANSMIT HEREWITH:

VIA:

(x)
( )
( )

(x)
( )
( )

As requested a t m e e t i n g
As per conversation
Per request of

( )
( )
( )

First Class Mail
Express Delivery
Telefax-# of Pages
(including cover sheet)
Our Messenger
Your Messenger
Hand Delivery

FOR YOUR:
( )
( )
( )

Approval
Review
Distribution

(x)
( )
()

File
Information

( )
( )

Use
Cornrnent

THE FOLLOWING:
No. of Copies
1

Description

Date
1/2 0/94

Negati.ve Declairation - Valley Plaza

REMARKS:

cc: Gerald Bregman
Ronald E. Turnquist
Connecticut •(203)255-3100

By Susan J . Portman, AICP
Associate/Planning
FAX • (914)967-6615

Long Island •(516)364-4544

�SEQR
617.21
Appendix F
State Environmental Quality Review
NEGATIVE DECLARATION
Notice of Determination of Non-Significance
Project Number

Date

January 20. 1994

This notice is issued pursuant to Part 617 of the implementing regulations pertaining to Article 8 (State
Environmental Quality Review Act) of the Environmental Conservation Law.
The Village of North Tarrvtown Planning Board . as lead agency, has determined that the proposed action
described below wll not have a significant effect on the environment and a Draft Environmental Impact Statement will not
be prepared.
Name of Action:

SEQR Status:

Valley Plaza Site Plan

Type I

X

Unlisted
Conditioned Negative Declaration:

Yes
X

No

Description of Action:
Proposed second-story and loft addition to existing one-story building to contain five retail spaces, five
dwelling units and one office.

Location:

(Include street address and the name of the municipality/county. A location map of appropriate scale is
also recommended.)
185 Valley Street, Village of North Tarrytown, Westchester County

�SEQR Negative Declaration

Page 2

Reasons Supporting This Determination:
(See 617.6(g) for requirements of this determination; see 617.6(h) for Conditioned Negative Declaration)
The proposed action will not cause a significant adverse impact on land, water, air, plants and animals,
agricultural land resources, aesthetic resources, historic and archaeological resources, open space and
recreation, transportation, energy, public health, growth and character of the community or cause
significant adverse noise and odor.

If Conditioned Negative Declaration, provide on attachment the specific mitigation measures imposed.
For Further Information:

m

ontact Person:

Linda David, Village Administrator

Address:

Village Hall
28 Beekman Avenue
North Tarrytown, New York 10591

Telephone Number:

(914) 631-1440

For Type I Actions and Conditioned Negative Declarations, a Copy of this Notice Sent to:
Commissioner, Department of Environmental Conservation, 50 Wolf Road, Albany, New York 12233-0001
Region 3, Department of Environmental Conservation, 21 South Putt Corners Road, New Paltz, New York 12561
Gerald Bregman, 185 Valley Street, North Tarrytown, New York 10591
Ronald E. Turnquist, 95 Beekman Avenue, North Tarrytown, New York 10591

500\not4-O06.sjp.crc

\

�</text>
                  </elementText>
                </elementTextContainer>
              </element>
            </elementContainer>
          </elementSet>
        </elementSetContainer>
      </file>
    </fileContainer>
    <collection collectionId="135">
      <elementSetContainer>
        <elementSet elementSetId="1">
          <name>Dublin Core</name>
          <description>The Dublin Core metadata element set is common to all Omeka records, including items, files, and collections. For more information see, http://dublincore.org/documents/dces/.</description>
          <elementContainer>
            <element elementId="50">
              <name>Title</name>
              <description>A name given to the resource</description>
              <elementTextContainer>
                <elementText elementTextId="14838">
                  <text>Planning Board Minutes &amp; Resolutions-1994</text>
                </elementText>
              </elementTextContainer>
            </element>
          </elementContainer>
        </elementSet>
      </elementSetContainer>
    </collection>
    <itemType itemTypeId="1">
      <name>Text</name>
      <description>A resource consisting primarily of words for reading. Examples include books, letters, dissertations, poems, newspapers, articles, archives of mailing lists. Note that facsimiles or images of texts are still of the genre Text.</description>
    </itemType>
    <elementSetContainer>
      <elementSet elementSetId="1">
        <name>Dublin Core</name>
        <description>The Dublin Core metadata element set is common to all Omeka records, including items, files, and collections. For more information see, http://dublincore.org/documents/dces/.</description>
        <elementContainer>
          <element elementId="50">
            <name>Title</name>
            <description>A name given to the resource</description>
            <elementTextContainer>
              <elementText elementTextId="13981">
                <text>MINS_PLAN_1994-01-20</text>
              </elementText>
            </elementTextContainer>
          </element>
          <element elementId="49">
            <name>Subject</name>
            <description>The topic of the resource</description>
            <elementTextContainer>
              <elementText elementTextId="13982">
                <text>Planning Board Minutes &amp; Resolutions-1994</text>
              </elementText>
            </elementTextContainer>
          </element>
          <element elementId="40">
            <name>Date</name>
            <description>A point or period of time associated with an event in the lifecycle of the resource</description>
            <elementTextContainer>
              <elementText elementTextId="13983">
                <text>1994</text>
              </elementText>
            </elementTextContainer>
          </element>
        </elementContainer>
      </elementSet>
    </elementSetContainer>
  </item>
  <item itemId="2272" public="1" featured="0">
    <fileContainer>
      <file fileId="2272">
        <src>https://sleepyhollow.localarchives.org/files/original/105a7c2c01075602ddd3c966bc70ec07.pdf</src>
        <authentication>a73ea8a7637d36998cf1affc9ea39c9d</authentication>
        <elementSetContainer>
          <elementSet elementSetId="4">
            <name>PDF Text</name>
            <description/>
            <elementContainer>
              <element elementId="52">
                <name>Text</name>
                <description/>
                <elementTextContainer>
                  <elementText elementTextId="20759">
                    <text>D R A F T

2/9/95

RESOLUTION
Adopted at the December 15, 1994 Meeting of the
Village of North Tarrytown Planning Board
RESOLUTION

SUBDIVISION AND SITE PLAN APPROVAL
PROPOSED ACTION: RESUBDIVISION TO REMOVE ONE
BUILDING LOT
OWNER: JAMES AND MARTHA BICK, ET AL
APPLICANT: JAMES AND MARTHA BICK
LOCATION: TERRACE CLOSE, BIRCH CLOSE
TAX MAP DESIGNATIONS:
11/1A/1, 11/1S/2A,
11/1S/2B1, 11/1S/8, 11/1S/9
ZONING: R-2A RESIDENTIAL

�RESOLUTION
Adopted at the December 15, 1994 Meeting of the
Village of North Tarrytown Planning Board
RESOLUTION

SUBDIVISION AND SITE PLAN APPROVAL
PROPOSED ACTION: RESUBDIVISION TO REMOVE OlTE
BUILDING LOT
OWNER: JAMES AND MARTHA BICK, ET AL
APPLICANT: JAMES AND MARTHA BICK
LOCATION: TERRACE CLOSE, BIRCH CLOSE
TAX MAP DESIGNATIONS:
11/1A/1, 11/1S/2A,
11/1S/2B1, 11/1S/8, 11/1S/9
ZONING: R-2A RESIDENTIAL
WHEREAS, the Planning Board of the Village of North Tarrytown
has reviewed an application for subdivision approval (the
application) pursuant to the Subdivision Regulations of the Village
of North Tarrytown, Chapter 62, Zoning, of the Code of the Village
of North Tarrytown and other requirements of the Village Cocie
considered pertinent to the application, which application is also
considered an application for site plan approval as required in
Section 62-29 of the Zoning Code, and which application is to
resubdivide properties located at 3 and 4 Terrace Close and 6 Birch
Close; and
WHEREAS, Lot A would be approximately 25,863 square feet in
size and would contain the existing dwelling at 3 Terrace Close and
would be made up of the existing parcel known as Section 11, BlocK
1A, Lot 1, an unnumbered parcel, and a portion of the existing
parcel known as Section 11, Block IS, Lot 8; and
WHEREAS, Lot B would be approximately 32,468 square feet in
size and would be made up of portions of the existing parcels known
as Section 11, Block IS, Lot 8 and Section 11, Block IS, Lot 9; and
WHEREAS, approximately 5,950 square feet of the existing
parcel known as Section 11, Block IS, Lot 9 would be added to the
side of the parcel at 4 Terrace Close and approximately 12,0 00
square feet of the existing parcel known as Section 11, Block is,
Lot 9 would be added to the rear of the parcel at 6 Birch Close;
and
WHEREAS, the proposed resubdivision is shown on the drawing
prepared by Charles H. Riley, Land Surveyor, and further identified
as follows:
"Subdivision Map Prepared For James A. &amp; Martha A. Bick, ReSubdivision of Lot 1 - Block 3, An Unnumbered Parcel, Lot 8 Block 2 and a Portion of Lot 9 - Block 2 As Shown On Revised
Map of Sleepy Hollow Manor - Filed in Westchester Courvty
Division of Land Records On June 23, 19 3 0 As Map No. 3 621,

�Located in the Village of North Tarrytown, Town of Mount
Pleasant, Westchester County, N.Y.," scale 1" = 20*, dated
October 28, 1994; and
WHEREAS, all references to the "Applicant" shall include the
Applicant's successor and assigns; and
WHEREAS, the Applicant has submitted a copy of a title report
which states that the Bicks are the current owners of the
unnumbered parcel; and
WHEREAS, the site has been visited by the Village's Planning
Consultant and the Planning Board is thoroughly familiar with the
site and all aspects of the proposed subdivision; and
WHEREAS, a duly advertised public hearing was held at the
Village Hall on November 17, 1994, at which time those wishing to
be heard were given the opportunity to be heard; and
WHEREAS, the Planning Board considered this a minor
subdivision and treated the preliminary and final as a single
approval; and
WHEREAS, in the course of this review and acting as Lead
Agency pursuant to Part 617 of the implementing regulations
pertaining to Article 8 of the Environmental Conservation Law, the
Planning Board has made the following findings and caused, noted or
conducted the following activities:
1.

Received an application fee;

2.

Caused field inspections to be made of the property and of the
surrounding areas;

3.

Requested, received and considered comments from the Village
Planning Consultant and the Building Inspector;

4.

Requested, received and reviewed a full Environmental
Assessment Form (EAF) in compliance with the New York State
Environmental Quality Review Act (SEQRA);

5.

Circulated the EAF and the notice of the Planning Board's
intent to be the Lead Agency on November 18, 1994 and received
a letter of no objection from the other involved agency dated
December 6, 1994;

6.

After review of said field conditions, recommendations and
EAF, as well as other materials and matters noted above, the
Planning Board, as Lead Agency, has determined that the
proposed action is an Type I Action and made a Negative
Declaration on December 15, 1994, and noted on the EAF its
determination of non-significance of environmental impact.
2

�NOW, THEREFORE, BE IT RESOLVED, that said application for
resubdivision and site plan approval, as shown on the drawing
entitled "Subdivision Map Prepared For James A. &amp; Martha A. Bick,
Re-Subdivision of Lot 1 - Block 3, An Unnumbered Parcel, Lot 8 Block 2 and a Portion of Lot 9 - Block 2 As Shown On Revised Map of
Sleepy Hollow Manor - Filed in Westchester County Division of Land
Records On June 23, 1930 As Map No. 3621, Located in the Village of
North Tarrytown, Town of Mount Pleasant, Westchester County, N.Y.,"
scale l" = 20', dated October 28, 1994, prepared by Charles H.
Riley, Land Surveyor, be and is hereby granted subdivision and site
plan approval and that the Applicant may obtain the endorsed
approval of the Planning Board Chairman or, as an alternate, the
Village Administrator, on a copy of this subdivision resolution and
upon the final mylar copy of the subdivision plat drawing revised
as necessary to show compliance with the following conditions and
the Applicant may obtain the endorsement of the Westchester County
Department of Health on the final mylar subdivision plat which
endorsements shall permit filing in the offices of the Westchester
County Clerk, provided, however, that this subdivision approval
shall expire within one hundred eighty (180) days from the date of
this resolution if the following conditions have not been completed
to the satisfaction of the Planning Board:
1.

The Applicant shall pay to the Village of North Tarrytown the
reimbursement of all application review fees as noted and
required in Section 62-30F of the Village Zoning Code.

2.

Revision of the above noted plat to demonstrate the following:
2.1

The plat shall be revised and titled "Final Subdivision
Plat;"

2.2

The final plat shall comply with the requirements of
Section 11 of the Village of North Tarrytown Subdivision
Regulations;

2.3

The date of this resolution shall be noted on the final
plat;

2.4

The tax map designations for all of the
properties shall be provided on the plat;

2.5

Any information on the plat, including the title, which
incorrectly refers to the tax map designations of the
involved properties shall be corrected, as appropriate;

2.6

The names and addresses of all of the property owners of
all of the involved properties shall be added to the
plat;

3

involved

�2.7

The existing and proposed property lines, area and
dimensions of all of the properties involved in the
subdivision shall be shown on the plat;

2.8

The area map shall be revised to correctly indicate all
of the properties involved in the subdivision;

2.9

The plat shall be corrected to reflect the fact that the
involved properties are located in Zoning District R-2A
(not R-2).

PLANNING BOARD
VILLAGE OF NORTH TARRYTOWN

By:

s ^

/**?

