<?xml version="1.0" encoding="UTF-8"?>
<itemContainer xmlns="http://omeka.org/schemas/omeka-xml/v5" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://omeka.org/schemas/omeka-xml/v5 http://omeka.org/schemas/omeka-xml/v5/omeka-xml-5-0.xsd" uri="https://sleepyhollow.localarchives.org/items/browse?collection=136&amp;output=omeka-xml&amp;sort_field=added" accessDate="2026-09-19T10:26:33+00:00">
  <miscellaneousContainer>
    <pagination>
      <pageNumber>1</pageNumber>
      <perPage>25</perPage>
      <totalResults>7</totalResults>
    </pagination>
  </miscellaneousContainer>
  <item itemId="2269" public="1" featured="0">
    <fileContainer>
      <file fileId="2269">
        <src>https://sleepyhollow.localarchives.org/files/original/2d76133a8f22d8aae7825f43d2b03d5f.pdf</src>
        <authentication>d84520559a1ae8eaa5f8341807f9fba0</authentication>
        <elementSetContainer>
          <elementSet elementSetId="4">
            <name>PDF Text</name>
            <description/>
            <elementContainer>
              <element elementId="52">
                <name>Text</name>
                <description/>
                <elementTextContainer>
                  <elementText elementTextId="20756">
                    <text>REGULAR MEETING

NORTH TARRYTOWN, NEW YORK
February 16,1995

A regular meeting of the North Tarrytown Planning Board was held on February
16,1995 at 8:00 P.M. in the Village Hall, 28 Beekman Avenue, North Tarrytown,
New York.

PRESENT:

George Hritz, Chairman
Donald Caetano
Ellen Tsangaris
Joanne Becker
James Donovan
David Perlmutter

ABSENT:

Edward McCarthy

ALSO PRESENT: Janet Gandolfo, Attorney
Mark A. DiGennaro, CAMCE
Susan J. Portman, Assoc/Planning
Chairman Hritz called the meeting to order at 8:00 P.M.

1.

PUBLIC HEARING: PHILIPSE MANOR RAILROAD STATION
SUB-DIVISION

Chairman Hritz stated that the Public Hearing was on the proposal relating to the
Philipse Manor Railroad Station renovation on behalf of the Hudson Valley
Writers Center. That it was really a re-drawing of the line to reflect the lease-hold
situation and the new ownership of the property. He asked Mr. Stever to explain
the new submission submitted.
Mr. Stever addressed the Board and stated that the HVWC has a leasehold
agreement and will be renovating the station.
Chairman Hritz commented that the plan was approved by the Department of
Health. The project did not require the project any variances. The Board had
declared its
intent to be Lead Agency and had received no objections from any other agencies.
He asked for a motion to declare the Board Lead Agency.

�Caetano made the motion to declare the Board Lead Agency.
David Perlmutter seconded.
Motion carried unanimously.
Ellen Tsangaris made a motion to make a Negative Declaration for SEQR.
James Donovan seconded.
Motion carried unanimously.
Donald Caetano asked if they were going to have any kind of shrubs on the
property.
Mr. Stever answered that the property that was transfered to the Hudson Valley
Writer Center was entirely paved. The grass adjacent to the Railroad Station was
property of the Railroad. The building itself will be lovely to look at.
Donald Caetano made a motion to approve the application for subdivision.
Joanne Becker seconded.
Motion carried unanimously.

2.

L. RODRIGUES: CONTINUATION OF A PUBLIC HEARING
RE: CHESTNUT RIDGE

Mark DeGennaro stated that he had problems with the retaining wall. He
suggested they re-submit a revised design .
Mr. Turnquist stated that they were aware of what was required.
Chairman Hritz asked Mr. Turnquist if the applicant received the variances from
the Zoning Board.
Mr. Turnquist answered "Yes." He then introduced Mr. Rodrigues1 son,
George. He explained the changes made in the plans.
Chairman Hritz asked him to summarize for the Board the applicant's status.
Mr. Turnquist, referring to the plans and the site model, explained the project as
follows:
76 Chestnut Street is proposed to be a 3 story building.
83 Depeyster Street is proposed to be a 3 story building.
Total of 18 dwelling units with parking in the garage.
Access to the parking will be strictly from the Depeyster Street side.

PAGE # 2

�He went into details regarding the parking garage.
He addressed some of Susan Portman's comments from the Memorandum of Feb.
10,1995. He stated that they have met all of the requirements for handicapped
parking. He explained about the handicap parking and passed out copies of
Regulation 1986.
Susan Portman read the Regulation ADA 1991.
Discussion on the size of the handicapped parking spaces ensued.
Mr. Turnquist pointed out that they had a handicapped lift and a clearance of 6* 8"
in
the garage. He explained how tenants will enter and exit the parking area.
Discussion on dumpsters and how they will deal with it followed.
Donald Caetano stated that they should have no problems. They will be better off
with dumpsters than with cans.
Mr. Turnquist said that they will use cans for 76 Chestnut and dumpsters for 83
Depeyster.
Chairman Hritz asked if he had any problems with landscaping.
Mr. Turnquist "What we had planned on doing was if there was a final decision
on this, we wanted to accommodate the stores, the retaining wall and address the
Landscaping as well. We would have a proper plan and detail of the whole thing."
Mr. Turnquist stated that the owner was upset about paying twice for the design
on the project. He was getting billed from the architect and the Planning
Consultants for their participation for the same project.
Chairman Hritz said that the Board will look into that and would like to see the
bills.
Discussion on the Landscaping continued.
Mr. Turnquist mentioned that he would like to see a stockade fence.
Donald Caetano commented that ivy grows through it. It was safe, looked
beautiful, was a strong fence and it didn't have to be painted.
Mr. Margotta stated that the fence had to get approval from the Architectural
Review Board.
Discussion followed.

PAGE #

3

�Mr. Turnquist, continuing to go down the list on the Memorandum, expressed his
surprise by the comment on page 4 part 7 about creating additional bedrooms.
On the sub-division of the lots, Mr. Turnquist said that it was up to the owner to
decide.
Mr. Margotta commented that when the Assessor got it, it was going to be one
lot.
Donald Caetano made a motion to declare the Board Lead Agency.
Ellen Tsangaris seconded.
Motion carried unanimously.
Mr. Turnquist explained how high are the neighboring buildings around Chestnut
Street and Depeyster Street.
Chairman Hritz asked him when will he be able to submit a landscaping plan.
Mr. Turnquist answered "next meeting".
Mark DeGennaro "I just want to make the Board aware that Mr. Turnquist is
going to put together the drainage and the retaining wall. However, it is some
concern of mine that with the wall you are proposing, this wonderful sub-division
and development, you are looking at the wall as if you are going to be able to built
it like this. At this point, I'm looking at certain possibilities of this wall actually
changing, thereby developing in a smaller lot size which might change the project
dramatically."
Mr. Turnquist answered "your concern is the capacity of the soil".
He explained the plans for the retaining wall.
Discussion on the soil and the retaining wall followed.
Mr. Margotta commented that he had all the variances he needed. His biggest
hurdle was the Zoning Board. Now , he had the retaining wall, the drainage and
the landscaping.
David Perlmutter said "The mere fact that he says that he doesn't want to go
along with this without the Board's approval doesn't compel us to grant him
approval. They have been here so many times that it is incredible. Mr. Turnquist
doesn't show up sometimes; he wants the approval tonight, he doesn't have the
landscaping and he objects to their landscaping (Clark's), he doesn't have the
proper foundation nor has he convinced the owner to do the boring but he wants
our

PAGE # 4

�approval."
James Donovan agreed with Mr. Perlmutter.
Discussion on the boring and the wall followed.
Chairman Hritz suggested that they get the boring done in the next 30 days, and
stated that they were not passing final approval that night.
James Donovan commented that Mark DeGennaro had done his job very well.
Mr. Turnquist suggested that the Board members walk around the project site.
Date to meet with Mr. Turnquist was set for Saturday, February 25 at 10:30 a.m.
at 83 Depeyster Street.
Hearing to be continued.

The Board voted to approve the following attached resolutions:
Sub-division and Site Plan Approval
Proposed Action:
Re-subdivision to remove one building lot
Owner:
James and Martha Bick
Applicant:
James and Martha Bick
Location:
Terrace Close, Birch Close
Tax Map Designations: 11/1 A/1,11/1S/2A, 11/1S,2B1,11/1S/8,11/1S/9
Zoning:
R-2A Residential
James Donovan moved to approve this resolution.
David Perlmutter seconded.
Carried unanimously.
Sub-division and Site Plan Approval
Proposed Action:
Subdivision of property into two (2) lots
Owner and Applicant:
Margaret M. and Vincent S. Shroba
Location:
81 Sleepy Hollow Road
Tax Designation:
Section 17, Block 6, Lot 14
Zoning:
R-3 Residential
Donal Caetano moved to approve this resolution.
James Donovan seconded.
Carried unanimously.