^

\ ^ M ^
7 J

Chairman

:h Tarrytown Planning Board
500\not4-043.sjp:ev

4

Date:

r//j&gt;/&lt;)y
/

7

�D R A F T

2/9/95

RESOLUTION
Adopted at the January 19, 1995 Meeting of the
Village of North Tarrytown Planning Board
RESOLUTION

SUBDIVISION AND SITE PLAN APPROVAL
PROPOSED ACTION: SUBDIVISION OF PROPERTY INTO
TWO (2) LOTS
OWNER AND APPLICANT: MARGARET M. AND VINCENT
S. SHROBA
LOCATION: 81 SLEEPY HOLLOW ROAD
TAX DESIGNATION: SECTION 17, BLOCK 6, LOT 14
ZONING: R-3 RESIDENTIAL

�RESOLUTION
Adopted at the January 19, 1995 Meeting of the
Village of North Tarrytown Planning Board
RESOLUTION

SUBDIVISION AND SITE PLAN APPROVAL
PROPOSED ACTION: SUBDIVISION OF PROPERTY INTO
TWO (2) LOTS
OWNER AND APPLICANT: MARGARET M. AND VINCENT
S. SHROBA
LOCATION: 81 SLEEPY HOLLOW ROAD
TAX DESIGNATION: SECTION 17, BLOCK 6, LOT 14
ZONING: R-3 RESIDENTIAL
WHEREAS, the Planning Board of the Village of North Tarrytown
has reviewed an application for subdivision approval (the
application) pursuant to the Subdivision Regulations of the Village
of North Tarrytown, Chapter 62, Zoning, of the Code of the Village
of North Tarrytown and other requirements of the Village Cocie
considered pertinent to the application, which application is also
considered an application for site plan approval as required in
Section 62-29 of the Zoning Code, and which application is to
subdivide property located at 81 Sleepy Hollow Road into two (2)
lots for residential development; and
WHEREAS, Lot 1A would be 6,235.2 square feet in size and Lot
IB would be 14,537.5 square feet in size and would contain the
existing dwelling at 81 Sleepy Hollow Road, as shown on the drawing
prepared by John J. Muldoon, Professional Land Surveyor, and
further identified as follows:
"Subdivision Map Prepared For Vincent S. &amp; Margaret M. Shroba,
Situate Village of No. Tarrytown, Town of Mt. Pleasant,
Westchester Co., N.Y.," scale 1" = 20', dated October 10,
1994; and
WHEREAS, all references to the "Applicant" shall include the
Applicant's successor and assigns; and
WHEREAS, the site has been visited by the Village's Planning
Consultant and the Planning Board is thoroughly familiar with the
site and all aspects of the proposed subdivision; and
WHEREAS, a duly advertised public hearing was held at the
Village Hall on October 20, 1994, at which time those wishing to be
heard were given the opportunity to be heard; and
WHEREAS, the Planning Board considered this a minor
subdivision and treated the preliminary and final as a single
approval; and

�WHEREAS, in the course of this review and acting as Lead
Agency pursuant to Part 617 of the implementing regulations
pertaining to Article 8 of the Environmental Conservation Law, the
Planning Board has made the following findings and caused, noted or
conducted the following activities:
1.

Received an application fee;

2.

Caused field inspections to be made of the property and of the
surrounding areas?

3.

Requested, received and considered comments from the Village
Planning Consultant, the Village Engineering Consultant and
the Building Inspector;

4.

Requested,, received and reviewed a full Environmental
Assessment Form (EAF) in compliance with the New York State
Environmental Quality Review Act (SEQRA) ;

5.

After review of said field conditions, recommendations and
EAF, as well as other materials and matters noted above, the
Planning Board, acting as Lead Agency, has determined that the
proposed action is an Unlisted Action and made a Negative
Declaration on January 19, 1995, and noted on the EAF its
determination of non-significance of environmental impact.

NOW, THEREFORE, BE IT RESOLVED, that said application for
subdivision and site plan approval for a two (2) lot subdivision,
as shown on the drawing entitled "Subdivision Map Prepared For
Vincent S. &amp; Margaret M. Shroba, Situate Village of No. Tarrytown,
Town of Mt. Pleasant, Westchester Co., N.Y.," scale 1" - 20*, dated
October 10, 1994, prepared by John J. Muldoon, Professional Land
Surveyor, be and is hereby granted subdivision and site plan
approval and that the Applicant may obtain the endorsed approval of
the Planning Board Chairman or, as an alternate, the Village
Administrator, on a copy of this subdivision and site plan
resolution and upon the final mylar copy of the subdivision plat
drawing revised as necessary to show compliance with the following
conditions and the Applicant may obtain the endorsement of the
Westchester County Department of Health on the final mylar
subdivision plat which endorsements shall permit filing in the
offices of the Westchester County Clerk, provided, however, that
this subdivision approval shall expire within one hundred eighty
(180) days from the date of this resolution if the following
conditions have not been completed to the satisfaction of the
Planning Board:
1.

The Applicant shall pay to the Village of North Tarrytown the
reimbursement of all application review fees as noted and
required in Section 62-30F of the Village Zoning Code.

2.

Revision of the above noted plat to demonstrate the following:
2

�2.1

The plat shall be revised and titled "Final Subdivision
Plat;"

2.2

The existing section, block and lot numbers shall be
provided on the plat;

2.3

The final plat shall comply with the requirements of
Section 11 of the Village of North Tarrytown Subdivision
Regulations;

2.4

The signature block for the endorsement of the Planning
Board Chairman shall be revised to comply with Section
ll.A(l)(c)(14c);

2.5

The date of this resolution shall be noted on the final
subdivision plat.

PLANNING BOARD
VILLAGE OF NORTH TARRYTOWN

By:

^-

7V

'

'

V"° / ^ V

George F. H r i t z , Chairman
V i l i a ^ B - o £ - N o r t h Tarrytown Planning Board
500\not5-004.sjp:ev

3

Date: _ _ V W ^

�SEQR
617.21
Appendix F
State Environmental Quality Review

NEGATIVE DECLARATION
Notice of Determination of Non-Significance

*

Project Number

Date: January 19, 1995

This notice is issued pursuant to Part 617 of the implementing regulations pertaining to Article 8 (State
Environmental Quality Review Act) of the Environmental Conservation Law.

The Village of North Tarrytown Planning Board, as lead agency, has determined that the proposed action
described below will not have a significant effect on the environment and a Draft Environmental Impact Statement
will not be prepared.

Name of Action: Shroba Subdivision

SEQR Status: Type I
Unlisted

X

Conditioned Negative Declaration:

Yes
X

&lt;

No

Description of Action:
Two-iot subdivision of a property approximately 0.477 acres in size. One lot will contain an existing house and detached
garage.

Location:

t&gt;

(Include street address and the name of the municipality/county. A location map of appropriate scale is
also recommended.)

81 Sleepy Hollow Road, North Tarrytown, Westchester County, New York
Tax Map Section 17, Block 6, Lot 14

T,

�"SEQR Negative Declaration

Page 2

Reasons Supporting This Determination:
(See 617.6(g) for requirements of this determination; see 617.6(h) for Conditioned Negative Declaration)
The proposed action wW not cause a significant adverse impact on land, ground or surface water quality or quantity,
drainage patterns, air quality, plants and animals, agricultural land resources, aesthetic resources, historic and
archaeological resources, open space and recreation, traffic and transportation systems, solid waste production, energy,
public health, growth and character of the community, cause conflict with community plans or goals, or cause significant
adverse noise and odor.

If Conditioned Negative Declaration, provide on attachment the specific mitigation measures imposed.

For Further Information:
«

Contact Person:

Linda David, Village Administrator

Address:

Village Hall, 28 Beekman Avenue
North Tarrytown, New York 10591

Telephone Number:

(914) 631-1440

cc: Mayor Treacy
Linda David, Village Administrator
Janet A. Gandolfo, Esq., Village Attorney
James T. Margotta, Building Inspector
Mark DiGennaro, Village Engineer
Vincent and Margaret Shroba

500\not5-003.sjp

�FREDERICK P. CLARK ASSOCIATES, INC.

David J. Port man, AICP
Howard I. Reynolds, PE
David H. Stolman, AICP

Planning/Development/Environment/Transportation
Rye, New York and Southport, Connecticut
350 Theodore Fremd Avenue
Rye, New York 10580
(914)967-6540

Michael A. Galante
Joanne P. Meder, AICP
Jim Donovan, RLA. ASLA

MEMORANDUM
To:

Village of North Tarrytown Planning Board

Date:

February 10, 1995

Subject:

Review of Chestnut Ridae/Hillside Court Site Plan

Plans:

Site plans and other drawings (total of eight) prepared
by Turnquist Architects, all but sheet SD-2 were revised
1/25/95.

1.

Project Description: Two 3-story buildings containing a total
of 18 dwelling units (32 bedrooms).

2.

Plan Revisions:
Increased size of office space at 76 Chestnut Street from
800 to 900 square feet.
Removed two 2-bedroom dwelling units previously proposed
for Hillside Court.
Reduced the total number of parking spaces from 49 to 45.
Provided five sitting areas as "usable open space."
Proposed additional landscaping.
Increased the setback for Hillside Court an additional
five feet from Depeyster Street.
Made two of the units in Hillside Court into handicapped
adaptable units.
Provided wheelchair lifts for each building.
Widened the entrance to the Chestnut Ridge garage to 22
feet.
Moved driveways to comply with Section 62-22.B of Zoning
Code.

Connecticut • (203) 255-3100

FAX • (914) 967-6615

Long Island • (516) 364-4544

�FREDERICK P. CLARK ASSOCIATES, INC.
Planning/Development/Environment/Transportation

Provided refuse areas for each building.
Zoning Compliance:
Variance required for lot size.
Variance required for building coverage.
Variance required for front yard setback for Chestnut
Ridge (see Section 62-13.b(2) of the Zoning Code
regarding Hillside Court).
Variance required for single and total side yards for
Chestnut Ridge.
Variance required for rear yard of Chestnut Ridge.
Variance required for loading space.
Parking and Circulation:
Spaces #9, #10, #28, #29, #30 are not full-size parking
spaces and should be appropriately designated for compact
car parking.
Two handicap parking spaces are shown. At least one
should have a loading aisle of eight feet in width.
The Applicant should demonstrate that the wheelchair lift
will not interfere with the opening of the car door for
a handicapped person utilizing parking space #17.
The curb radius for the driveway onto Depeyster Street
should be increased.
A sign should be provided at entrance to the parking area
for Hillside Court which indicates the clearance height.
The Applicant should indicate the route the Valley Plaza
residents will take to access the parking area (i.e.,
through the Chestnut Ridge building).
Refuse: It is assumed that the refuse containers will be cans
rather than dumpsters.
If dumpsters are proposed, the
Applicant should indicate how they will be emptied.

2

�FREDERICK P. CLARK ASSOCIATES, INC.
Planning/Development/Environment/Transportation
6

»

Landscaping and Buffers:
•

The trees should be drawn at a larger size, showing a
canopy of approximately 10 to 15 feet.

•

We recommend that trees only be provided in the following
locations (other trees now shown on the plan should be
redrawn as shrubs):
•

One in the southeastern corner of the site (Sitting
Area E ) ;

•

Three along the easterly side and one
northwesterly corner of Sitting Area C;

•

One in the parking island between spaces #20 and 21;

•

One at the northern point of Sitting Area A, one to
the north of spaces #21 and 22 (southwestern point
of Sitting Area A) and one to the north of spaces
#23 and 24;

•

One to the east of space #31 (Sitting Area B ) ;

•

One to the east of the lower level unit in Chestnut
Ridge (south of the staircase labeled "A") - a few
more shrubs could also be added to the east of
staircase A.

in the

We recommend that the trees be a mixture of Zelkova,
Hornbeam,
Linden,
Katsura
or
similar
species;
approximately 1 1/2 inch minimum caliper when planted.
•

We recommend that the shrubs be a mixture of Inkberry,
Taxus (Yew), Spirea, Juniper (in sunny areas), Japanese
Holly or similar species; approximately 15 to 18 inches
in diameter when planted.
We note that a four-foot high chain link fence is
proposed on top of the proposed retaining wall on the
eastern side of the property.
The Planning Board may want to request evergreen
plantings between the proposed retaining wall and the
adjacent properties on the east side of the site. [We
recommend approximately 10 trees; Leyland Cypress and/or
Arborvitae, 5 to 6 feet in height when planted.]

3

�FREDERICK P. CLARK ASSOCIATES, INC.
Planning/Development/Environment/Transportation

7.

Other Comments: The Planning Board may want to ask the
Applicant to note on the plan that the rooms marked as "D,"
assumed to be the dining areas, will not be enclosed to create
additional bedrooms.

8.

Subdivision;
The Applicant should indicate whether the
subdivision line will be dissolved or restrictive covenants
will be filed.

9.

Environmental Review; The Planning Board may declare itself
the Lead Agency and either ask for additional information or
make a determination of significance.

10.

Further Information;
•

Suggested plan r e v i s i o n s ;
•

Add names of neighboring property owners and
location
of
existing
buildings
on adjacent
properties (if Planning Board requests).

•

Provide simple drawing (to scale) of proposed buildings
and neighboring buildings, as viewed from Chestnut Street
and Depeyster Street.

•

Provide elevation drawing of the view of Hillside Court
and the retaining wall from the properties to the east.
Susan J. Portman, AICP, Associate/Planning
Nicholas A. Pouder, Associate/Environmental Planning

cc:

Sean Treacy, Mayor
Linda E. David, Village Administrator
Janet A. Gandolfo, Esq., Village Attorney
James T. Margotta, Building Inspector
Mark DiGennaro, Village Engineer
Ronald Turnquist

500\not5-007.sjp:aj

4

�FREDERICK P. CLARK ASSOCIATES, INC.

David J. Portman, AICP
Howard I. Reynolds, PE
David H. Stolman, AICP

Planning/Development/Environment/Transportation
Rye, New York and Southport, Connecticut
350 Theodore Fremd Avenue
Rye, New York 10580
(914)967-6540

Michael A. Galante
Joanne P. Meder, AICP
Jim Donovan, RLA, ASLA

MEMORANDUM
To:

Village of North Tarrytown Planning Board

Date:

April 13, 1995

Subject:

Review of Philipse Plaza Site Plan

Plan:
1.

Site Plan Prepared by Contadino Architects, 4/6/95
Plan Revisions:
Building coverage reduced from 6,640 square feet (office
space) to 6,440 square feet.
Reduced number of loading spaces from two to one.
Removed previously proposed sidewalk along site frontage.
Reduced previously proposed landscaped area along site
frontage.
Widened entrance driveways to 26 feet from 22 feet.
Reduced the width of the channelization
previous proposal.

island from

Slightly revised layout of parking spaces.
Zoning Compliance:
Variance needed for rear yard setback.
Variance needed for number of parking and loading spaces.
Variance needed for requirement of buffer strip in
addition to rear yard setback (Section 62.9C(2)).
Parking and Circulation:
Recommend switching locations of one of the handicap
parking spaces and handicap loading aisles so that the

;onnecticut • (203) 255-3100

FAX • (914)967-6615

Long Island • (516) 364-4544

�FREDERICK P. CLARK ASSOCIATES, INC.
Planning / Development / Environment /Transportation

middle handicap space has a loading aisle on either side
of it.
Recommend increasing aisle width throughout parking area,
wherever possible.
Recommend cutting back the ends of parking isl ands to
improve circulation and turning capability.
Recommend Applicant discuss proposed design concept with
the New York State Department of Transportation (J^YSDOT).
4.

Landscaping and Suffers;
needed.

Landscaping and screening

plan

5.

Environmental Review: The Environmental Assessment Fo^n (EAF)
will be circulated as soon as it has been received and
reviewed.

6.