PAGE # 5

�Donald Caetano moved to approve the minutes of January 19,1995 as submitted.
James Donovan seconded.
Carried unanimously.
Chairman Hritz welcomed the Board's new member, Joanne Becker to the Board.
There being no further business, the meeting was adjourned.

Recording Secretary

PAGE # 6

�Approved with r e s p e c t t o substance and form:

Village/JAttorney

Dated: U &lt;7W? ?

Approved by t h e Planning Board

Chairman or Ac'tiijig Chairman

Filed with Village Clerk

Pi ark or.Deputy Clerk

Dated:

Skills

/&lt;, m^r

Date of Meeting

�</text>
                  </elementText>
                </elementTextContainer>
              </element>
            </elementContainer>
          </elementSet>
        </elementSetContainer>
      </file>
    </fileContainer>
    <collection collectionId="136">
      <elementSetContainer>
        <elementSet elementSetId="1">
          <name>Dublin Core</name>
          <description>The Dublin Core metadata element set is common to all Omeka records, including items, files, and collections. For more information see, http://dublincore.org/documents/dces/.</description>
          <elementContainer>
            <element elementId="50">
              <name>Title</name>
              <description>A name given to the resource</description>
              <elementTextContainer>
                <elementText elementTextId="14839">
                  <text>Planning Board Minutes &amp; Resolutions-1995</text>
                </elementText>
              </elementTextContainer>
            </element>
          </elementContainer>
        </elementSet>
      </elementSetContainer>
    </collection>
    <itemType itemTypeId="1">
      <name>Text</name>
      <description>A resource consisting primarily of words for reading. Examples include books, letters, dissertations, poems, newspapers, articles, archives of mailing lists. Note that facsimiles or images of texts are still of the genre Text.</description>
    </itemType>
    <elementSetContainer>
      <elementSet elementSetId="1">
        <name>Dublin Core</name>
        <description>The Dublin Core metadata element set is common to all Omeka records, including items, files, and collections. For more information see, http://dublincore.org/documents/dces/.</description>
        <elementContainer>
          <element elementId="50">
            <name>Title</name>
            <description>A name given to the resource</description>
            <elementTextContainer>
              <elementText elementTextId="13929">
                <text>MINS_PLAN_1995-02-16</text>
              </elementText>
            </elementTextContainer>
          </element>
          <element elementId="49">
            <name>Subject</name>
            <description>The topic of the resource</description>
            <elementTextContainer>
              <elementText elementTextId="13930">
                <text>Planning Board Minutes &amp; Resolutions-1995</text>
              </elementText>
            </elementTextContainer>
          </element>
          <element elementId="40">
            <name>Date</name>
            <description>A point or period of time associated with an event in the lifecycle of the resource</description>
            <elementTextContainer>
              <elementText elementTextId="13931">
                <text>1995</text>
              </elementText>
            </elementTextContainer>
          </element>
        </elementContainer>
      </elementSet>
    </elementSetContainer>
  </item>
  <item itemId="2270" public="1" featured="0">
    <fileContainer>
      <file fileId="2270">
        <src>https://sleepyhollow.localarchives.org/files/original/014437bead5bb2981efdf2f5f6d6beee.pdf</src>
        <authentication>a0e0231f46ac849fd182743d8d7485fb</authentication>
        <elementSetContainer>
          <elementSet elementSetId="4">
            <name>PDF Text</name>
            <description/>
            <elementContainer>
              <element elementId="52">
                <name>Text</name>
                <description/>
                <elementTextContainer>
                  <elementText elementTextId="20757">
                    <text>REGULAR MEETING

NORTH TARRYTOWN, NEW YORK
December 21. 1995

A regular meeting of the North Tarrytown Planning Board was held on December 21,
1995 at 8:00 p.m. in the Village hall, 28 Beekman Avenue, North Tarrytown, N e w York.
PRESENT:

George Hritz, Chairman
Donald Caetano
Nick Cicchetti
Betsy Sawyer Gaylin
Joanne Becker

ABSENT:

Edward McCarthy
David Perlmutter

ALSO PRESENT:

Janet A. Gandolfo, Attorney
James Margotta, Building Inspector

Chairman Hritz called the meeting to order at 8:10 p.m.
Chairman Hritz went over the memo of December 19, 1995 from Linda David on
the subject of the Hudson Recyling final environmental statement. He said that the Board
had been asked to look into it in a general way.
Chairman Hritz introduced Betsy Sawyer Gaylin as the new Board member and
went over her background.
1. Charles Pateman (Peck Property) Barnhart Avenue
Informal meeting to discuss possible development of Barnhart property
Chairman Hritz stated that this being an informal hearing the Board's engineers
did not have to be present.
Mr. Pateman came forward and said that this was an informal discussion
regarding a proposed project on Barnhart Avenue. There were six existing units now and
they were occupied. They were in a state of disrepair. The proposal was to demolish the
six existing units. He showed pictures of the property and site plans of the proposed
project. He stated that the property was in a R-5 zone. He said that they were here
tonight to get the Board's comments as to whether this project was acceptable. Referring
to the site plans, Mr. Pateman went over the project in detail.
Ms. Gandolfo asked how was he calculating the parking spaces needed because it
was one parking space per unit.
Mr. Pateman said that there were going to be four families so it was going to be 2
spaces for each.
Mr. Cicchetti asked where the other two spaces would be located.
Referring to the plans, Mr. Pateman explained where and how many parking
spaces will be available.

�Mr. Caetano asked what type of materials were going to be used.
Discussion on size, height, appearance of the building followed with Mr. Pateman
explaining the site plans.
Ms. Gandolfo asked about the ownership of the property.
Mr. Pateman answered that it will be under one ownership.
Mr. Caetano asked about sanitation provisions.
Mr. Pateman stated that they had an area that had not been developed yet where a
dumpster would be maintained for the garbage disposal.
Chairman Hritz made a personal comment that he had visited the area and that
most of the houses were owned by the people who lived in them. They were well kept
and that it was a nice neighborhood.
Mr. Pateman stated that they wanted to make the project as nice as possible with a
reasonable return.
Chairman asked him what the Board could do for him.
Mr. Pateman answered that he wanted the Board's opinion as to whether to go
forward or not.
Ms. Gaylin asked if he owned the property.
Mr. Pateman answered no, they had an option to buy.
Ms. Gandolfo stated that they had seven different dwelling units on one lot and
that was not allowed by the code.
Discussion on the location and size of the lot ensued.
Mr. Cicchetti asked if the houses there now were 2 family residences.
Mr. Peck answered that they were 1 family residences and have been for 100
hundred years.
Mr. Cicchetti stated that the 24 ft. entrance with 20 feet between the parking
spaces bothered him.
Discussion on the definition of the code and the project followed.
Chairman Hritz commented that Dr. Sweet, the Board's liason to the Board of
Trustees was present and asked if he had any feelings about whether or not the Trustees
would like to look at this as a legislative matter, to give the Board any guidance on it.
Chairman read a section from article 4 - application and regulation - section 627C to the Board.
Dr. Sweet said that the Board of Trustees were trying to make the community
aware of the LWRP. As part of a whole concept of the LWRP. There were zoning

�changes and alterations of the existing codes due to G.M. leaving in the LWRP.
Mr. Peck commented that the property did not join the G.M. property, it was not
G.M.
Mr. Sweet stated that the RR ran right along side of it.
Mr. Caetano stated that the Board should have the right to accept this, bring it to
the Zoning Board.
Chairman commented that was his opinion. He stated that the Trustee liason had
suggested that the developer look at the plans for the LWRP and see what the area
covered and the developer was happy to do that.
Mr. Margotta commented that rather then get too many boards involved, have him
review the LWRP, then have him come back for a preliminary meeting. He may want to
come back and change his concept.
Mr. Pateman asked to be placed on the agenda for the next meeting.
2. Mr. Peck - 38-40 Kendall Avenue - Sub-division
Mathew Worner, R.E. attorney, came forward and stated that Mr. Peck had come
before the Board before with regard to property on Kendall Avenue. Mr. Peck was
executor of the estate that owns two houses on Kendall Avenue.
Chairman commented that there was a letter from Mr. Peck to Mr. Margotta dated
9/22/95; Mr. Margotta's response dated 10/3/95; Mr. Peck's dated 10/7/95 and the Title
Co. dated 11/7/95. The letter said that there were 2 lots on the County's map and one lot
on the Village's map.
Mr. Margotta stated that there was a mistake on his letter of 10/3/95. Instead of
Irving Place it was Kendall Ave.
Mr. Worner said that a sub-division was not required. In 1897 the property in
question was listed as 2 lots, 9 &amp; 10. Local maps merged them to lot 17.
Ms. Gandolfo commented that the Village records are not always complete. A
subsequent map showed one lot with 2 structures on it. The community had different lot
numbers. "We don't go by those lot numbers. Furthermore, by the description it appears
to be one lot. You only have one deed description."
Discussion on the lot description followed.
Ms. Gandolfo asked what was the fee for a single sub-division.
Mr. Margotta answered $2,500.00 for the escrow account.
Chairman Hritz asked if the Board could waive the fee.
Mr. Margotta said he didn't want to start that practice.
Mr. Caetano asked whose map was correct, the county or the Village's.