Further Information:
Location(s) and dimensions of any freestanding
proposed.

sign(s)

Information regarding whether a restaurant use
included in the new building.

will be

The majority of the above comments were discussed in greater detail
in previous review memos.
Susan J. Portman, AICP, Associate/Plar^ning
cc:

Sean Treacy, Mayor
Linda E. David, Village Administrator
Janet A. Gandolfo, Esq., Village Attorney
James T. Margotta, Building Inspector
Mark A. DiGennaro, Village Engineer
Louis Contadino, AIA
John Hughes, Esq.

500\not5-033.sjp:aj

2

�Approved with respect to substance and form:

?//»/ fsT
ViMage Attorne,
Dared:

Planning Board

Approved

Acting Chairman

f

Filed with Village Clerk

Clerk or Deputy Clerk
Dated: JLJ(n 1^

•IOtLtl^yl^

Date j£ Meeting

/

/f,

/f?S^

h&lt;&lt;h?

�REGULAR MEETING

NORTH TARRYTOWN, NEW YORK
December 15, 1994

A regular meeting of the North Tarrytown Planning Board was held
on December 15, 1994 at 8:00 p.m. at the Village Hall, 28 Beekman
Avenue, North Tarrytown, New York.
PRESENT:

George Hritz, Chairman
Donald Caetano
Ellen Tsangaris
Edward McCarthy
David Perlmutter

ABSENT:

James Donovan

ALSO PRESENT:

Janet Gandolfo, Attorney
James Margotta, Building Inspector
Susan J. Portman, Assoc. / Planning
Mark A. DiGennaro, CAMCE

Chairman Hritz called the meeting to order at 8:15 p.m.
1.

CONTINUATION OF SITE PLAN APPROVABLE APPLICATION RE:
CHESTNUT RIDGE

Mr. Laurentino Rodrigues and Mr. Turnquist came forward and passed
out site plans for 76 Chestnut Ridge aqnd 83 Depeyster Street.
Mr. Turnquist, the architect, gave an update on this site plan.
There were problems with the parking lots, then the retaining
wall. He said they were trying to combine both projects into
one. Referring to the plans, he went on to explain the changes,
the number of units and the parking spaces that this project
will have.
Discussion on the site plans followed,
Mr. Turnquist stated that they will apply to the- Zoning Board of
Appeals to seek the variances they need. He also said they will
submit an EAF»
Mr. Margotta pointed out that the EAF should be submitted to the
Planning Board and the Zoning Board of Appeals.
Discussion on the number of units, office and parking spaces, and
the out-look of the project from a distance ensued.
Susan Portman commented that the Planning Board should declarethis a Type I Action. The applicant should submit an EAF as
soon as possible.

�PAGE # 2
Discussion as to when they could go before the Zoning Board of
Appeals followed.
Mr. Margotta advised them to go before the Zoning Board of Appeals
on the following Wednesday for a preliminary review.
Chairman Hritz ask for a motion to declare the Planning Board'^
intent to be Lead Agency. Ellen Tsangaris made the motion.
Donald Caetano seconded. Motion carried unanimously.
After reviewing the minutes of November 17, 1994, Chairman Hri-^z
asked for a motion to approve them as amended.
David Perlmutter moved to approve the minutes as amended.
Edward McCarthy seconded. Motion carried unanimously.
Chairman Hritz asked for a motion to follow Mr. Perlmutter's
recommendation on the Recreation Fees which was recorded in
the minutes of November 17, 1994.
Donald Caetano motioned.
unanimously.

Ellen Tsangaris seconded.

Motion carried

Chairman Hritz stated that there were 2 applicants that had
applications to have their Recreation Fees reduced. The Board
of Trustees will have to make the decision regarding any fees.
The Planning Board can make a recommendation to the Trustees.
2.

FINAL APPROVAL RE: APPLICATION FOR A SUBDIVISION BY J A M S
AND MARTHA BICK, 3 TERRACE CLOSE.

Chairman Hritz asked for a motion to approve the Bick application.
Mr. David Perlmutter moved to make a negative declaration.
Ellen Tsangaris seconded. Motion carried unanimously.
Mr. Edward McCarthy motioned to approve the Bick application.
Donald Caetano seconded. Motion carried unanimously.
3.

CONTINUATION OF A PUBLIC HEARING RE: PHILIPSE PLAZA BT
ANTONIO RODRIGUES FOR SITE PLAN APPROVAL, NO. BROADWAY

Public Hearing adjourned.
General discussion followed among the Board members.
Mr. James Margotta explained that it appeared that the State &gt;ranted
to make the project further from Route 9 and that it also appeared
to their architect that 10 of the 11 parking spaces are going "to

�PAGE #3
be eliminated when this goes into effect. Already, as it is,
they require variances for 10 parking spaces, but with the State
taking 10, that's going to be 20 parking spaces.
Discussion followed on the parking spaces that the State wanted
to eliminate and what can be done to help the applicant.
Mr. Caetano suggested that the Board get the County involved.
Chairman Hritz stated that the Board was willing to help and to
offer advice, but it was not the Board's job to make the
project work.
Discussion followed as to what to do to help the applicant with
the State. It was suggested that the applicant contact the
State Dot.
There being no further business before the Board, Chairman Hritz
asked for a motion to adjourned the meeting.
David Perlmutter motioned. Edward McCarthy seconded.
Motion carried unanimously.

Respectfully submitted,
CARMEN G. MARIANO
Recording Secretary

�STATE OF N E W YORK
D E P A R T M E N T OF TRANSPORTATION
4 BURNETT BOULEVARD
P O U G H K E E P S I E , N.Y. 1 2 6 0 3
A L B E R T j BAJMAN
REGIONAL DIRECTOR

J O H N C EGAN
COMMISSIONER

November 29, 1994
Michael A. Galante
Vice President
Frederick P. Clark Associates, Inc.
Rye, New York and Southport, Connecticut
RE: Philipse Plaza
Old Broadway / Pocantico Street Intersection Improvement
Village of North Tarrytown
Westchester County
Our Traffic Engineering and Safety group have completed the review of the referenced proposal
and have the following comments to offer.
a) We agree with the realignment of the east curbline of Route 9 in front of the proposed
development, which will be helpful in reducing the size of the intersection area and better
define traffic paths for motorists. However we can not approve of the geometries proposed
in the sketch as submitted, because it would appear to increase the degree of curvature of
Route 9 which we don't believe would be beneficial. We have prepared an acceptable
alternative which we are returning herewith.
b) The site plan does not appear to properly depict the right-of-way boundary along Route 9
according to this Department's record plans.
c) The minimum depth of the channelization island should be \'2 the width of the widest
driveway.
d) We would suggest that the 30 foot maximum driveway width be used to make it easier for
delivery and service vehicles entering/exiting the site.
e) Surface runoff (drainage) have to be designed and included in the plan.
f) There are currently no plans to upgrade the existing traffic signal.

�The applicant should submit the necessary information to the Regional Traffic and Safety Group
to initiate the highway work permit process. If you require additional information or want to
discuss this proposal, we can be reached at (914) 431-7905.
Very truly yours,
Wai K. Cheung
Civil Engineer II

By: _$&amp;__£.
Akhter A. Shareef
Civil Engineer I

��SEQR
617.21
Appendix F
State Environmental Quality Review
NEGATIVE DECLARATION
Notice of Determination of Non-Significance

o
Project Number

Date

November 21. 1994

This notice is issued pursuant to Part 617 of the implementing regulations pertaining to Article 8 (State
Environmental Quality Review Act) of the Environmental Conservation Law.
The Village of North Tarrvtown Planning Board . as lead agency, has determined that the proposed action
described below will not have a significant effect on the environment and a Draft Environmental Impact Statement will not
be prepared.
Name of Action:
SEQR Status:

Type I

Levy Estate Two-Lot Subdivision, Irving Place
X

Unlisted
Conditioned Negative Declaration:

Yes
X No

Description of Action:
Two-lot subdivision of a property 6,515 square feet in size.

Location:

(Include street address and the name of the municipality/county. A location map of appropriate scale is
also recommended.)

21 and 23 Irving Place, Village of North Tarrytown, Westchester County.
Tax Map Sheet 78, Block 15, Lot 21.

�SEQR Negative Declaration

Page 2

Reasons Supporting This Determination:
(See 617.6(g) for requirements of this determination; see 617.6(h) for Conditioned Negative Declaration)

The proposed action will not cause a significant adverse impact on land, ground or surface water quality
or quantity, drainage patterns, air quality, plants and animals, agricultural land resources, aesthetic
resources, historic and archaeological resources, open space and recreation, traffic and transportation
systems, solid waste production, energy, public health, growth and character of the community, cause
conflict with community plans or goals, or cause significant adverse noise and odor.

For Further Information:
Contact Person:

Linda David, Village Administrator

Address:

Village Hall, 28 Beekman Avenue
North Tarrytown, New York 10591

Telephone Number:

(914) 631-1440

For Type I Actions and Conditioned Negative Declarations, a Copy of this Notice Sent to:
Commissioner, Department of Environmental Conservation, 50 Wolf Road, Albany. New York 12233-0001
Region 3, Department of Environmental Conservation, 21 South Putt Corners Road, New Paltz, New York 12561
Mayor Sean Treacy, Village Hall, 28 Beekman Avenue, North Tarrytown, New York 10591
Levy Estate, c/o Albert Peck, 218 Altamont Avenue, Tarrytown, New York 10591

500\not4-0l4.sjp.ev

�FREDERICK P. CLARK ASSOCIATES, INC.

David J. Portman, AICP
Howard I. Reynolds, PE
David H. Stolman, AICP

Planning/Development/Environment/Transportation
Rye, New York and Southport, Connecticut
350 Theodore Fremd Avenue
Rye. New York 10580
(914)967-6540
TO:

Michael A. Galante
Joanne P. Meder, AICP
Jim Donovan, RLA. ASLA

V i l l a g e of North Tarrytown P l a n n i n g Board

DATE: H / 2 1 / 9 4

Sean T r e a c y , Linda David, James M a r g o t t a ,

PROJECT: 5 2 0 . 0 4 0 / P e c k - I r v i n g P l a c e

J a n e t Gandolfo, Mark DiGennaro

FAX NO.:

WE TRANSMIT HEREWITH:

VIA:

(x)
( )
( )

(*)
( )
( )

As requested
As per conversation
Per request of

( )
( )
( )

First Class Mail
Express Delivery
Telefax-# of Pages
(including cover sheet)
Our Messenger
Your Messenger
Hand Delivery

FOR YOUR:
( )
(x)
( )

Approval
Review
Distribution

(*)

File
Information

( )
( )

Use
Comment

THE FOLLOWING:
No. of Copies

Description

Date

1

11/21/94

Negative

1

11/17/94

Draft

Declaration

Resolution

REMARKS:

cc: Applicant, Involved and Interested
Agencies, as appropriate
Connecticut •(203) 255-3100

By

Susan J. Portman, AICP
Associate/Planning

FAX • (914, 967-6615

Long Island • (516) 364-4544

�FREDERICK P. CLARK A S S O C I A T E S , I N C .
Planning/Development/Environment/Transportation
Rye, New York and Southport, Connecticut

David J. Portman, A,CP
Howard I. Reynolds, PE
David H. Stolman, AICP

350 Theodore Fremd Avenue
Rye, New York 10580
(914) 967-6540

Michael A. Galante
Joanne P. Meder, AICP
jjm Donovan, RLA. ASLA

MEMORANDUM
To:

Village of North Tarrytown Planning Board

Date:

December 7, 1994

Subject:

Philipse Plaza Site Plan Application

As requested, we have compared the site plan drawing (dated
November 7, 1994) for the application known as "Philipse Plaza"
against the recently amended parking standards in the Village
Zoning Code. While the size of the spaces conforms with the new
regulations, the number of spaces shown on the plan is still
deficient.
The other day we distributed copies of a letter we received from
the New York State Department of Transportation (NYSDOT) regarding
potential modifications to the curbline along Route 9.
As
requested by NYSDOT, the Applicant should submit information to
begin the Highway Work Permit process. In addition, it may be
helpful to set up a meeting between a representative of NYSDOT, our
office and the Applicant.
We still have not received a full Environmental Assessment Form
(EAF) from the Applicant.
Susan J. Portman, AICP, Associate/Planning
cc:

Sean Treacy, Mayor
Linda E. David, Village Administrator
Janet A. Gandolfo, Esq., Village Attorney
James T. Margotta, Building Inspector
Mark A. DiGennaro, Village Engineer
Louis Contadino, AIA

500\notA-039.sjp.crc

Connecticut • (203) 255-3100

FAX • (914)967-6615

Long Island -(516)364-4544

�14-16-2 (2/87)-7c

'

617.21
Appendix A
State Environmental Quality Review

*

SEQR

FULL ENVIRONMENTAL ASSESSMENT FORM
Purpose: The full EAF is designed to help applicants and agencies determine, in an orderly manner, whether a project
or action may be significant. The question of whether an action may be significant is not always easy to answer. Frequently, there are aspects of a project that are subjective or unmeasureable. It is also understood that those who determine
significance may have little or no formal knowledge of the environment or may be technically expert in environmental
analysis. In addition, many who have knowledge in one particular area may not be aware of the broader concerns affecting
the question of significance.
The full EAF is intended to provide a method whereby applicants and agencies can be assured that the determination
process has been orderly, comprehensive in nature, yet flexible to allow introduction of information to fit a project or action.
Full EAF Components: The full EAF is comprised of three parts:
Part 1: Provides objective data and information about a given project and its site. By identifying basic project
data, it assists a reviewer in the analysis that takes place in Parts 2 and 3.
Part 2: Focuses on identifying the range of possible impacts that may occur from a project or action. It provides
guidance as to whether an impact is likely to be considered small to moderate or whether it is a potentiallylarge impact. The form also identifies whether an impact can be mitigated or reduced.
Part 3: If any impact in Part 2 is identified as potentially-large, then Part 3 is used to evaluate whether or not the
impact is actually important.

DETERMINATION OF SIGNIFICANCE-Type 1 and Unlisted Actions
K)

Identify the Portions of EAF completed for this project:

[2

Part 1

Part 2

DPart 3

Upon review of the information recorded on this EAF (Parts 1 and 2 and 3 if appropriate), and any other supporting
information, and considering both the magitude and importance of each impact, it is reasonably determined by the
lead agency that:
JS

A. The project will not result in any large and important impacts) and, therefore, is one which will not
have a significant impact on the environment, therefore a negative declaration will be prepared.