�Discussion on the County and Village maps ensued.
Mr. Margotta said that this had been done before for Mr. Peck.
Chairman told Mr. Peck to fill out the long EAF and they will look at it.
Mr. Caetano made a motion that Mr. Peck to come back to the next meeting at the
full expense of Mr. Al Peck for any investication or anything that he does for this
property to be approved and be sub-divided to the full satisfaction of Clark Associates.
Mr. Cicchetti seconded.
Motion carried unanimously.
Chairman Hritz made a motion to approve the October 19,1995 minutes as
amended.
Mr. Cicchetti seconded.
Motion carried unanimously.
There being no further business, the meeting was adjourned.
Respectfully submited,
^

^

^

^

^

^

^

CARMEN G. MARIANO
Recording Secretary'

^

-

^

�UJest Chester County
ANDREW P. O'ROURKE
County Executive
DEPARTMENT OF HEALTH
MARK &amp; RAPOPORT, M.D. M.P.H.
Commissioner

December 6 ,

1994

Village of North Tarrytown
Planning Board
28 Beekman Avenue
No. Tarrytown, NY 10591
RE: Log #: 94S104
Bick Subdivision
No. Tarrytown (T)
Dear Ms. David:
Reference is made to the lead agency designation notice dated November 18,
1994. We note that the Village of No. Tarrytown Planning Board has made a
determination to act as lead agency for the proposed action.
Please be advised that this Department does not wish to assume lead agency
status for this project. If a determination has been made, or if a
determination is made that an Environmental Impact Statement is required, we
would appreciate a copy of the document for review and possible comment.

Richard Paccione, P.E.
^-*-~
Associate Engineer
Bureau of Environmental Quality
RP:AA:ls
cc:

District Office
chron
file

19 Bradhurst Avenue • Hawthorne. N.Y 10532

�Sean Treacy, Mayor

Linda E. David
Administrator
Donal M. Walsh. Jr.
Village Counsel
Angela Everett
Deputy Village Clerk
Frank Anzovino
Treasurer

TRUSTEES
Morris Alter
Jose Blanco
John T. Hayes, Jr.
Scott P. Horecky
Michael Hyland
Richard C. Sweet

HISTORIC PAST - GREAT FUTURE

To:

All Members of the Planning Board

From: James Margotta
Date:

November 16,1995

The November 16, 1995 Planning Board meeting has been cancelled

*

28 Beekman Avenue, North Tarrvtown, New York 10591
(914) 631-1440

�^

Approved with respect to substance and form

(L^(k
Village Attonne'y

Dated:

VI

_/

t

i .

'V*'/'*^

A p p r o v e d b y t h e Planning Board
^

Chairman or(Acting^Chairman
Dated:
\
J \7~lz-Ujf'

Filed with Village Clerk

d o r k or Deputy Clerk

Dated:

f])rJ&lt;ijL

�•

1

•

Approved with respect to substance and form:

village attorney
Dated?

Approved by the Planning Board

Chairman o
Dated:

Chairman

^ i

l^G

Filed with Village Clerk

?*Jl^ .

-Glerk or fieputy Clerk

Dated:

C-^uuCtfa

C/JZC/f£

&lt;Cd^£U^U£:
ui^^A^D*^

Date of Meeting

r2/J9 &lt;/&lt;?

�</text>
                  </elementText>
                </elementTextContainer>
              </element>
            </elementContainer>
          </elementSet>
        </elementSetContainer>
      </file>
    </fileContainer>
    <collection collectionId="136">
      <elementSetContainer>
        <elementSet elementSetId="1">
          <name>Dublin Core</name>
          <description>The Dublin Core metadata element set is common to all Omeka records, including items, files, and collections. For more information see, http://dublincore.org/documents/dces/.</description>
          <elementContainer>
            <element elementId="50">
              <name>Title</name>
              <description>A name given to the resource</description>
              <elementTextContainer>
                <elementText elementTextId="14839">
                  <text>Planning Board Minutes &amp; Resolutions-1995</text>
                </elementText>
              </elementTextContainer>
            </element>
          </elementContainer>
        </elementSet>
      </elementSetContainer>
    </collection>
    <itemType itemTypeId="1">
      <name>Text</name>
      <description>A resource consisting primarily of words for reading. Examples include books, letters, dissertations, poems, newspapers, articles, archives of mailing lists. Note that facsimiles or images of texts are still of the genre Text.</description>
    </itemType>
    <elementSetContainer>
      <elementSet elementSetId="1">
        <name>Dublin Core</name>
        <description>The Dublin Core metadata element set is common to all Omeka records, including items, files, and collections. For more information see, http://dublincore.org/documents/dces/.</description>
        <elementContainer>
          <element elementId="50">
            <name>Title</name>
            <description>A name given to the resource</description>
            <elementTextContainer>
              <elementText elementTextId="13933">
                <text>MINS_PLAN_1995-12-21</text>
              </elementText>
            </elementTextContainer>
          </element>
          <element elementId="49">
            <name>Subject</name>
            <description>The topic of the resource</description>
            <elementTextContainer>
              <elementText elementTextId="13934">
                <text>Planning Board Minutes &amp; Resolutions-1995</text>
              </elementText>
            </elementTextContainer>
          </element>
          <element elementId="40">
            <name>Date</name>
            <description>A point or period of time associated with an event in the lifecycle of the resource</description>
            <elementTextContainer>
              <elementText elementTextId="13935">
                <text>1995</text>
              </elementText>
            </elementTextContainer>
          </element>
        </elementContainer>
      </elementSet>
    </elementSetContainer>
  </item>
  <item itemId="2271" public="1" featured="0">
    <fileContainer>
      <file fileId="2271">
        <src>https://sleepyhollow.localarchives.org/files/original/9aab4ad0506891a8c8640ded46b131b5.pdf</src>
        <authentication>50459106fba9489f4e70d295945b9028</authentication>
        <elementSetContainer>
          <elementSet elementSetId="4">
            <name>PDF Text</name>
            <description/>
            <elementContainer>
              <element elementId="52">
                <name>Text</name>
                <description/>
                <elementTextContainer>
                  <elementText elementTextId="20758">
                    <text>REGULAR MEETING

NORTH TARRYTOWN, NEW YORK
January 19,1995

A regular meeting of the North Tarrytown Planning Board was held on January
19,1995 at 8:00 P.M. in the Village Hall, 28 Beekman Avenue, North Tarrytown,
New York.
PRESENT:

George Hritz, Chairman
Donald Caetano
Ellen Tsangaris
Edward McCarthy
David Perlmutter

ABSENT:

James Donovan

ALSO PRESENT: Janet Gandolfo, Attorney
James Margotta, Building Inspector
Mark A. DiGennaro
Susan J. Portman, Assoc./Planning

Chairman Hritz called the meeting to order at 8:00 P.M.
1.

CONTINUATION OF SITE PLAN APPROVAL, APPLICATION RE:
CHESTNUT RIDGE

Adjourned to February meeting at the request of the applicant.
2.