D

B. Although the project could have a significant effect on the environment, there will not be a significant
effect for this Unlisted Action because the mitigation measures described in PART 3 have been required,
therefore a CONDITIONED negative declaration will be prepared.*

D

C. The project may result in one or more large and important impacts that may have a significant impact
on the environment, therefore a positive declaration will be prepared.
gative Declaration is only valid for Unlisted Actions

TC^VL
|^iMc.Ha
( . ' t&lt; &gt; " /

r s

Lg^H

-

EstKH,

Ju.bdW»Ji'M

-

Ic-v.ttj f°Uc4

Name of Action

A it

t4arWy T 6 ^ r « f f o v u *

Rcu/mtA.* gogcc)

f

Name of Lead Agenc

OvAW'MtfLn
Print or

me of Responsible Officer \m I pfujAgency

&gt; ^

&gt;

trSj^nature opKesponsible Officer in Le
•i

Title of Responsible Officer

y

Signature
jre of Preparer
Preparei (If different from responsible officer)

'ha
Date
1

�•

r/.;.'i ', —fi\OJtCl IK'f uf.l.'.ATION

&gt;

P M r-rrr;:' bv P. ; ]%t\

Sv:-r,:.ot

r-.Ol ICC. 7N.: cJocu"-*. .: •* &lt;.\.-,
^
•., • '.••'•• v ;•: ' '.T p r c p o c : n «^ f,«&gt;v * J:J -..fsiir,: c f ! u :
on the envurr " . r o t Please cor"-'t-&lt;- » '.' &lt;" ••- "Vi- &lt;•
• ' : . , ' ;
'.• •.••'. :i t o tl.oc quc.^tior.s vs.!i be corijidcrt J
as pari of the application for approval aiiu n.cv b t &gt;ub;i ct lo furiher verification and public review" Provide an&gt; additional
information you be lit vc will be needed to complete Parts 2 and 3
It is expected that completion of the full EAF will be dependent on information currently available and will not involve
(. 5&lt;r.c-.s stuo.o. rt scorer, c if-viM.^... ..:•. n if.:&lt;:•;. . • . •• _..
Cc v ! . i n ; ! , • :i
KAMi G-" A l

4ufi- oM&amp;l^ - ^ 1
LOCATION OF ACTION (Include St/ett Address. Municipality «wJ County)
/7

•I

NAME OF APPLICANT/SPONSOR

lKVlM&lt;sr

g

^

e

FtA-V^

BUSINESS TELEPHONE

ADDRESS
ZIP CODE

STATE

CITY/PO

NJ, T ^ i g j e . v - r p w M

K/,Y.

NAME OF OWNER (If diMerenl)

ho^i

BUSINESS TELEPHONE

ep

^

l^L\/|

ADDRESS
CITY/PO

'. I"_

I STATE

I^:e£tsw M -. M )i

f ZIP

CODE

SCRIPT ION Cf ACTIOS

%

Please Complete Each Question —Indicate NA. if not applicable

A. Site Description
Physical setting of overall project, both developed and undeveloped areas.
1. Present land use:
DUrban
Dlndustrial
DCommercial
Efeesidential (suburban)

CFore&gt;l
2. Total acreage of project area:

DAgricuIture
,

* J*^

DOther
acres.

APPROXIMATE ACREACE
Meadow or Brushland (Non-agricultural)

PRESENTLY
acres

AFTER COMPLETION
acres

, acres
, acres
acres
acres
acres
acres
acres

. acres
. acres
: acres
acres
acres
acres
acres

Forested
Agricultural (Includes orchards, cropland, pasture, etc.)
Wetland (Freshwater or tidal as per Articles 24, 25 of ECL)
Water Surface Area
Unvegetated (Rock, earth or fill)
,1*7

Roads, buildings and other paved surfaces

Other (Indicate typejL

DRural (non-farm)

'.

r/3T

3. What is predominant soil type{s) on project site?
a. Soil drainage:

d W e l l drained
\ Q Q % of site
DPoorly drained _______ % of site

DModerately well drained

% of site

b. If any agricultural land is involved, how many acres of soil are classified within soil group 1 through 4 of the NYS
Land Classification System? __________ acres. (See 1 NYCRR 370).
4. Are there bedrock outcroppings on project site?
a. What is depth to bedrock?

DYes
0No
(in feet)

„ v

�»

__

I

i j p - ,- • ; ;•. '• : . " • ' , c " * , . ;

.

HcgiJ'c;: «/ M " * ' ' • ''..-.•'

,;

• '•
.

c

cc":r!

•

."* b

"

•.

.:.*•(

$••:•

o -

,

•&lt;:*'&gt;•

r&gt;« c .

t

•

"•

!•«•.«.&lt;.' &lt;•• : ' &lt; f

' ta r -r!r . •'• :.

J. IJ project s u b i - l ^ n t ^ i ^ coiu^,..; _•: :_• , site .I&gt;ICW o:. li',t i.v^ :tc: c:' KK.\:or.;.' \i\nu
8. What is the depth of the v.a:er tsh't 5

, ;

V

PVr«

Z^^io

-

j

r

"v V&gt;&lt;&lt; hunting fish.*.. •:: shc-i! : •• •. c: re • t f ' it" : :•••' f«tl&gt; evu* m th-* r ''\' -''t area'
L'&lt;X;

}.•:./..

*.'.t

DYes

Cc

'.

-

Z&amp;o

^

(in feet)

9 l.« site l o o t e d c-v. • .•• r-'- -•, y ' - - - • ! r r se'&lt; soi-rcf r::

"i i

c t!. s t

&lt;

/

•

&gt;•

According to

•

•

r^ c i
"

____

Identify each species
12. Are there any unique or unusual land forms on the project site? (i.e.. cliffs, dunes, other geological formations)
•Yes

25No

Describe

13. Is the project site presently used by the community or neighborhood as an open space or recreation area?
•Yes
D$No
If yes. explain
___
14.

Does the present site include scenic views known to be important to the community?
•Yes
0^0

$£

15. Streams within or contiguous to project area:
a. Name of Stream and name of River to which it is tributary
1t&gt;. Lakes, ponds, v. etiand areas wi;\i-i or cont.g'jC'-s to project e:c-e

b. Size (In acres)

a. Name

•

17. Is the site served by existing public utilities?
JS&amp;es
DNo
a) If Yes, does sufficient capacity exist to allow connection?
fJQ'es
b) If Yes, will improvements be necessary to allow connection? •
DYes

DNo
DNo

18. Is the site located in an agricultural district certified pursuant to Agriculture and Markets Lav., Article 25;AA,
Section 303 and 304?
DYes
Dlfco
19. Is the site located in or substantially contiguous to a Critical Environmental Area designated pursuant to Article 8
of the ECL, and 6 NYCRR 617?
0Ves
DNo
20. Has the site ever been used for the disposal of solid or hazardous wastes?

DYes

EKo

B. Project Description
1. Physical dimensions and scale of project (fill in dimensions as appropriate)
a. Total contiguous acreage owned or controlled by project sponsor.
b. Project acreage to be developed:

'i*?

acres initially;

c. Project acreage to remain undeveloped
d. Length o f project, in miles:

'

. acres.
^A-7

(if appropriate)

e. If the project is an expansion, indicate percent of expansion proposed
f. Number of off-street parking spaces existing

"

g. Maximum vehicular trips generated per hour

; proposed
A//ft

h. If residential: Number and type of housing units:
One Family
Two Family
Initially
Ultimately

__

acres ultimately.

acres.
'
'

%;
"""*

(upon completion of project)?
Multiple Family

Condominium

-

J__

i. Dimensions (in feet) of largest proposed structure

height;

width;

j . Linear feet of frontage along a public thoroughfare project will occupy is? L_3_____. ft. 7
3 .

length

�2. How much natural material (i e
l

-cck, earth, etc ) vsill be removed from the site'

3. Will'dtsturbed areas be recla.med?

DYes

^No

ft^O

ton$/cubic yards

DN/A

a. If yes, for what i n t e n d . , purpose is the site being reclaimed?
D. W i l l topsoil be stockpiled for reclamation?

DYes

ffiNo

c. W i l l upper subsoil be stockpiled for reclamation?

•

DYes

jlQNo

4. How many acres of vegetation (trees, shrubs, ground covers) will be removed from site?

__ acres

5. Will any mature forest (over 10X3 years old) or other locally-important vegetation be removed by this project?

DYes

tfNo

/

6. If single phase project: Anticipated period of construction
7. If multi-phased:

tj

a. Total number of phases anticipated

N/A|

months, (including demolition).

__

/n

(number).

b. Anticipated date of commencement phase 1

month

year, (including demolition)

c. Approximate completion date of final phase

month

year.

d. Is phase 1 functionally dependent on subsequent phases?
8. Will blasting occur during construction?

DYes

9. Number of jobs generated: during construction
10. Number of jobs eliminated by this project

DYes

DNo

l^o
rW/f

; after project is complete

___

"

11. Will project require relocation of any projects or facilities?

12. Is surface liquid waste disposal involved?

DYes

DYes

B^o

If yes. explain

E^No

a. If yes, indicate type of waste (sewage, industrial, etc.) and amount
b. Name of water body into which effluent will be discharged
^

13. Is subsurface liquid waste disposal involved?

DYes

©No

Type

14. Will surface area of an existing water body increase or decrease by proposal?
Explain
15. Is project or any portion of project located in a 100 year flood plain?
16. Will the project generate solid waste?

DYes

DYes

DYes

_3&gt;lo

£rN&lt;

£3No

a. If yes, what is the amount per month

tons

b. If yes, will an existing solid waste facility be used?

DYes

c. If yes. give name

DNo

; location

d. W i l l any wastes not go into a sewage disposal system or into a sanitary landfill?

DYes

e. If Yes. explain
17. Will the project involve the disposal of solid waste?

DYes

[HNo

a. If yes, what is the anticipated rate of disposal?

tons/month.

b. If yes, what is the anticipated site life?
18. W i l l project use herbicides or pesticides?

years.
DYes

£_lNo

19. W i l l project routinely produce odors (more than one hour per day)? DYes

_5No

20. W i l l project produce operating noise exceeding the local ambient noise levels?
21.-Will project result in an increase in energy use?

DYes

DYes

_§No

If yes , indicate typefsj
22. If water supply is from wells, indicate pumping capacity
23.

Total anticipated water usage per day

24. Does project involve Local. State or Federal funding?
If Yes, explain

;

gallons/minute.

gallons/day.
DYes

.J_9No
'

Cftlo

DNo

�25. Approvals Required:

Submittal
Date

Type

•

City. Town. Village Board

DYes

DNo

CttyHTeww. Village Planning Board

fiYes

DNo

Gity, Toww Zoning Board

Efres

DNO

€tty. County Health Department

JBYes

DNo

Other Local Agencies

DYes

DNo

Other Regional Agencies

GYes

DNo

State Agencies

DYes

DNo

Federal Agencies

DYes

DNo

C. Zoning and Planning Information
1

Does proposed action involve a planning or zoning decision?

efves

DNo

If Yes, indicate decision required:
Dzoning amendment

t&amp;zoning variance

Dnew/revision of master plan

Ospecial use permit

Dresource management plan

What is the zoning classification(s)of the site?

^subdivision

Dsite plan

Dother

j£-"?5

What is the maximum potential development of the site if developed as permitted by the present zoning?

One 4-fbmjit* DweiM

&lt;&amp;»•- u^rc r

What is the proposed zoning of the site?

—iuo&amp;

tfr*ni/tfcun4-

£&amp;&amp;tflg. n j T U U -

(**&amp;

QI**$L}

__

What is the maximum potential development of the site if developed as permitted by the proposed zoning?
g ^
flP

l^r-

S u a - Q U A S I D / ^

6. Is the proposed action consistent with the recommended uses in adopted local land use plans?

yla^Yes

DNo

7. What are the predominant
use{5) ana
and zoning
zoning ciassmcauons
classifications wunin
within a
a V*
mile raoius
radius o
ofi proposed
proposed action?
action?
,ni land
iana use\sj
•/« miie
8. Is the proposed action compatible w i t h adjoining/surrounding land uses within a V* mile?
9. If the proposed action is the subdivision of land, how many lots are proposed?
•*—

0^£es

DNo

DYes

ISNo

a. W h a t is the minimum lot size proposed? __
10. W i l l proposed action require any authorizations) for the formation of sewer or water districts?

1 1 . W i l l the proposed action create a demand for any community provided services (recreation, education, police,
fire protection)?
DYes
0No
a. If yes, is existing capacity sufficient to handle projected demand?

GYes

DNo

12. W i l l the proposed action result in the generation of traffic significantly above present levels?
a. If yes. Is the existing road network adequate to handle the additional traffic?

DYes

(DYes

£§No

DNo

D. Informational Details
Attach any additional information as may be needed to clarify your project. If there are or may be any adverse
Impacts associated w i t h your proposal, please discuss such impacts and the measures which you propose to mitigate or
avoid them.

«

;,

E. Verification
Ii cenuy
certify u
that
the
information proviaea
provided aoove
above is
is true
true to
to tne
the oesi
best o
ofi my
my Know
knowledge.
iai m
e iniurmauun
Applicant/Sponsor Name „

Sl.nM.,r» 0(kj£-*MM7~~

4&amp;&gt;fl(gggr"

t3A4g^Tt&gt;JA^
Title

, Date

ifa/rf

_M&amp;kKTTgT

U the action is in the Coastal Area, and you are a state agency, complete the Coastal Assessment Form before proceeding
with this assessment.
5

�'

Part 2 —PROJECT IMPACTS A N D THEIR
Responsibility of Lead Agency

MAGNITUDE.

General Information (Read Carefully)
« In completing the form the reviewer should be guided by the question Have my responses and determinations been
reasonable? The reviewer is not expected to be an expert environmental analyst
*

• Identifying that an impact will be potentially large (column 2) does not mean that it is also necessarily significant.
Any large impact must be evaluated in PART 3 to determine significance. Identifying an impact in column 2 simply
asks that it be looked at further.
• The Examples provided are to assist the reviewer by showing types of impacts and wherever possible the threshold of
magnitude that would trigger a response in column 2. The examples are generally applicable throughout the State and
for most situations. But. for any specific project or site other examples and/or lower thresholds may be appropriate
for a Potential Large Impact response, thus requiring evaluation in Part 3.
• The impacts of each project, on each site, in each locality, will vary. Therefore, the examples are illustrative and
have been offered as guidance. They do not constitute an exhaustive list of impacts and thresholds to answer each question
• The number of examples per question does not indicate thejmportance of each question.
• In identifying impacts, consider long term, short term and cumlative effects.
Instructions (Read carefully)
a. Answer each of the 19 questions in PART 2. Answer Yes if there will be any impact.
b. Maybe answers should be considered as Yes answers.
c. If answering Yes to a question then check the appropriate box (column 1 or 2) to indicate the potential size of the
impact. If impact threshold equals or exceeds any example provided, check column 2. If impact will occur but threshold
is lower than example, check column 1.
d. If reviewer has doubt about size of the impact then consider the impact as potentially large and proceed to PART 3.
e. If a potentially large impact checked in column 2 can be mitigated by change(s) in the project to a small to moderate
impact, also check the Yes box in column 3. A No response indicates that such a reduction is not possible. This
must be explained in Part 3.

&lt;a

2
Small to
Moderate
Impact

Potential
Large
Impact

D

•

DYes

DNo

D

D

DYes

DNo

n
D

•
D

GYes
DYes

• No
• No

• Construction that will continue for more than 1 year or involve more
than one phase or stage.

D

D

DYes

DNo

• Excavation for mining purposes that would remove more than 1,000
tons of natural material (i.e., rock or soil) per year.

D

D

DYes

DNo

• Construction or expansion of a sanitary landfill.

D
D
D

D
D
D

DYes.. DNo
DYes DNo
DYes D N O

D

•

DYes

IMPACT ON LAND
1 . Will the proposed action result in a physical change to the project site?
0NO
DYES
Examples that would apply to column 2
• Any construction on slopes of 15% or greater, (15 foot rise per 100
foot of length), or where the general slopes in the project area exceed
10%.
• Construction on land where the depth to the water table is less than
3 feet.
• Construction of paved parking area for 1.000 or more vehicles.
. • Construction on land where bedrock is exposed or generally within
3 feet of existing ground surface.

• C o n s t r u c t i o n in a "designated floodway.
• Other impacts

Can Impact Be
Mitigated By
Project Change

2 , Will there be an effect V. ...iy un.que or unusual land forms found on
the site? (i.e.. cliffs, dunes, geological formations. etc.)£_&amp;SO
DYES
• Specific land forms:

____________

DNo

�1

2

Small to
Moderate
Impact

Potential
Large
Impact

D
D

D
D

D
D
D

D
D
D

DYes

DNo

DYes

DNo

DYes

DNo

D

D

DYes

DNo

D
D

•

DYes

DNo

D

DYes

DNo

D
D

D
D

DYes
DYes

DNo
DNo

• Proposed Action requires water supply from wells with greater than 45
gallons per minute pumping capacity.

D

D

DYes

DNO

• Construction or operation causing any contamination of a water
supply system.

D

D

DYes

DNO

• Proposed Action will adversely affect groundwater.
• Liquid effluent will be conveved off the site to facilities which presently
do not exist or have inadequate capacity.

D
D

D
D

DYes
DYes

DNO
DNO

• Proposed Action would use water in excess of 20,000 gallons per
day

D

D

DYes

DNO

• Proposed Action will like'v c a . : - ' siltation or other discharge into an
..existing body of water to ti."?ex»*-*i; that there will be an obvious visual
"contrast to natural conditions.

D

D

IZ^es

• NO

• Proposed Action will require the storage of petroleum or chemical
, products greater than 1.100 gallons.

D

D

DYes ' DNo

• Proposed Action will allow residential uses in areas without water
and/or sewer services.

D

D

DYes

•NO"

• Proposed Action locates commercial and/or industrial uses which may
require new or expansion of existing waste treatment and/or storage
facilities.

D

D

DYes

•NO

• Other

D

D

• Y es

•N&lt;

D

D

•Yes

CNo

IMPACT ON WATER
3 W i l l proposed action affect any water body designated as protected'
(Under Articles 15, 24, 25 of the Environmental Conservation Law, ECU
&lt;g[NO
DYES
Examples that would apply to column 2
• Developable area of site contains a protected water body.
• Dredging more than 100 cubic yards of material from channel of a
protected stream.
• Extension of utility distribution facilities through a protected water body.
• Construction in a designated freshwater or tidal wetland.

• Other impacts:
Will proposed action affect any non-protected existing or new body
of water?
JBfNO
CYES
Examples that would apply to column 2
• A 10% increase or decrease in the surface area of any body of water
or more than a 10 acre increase or decrease.

Can Impact Be
Mitigated By
Project Change

DYes

DNo

DYes

DNo

4

• Construction of a body of water that exceeds 10 acres of surface area.
• Other impacts:

5. W i l l Proposed Action affect surface or groundwater
quality or quantity?
E$NO
Examples that would apply to column 2

DYES

• Proposed Action will require a discharge permit.

V

• Proposed Action requires use of a source of water that does not
have approval to serve proposed (project) action.

impacts:

6 . W i l l proposed action alter drainage flow or patterns, or surface
water runoff?
B&amp;O
DYES
Examples that would apply to column 2
• Proposed Action would change flood water flows.
7
I

�"i
Small to
Moderate
Impact
D
D
D
D

2
Potential
Large
Impact

D "

3
Can Impact Be
Mitigated By
Project Change

D
D
D

DYes
DYes
DYes
DYes

DNO
DNO
DNO
DNO

•

D

DYes

DNo

D

D

DYes

DNo

•

D

DYes

DNo

• Proposed action will allow an increase in the amount of land committed
to industrial use.

D

G

DYes

DNo

• Proposed action will allow an increase in the density of industrial
development within existing industrial areas.

D

D

DYes

DNo

•

•

DYes

DNo

• Reduction of one or more species listed on the New York or Federal
list, using the site, over or near site or found on the site.

D

D

DYes

DNo

• Removal of any portion of a critical or significant wildlife habitat.

D
D

D
D

DYes

DNo

DYes

DNo

D

D

DYes

DNo

• Proposed Action would substantially interfere with any resident or
migratory fish, shellfish or wildlife species.

D

D

DYes

DNo

• Proposed Action requires the removal of more than 10 acres
of mature forest (over 100 years of age) or other locally important
vegetation.

D

D

DYes

DNo

D

D

DYes

DNo

Proposed Action may cause substantial erosion
• Proposed Action is incompatible with existing drainage patterns
• Proposed Action will allow development in a designated floodway.
• Other impacts:

IMPACT ON AIR
0NO
DYES
7. Will proposed action affect air quality?
Examples that would apply to column 2
• Proposed Action will induce 1,000 or more vehicle trips in any given
hour.
• Proposed Action will result in the incineration of more than 1 ton of
refuse per hour.
• Emission rate of total contaminants will exceed 5 lbs. per hour or a
heat source producing more than 10 million BTU's per hour.

• Other impacts:

i

IMPACT ON PLANTS AND ANIMALS
8. Will Proposed Action affect any threatened or endangered
species?
£*NO
Examples that would apply to column 2

DYES

• Application of pesticide or herbicide more than twice a year, other
than for agricultural purposes.
• Other

9

impacts:

:

Will Proposed Action substantially affect non-threatened or
non-endangered species?
&gt;B&amp;0
Examples that would apply to column 2

DYES

I M P A C T ON AGRICULTURAL LAND RESOURCES
10

Will the Proposed Action affect agricultural land resources?
#NO
DYES
Examples that would apply to column 2
;• The proposed action would sever, cross or limit access to agricultural
land (includes cropland, hayfields, pasture, vineyard, orchard, etc.)
8

�2

• Construction activity would excavate or compact the soil profile of
agricultural land.
• The proposed action would irreversibly convert more than 10 acres
of agricultural land or. if located in an Agncultutal District, more
than 2.5 acres of agricultural land.
• The proposed action would disrupt or prevent installation of agricultural
land management systems (e.g.. subsurface drain lines, outlet ditches,
strip cropping); or create a need for such measures (eg. cause a farm
field to drain poorly due to increased runoff)
• Other impacts. _
.

#

.

IMPACT ON AESTHETIC RESOURCES
1 1 . W i l l proposed action affect aesthetic resources?
G8&amp;0
DYES
(If necessary, use the Visual EAF Addendum in Section 617.21.
Appendix B )
Examples that would apply to column 2
• Proposed land uses, or project components obviously different from
or in sharp contrast to current surrounding land use patterns, whether
man-made or natural.
Proposed land uses, or project components visible to users of
aesthetic resources which will eliminate or significantly reduce their
enjoyment of the aesthetic qualities of that resource.
Project components that will result in the elimination or significant
screening of scenic views known to be important to the area.
Other impacts.

IMPACT ON HISTORIC AND ARCHAEOLOGICAL RESOURCES
12. W i l l Proposed Action impact any site or structure of historic, prehistoric or paleontological importance?
IZnMO
DYES
Examples that would apply to column 2
• Proposed Action occurring wholly or partially within or substantially
contiguous to an\ tacilit\ or site listed on the State or National Register
of historic places.
• Any impact to an archaeological site or fossil bed located within the
project site.
• Proposed Action will occur in an area designated as sensitive for
archaeological sites on the NYS Site Inventory.
• Other impacts:

Small to
Moderate
Impact

Potential
Large
Impact.

D

D

DYes

DNo

D

D

DYes

DNo

D

D

DYes

DNo

D

D

DYes

DNo

D

D

DYes

DNo

D

D

DYes

DNo

D

D

DYes

DNo

D

D

DYes

DNo

D

D

DY es

DNo

D

D

Dy.es

DNr.

D

D

DYes

DNo

D

D

DYes

DNo

Can Impact Be
Mitigated By
Project Change

.f

IMPACT ON OPEN SPACE A N D RECREATION
13 W i l l Proposed Action affect the quantity or quality of existing or
future open spaces or recreational opportunities?
Examples that would a^ply to ccdumn 2
^ ^ . - ^ ^ J f i M Q ^ DYES
• The permanent foreclosure of a future recreationa^pponimr
• A major reduction of an open space important to the coounuoiliit ••'
• Other impacts:

9

&lt;r

I

.

D

d

D
D'
D

DYes DNo
DYes D N O
DYes ' D N O

�1

rMPACT ON TRANSPORTATION

^

Small t o
Moderate
Impact

14. W i l l there be an effect to existing transportation systems?

Can Impact Be
Mitigated By
Project Change

Examples that would apply to column 2
• Alteration of present patterns of movement of people and/or goods.
• Proposed Action will result in major traffic problems.
• Other impacts:

•
D
•

•
•
•

•
•

•
•

•

•

•
•

•
•
.•
•

D

• Yes

G No

•Yes

GNO

• Yes

GNO

IMPACT ON ENERGY
15. W i l l proposed action affect the community's sources of fuel or
energy supply?
0NO
DYES
Examples that would apply to column 2
• Proposed Action will cause a greater than 5% increase in the use of
any form of energy in the municipality.

•Yes

GNO

•Yes

GNo

•Yes

GNo

•Yes

DNo

•Yes
• Yes

GNO

GYes

GNo

a

•Yes

• No

D

D

GYes . GNo

•

D

GYes

GNO

• Storage facilities for one million or more gallons of liquified natural
gas or other flammable liquids.

D

D

GYes

GNO

• Proposed action may result in the excavation or other disturbance
within 2.000 feet of a site used for the disposal of solid or hazardous
waste.

D

a

GYes

GNO

• Other impacts:

D'

D

GYes

GNO

• Proposed Action will require the creation or extension of an energy
transmission or supply system to serve more than 50 single or two family
residences or to serve a major commercial or industrial use.
• Other impacts.

NOISE AND ODOR IMPACTS
16. W i l l there be objectionable odors, noise, or vibration as a result
of the Proposed Action?
,©NO
DYES
Examples that would apply to column 2
:&lt;

• Blasting within 1,500 feet of a hospital, school or other sensitive
facility.
• Odors will occur routinely (more than one hour per day).
• Proposed Action will produce operating noise exceeding the local
ambient noise levels for noise outside of structures.
• Proposed Action will remove natural barriers that would act as a
noise screen.
• Other

impacts:

D
D

GNo

IMPACT ON PUBLIC HEALTH
17. W i l l Proposed Action affect public health and safety?
|E_NO
Examples that would apply to column 2

DYES

• Proposed Action may cause a risk of explosion or release of hazardous
substances (i.e. oil, pesticides, chemicals, radiation, etc.) in the event of
accident or upset conditions, or there may be a chronic low level
discharge or emission.
• Proposed Action may result in the burial of "hazardous wastes" in any
form (i.e. toxic, poisonous, highly reactive, radioactive, irritating.
~ infectious, etc.)

.
10

" I I

�1
Small to
Moderate
Impact

2
Potential
Large
Impact-

• The permanent population of the city, town or village in which the
project is located is likely to grow by more than 5%.

D

D

DYes

DNo

• The municipal budget for capital expenditures or operating services
will increase by more than 5% per year as a result of this project.
• Proposed action will conflict with officially adopted plans or goals.

D

D

DYes

D.No
DNo
DNo
DNo
DNo

DDD

DYes
DYes
DYes

DNo
DNo
DNo

IMPACT ON GROWTH AND CHARACTER
OF COMMUNITY OR NEIGHBORHOOD
18. Will proposed action affect the character of the existing community?

tiJUo

3
Can Impact Be
Mitigated By
Project Change

DYES

DDD

DDD

Examples that would apply to column 2

DYes
DYes
DYes

• Development will create a demand for additional community services
(e.g. schools, police and fire, etc.)

D

D

DYes

• Proposed Action will set an important precedent for future projects.

DDD

• Proposed action will cause a change in the density of land use.
• Proposed Action will replace or eliminate existing facilities, structures
or areas of historic importance to the community.

• Proposed Action will create or eliminate employment.
• Other

impacts:

19. Is there, or is there likely to be, public controversy related to
potential adverse environmental impacts?
JES&amp;O DYES

If Any Action in Part 2 Is identified as a Potential Large impact or
if You Cannot Determine the Magnitude of impact, Pmceed to Part 3

I

Part 3-EVALUATION OF THE IMPORTANCE OF IMPACTS
Responsibility of Lead Agency
Part 3 must be prepared if one or more impact(s) is considered to be potentially large, even if the impact(s) may be
mitigated.
Instructions
Discuss the following for each impact identified in Column 2 of Part 2:
1 . Briefly describe the impact.
2 . Describe (if applicable) how the impact could be mitigated or reduced to a small to moderate impact by project chahgefs).
3 . Based on the information available, decide if it is reasonable to conclude that this impact is important.
'V

•

. To answer the question of importance, consider:
• The probability of the impact occurring
• The duration of the impact •-- •
.
• Its irreversibility, including permanently lost resources of value
• Whether the impact can or will be controlled
• The regional consequence of the impact
• Its potential divergence from local needs and goals
• Whether known objections to trie project relate to this impact.

(Continue on-attachments)

11

•

.
.'
..

..

.
.

'

'*.'«

�FREDERICK P. CLARK ASSOCIATES, INC.