PRELIMINARY HEARING - PHILIPSE MANOR RAILROAD STATION
SUBDIVISION

Chairman Hritz asked Mr. Stever, representing the applicant, to give the Board a
summary of what the application was all about.
Mr. Stever stated that he was a member of the Board of Directors of the
Hudson Valley Writers Center, Inc., a non-profit Corporation. The majority of the
members are residents of the Village. He explained their efforts to restore the
Philipse Manor Station which had been technically abandoned by the M.T.A. 17
years ago. He stated that the building was now in ruins. That the Center has

�PAGE

secured grants &amp; donations to rehabilitate the building. They had a 99 year lease
from the railroad and a 25 year sub-lease from the M.T.A. "The Writers' Center
is both the landloard and the sub-tenant of the M.T.A. The property still remain
technically, railroad property, but since the Writers' Center has acquired a fee, it
appears that there was a subdivision of the fee and requiring an approval for which
we are here today, " Mr. Stever stated.
Chairman Hritz asked him if he was referring to title fee when he used the word
"fee".
He said yes.
Chairman Hritz explained to the Board that the Writers' Center is basically taking
a hole in the middle of the Penn Central property and the Writers' Center owned it
from the ground up. He told Mr. Stever that what they needed was the Board's
approval of the subdivision.
Discussion followed.
Donald caetano made a motion to declare the Board as Lead Agency.
Edward McCarthy seconded.
Motion carried unanimously.
The application was put on the calender for a Public Hearing next month.
3. VINCENT SHROBA - SUB-DIVISION APPLICATION - CONTINUATION
Chairman Hritz asked the applicant to give a general description of his application.
Mr. Vincent Shroba,Sr. and his son, Steven came forward.
Mr. Shroba stated that they wanted to subdivide the property.
Ms. Janet Gandolfo stated that all they wanted to do was a simple subdivision
across the property, and then if they ever decided to build they will have to deal
with whatever problems they'll have with setbacks, etc. They are just looking
for a simple subdivision.
Chairman Hritz asked if anybody else had any comments.
Discussion on the application followed.

�Donald Caetano made a motion to declare the Planning Board Lead Agency.
Edward McCarthy seconded.
Motion carried unanimously.
Donald Caetano made a motion to make a negative declaration.
Edward McCarthy seconded.
Motion carried unanimously.
Donald Caetano made a motion to approve the application.
Edward McCarthy seconded.
Motion carried unanimously.
Mr. McCarthy move to approve the minutes of December 15,1994 as amended.
Donald Caetano seconded.
Motion carried unanimously.
There being no further business, the meeting was adjourned.
Respectfully submitted^
^CARMEN G. MARIANO
Recording Secretary

�FREDERICK P. CLARK ASSOCIATES, INC.

David J. Portman, AICP
Howard I. Reynolds, PE
David H. Stolman, AICP

Planning/Development/Environment/Transportation
Rye, New York and Southport, Connecticut
350 Theodore Fremd Avenue
Rye, New York 10580
(914)967-6540

Michael A. Galante
Joanne P. Meder, AICP
Jim Donovan, RLA, ASLA

North Tarrytown P l a n n i n g Board,

TO:

DATE:

12/19/94

Mayor T r e a c y , Linda David, J a n e t Gandolfo, PROJECT: 5 2 0 . 0 3 6 / 5 2 0 . 0 4 1
James M a r g o t t a , Mark DiGennaro

FAX NO.:

WE TRANSMIT HEREWITH:

VIA:

(x)
( )
( )

(x)
( )
( )

As requested
As per conversation
Per request of

( )
( )
( )

First Class Mail
Express Delivery
Telefax - # of Pages
(including cover sheet)
Our Messenger
Your Messenger
Hand Delivery

FOR YOUR:
( )
( )
( )

Approval
Review
Distribution

( )
(x)
( )

File
Information

( )
( )

Use
Comment

THE FOLLOWING:
No. of Copies

1

Date

Description

12/15/94

Negative Declaration - Bick Subdivision

12/19/94

Notice of Intent to be Lead Agency, EAF Part
- Chestnut Ridge/Hillside Court Site Plan

REMARKS:

We are currently preparing a resolution of approval for the Bick

Subdivision and a review memo of the Chestnut Ridge Site Plan.

John Hughes, Esq. (Bick)
cc: Ron Turnquist (Chestnut Ridge)
By Susan J. Portman, AICP
Involved &amp; Interested Agencies (Chestnut Ridge;
NYSDEC
Connecticut • (203) 255-3100

FAX • (914) 967-6615

Long Island • (516) 364-4544

�SEQR
617.21
Appendix F
State Environmental Quality Review

*t

NEGATIVE DECLARATION
Notice of Determination of Non-Significance

Project N u m b e r

Date: December 15, 1994

This n*.otice is issued pursuant to Part 617 of the implementing regulations pertaining to Article 8 (State
Environmental Quality Review Act) of the Environmental Conservation Law.

The Visuage of North Tarrytown Planning Board, as lead agency, has determined that the proposed action
descriUbed below will not have a significant effect on the environment and a Draft Environmental Impact Statement
will n a o t be prepared.

Name of ActicK&gt;n: Bick Subdivision

SEQR Status: : Type 1

X

Unlisted
Conditioned ^Negative Declaration:

1

Yes
X No

Description a * f Action:
This is an application to resubd'rvide property by breaking up an undeveloped lot and distributing the pieces to
neighboring leasts. As a result, one building lot will be eliminated from the subdivision.

Location:

(Include street address and the name of the municipality/county. A location map of appropriate scale is
also recommended.)

'3 Terrace Closse, North Tarrytown, Westchester County, New York
(See attached i area map - not to scale)

�«. SEQR Negative Declaration

Page 2

I T " leasons
'

Supporting This Determination:
| (See 617.6(g) for requirements of this determination; see 617.6(h) for Conditioned Negative Declaration)

The proposed action will not cause a significant adverse impact on land, ground or surface water quality or quantity,
drainage patterns, air quality, plants and animals, agricultural land resources, aesthetic resources, historic and
archaeological resources, open space and recreation, traffic and transportation systems, solid waste production, energy,
public health, growth and character of the community, cause conflict with community plans or goals, or cause significant
adverse noise and odor.

If Conditioned Negative Declaration, provide on attachment the specific mitigation measures imposed.
For Further Information:

Contact Person:

Linda David, Village Administrator

Address:

Village Hall, 28 Beekman Avenue
North Tarrytown, New York 10591

Telephone Number:

(914) 631-1440

For Type I Actions and Conditioned Negative Declarations, a Copy of this Notice Sent to:
Commissioner, Department of Environmental Conservation, 50 Wolf Road, Albany, New York 12233-0001
Region 3, Department of Environmental Conservation, 21 South Putt Corners Road, New Paltz, New York 12561
Mayor Sean Treacy, Village Hall, 28 Beekman Avenue, North Tarrytown, New York 10591
James and Martha Bick, c/o John Hughes, Jr., Esq., 49 Beekman Avenue, North Tarrytown, NY 10591

*500\not4-O41.sJp

�PHELPS

MEMORIAL

HOSPITAL

t

AREA MAP

n-»

�SEQR
617.21
Appendix F
State Environmental Quality Review

NEGATIVE DECLARATION
Notice of Determination of Non-Significance
Project Number

Date: January 19, 1995

This notice is issued pursuant to Part 617 of the implementing regulations pertaining to Article 8 (State
Environmental Quality Review Act) of the Environmental Conservation Law.

The Village of North Tarrytown Planning Board, as lead agency, has determined that the proposed action
described below will not have a significant effect on the environment and a Draft Environmental Impact Statement
will not be prepared.

Name of Action: Shroba Subdivision

SEQR Status: Type I
Unlisted

X

Conditioned Negative Declaration:

Yes
X

No

Description of Action:
Two-lot subdivision of a property approximately 0.477 acres in size. One lot will contain an existing house and detached
garage.

Location:

(Include street address and the name of the municipality/county. A location map of appropriate scale is
also recommended.)

|81 Sleepy Hollow Road, North Tarrytown, Westchester County, New York
Tax Map Section 17, Block 6, Lot 14

�SEQR Negative Declaration

Page 2

Reasons Supporting This Determination:
(See 617.6(g) for requirements of this determination; see 617.6(h) for Conditioned Negative Declaration)
The proposed action will not cause a significant adverse impact on land, ground or surface water quality or quantity,
drainage patterns, air quality, plants and animals, agricultural land resources, aesthetic resources, historic and
archaeological resources, open space and recreation, traffic and transportation systems, solid waste production, energy,
public health, growth and character of the community, cause conflict with community plans or goals, or cause significant
adverse noise and odor.

If Conditioned Negative Declaration, provide on attachment the specific mitigation measures imposed.
For Further Information:

Contact Person:

Linda David, Village Administrator

Address:

Village Hall, 28 Beekman Avenue
North Tarrytown, New York 10591

Telephone Number:

(914) 631-1440

cc: Mayor Treacy
Linda David, Village Administrator
Janet A. Gandolfo, Esq., Village Attorney
James T. Margotta, Building Inspector
Mark DiGennaro, Village Engineer
Vincent and Margaret Shroba
500\not5-003.sjp

�VILLAGE OF NORTH TARRYTOWN
WESTCHESTER COUNTY, NEW YORK
LEAD AGENCY SELECTION FORM

Project Name or Description Chestnut R i d g e / H i l l s i d e Court Site Plan - Construction
of two buildings on two combined l o t s .

One b u i l d i n g would be three s t o r i e s and

contain 12 dwelling u n i t s and an o f f i c e .
and contain 8 dwelling u n i t s .
Project Location

The other b u i l d i n g would be three s t o r i e s

Parking would be provided at grade and under the

76 Chestnut S t r e e t / 8 3 Depevster S t r e e t

Name Of Applicant Laurent ino Rodrigues E n t e r p r i s e s , I n c .
Village Agency Intending to Act as Lead Agency
Address

__

North Tarrvtown Planning Board

Village H a l l , 28 Beekman Avenue, North Tarrytown, NY 10591

Contact Person Linda E. David, Village Administrator
Date Mailed December 19, 1994

Telephone Number

(914) 631-1440

Type of Action (Check A or B)
13 A.

TYPE I

•

UNLISTED

B.

Lead agency must be chosen within 30 days of above date.

Deadline Reply Date

II.

January 19. 1994

Required Approvals and Reviews (Check all permits, waivers, or other actions which may be
required)
•

Rezoning

•

Subdivision Approval *

E

Site Development Plan Approval

•

Special Permit

13

Variance

•

Wetlands Permit

•

Stream Discharge Permit - New York State Department of Environmental Conservation

[3

Sewage Disposal/Water Supply Approval - Westchester County Health Department

•

Review by Westchester County Department of Planning

•

Curb Cut Approval - New York State Department of Transportation/Westchester County
Department of Public Works

•

Other. Specify:

*May be required

�VILLAGE OF NORTH TARRYTOWN
WESTCHESTER COUNTY, NEW YORK
LEAD AGENCY SELECTION FORM - PAGE 2

III.

IV.

Environmental Significance of Action: Initial Review of Environmental Assessment Form
indicates that: (Check A, B, or C - To be done by Initiating agency)
D A.

The proposed action appears likely to have a significant effect on the environment; a
positive declaration is likely.

D B.

The proposed action appears not likely to have a significant effect on the environment; a
negative declaration Is likely.

0

No opinion has been made yet as to whether a positive or negative declaration is likely for
this action.

C.

A Copy of this Form and the Environmental Assessment Form Has Been Sent to the Agencies
Indicated on the Attached List.

Attachments:

Lead Agency Selection Reply Form
List of Involved or Interested Agencies
Environmental Assessment Form (Part 1)

�VILLAGE OF NORTH TARRYTOWN
WESTCHESTER COUNTY, NEW YORK
LEAD AGENCY SELECTION REPLY FORM

Reply Form to be Filled Out by Involved Agencies

The __

(list agency) has examined this form

and accompanying documentation for the application known as
and: (Check A or B)
•

A.

D B.

Doesjnot want to be Lead Agency.
Wants to be Lead Agency for this action.

Additional comments or concerns (Attach additional pages if necessary):

Reviewed by:

Signature

Name

Title

Date

PLEASE RETURN TO THE AGENCY INITIATING THIS PROCESS {LISTED ON THE FIRST PAGE OF
THIS FORM) BY THE DATE INDICATED. IF NO REPLY IS RECEIVED BY THE DATE INDICATED, THE
VILLAGE AGENCY INDICATED WILL ASSUME THAT YOU CONCUR WITH ITS DESIGNATION AS LEAD
AGENCY.
500/not3-030.Jd

�LIST OF INVOLVED OR INTERESTED AGENCIES
(only includes those marked with an "X")

Planning Board
Village of North Tarrytown
28 Beekman Avenue
North Tarrytown, New York 10591

13

New York State Department of
Environmental Conservation
50 Wolf Road
Albany, New York 12233-0001

Zoning Board of Appeals
Village of North Tarrytown
28 Beekman Avenue
North Tarrytown, New York 10591

Q

Westchester County Department
of Health
19 Bradhurst Avenue
Hawthorne, New York 10532

New York State Department of
Environmental Conservation
21 South Putt Corners Road
New Paltz, New York 12561

•

New York State Department of
Transportation
4 Burnett Boulevard, Region 8
Poughkeepsie, New York 12603

(Other Agencies)

500\not4-00fl.sjp

�•DEC 18 '94 12:34PM TURNQUIST ARCHITECTS ••

P.3

14-16-2 (2/87)-7c
617.21
.
_
Appendix A
State Environmental Quality Review

SEQR

FULL ENVIRONMENTAL ASSESSMENT FORM
Purpose: The full EAF is designed to help applicants and agencies determine, in an orderly manner, whether a project
or action may be significant. The question of whether an action may be significant is not always easy to answer. Frequently, there are aspects of a project that are subjective or unmeasureable. It is also understood that those who determine
significance may have little or no formal knowledge of the environment or may be technically expert in environmental
analysis. In addition, many who have knowledge in one particular area may not be aware of the broader concerns affecting
the question of significance.
The full EAF is intended to provide a method whereby applicants and agencies can be assured that the determination
process has been orderly, comprehensive in nature, yet flexible to allow introduction of information to fit a project or action.
Full EAF Components: The full EAF is comprised of three parts:
Part 1: Provides objective data and information about a given project and its site. By identifying basic project
data, it assists a reviewer in the analysis that takes place in Parts 2 and 3.
Part 2: Focuses on identifying therange of possible impacts that may occur from a project or action. It provides
guidance as to whether an Impact is likely to be considered small to moderate or whether it is a potentially*
large impact The form also identifies whether an impact can be mitigated or reduced.
Part 3: if any impact in Part 2 is identified as potentially-large, then Part 3 is used to evaluate whether or not the
impact is actually important.

D E T E R M I N A T I O N O F S I G N I F I C A N C E - T y p e 1 a n d Unlisted Actions
Identify the Portions of EAF completed for this project:

0

Part 1

D

Part 2

OPart 3

Upon review of the information recorded on this EAF (Parts 1 and 2 and 3 if appropriate), and any other supporting
information, and considering both the magitude and importance of each impact, it is reasonably determined by the
lead agency that:
D

A. The project will not result in any large and important impacts) and, therefore, is one which will not
have a significant impact on the environment, therefore a negative declaration will be prepared.

•

B. Although the project could have a significant effect on the environment, there will not be a significant
effect for this Unlisted Action because the mitigation measures described in PART 3 have been required,
therefore a CONDITIONED negative declaration will be prepared.'

O

C. The project may result in one or more large and important impacts that may have a significant impact
on the environment, therefore a positive declaration will be prepared.
* A Conditioned Negative Declaration is only valid for Unlisted Actions

Chestnut Ridge/Hillside Court
76 Chestnut Street/83 Depeyster Street, North Tarrytown, NY
Name of Action

Name of Lead Agency

Print or Type Name of Responsible Officer in Lead Agency

Title of Responsible Officer

Signature of Responsible Officer in Lead Agency

Signature of Preparer (If different from responsib'i officer)

Date

�• DEC 18 .'94 12:35PM TURNQUIST ARCHITECTS

P.4

PART 1-PROJECT INFORMATION
Prepared by Project Sponsor
NOTTCE; This document is designed to assist in determining whether the action proposed may have a significant effert
on the environment. Please complete the entire form, Parts A through E. Answers to these questions will be considei
'as part of the application for approval and may be subject to further verification and public review. Provide any additional
information you believe will be needed to complete Parts 2 and 3.
It is expected that completion of the full EAF will be dependent on information currently available and will not involve
new studies, research or investigation. If information requiring such additional work is unavailable, so indicate and specify
each instance.
NAME OF ACTION

Chestnut Ridge/Hillside Court
LOCATION OF ACTION (Include Strut Addr»»«, Municipality and County)

76 Chestnut Street &amp; 83 Depeyster Street, N.Tarrytown NY (We3tchester Cc
NAME OP APPLICANT/SPONSOR

Turnquist

BUSINESS TELEPHONE

Architects

(914)631-9107

ADDRESS

95 Beekman Avenue
STATE

C1TY/PO

North Tarrytown

2JPCO0E

NY

NAME OF OWNER (If &lt;JllfBr«nt)

10591

BUSINESS TELEPHONE

Laurentino Rodrigues Enterprises

(914)

631-3336

ADDRESS

180 Valley Street
STATE

CITWPO

ZIP CODE

10591

NY

North Tarrytown
DESCRIPTION OF ACTION

Construction of 2 buildings including 20 dwelling units,
office space, garage and on-site parking for 49 vehicles

Please Complete Each Question—Indicate N.A. if not applicable

A. Site Description
Physical setting of overall project, both developed and undeveloped areas.
1. Present land use;
EUrban
Dlndustrial
DCommercial
DResidential (suburban)
OForest

QAgriculture

2. Total acreage of project area:
0-43
APPROXIMATE ACREACE
Meadow or Srushland (Non-agricultural)

DOther
acres.