David J. Portman, AICP
Howard I. Reynolds, PE
David H. Stolman, AICP

Planning/Development/Environment/Transportation
Rye, New York and Southport, Connecticut
350 Theodore Fremd Avenue
Rye, New York 10580
(914)967-6540
JO;

Michael A. Galante
Joanne P. Meder, AICP
Jim Donovan, RLA. ASLA

V i l l a g e of North Tarrytown Planning Board DATE: 1 1 / 1 8 / 9 4
Sean Treacy, Linda David, James Margotta, PROJECT: 520 - 039 »
Janet Gandolfo, Mark DiGennaro

520.041

FAX NO.:

WE TRANSMIT HEREWITH:

VIA:

(x)
( )
( )

(x)
( )
( )

As requested
As per conversation
Per request of

( )
( )
( )

First Class Mail
Express Delivery
Telefax-# of Pages
(including cover sheet)
Our Messenger
Your Messenger
Hand Delivery

FOR YOUR:
( )
(x)
( )

Approval
Review
Distribution

( )
(x)
( )

File
Information

Use
Comment

Date

Description

THE FOLLOWING:
No. of Copies
1

11/18/94

Bick - Notice of Intent to be Lead Agency, Circulation List, EAF

1

11/17/94

Peck - Sleepy Hollow Road - N e g a t i v e D e c l a r a t i o n , EAF,
Draft

Resolution

REMARKS:

cc: Applicants, Involved and Interested
Agencies, as appropriate
Connecticut -(203)255-3100

By Susan J. Portman, AICP
Associate/Planning

FAX • (914) 967-6615

Long Island • (516) 364-4544

�VILLAGE OF NORTH TARRYTOWN
WESTCHESTER COUNTY, NEW YORK
LEAD AGENCY SELECTION FORM

Project Name or Description

Bick S u b d i v i s i o n , Terrace Close

This i s an a p p l i c a t i o n to resubdivide p r o p e r t y by breaking up an undeveloped l o t
and d i s t r i b u t i n g the pieces t o neighboring l o t s .

As a r e s u l t , one b u i l d i n g l o t

T.7-M1 hP Pliminated from the s u b d i v i s i o n .
Project Location Terrace Close, North Tarry town, NY 10591
Name of Applicant

James and Martha Bick

Village Agency Intencfoig to Act as Lead Agency
Address

Planning Board

28 Beekman Avenue, North Tarrytown, NY 10591

Contact Person

Date Mailed

Linda David, Village Administrator

11/18/94

Telephone Number

(914) 631-1440

^

Type of Action (Check A or B)
69 A.
•

TYPE I

B. UNLISTED

Lead agency must be chosen within 30 days of above date.
Deadline Reply Date

II.

December 19, 1994 ( p r e f e r a b l y by Planning Board meeting
12/15/94)

Required Approvals and Reviews (Check all permits, waivers, or other actions which may be
required)
D

Rezoning

13

Subdivision Approval

•

Site Development Plan Approval

•

Special Permit

•

Variance

•

Wetlands Permit

•

Stream Discharge Permit - New York State Department of Environmental Conservation

H

Sewage Disposal/Water Supply Approval - Westchester County Health Department

•

Review by Westchester County Department of Planning

•

Curb Cut Approval - New York State Department of Transportation/Westchester County
Department of Public Works

•

Other. Specify:

�VILLAGE OF NORTH TARRYTOWN
WESTCHESTER COUNTY, NEW YORK
LEAD AGENCY SELECTION FORM - PAGE 2

III.

IV.

Environmental Significance of Action: Initial Review of Environmental Assessment Form
indicates that: (Check A, B, or C - To be done by initiating agency)
•

A.

The proposed action appears likely to have a significant effect on the environment; a
positive declaration is likely.

•

B.

The proposed action appears not likely to have a significant effect on the environment; a
negative declaration is likely.

D C.

No opinion has been made yet as to whether a positive or negative declaration is likely for
this action.

A Copy of this Form and the Environmental Assessment Form Has Been Sent to the Agencies
Indicated on the Attached List.

Attachments:

Lead Agency Selection Reply Form
List of Involved or Interested Agencies
Environmental Assessment Form

�VILLAGE OF NORTH TARRYTOWN
WESTCHESTER COUNTY, NEW YORK
LEAD AGENCY SELECTION REPLY FORM

Reply Form to be Filled Out by Involved Agencies

The

(list agency) has examined this form

and accompanying documentation for the application known as
Bick Subdivision, Terrace Close
•

A. Does not want to be Lead Agency.

•

B. Wants to be Lead Agency for this action.

and;

|Check

A o r B)

Additional comments or concerns (Attach additional pages if necessary):

Reviewed by:

Signature

Name

Title

Date

PLEASE RETURN TO THE AGENCY INITIATING THIS PROCESS (LISTED ON THE FIRST PAGE OF
THIS FORM) BY THE DATE INDICATED. IF NO REPLY IS RECEIVED BY THE DATE INDICATED, THE
VILLAGE AGENCY INDICATED WILL ASSUME THAT YOU CONCUR WITH ITS DESIGNATION AS LEAD
AGENCY.
500'noi3-03C jo

�LIST OF INVOLVED OR INTERESTED AGENCIES

C2

Planning Board
Village of North Tarrytown
28 Beekman Avenue
North Tarrytown, New York 10591

•

Westchester County Department
of Planning
432 County Office Building
White Plains, New York 10601

•

Zoning Board of Appeals
Village of North Tarrytown
28 Beekman Avenue
North Tarrytown, New York 10591

df

Westchester County Department
of Health
19 Brad hurst Avenue
Hawthorne, New York 10532

CS3

New York State Department of
Environmental Conservation
21 South Putt Corners Road
New Paltz, New York 12561

•

New York State Department of
Transportation
4 Burnett Boulevard, Region 8
Poughkeepsie, New York 12603

G9

New York State Department of
Environmental Conservation
50 Wolf Road
Albany, New York 12233-0001

(Other Agencies)

500\not3-030.jd

�14-16-2 (2/87)-7c
617.21
. _
Appendix A
State Environmental Quality'Review

SEQR

. FULL ENVIRONMENTAL ASSESSMENT FORM
Purpose: The full EAF is designed to help applicants and agencies determine, in an orderly manner, whether a project
or action may be significant. The question of whether an action may be significant is not always easy to answer. Frequently, there are aspects of a project that are subjective or unmeasureable. It is also understood that those who determine
significance may have little or no formal knowledge of the environment or may be technically expert in environmental
analysis. In addition, many who have knowledge in one particular area may not be aware of the broader concerns affecting
the question of significance.
The full EAF is intended to provide a method whereby applicants and agencies can be assured that the determination
process has been orderly, comprehensive in nature, yet flexible to allow introduction of information to f i t a project or action.
Full EAF Components: The full EAF is comprised of three parts:
Part 1: Provides objective data and information about a given project and its site. By identifying basic project
data, it assists a reviewer in the analysis that takes place in Parts 2 and 3.
Part 2: Focuses on identifying the range of possible impacts that may occur from a project or action. It provides
guidance as to whether an Impact is likely to be considered small to moderate or whether it is a potentiallylarge impact. The form also identifies whether an impact can be mitigated or reduced.
Part 3: If any impact in Part 2 is identified as potentially-large, then Part 3 is used to evaluate whether or not the
impact is actually important.

D E T E R M I N A T I O N OF S!GN1F1CANCE-Type 1 a n d Unlisted Actions
.

Identify the Portions of EAF completed for this project:

D

Part 1

D

Part 2

DPart 3

Upon review of the information recorded on this EAF (Paris 1 and 2 and 3 if appropriate), and any other supporting
information, and considering both the magitude 2nd importance of each impact, it is reasonably determined by the
lead agency that:
$

A. The project will not result in any large 2nd important impacts) and, therefore, is one which will not
have a significant impact on the environment, therefore a negative declaration will be prepared.

D

B. Although the project could have a significant effect on the environment, there will not be a significant
effect for this Unlisted Action because the mitigation measures described in PART 3 have been required,
therefore a CONDITIONED negative declaration will be prepared.'

C. The project may result in one or more large 2nd important impacts that may have a significant impact
on the environment, therefore a positive declaration will be prepared.
• A Conditioned Negative Declaration is only valid for Unlisted Actions

D

James Bick and Martha B i c k ( £ V - ^ (
Planning Board - Village of North

- Q^jt^bdio. jiiv\
Name of Action

Tarrytown
Name of Lead Agency

*

Print or Type Name of Responsible Officer in Lead Agency

Title o f Responsible Officer

Signature of Responsible Officer in Lead Agency

f / / " ' J*
&gt;nsf»l officer)
Signatured Preparer (If different from responsrole

9fS

October 3, 1994

_ *
Date

�PART 1—PROJECT INFORMATION
Prepared by Project Sponsor
(.NOTICE: This d o c u m e n t is designed to assist in determining whether jhe action proposed may have a significant effert
on the environment. Please complete the entire form. Parts A through E. Answers to these questions will be considei
as part of the application for approval and may be subject to further verification and public review. Provide any additional
information you believe will be needed to complete Parts 2 and 3.
It is expected that completion of the full EAF will be dependent on information currently available and will not involve
new studies, research or investigation, (f information requiring such additional work is unavailable, so indicate and specify
each instance.
NAME OF ACTION

JAMES BICK a n d MARTHA BICK
LOCATION OF ACTION (Include Street Address, Municipality and Coijnty)

3 T e r r a c e C l o s e , North Ta r r y t w o n , New YOrk
NAME OF APPLICANT/SPONSOR

BUSINESS TELEPHONE

( 914,

James Bick and Martha Bick
ADDRESS 3

T e r r a c e

631-8855

c l o s £ j

STATE

North Tarrytown

ZIP CODE

NY

10591

BUSINESS TELEPHONE

NAME OF OWNER (If dliierent)

same

(

)

ADDRESS

same
STATE

CITTVPO

ZJPCODE

-—

same
DESCRIPTION CF ACTION

Cre&gt;a*rT5n of one b u i l d i n g

lot

6.\A&amp;

r-e;^ • v t o d ' V ;

j&gt;&gt;-&gt;

°*~

r.&lt;*y*v c«?^ +- &gt;©*-£

.

1
Please Complete Each Question—Indicate S'.A. if not applicable

A. Site Description
Physical setting of overall project, both developed and undeveloped areas.
1. Present land use:
GUrban
Glndustrial
GCommercial
C&amp;'Residential (suburban)
CFcrest
GAgriculture
QOther
2. Total acreage c: project area:
^ • -3
APPROXIMATE ACREACE
Meadow cr Srushland (Non-agricultural)
forested

CRural (non-farm)

acres.
PRESENTLY
acres
i •

Agricultural (Includes orchards, cropland, pasture, etc.)
Wetland (Freshwater or tidal as ^er Articles 24, 25 of ECL)
Water Surface Area
Unvegetated (Rock, earth or fill)
Roads, buildings and ether paved surfaces
Residential
Other (Indicate type).

1+

C.

acres
acres
acres
acres
acres
acres
acres

AFTER COMPLETION
acres

I- c

14-

acres
acres
acres
acres
acres
acres
acres

3. What is predominant soil type{s) on project site?
a. Soil drainage:
©Well drained J Q Q
% of sJte
OModerately well drained
% of site
GPoorly drained
% of site
b. If any agricultural land is involved, how many acres of soil are classified within soil group 1 through 4 of the N
Land Classification System?
N/A
acres. (See 1 NYCRR 370).
4. Are there bedrock outcroppings on project site?
a. What is depth to bedrock?
10-15+

CXYes
ONo
(in feet)

�5. Approximate percentage of proposed project site w i t h slopes:

CO-10%

%

DlO-15%

E l 5% or greater

__%

_• %

). Is project substantially c o n t i g u o u s t o , or c o n t a i n a building, site-,'or district, listed on the St'ate or the N a t i o n a l
Registers of Historic Places?
CYes
QSs'o
7. Is project substantially c o n t i g u o u s to a site listed on the Register of National N a t u r a l Landmarks?
S. W h a t is the d e p t h of the w a t e r table? 2 0 +

DYes

d$No

(in feet)

9. Is site located over a p r i m a r y , p r i n c i p a l , or sole source aquifer?

CYes

KJNo

10. Do hunting, fishing or shell fishing opportunities presently exist in the project area?

DYes

DNo

1 1 . Does project site c o n t a i n any species of plant or animal life that is i d e n t i f i e d as t h r e a t e n e d or endangered?
DYes

C_No

According to

Identify each species

—_—.—__——

12. Are there 2ny u n i q u e or unusual land forms on the project site? (i.e., cliffs, dunes, other g e o l o g i c a l f o r m a t i o n s )
CYes

_&gt;No

Describe

13. Is the project site presently used by the c o m m u n i t y or neighborhood as an open space or r e c r e a t i o n
CYes
C?N'o
If yes, explain
14.

area?
.

Does the present site i n c l u d e scenic views k n o w n to be important to the c o m m u n i t y ?
DYes
(3No

15. Streams w i t h i n or c o n t i g u o u s t o project area:

None

a. Name of Stream a n d name of River t o w h i c h it is tributary

'

16. Lakes, ponds, w e t l a n d areas w i t h i n or contiguous to project area:
a. Name

y/A

7

~ . !s the site served

^&gt;- Size (In acres)

by existing public utilities?

iSYes

C'N'o

a) If Yes, does s u f f i c i e n t c a p a c i t y exist to a l l o w connection?

EYes

b) If Yes. w i i l i m p r o v e m e n t s be necessary to allow connection?

GNo

C?Ves

GNo

' 3 . is the site l o c a t e d in an a g r i c u l t u r a l district certified pursuant to Agriculture and Markets Law, A r t i c l e 25-AA,
Section 203 and 304?
DYes
ENo
19. Is the site located in or s u b s t a n t i a l l y contiguous to a Critical Environmental Area designated pursuant t o A r t i c l e 8
of the ECL, and 6 NYCRR 617?
^&lt;Yes
CNo
:0. Has the site ever been used f o r the disposal of solid or hazardous wastes?

DYes

LJNo

3. Project Description
'.

Physical dimensions and scale of project (fill in dimensions as appropriate)
a. Total contiguous acreage owned or c o n t r o l l e d by project sponsor
b. Project acreage to be d e v e l o p e d :

1+

acres.