Forested
Agricultural (Includes orchards, cropland, pasture, etc.)
Wetland (Freshwater or tidal as per Articles 24. 25 of ECL)
Water Surface Area
Unvegetated (Rock, earth or fill) ~
Roads, buildings and other paved surfaces

Other (Indicate type)

0 A3

.

3. What is predominant soil type(s) on project site?

DRural (non-farm)

PRESENTLY
acres

AFTER COMPLETION
acres

acres
acres
acres
acres
acres
acres
acres

acres
acres
acres
acres
acres
acres
acres

Brown s i l t w i t h t r a c e M-F sand

% of site
DWell drained ..jOO
% of site
OModerately weU drained
DPoorly d rained _______ % of site
b. If any agricultural land i$ involved, how many acres of soil are classified within soil group 1 through 4 of the N*
Land Classification System? W/A
acres. (See 1 NYCRR 370).
a. Soil drainage:

4. Are there bedrock outcroppings on project site?
a. What is depth to bedrock?

QYes
QNo
(in feet)

�-DEC 18 ' 9 4 12:36PM TURNQUIST ARCHITECTS

P.5

5. Approximate percentage of proposed project site with slopes:

Cf&gt;10%

%

Dl5% or greater

ClO-15% __

fin

%

%

6. Is project substantially contiguous to, or contain g building, site-, or district, listed on the State or the National
Registers of Historic Places?
DYes
©No
'"/. 1$ project substantially contiguous to a site listed on the Register of National Natural Landmarks?
8. What is the depth of the water table? " Q " e

DYes

[jjNo

atfJ,3_fflet

9. Is site located over a primary, principal, or sole source aquifer?

OYes

fiDNo

10. Do hunting, fishing or shell fishing opportunities presently exist in the project area?

CYes

QtNo

11. Does project site contain any species of plant or animal life that is identified as threatened or endangered?
• Yes
£)No
According to
,
Identify each species
,
...., .
__
12. Are there any unique or unusual land forms on the project site? (i.e., cliffs, dunes, other geological formations)
•Yes

ENo

Describe

_____

,

13. Is the project site presently used by the community or neighborhood as an open space or recreation area?
•Yes
CBNo
If yes, explain
14.

Does the present site include Scenic views known to be important to the community?
•Yes
QBNo

15. Streams within or contiguous to project area:
none*
a. Name of Stream and name of River to which it is tributary

___

16. Lakes, ponds, wetland areas within or contiguous to project area:

a. Name
n

none

b. Size {In acres)

7 . Is the site served by existing public utilities?
SYes
CNo
a) If Yes, does sufficient capacity exist to allow connection?
EYes
b) If Yes, will improvements be necessary to allow connection?
§Yej

DNo
DNo

18. Is the site located in an agricultural district certified pursuant to Agriculture and Markets Law, Article 25-AA,
Section 303 and 304?
DYes
fflNo
19. Is the site located in or substantially contiguous to a Critical Environmental Area designated pursuant to Article 8
of the ECL, and 6 NYCRR 617?
CBYes
DNo
20. Has the site ever been used for the disposal of solid or hazardous wastes?

DYes

CBNo

B. Project Description
1. Physical dimensions and scale of project (fill in dimensions a appropriate)
a. Total contiguous acreage owned or controlled by project sponsor
b. Project acreage to be developed: _

0*43

c. Project acreage to remain undeveloped

fl

acres initially;
0

- 43

acres.

0 • 43

acres ultimately.

acres.

d. Length of project, in miles:
N/A
(If appropriate)
e. If the project is an expansion, indicate percent of expansion proposed

N/A

f. Number of off-street parking spaces existing

49

8

; proposed

%•

g. Maximum vehicular trips generated per hour t___________L_— (upon completion of project)?
h. If residential: Number and type of housing units:
One Family
Two Family

Multiple Family

Initially
Ultimately
i. Dimensions (in feet) of largest proposed structure

Condominium

2Q
2Q

40

height;

46

width; . ? 1

j . Linear feet of frontage along a public thoroughfare project will occupy is?90&amp;46

ft.

length.

�• DEC 18 ' 9 4 12:36PM TURISQUIST ARCHITECTS

p

2. How much natural material (i.e.. rock, earth, etc.) will be removed'from the site? N o n e
3. Will disturbed areas be reclaimed?

DYes

DNo

tons/cubic yards

85N/A

' a. If yes. for what intends purpose is the site being reclaimed?
b. Will topsoil be stockpiled for reclamation?

DYes

.

DNo

c. Will upper subsoil be stockpiled for. reclamation?

DYes

DNo

A. How many acres of vegetation {trees, shrubs, ground covers) will be removed from site?

none

acres.

5. Will any mature forest (over 100 years old) or other locally-important vegetation be removed by this project?
DYes
BNo
' 6. If single phase project Anticipated period of construction

12

months, (including demolition).

7. If multi-phased:
a. Total number of phases anticipated -.

(number).

b. Anticipated date of commencement phase 1 _ _ _ _ _ _ _ month

year, (including demolition).

c. Approximate completion date of final phase

year.

month

d. Is phase 1 functionally dependent on subsequent phases?
8. Will blasting occur during construction?

DYes

QYes

DNo

ENo

9. Number of jobs generated: during construction

°

; after project is complete

_

10. Number of jobs eliminated by this project _I?pne.
11. Will project require relocation of any projects or facilities?

12. Is surface liquid waste disposal involved?

DYes

DYes

©No

If yes, expla in

SNo

a. If yes, indicate type of waste (sewage, industrial, etc.) and amount
b. Name of water body into which effluent will be discharged
13. Is subsurface liquid waste disposal involved?

£)Yes

DNo

Type

SftWaqfi

14. Will surface area of an existing water body increase or decrease by proposal?

DYes

Explain
15. Is project or any portion of project located in a 100 year flood plain?

&gt;

16. Will the project generate solid waste?

®Yes

a. If yes, what is the amount per month
Char1p.fi

XlYes

Point

_ _ _ ;

DNo
location — P p p V f i V i 1 1

d. Will any wastes not go into a sewage disposal system or into a sanitary landfill?
e. If Yes, explain

,

DYes

QSNo

__

17. Will the project involve the disposal of solid waste?

CYes

SJNO

a. If yes, what is the anticipated rate of disposal?

tons/month.

b. If yes. what is the anticipated site life? .
18. Will project use herbicides or pesticides?

___

tons

b. If,yes, will an existing solid waste facility be used?
c. If yes, give name

DYes

ESNo

.
gNo

DNo

ll •*

years.
DYes

ENo

19. Will project, routinely produce odors (more th3n one hour per day)? CYes

58No

20. Will project produce operating noise exceeding the local ambient noise levels?
21. Will project result in an increase in energy use?

K'Yes

DYes

QONo

DNo

If yes , indicate tvpe&lt;s) e l e c t r i c a l &amp; gas f o r h e a t i n g , c o o l i n g &amp; l i g h t i n g
22. If water supply is from wells, indicate pumping capacity
23.

N/A

gallons/minute.

Total anticipated water usage per day

24. Does project involve Local, State or Fede.al funding?
If Yes, explain _ _

6

DYes

QjNo
,

�•DEC 18 '94 12:37PM TURNQUIST ARCHITECTS

:&amp;:i*&amp;tf£3%£
:••;•/&gt;

#?^#*:

25. Approvals Required:

Submittal
Date

Type

9

City, Town, Village Board

BYes

DNO

&gt; Jty, Town. Village Planning Soard

BYes

CNO

City, Town Zoning Board

DBYes

DNO

City. County Health Department

DYes

BfNo

Other Local Agencies

®Yes

CNo

Other Regional Agencies

DYes

CSNo

State Agencies

DYes

ENo

Federal Agencies

DYes

®No

b n i 1rji nrj

permit
approval

12/15/94
12/21/94

vflT-i anr-o.ei
;,rp

h i t o r ' t ' Lirftl r***"*™
board

C. Zoning and Planning Information
1 . Does proposed action involve a planning or zoning decision?

DEVes

DNo

If Yes, indicate decision required:
Ozoning amendment

CBzoning variance

Onew/revision of master plan

Dspecial use permit

Dresource management plan

2. What is the zoning c l a s s i f i c a t i o n ^ the site?

C*-2 G e n e r a l

Dsubdivision

Dother

GSsite plan

L„

Commercial

3 . What is the maximum potential development of the site if developed as permitted by the present zoning?
12

dwelling

units

\

frpp^X,

4 . What is the proposed zoning of the site?

IQMQ

J *

CpiwcfincxLt j^.lcSiV,

B-

. H H r i r f r r p f r r J we 1 1 - i rrcjr—6—eemmc r a i a 1

Mo e k a ^ c

5. .What is the maximum potential development of the site if developed as permitted by the proposed zoning?

'-. Is the proposed action consistent with the recommended uses in adopted local land use plans?

Q|Yes

DNo

' 7 . What are the predominant land use{sfand Zoning classifications within a V* mile radius of proposed action?

commercial, institutional, public and residential c-i,L-Z. f*-3.R-JT.R~fo
j

i

t

/

8. Is the proposed action compatible with adjoining/surrounding land uses within a V* mile?
9. If the proposed action is the subdivision of land, how many lots are proposed?

J

'"

CSYes

DNo

CYes

CSNo

W/A

a. What is the minimum lot size proposed? ___
10. Will proposed -action require any authorization(s) for the formation of sewer or water districts?

1 1 . Will the proposed action create a demand for any community provided services (recreation, education, police,
fire protection)?
SDYes
DNo
a. If yes, is existing capacity sufficient to handle projected demand?

EYes

DNo

12. Will the proposed action result in the generation of traffic significantly above present leveis?
a, If yes, is the existing road network adequate to handle the additional traffic?

DYes

DYes

K)No

DNo

D. Informational Details
Attach any additional information as may be needed to clarify your project. If there are or may be any adverse
impacts associated with your proposal please discuss such impacts and the measures which you propose to mitigate or
avoid them.

E. Verification
I certify that the information provided above is true to the best of my knowledge.
\pp!icant/Spo£*pr r w * m ^
r •-

-

signature

- — r yfjr

(

- - - • ^«a«q

Turnfluist-.

A^rtXAX^I\XAUA^
dAlfiiriZ

Architects

.
Title

Date

12/15/94

Architect

If (he action iJ in the CoaMaMfcrt, and you ire a stale agency, complete the Coastal Assessment Form before proceeding
with this assessment.

�FREDERICK P. CLARK A S S O C I A T E S , I N C .
Planning/Development/Environment/Transportation
Rye, New York and Southport, Connecticut

David J. Portman, A,CP
Howard I. Reynolds, PE
David H. Stolman AICP

350 Theodore Fremd Avenue
Rye, New York 10580
(914) 967-6540

Michael A. Galante
Joanne P. Meder, AICP
jjm Donovan, RLA. ASLA

MEMORANDUM
To:

Village of North Tarrytown Planning Board

Date:

January 13, 1995

Subject:

Planning Board Meeting Agenda. January 19. 1995

1.

Chestnut Ridge/Hillside Court Site Plan Application:
As
requested, on December 23, 1994, we distributed a memo which
contained our review of this application. At the January 19,
1995 meeting, the Planning Board may declare itself the Lead
Agency in the review of this matter. We have not received any
further materials since last December.

2.

Philipse Manor Railroad Station Subdivision:
We have not
received any materials for review concerning this project.

3.

Shroba Preliminary Subdivision: On September 16, 1994, we
distributed a memo which contained our review of this
application. This item was discussed at the September 22,
1994 meeting of the Planning Board. At the October 20, 1994
meeting, it was announced that the Applicant requested that
the review of this application be temporarily discontinued.
We have not received any new materials for review.

4.

Other:
As requested, enclosed is a draft resolution of
approval for the Bick Subdivision. Due to the insufficient
and inconsistent information included on the plat, the
Applicant will need to confirm some of the information
contained
within
the
resolution,
including
the tax
designations, sizes of parcels and that the description
includes all of the involved tax lots. We have been working
with the Applicant to resolve this issue. However, until the
information is confirmed, the resolution should not be
approved.
Susan J. Portman, AICP, Associate/Planning

Enclosure
cc:

Sean Treacy, Mayor
Linda E. David, V i l l a g e Administrator
Janet A. Gandolfo, E s q . , V i l l a g e Attorney
James T. Margotta, Building I n s p e c t o r
Mark A. DiGennaro, V i l l a g e Engineer

Connecticut • (203) 255-3100

FAX • (914) 967-6615

Long Island • (516) 364-4544

�FREDERICK P. CLARK ASSOCIATES, INC.
Planning/Development/Environment/Transportation
Rye, New York and Southport, Connecticut

David J. Portman, A,CP
Howard I. Reynolds, PE
David H. Stolman, AICP

350 Theodore Fremd Avenue
Rye, New York 10580
(914) 967-6540

Michael A. Galante
Joanne P. Meder, AICP
Jim Donovan, FLA. ASLA

MEMORANDUM
To:

Village of North Tarrytown Planning Board

Date:

December 23, 1994

Subject:

Review of Chestnut Ridge/Hillside Court Site Plan

As requested, we have reviewed the site plan application known as
"Chestnut Ridge/Hillside Court" for a property approximately 18,712
square feet in size located along the southern side of Chestnut
Street at 7 6 Chestnut Street and the northerly side of Depeyster
Street at 83 Depeyster Street, in the C-2 General Commercial
District.
The properties currently support two residences
containing a total of approximately six dwelling units and
associated parking.
The Applicant is proposing to remove the existing residences and
replace them with two three-story buildings containing a total of
2 0 dwelling units. The building at 76 Chestnut Street ("Chestnut
Ridge") is proposed to contain 800 square feet of office space,
four one-bedroom units and eight two-bedroom units. The building
at 83 Depeyster Street ("Hillside Court") is proposed to contain
eight two-bedroom units.
A total of 49 parking spaces are
proposed, including 12 spaces under Chestnut Ridge, 18 spaces under
Hillside Court and three spaces off of Chestnut Street. Except for
those three spaces, vehicular access to the site would be from
Depeyster Street.
The Applicant has submitted
Turnquist Architects:

the following

plans prepared by

1.

"SD1, Site Plan, Location Map, Legend and Notes, Proposed
Chestnut Ridge/Hillside Court, 7 6 Chestnut Street/83 Depeyster
Street, North Tarrytown, New York 10591," scale as noted,
dated December 12, 1994; and

2.

"1, Schematic Plan of First Floor (76 Chestnut Street),
Proposed Chestnut Ridge/Hillside Court, 76 Chestnut Street/83
Depeyster Street, North Tarrytown, New York 10591," scale 1/4"
= 1', dated December 12, 1994; and

Connecticut • (203) 255-3100

FAX • (914)967-6615

Long Island -(516) 364-4544

�FREDERICK P. CLARK ASSOCIATES, INC.
Planning/Development/Environment/Transportation

3.

"2, Schematic Plan of Second Floor (76 Chestnut Street and 83
Depeyster Street), Proposed Chestnut Ridge/Hillside Court, 76
Chestnut Street/83 Depeyster Street, North Tarrytown, New York
10591," scale 1/4" = 1', dated May 28, 1994 and most recently
revised December 12, 1994; and

4.

"3, Schematic Plan of Third Floor (76 Chestnut Street and 83
Depeyster Street), Proposed Chestnut Ridge/Hillside Court, 76
Chestnut Street/83 Depeyster Street, North Tarrytown, New York
10591," scale 1/4" = 1 ' , dated May 28, 1994 and most recently
revised December 12, 1994.

REVIEW COMMENTS
1.

Zoning Compliance:
The proposed principal office and
residential uses and the proposed accessory garage use are all
permitted in the C-2 District.
The construction of two
buildings on one property is considered a "planned development
group."
The minimum lot size for a residential use (multiple
dwellings) is 5,000 square feet for the first three dwelling
units and 1,500 square feet for each additional dwelling unit.
Since the size of the property is only 18,712 square feet, the
Zoning Code permits a maximum of 12 dwelling units on this
site. In order to allow 20 dwelling units on this site, it
would have to be 30,500 square feet in size. Either the site
plan must be revised to comply with this requirement or a
variance must be obtained from the Zoning Board of Appeals
(ZBA).
In the C-2 District, there is a 20-foot front yard setback
requirement for a residential use. The merging of these two
properties into one would result in the creation of a "through
lot." The front yard of a through lot is determined by the
street with the greater width (probably Depeyster Street).
Assuming there would be two "front yards," only three feet is
proposed from Chestnut Street and 5.5 feet from Depeyster
Street.
Not all of the existing buildings on neighboring
properties appear to have been set back 20 feet. Section 6213.b(2) of the Zoning Code states the following:
"Variance of Front Yard Requirements. When a
vacant lot is situated between two improved
lots, each having a principal building within
twenty-five (25) feet of any side lot line of
such unimproved lot, the front yard may be
reduced to the greatest depth of the front
yard of such adjoining improved lots, but
2