1

acres initially;

c. Project acreage to r e m a i n u n d e v e l o p e d
d. Length of project, in miles: N/A

1 • 5+
l" "

acres u l t i m a t e l y .

acres.
(If appropriate)

e. If the project is an expansion, indicate percent of expansion proposed

N/A

f. Number of off-street p a r k i n g spaces existing

}]/A

; proposed

g. M a x i m u m v e h i c u l a r trips generated per hour

%;

(upon c o m p l e t i o n of project)?

n. If residential: Number and type of housing units:
One Family
Initially

i

Ultimately

J_

T w o Family

i. Dimensions (in feet) of largest proposed structure

N/A
/

M u l t i p l e Family

.

height;

j . Linear feet of f r o n t a g e along a public thoroughfare project will occupy is?
3

Condominium

width;

length.
ft.

�2. How much natural material (i.e.. rock, earth, etc.) will be removecTfrom the site? JllA
3. Will disturbed areas b e reclaimed?

GYes

ENo

C'N/A

a. If yes. for what intend^J purpose is the site being reclaimed?
b. Will topsoil be stockpiled for reclamation?

tons/cubic yards

DYes

llL2

__

CX.S'o

c. Will upper subsoil be stockpiled for reclamation?

GYes

0No

A. How many acres of vegetation (trees, shrubs, ground covers) will be removed from site?

acres.

5. Will any mature forest (over 100 years old) or other locally-important vegetation be removed by this project?
DYes
C&amp;lo
6. If single phase p r o j e c t Anticipated period of construction

months, (including demolition).

7. If multi-phased:
N/A
a. Total number of phases anticipated
b. Anticipated date of commencement phase 1
c. Approximate completion date of final phase

(numDer).
N/A
month
N/A
month

d. Is phase 1 functionally dependent on subsequent phases?
8. Will blasting o c c u r during construction?

DYes

DYes

UNo

ENo

9. Number of jobs generated: during construction

; after project is complete

TO. Number of jobs eliminated by this project

N/A

N/A

11. Will project require relocation of any projects or facilities?

12. Is surface liquid waste disposal involved?

year, (including demolition).
year.

DYes

DYes

(25NO

If yes, explain

ENo

a. If yes, indicate t y p e of waste (sewage, industrial, etc.) and amount —EL/A.
N/A
b. Name cf water b o d y into which effluent will be discharged
1—
13. Is subsurface liquid w a s t e disposal involved?
DYes
C?No
Type
i-4. Will surface area of an existing water body increase or decrease by proposal?
Explain
15. Is project or any portion of project located in a 100 year flood plain?
16. Will the project generate solid waste?

EYes

a. If yes, what is the a m o u n t per month

DYes

N/A

-ENo

tons

:

EYes

DNo

; location

;

d. Will any wastes not go into a sewage disposal system or into a sanitary landfill?
e. If Yes, explain
(^Yes

L'No

DNo

a. If yes, what is the anticipated r2te cf disposal?

tons/month.

b. If yes, what is the anticipated site life?
18. Will project use herbicides or pesticides?

years.
DYes

ENo

19. Will prcjec: routinely produce odors (mere than one hour per cay)? GYes
20. Will project p r o d u c e operating noise exceeding the local ambient noise levels?
21. Will project result in an increase in energy use?

GYes

ENo
DYes

2§No

if yes , indicate typeCs)
122. If water supply is from wells, indicate pumping capacity
Total anticipated w a t e r usage per day

'

24. Does project involve Local, State or Federal funding?
If Yes, explain

DYes

.

17. Will the project involve the disposal cf solid waste?

23.

LENo

CNo

b. If,yes, will an existing solid waste facility be usee?
c. If yes, give name

DYes

W/A

"'

gallons/minute.

gallons/day.
DYes

SNo

ENo

�25. Approvals R e q u i r e d :

Submittal
Type

City. T o w n . V i l l a g e Board

DYes

j t y . T o w n . V i l l a g e Planning Board

fcjYes

CNo

Date

•'

CNo

Subdivision

City, T o w n Z o n i n g Board

DYes

CNo

•City. C o u n t y H e a l t h D e p a r t m e n t

EYes

CNo

£**&gt;&lt;** V * J '* CVN

O t h e r L0C2I Agencies

CYes

CNo

«

O t h e r Regional Agencies

DYes

CNo

State Agencies

DYes

CNo

Federal Agencies

DYes

CNo

10-3-1994

C. Zoning and Planning Information
'1.

Does proposed a c t i o n involve a planning or zoning decision?

CYes

CNo

If Yes, i n d i c a t e decision required:
Droning amendment

C z o n i n g variance

D n e w / r e v i s i o n o f master plan

C s p e c i a l use p e r m i t

Dresource management plan

2 . W h a t is the z o n i n g classification(s)of the site?

R^fr5^

r"

^subdivision

Dsite plan

Dother

**

1

3 . W h a t is the m a x i m u m poten* ?! development of the site if d e v e l o p e d as p e r m i t t e d by the present zoning?

I- b u i l d i n g l o t •

2. di&amp;ttiti^S

4 . W h a t is the p r o p o s e d zoning of the site?

(c*e c/\ tt\Lh, a^de^tlcped

R~T&gt;&gt;

/c4-^)

J.

5. W h a t is the m a x i m u m potential development of the site if d e v e l o p e d as p e r m i t t e d by the proposed zoning?
1 ImMilii.y

lofr

N A

•. Is the proposed a c t i o n consistent with the recommended uses in a d o p t e d local land use plans?

CSYes

DNo

7. W h a t are the p r e d o m i n a n t land use{s) and zoning classifications w i t h i n a V* mile radius of proposed action?
Residential

single

family

t

iajfiiuhc f\ml ',

Q-~\ , tL-2Af

H*

8.

Is t h e proposed a c t i o n c o m p a t i b l e w i t h adjoining/surrounding

9.

If the proposed a c t i o n is the subdivision of land, how many lots are proposed? - 1 (£zS"bAiv-'i;cs\
a. W h a t is t h e m i n i m u m lot size proposed?

1+

land uses w i t h i n a V* mile?

a i i e - oft*A.

-«uf-cu&lt;

DNo

- r&amp;mc W c

&amp;AZ b * : &gt; ' &lt; i &gt; ^

1 0 . W i l l proposed a c t i o n require any a u t h o r i z a t i o n ^ ) for the f o r m a t i o n of sewer or water districts?
11.

£]Yes

DYes

K ^
CNo

W i l l t h e proposed a c t i o n create a demand f o r any c o m m u n i t y p r o v i d e d services (recreation, e d u c a t i o n , p o l i c e ,
fire protection}?
DYes
£s'o
a. If yes, is existing capacity sufficient to handle projected demand? N^" C^Yes

CNo

12. W i l l the proposed a c t i o n result in the generation of traffic s i g n i f i c a n t l y above present levels?
a. If yes, is the existing read network adequate to handle the a d d i t i o n a l traffic?

DYes

DYes

fcs'o

DNo

D. Informational Details
A t t a c h any a d d i t i o n a l i n f o r m a t i o n as may be needed to c l a r i f y your project. If there are or. may be any adverse
impacts associated w i t h y o u r proposal, please discuss such impacts and the measures w h i c h you propose t o m i t i g a t e or
avoid t h e m .

E. Verification
I certify that t h e i n f o r m a t i o n provided above is true to the best of m y k n o w l e d g e .

Ipplicant/Sponsor Name

JAMES BICK AND MARTHA BICK

Date

October 3 , 1994

Title A t t o r n e y
If the a c t i o n \% in the Coastal Area, and you are a state agency, c o m p l e t e the Coastal Assessment Form before p r o c e e d i n g
w i t h this assessment.

�Part 2—PROJECT IMPACTS AND THEIR MAGNITUDE
Responsibility of Lead Agency
[eneral Information (Read Carefully)
f
In completing the form the reviewer should be guided by the question: Have my responses and determinations been
reasonable? The reviewer is not expected to be an expert environmental analyst.
• Identifying that an impact will be potentially large (column 2) does not mean that it is also necessarily significant. ~"
Any large impact must be evaluated in PART 3 to determine significance. Identifying an impact in column 2 simply
asks that it be looked at further.
• The Examples provided are to assist the reviewer by showing types of impacts and wherever possible the threshold of
magnitude that would trigger a response in column 2. The examples are generally applicable throughout the State and
for most situations. But. for any specific project or site other examples and/or lower thresholds may be appropriate
for a Potential Large Impact response, thus requiring evaluation in Part 3.
• The impacts of each project, on each site, in each locality, will vary. Therefore, the examples are illustrative and
have been offered as guidance. They do not constitute an exhaustive list of impacts and thresholds to answer each question.
• The number of examples per question does not indicate the importance of each question.
• In identifying impacts, consider long term, short term and cumlative effects.
Instructions (Read carefully)
a. Answer each of the 19 questions in PART 2. Answer Yes if there will be any impact.
b. Maybe answers should be considered as Yes answers.
c. If answering Yes to a question then check the appropriate box (column 1 or 2) to indicate the potential size of the
impact. If impact threshold equals or exceeds any example provided, check column 2. If impact will occur but threshold
is lower than example, check column 1 .
d. If reviewer has doubt about size of the impact then consider the impact as potentially large and proceed to PART 3.
e. If a potentially large impact checked in column 2 can be mitigated by changes) in the project to a small to moderate
impact, also check the Yes bcx in column 3. A No response indicates that such a reduction is not possible. This
must be explained in Part 3.

1
Small to
Moderate
Impact

2
Potentia
Large
Impact

D

D

D Y es

DN&lt;

D

D

D Y es

DN&lt;

D
D

D
n

DYes
DYes

DNo
DNO

• Construction that w i l l c o n t i n u e for more than 1 year or involve more
than one phase or stage.

D

D

DYes

DNO

• Excavation for mining purposes t h a t w o u l d remove more than 1,030
tens of natural m a t e r i a l (i.e., rock or soil) per year.

D

D

DYes

DNO

• Construction or expansion of a sanitary l a n d f i l l .

D
D
D

D
D
D

DYes
DYes
DYes

DNO
DNO

D

D

D Y es

DNo

IMPACT ON LAND
1 . W i l l the proposed action result in a physical change to the project site?
f£NO
DYES
Examples that w o u l d a p p l y to c o l u m n - 2
• Any construction on slopes of 1 5 % or greater, (15 foot rise per 100
foot of length), or where the general slopes in the project 2!ea exceed
',0%.
• Construction on land where the depth to the water table is less th.2n
3 feet.
• Construction of paved p a r k i n g area for 1,000 or more vehicles.
• Construction en land where bedrock is exposed or generally within
3 feet of existing ground surface.

• Construction in a designated f l o o d w a y .
• Other

impacts

C a n I m p a c t Be
M i t i g a t e d By
Project C h a n g e

DNO

W i l l there be an e f f e c t f.. _.iy unique or unusual land forms found on
the site? (i.e., cliffs, dunes, geological f o r m a t i o n s , etc)JJ^NO
DYES
• Specific

land

forms:
6

�I M P A C T O N WATER
|. W i l l proposed a c t i o n a f f e c t any water body designated as protectee?
(Under Articles 15, 24, 25 o f the Environmental Conservation Law, ECL)

SNO

1

2

Small to
Moderate
Impact

Potential
Large
Impact

Can Impact Be
Mitigated By
Project Change

GYES

Examples that w o u l d a p p l y to column 2
• D e v e l o p a b l e area of site contains a protected water body.
• Dredging more t h a n 100 c u b i c yards of material f r o m channel of a
p r o t e c t e d stream.
• Extension of utility distribution facilities through a protected water body.
• Construction in a designated freshwater or tidal w e t l a n d .
• O t h e r impacts:

4 . W i l l proposed a c t i o n a f f e c t any non-protected existing or new body
of water?
DNO
DYES
Examples that w o u l d a p p l y to column 2
• A 1 0 % increase or decrease in the surface area of any body of water
or more than a 10 acre increase or decrease.
• Construction of a b o d y o f water that exceeds 10 acres of surface area.
• Other impacts:

D

•

DYes

DNo

•
•
•
•

D

DYes

DNo

•
•

DYes

DNo

DYes

DNo

D

DYes

DNo

D

D

DYes

DN&lt;

D
D

D
D

DYes

DNo

DYes

DNO

•
•
•
•

D
D

DYe5

DNo

DYes

DNo

D

DYes

D'No

D

DYes

DNo

D
D

D
D

D'Yes
DYes

DNo
D'No

•
•

D

DYes

CNo

D

DYe5

CNo

n

G

DYes

CNO

D

D

DYes

DNo

•

n

UYes

GNO

•

D

DYe&lt;

DNo

•

D

DYes

5. W i l l Proposed A c t i o n a f f e c t surface or groundwater
q u a l i t y or quantity?
Examples that w o u l d a p p l y to column 2

!^NO

DYES

Proposed A c t i o n w i l l require a discharge permit.

•

Proposed A c t i o n requires use of a source of water that does no_t
have approval to serve proposed (project) action.
• Proposed A c t i o n requires w a t e r supply f r c m wells w i t h greater than 45
gallons per m i n u t e p u m p i n g capacity.
• Construction or o p e r a t i o n causing any contamination of a water
supply system.
• Proposed A c t i o n w i l l adversely affect groundwater.
u
Liquid effluent w i l l be c o n v e y e d off the site to facilities which presently
do not exist or have i n a d e q u a t e capacity.
• Proposed A c t i o n w o u l d use water in excess of 20.030 gallons per
day.
• Proposed A c t i o n w'ill l i k e l y cause siltation or other discharge into an
existing body of water to the extent that there w i l l be an obvious visual
contrast to n a t u r a l c o n d i t i o n s .
• Proposed A c t i o n w i l l require the storage of petroleum or chemical
products greater than 1,100 gallons.
• Proposed A c t i o n w i l l a l l o w residential uses in are25 w i t h o u t water
and/or sewer services.
• Proposed A c t i o n locates c o m m e r c i a l and/or industrial uses w h i c h .may
require new or expansion of existing waste treatment and/or storage
facilities.
• Other

impacts:

. W i l l proposed a c t i o n a l t e r drainage f l o w or patterns, or surface
water runoff?
QNO
DYES
Examples that w o u l d a p p l y to column 2
• Proposed A c t i o n w o u l d change flood water flows.
-

..

7

ON,

�Small to
Moderate
Impact

Impact

Can Impact Be
Mitigated By
Project Change

D
D
D
D

D
D
D
D

DYes
DYes
DYes
DYes

DNO
DNO
DNO
D.No

D

D

(_Yes

GNo

•

•
•

DYes

DNo

DYes

DNo

• Proposed Action may cause substantial erosion.
• Proposed Action is incompatible with existing drainage patterns.
• Proposed Action will allow development in a designated floodway.
• Other impacts:

2
Potential
Large

-

IMPACT ON AIR
CNO
DYES
7 . Will proposed action affect air quality?
Examples t h a t would apply to column 2
• Proposed Action wiil induce 1,000 or more vehicle trips in any given
hour.
• Proposed Action will result in the incineration of more than 1 ton of
refuse per hour.
• Emission rate of total c o n t a m i n a n t s will exceed 5 lbs. per hour or a
heat source producing more than TO million 3TU's per hour.

D

•
•

D

DYes

DNo

D

DYes

DNo

D

D

DYes

DNo

• Reduction c; one or more species listed on the New York or Federal
list, using the site, over or near site ct found on the site.

•

D

C'Yes

DNo

• Removal cf any portion of a critical or significant wildlife habitat.

n

•

D
D

DYes
DYes

DNo
DNo

D

D

DYes

GNo

• Proposed Action wouid substantially interfere with any resident or
migratory fish, shellfish or wildlife species.

n

D

L-Yes

!_No

• Proposed Action requires the removal cf more than TO acres
cf mature forest (ever TOO years of age) or ether locally important
vegetation.

D

D

DYes

D'No

D

D

DYes

• Proposed action will allow an increase in the a m o u n t of Jand.committed
to industrial use.
• Proposed action will allow an increase in the density of industrial.
development within existing industrial areas.

• Other impacts: .
IMPACT ON PLANTS AND ANIMALS
8. Will Proposed Action affect any threatened or endangered
species?
_NO
Examples t h a t would apply to column 2

GYE5

• Application cf pesticide or herbicide more than twice a year, other
than for agricultural purposes.
• Other

imoacVs:

.

9. Will Proposed Action substantially affect non-threatened ex
non-endangered species?
_NO
Examples that wouid apply to column 2

C&gt;5S

IMPACT ON AGRICULTURAL LAND RESOURCES
TO. Will the Proposed Action affect agricultural land resources?
_NO
DYES
Examples that would apply to column 2
'he proposed action would sever, cross or limit access to agricultural
land (includes cropland, hayfields, pasture, vineyard, orchard, etc.)

8

DN&lt;

�1
Small to

•

Proposed Action may C2use substantial erosion.

•

Proposed Action is incompatible with existing drainage patterns.

•

proposed Action will allow development in a designated iloodway.

Moderate

Potential
Large

Impact

Impact

D
D
D
D

D
D
D
D

DYes
QYes
DYes
DYes

DNo
DNo
DNo
DNo

D

D

DYes

DNo

D

•

DYes

DNo

• Other impacts: __

Can Impact Be
Mitigated By
Project Change

IMPACT ON AIR
7. Will proposed action affect air quality?
Examples that would apply to column 2

JCSO

DYES

•

proposed Action will induce 1,000 or more vehicle trips in any given
hour.
• proposed Action will result in the incineration of more than 1 ton of
refuse per hour.
•

Emission rate of total contaminants will exceed 5 lbs. per hour or a
heat source producing more than 10 million 3TU's per hour.

D

D

DYes

DNo

•

Proposed action will allow an increase in the amount of land.committed
to industrial use.

D

D

DYes

DNo

•

Proposed action will allow an increase in the density of industrial.
development within existing industrial areas.

D

D

DYes

DNo

•

Other impacts: .

D

D

DYes

DNo

D

D

D Y es

•N«

D
D

D
D

DYes
DYes

DNo
DNo

D

D

DYes

DNo

DYes

ONo

IMPACT ON PLANTS AND ANIMALS
8.

Will Proposed Action affect any threatened or endangered
species?
£JNO
GYES
Examples t h a t would apply to column 2
Reduction of o n e or more species listed on the New York or Federal
list, using the site, ever or near site or found on the site.
Removal of any portion of a critical or significant wildlife habitat.
Application of pesticide or herbicide more than twice a year, other
than for agricultural purposes.
Other

impacts:

. Will Proposed Action substantially affect non-threatened or
non-endangered species?
£SsO
Examples that would appiv to column 2

CYES

Proposed Action would substantially interfere with any resident or
migratory fish, shellfish or wildlife species.

D

proposed Action requires tne removal cf more than 10 acres
of mature forest (over 100 years of age) or other locally important
vesetat.cn.

D

D

DYes

DNo

D

a

DYes

DNo

IMPACT ON AGRICULTURAL LAND RESOURCES

•

O. Will the Proposed Action affect agricultural land resources?
£JNO
CYES
Examples t h a t would apply to column 2
he proposed action would sever, cross or limit access to agricultural
land (includes cropland, hayfields, pasture, vineyard, orchard, etc.)

8

�2
Small to
Moderate
Impact

Potentfal
Large
Impact

Construction activity would excavate or compact the soil profile of
agricultural land.

D

D

DYes

G N O

• The proposed action would irreversibly convert more than 10 acres
of agricultural land or, if located in an Agricultutal District, more
than 2.5 acres of agricultural land.

D

D

DYes

DNo

• The proposed action would disrupt or prevent installation of agricultural
land management systems (e.g., subsurface drain lines, outlet ditches,
strip cropping); or create a need for such measures (e.g. cause a farm
field to drain poorly due to increased runoff)

D

D

DYes

DNo

• Other impacts: _ _ _ _ _ _ _ _ _

D

D

DYes

DNo

D

D

DYes

DNo

D

D

DYes

DNo

Project components that will result in the elimination or significant
screening of scenic views known to be important to the area.

D

D

DYes

DNo

Other impacts:

D

D

DYes

DNo

• Proposed A c t i o n o c c u r r i n g w h o l l y cr partially w i t h i n or substantially"
contiguous to any f a c i l i t y or site listed on the State or National Register
of historic places.

D

D

DYes

DNo

• Any i m p a c t to an a r c h a e o l o g i c a l site or fossil bed located w i t h i n the
project site.
• Proposed Action w i l l o c c u r in an area designated as sensitive for
archaeological sites en the NYS Site Inventory.

D

D

DYes

DNo

D

D

DYes

DNo

D

D

DYes

DNo

D
D
D

D
D
D

DYes

DNo

DYes

DNo

DYes

DNo

IMPACT ON AESTHETIC RESOURCES
- | 1 . Will proposed action affect aesthetic resources?
CNO
DYES
(If necessary, use the Visual EAr Addendum in Section 617.21,
Appendix B.)
Examples that would apply to coiumn 2
• Proposed land uses, or project components obviously different fro'm
or in sharp contrast to current surrounding land use patterns, whether
man-made or natural.
• Proposed land uses, or project components visible to users of
aesthetic resources which will eliminate or significantly reduce their
•enjoyment of the aesthetic qualities of that resource.

Can Impact Be
Mitigated By
Project Change

I M P A C T ON H I S T O R I C A N D A R C H A E O L O G I C A L R E S O U R C E S
12. W i l l Proposed A c t i o n i m p a c t any site or slructure of historic, p r e
historic or p a l e o n t o l o g i c a l importance?
SJNO
DYES
Examples that w o u l d a p p l y t o c o l u m n 2

• Other

impacts:

IMPACT ON O P E N SPACE A N D RECREATION
13. W i l l Proposed A c t i o n a f f e c t the q u a n t i t y or quality of existing cr
f u t u r e open spaces or recreational opportunities?
Examples that would apply to column 2
CNO
DYES
The permanent foreclosure of a future recreational opportunity.
A major reduction of an open space important to the community.
Other impacts;
I

�Small to
Moderate
Impact

2
Potential
Large .
Impact

D
G
D

D
D
D

D

• Proposed Action will require the creation or extension of an energy
transmission or supply system to serve more than 50 single or two family
residences or to serve a major commercial or industrial use.
• Other impacts:

IMPACT ON TRANSPORTATION
\4. W i l l there be an effect to existing transportation systems?
ENO
Examples that would apply to column 2

•'
CYES

• Alteration of present patterns of movement of people and/or goods.

Can Impact Be
Mitigated By
Project Chanc
DYes

DNO

GYes

CNo

DYes

Ds'o

D

DYes

CNo

D

D

DYes

DNo

D

D

DYes

DNo

• Blasting within 1.500 feet of a hospital, school or other sensitive
facility.

D

D

DYes

DNo

• Odors will occur routinely (more than one hour per day).

D
D

D
D

DYes

DNo

DYes

DNo

• Proposed Action will remove natural barriers that would act as a
noise screen.

D

D

DYes

DNo

• Other

D

D

GYes

CNo

• Proposed Action may cause a risk of explosion cr release of hazardous
substances (i.e. c;I. pesticides, chemicals, radiation, etc.) in the event of
accident cr ucset conditions, or there may be a chronic low level
discharge cr emission.

D

D

UYes

GSo

• Proposed Act:cn may resuit in the buriai ti "hazardous wastes" in any
form (i.e. toxic, poisonous, highly reactive, radioactive, irritating,
infectious, etc.)

D

a

GYes

CNo

• Storage facilities for one million or more gallons of liquified natural
gas or other flammable liquids.

D

D

GYes

GNo

• Proposed action may result in the excavation or other disturbance
within 2.000 feet of a site used for the disposal of solid or hazardous
waste.

D

D

GYes

CNO

•

D

GYes

GNo

• Proposed Action will result in major traffic problems.
• Other impacts:

.
IMPACT ON ENERGY

15. Will proposed action affect the community's sources of fuel or
energy supply?
6&amp;NO
GYES
Examples that would apply to column 2
• Proposed Action will cause a greater than 5% increase in the use of
any form of energy in the municipality.

NOISE A N D ODOR IMPACTS
16. Will there be objectionable odors, noise, or vibration as a result
of the Proposed Action?
• ENO
DYES
Examples that would apply to column 2

• Proposed Action will produce operating noise exceeding the local
ambient noise ieveis for noise outside of structures.

impacts:
IMPACT ON PU3L1C HEALTH

17. Will rrcoaed

Action affect public heaith and safety?
£NO
Examples that would apply to column 2

• Other impacts:

10

DYES

�IMPACT ON GROWTH AND CHARACTER
OF COMMUNITY OR NEIGHBORHOOD
r#
*. Will proposed action affect the character of the existing community?
EJNO

1
Small to
Moderate
Impact

2
Potential
Large impact

D

D

DYes

DNO

D

D

DYes

DNO

D
D
D

D
D
D

DYes
DYes
DYes

DNO
DNO
CNO

D

D

DY es

DNO

D
D
D

D
D
D

DYes
DYes
DYes

DNO
DNO
DNO

DYES

Can Impact Be
Mitigated 3y

Project Change

Examples that would apply to column 2
• The permanent population of the city, town or village in which the
project is located is likely to grow by more than 5%.
• The municipal budget for capital expenditures or operating services
will increase by more than 5% per year as a result of this project.
• Proposed action will conflict with officially adopted plans or goals.
• Proposed action will cause a change in the density of land use.
• Proposed Action wiil replace or eliminate existing facilities, structures
or areas of historic importance to the community.
• Development will create a demand for additional community services
(e.g. schools, police and fire, etc.)
• Proposed Action will iet an important precedent for future projects.
• Proposed Action will create or eliminate employment
• Other

imparts-

•

19. Is there, or is there likely to be, public controversy related to
potential adverse environmental impacts?
^ J N O DYES

If Any Action in Part 2 Is identified as a Potential Large Impact or
If You Cannot Determine the Magnitude of Impact, Proceed to Part 3

Part 3—EVALUATION OF THE IMPORTANCE O F IMPACTS
Responsibility of Lead Agency
Part 3 must be prepared if one or more impact(s) is considered to be potentially large, even if the impact(s) may be
mitigated.
Instructions
Discuss the following for each impact identified in Column 2 of Part 2:
1 . 5rief!y describe the impact.
2 . Describe (if applicable) how the impact could be mitigated or reduced to a small to moderate impact by project changed).
3. Based on the information available, decide it it is reasonable to conclude that this impact is important.
To answer the question of importance, consider:
• The probability of the impact occurring
- —.
• The duration of the impact
• lis irreversibility, including permanently lost resources of value
• Whether the impact can or will be controlled
• The regional consequence of the impact
• Its potential divergence from local needs and goals
• Whether known objections to the project relate to this impact.
(Continue on attachments)

11

�Approved with respect to substance and form:

Approved by the Planning Board

Filed with Village Clerk

•Cleric cif Deputy Clerk

Dated:
il/fc fy
• *//(.{

fOoOe/tili&amp;L 17. m&lt;/
a4-Q
/
~&gt;-P M
o o 4 - i «rf
Date
of
Meeting

'

�</text>
                  </elementText>
                </elementTextContainer>
              </element>
            </elementContainer>
          </elementSet>
        </elementSetContainer>
      </file>
    </fileContainer>
    <collection collectionId="135">
      <elementSetContainer>
        <elementSet elementSetId="1">
          <name>Dublin Core</name>
          <description>The Dublin Core metadata element set is common to all Omeka records, including items, files, and collections. For more information see, http://dublincore.org/documents/dces/.</description>
          <elementContainer>
            <element elementId="50">
              <name>Title</name>
              <description>A name given to the resource</description>
              <elementTextContainer>
                <elementText elementTextId="14838">
                  <text>Planning Board Minutes &amp; Resolutions-1994</text>
                </elementText>
              </elementTextContainer>
            </element>
          </elementContainer>
        </elementSet>
      </elementSetContainer>
    </collection>
    <itemType itemTypeId="1">
      <name>Text</name>
      <description>A resource consisting primarily of words for reading. Examples include books, letters, dissertations, poems, newspapers, articles, archives of mailing lists. Note that facsimiles or images of texts are still of the genre Text.</description>
    </itemType>
    <elementSetContainer>
      <elementSet elementSetId="1">
        <name>Dublin Core</name>
        <description>The Dublin Core metadata element set is common to all Omeka records, including items, files, and collections. For more information see, http://dublincore.org/documents/dces/.</description>
        <elementContainer>
          <element elementId="50">
            <name>Title</name>
            <description>A name given to the resource</description>
            <elementTextContainer>
              <elementText elementTextId="13941">
                <text>MINS_PLAN_1994-12-15</text>
              </elementText>
            </elementTextContainer>
          </element>
          <element elementId="49">
            <name>Subject</name>
            <description>The topic of the resource</description>
            <elementTextContainer>
              <elementText elementTextId="13942">
                <text>Planning Board Minutes &amp; Resolutions-1994</text>
              </elementText>
            </elementTextContainer>
          </element>
          <element elementId="40">
            <name>Date</name>
            <description>A point or period of time associated with an event in the lifecycle of the resource</description>
            <elementTextContainer>
              <elementText elementTextId="13943">
                <text>1994</text>
              </elementText>
            </elementTextContainer>
          </element>
        </elementContainer>
      </elementSet>
    </elementSetContainer>
  </item>
</itemContainer>