�FREDERICK P. CLARK ASSOCIATES, INC.
Planning/Development/Environment/Transportation

shall not be less than ten (10) feet,
provided, however, that where any lot shall
front on a right-of-way which is proposed on
the Official Map of the Village of North
Tarrytown to be widened, the front yard of
such lot shall be as required in the district
where such lot is located and shall be
measured from such proposed future right-ofway . "
As these are not currently vacant lots, the Building Inspector
should state whether the Planning Board would be able to apply
this regulation to this site plan. If it is determined that
this regulation may be applied and the Planning Board -wants to
apply it, the Applicant should demonstrate that the
neighboring properties comply with this standard and then the
Applicant must revise the site plan to comply with the 10-foot
front yard setback. If the 10-foot setback standard is not
followed or the 20-foot setback is not provided, the Applicant
must obtain a variance from the ZBA.
A three-foot minimum side yard setback is required for a
residential use.
Adequate single side yard setbacKs are
provided for Hillside Court but a side yard of only two feet
is proposed for Chestnut Ridge. The total setback of both
side yards is required to be 12 feet for a residential use but
only seven feet is provided for Chestnut Ridge and only 10
feet is provided for Hillside Court. Absent the granting of
such setback variances by the ZBA, the plan must be revised to
comply with the side yard setback requirement.
A 25-foot rear yard setback is required for a residential use.
This site plan only shows a rear yard of approximately four
feet (or three feet from Chestnut Street, if that is
considered the "rear yard" as mentioned above). The plan must
either be revised to comply with this requirement or a
variance obtained from the ZBA.
The maximum building coverage for a residential use is 35%.
The proposed building coverage is 47%. The plan must either
be revised to comply with this requirement or a variance
obtained from the ZBA.
The minimum lot width is 50 feet for a residential use.
site appears to comply with this standard.

The

The buildings are proposed to be 35 and 40 feet in height,
within the maximum height of 45 feet permitted in this
District.
3

�FREDERICK P. CLARK ASSOCIATES, INC.
Planning/Development/Environment/Transportation

2.

Parking. Loading and Circulation: The previously approved
Valley Plaza Site Plan Application received a number of
variances froa the ZBA on January 19, 1994. The minutes of
that ZBA meeting state:
11

. . . that the variances be granted as requested,
with the express condition that the variances
relating to the construction of the apartments are
conditioned specifically on the acquisition of 7 6
Chestnut Street for off-street parking, and the
approval of the off-street parking site by the
Planning Board, and that eight parking spaces be
dedicated for the express use of the apartments and
the remaining ten spaces be dedicated to the
village for its use." (emphasis added)
According to the parking standards of the Zoning Code, three
parking spaces would be required for the office use and 38 for
the residential use. This is a total of 41 spaces required
for the proposed buildings. The ZBA minutes approving the
variances for Galley Plaza state that eight parking spaces are
to be dedicated for the use of that site and 10 spaces to be
dedicated to the Village for its use. It is not clear why the
proposed site plan states that 7.5 spaces are required for
Valley Plaza. A total of 49 spaces appear to be required (41
for the proposed buildings and 8 for Valley Plaza) , assuming
that the "Village's use" of its 10 spaces can be considered
included in the 41 for the proposed buildings and not in
addition to t&amp;em.
A total of 49 parking spaces are proposed for the site,
including 12 spaces under the building at 76 Chestnut Street,
18 spaces under the building at 83 Depeyster Street and three
spaces off of Chestnut Street. Many of the parking spaces are
smaller than the minimum nine feet by 18 feet size required.
Section 62-14 allows for compact car parking (a maximum of 60%
of the spaces, or 2 9 spaces in this case) if properly
designated. If the Applicant does not want to designate
compact car perking as allowed in that Section, the plan must
either be revised to comply with the full size parking space
requirements or a variance obtained from the ZBA.
The one handicap parking space (#34) provided is irregular in
shape and would not comply with the standards of the Federal
Americans with Disabilities Act (ADA). The handicap space
should be redesigned to be eight feet in width with an eightfoot wide loading aisle. According to a representative of the
State Codes Commission, the State Building Code requires two
handicap parking spaces (one per building) . Each building is
4

�FREDERICK P. CLARK ASSOCIATES, INC.
Planning/Development/Environment/Transportation

required to have at least one accessible route. In addition,
that representative stated that the handicapped adaptable
units cannot be combined in one building and that 25% of the
units in each building must be handicapped adaptable; i.e.,
three units in Chestnut Ridge and two in Hillside Court. The
plans should be revised to comply with these requirements. We
also suggest that parking space 34 be moved farther away from
the nearby apartment window.
We do not recommend approval of parking spaces 45 and 46 since
they will be difficult to use. Spaces 39 and 40 will probably
be forced to back out of the garage. Spaces 18 and 2 5 are not
long enough to function as parallel parking spaces. Both of
these spaces would encourage backing out onto Depeyster
Street. The driver's door of a vehicle parking in spaces 20,
22 and 24 would be hindered by the location of the building
columns. These should be moved, if possible. The columns
located at the southern corners of spaces 3, 5, 7, 9 and 11
should be moved back a few feet, if possible, because they
would interfere with vehicles attempting to park. Spaces 47,
48 and 49 on Chestnut Street are also required to back out
onto the street.
Both driveways, the driveway off of Depeyster Street and the
driveway to the three parking spaces off of Chestnut Street,
do not comply with § 62-22.B, which requires that a driveway
should be at least 15 feet from a side lot line at the street
line.
The location of the driveways should be revised to
comply with the Zoning Code or a variance obtained from the
ZBA.
The entrance to the garage at Chestnut Ridge should be widened
to a minimum of 22 feet. The driveway access to Depeyster
Street should be widened to 22 feet.
The portion of the
parking aisle which is only shown as 18 feet should be widened
to 21 feet. It may be possible to pick up a few feet from
some of the spaces which are 19 feet in length.
The Applicant should indicate the clearance height for the
entrance to the proposed driveway from Depeyster Street. If
trucks will not be able to enter the site, a sign should be
provided indicating the clearance height.
Chestnut Street is a narrow, two-way, local road with parking
permitted along the south side. Depeyster Street is a two-way
local road with parking permitted along both sides.
A
development of this type will add approximately 26 vehicle
trips to area roads during peak hours.
5

�FREDERICK P. CLARK ASSOCIATES, INC.
Planning/Development/Environment/Transportation

One loading space is required for an office use less t^ian
20,000 square feet in size, A loading space has not been
provided and should be shown or a variance obtained from -the
ZBA.
3.

Lighting. Signage and Dumpster: Lighting for the parking area
is required in § 62-14.D(5). Information should be provided
regarding the location of the proposed lighting fixtures.
Fixtures should be positioned so as to minimize off-site li&lt;ght
spillage to the maximum extent possible.
The location and size of any sign to be located on "this
property should be provided.
The Applicant should also indicate where a dumpster will be
located.

4.

Landscaping and Buffers: The eastern border of the property
adjacent to the single-family house contains a large hec\ge.
The Applicant should indicate whether the existing hedge i ^ on
the subject property and whether it could be retained to s^rve
as a screen for the neighboring one-story single-family
residence.
Consistent with § 62-30, the Planning Board may require
landscaping and fences as described in § 62-9.C in ordexr to
provide for the "harmonious relations" between the site and
adjacent properties. The site plan currently only indicates
a total of six proposed trees or shrubs. Five of the proposed
plantings appear to be located partially within the toad
right-of-way.
The Applicant should describe the size and
species proposed. We recommend landscaping along the side and
rear property boundaries, particularly around the parking
area, and in the area to the southeast of the driveway on
Depeyster Street. A landscaping plan should be submitted to
the Board which will include a plant list containing plant
species, number and size and location.
The Schedule of Regulations contains a requirement of 100
square feet of usable open space per dwelling unit for
multiple dwellings. (In this case, 2,000 square feet total
would be required.) The plan must either be revised to comply
with this requirement or a variance obtained from the ZBA.

5.

Subdivision: The merging of these two lots would create a
through lot. The Applicant should either prepare and file a
subdivision plat showing a dissolved subdivision line or file
restrictive covenants (at the office of the Westchester County
6

�FREDERICK P. CLARK ASSOCIATES, INC.
Planning/Development/Environment/Transportation

Clerk) that state that for the life of this project, the two
lots will not be sold separately.
6.

Off-Site Parking Area: Section 62-21.D contains the following
requirement for an off-site parking area:
"A site plan and map indicating the location
of a proposed off-site parking area, its
relationship to the principal use to which it
is appurtenant and to public and quasi-public
uses within three hundred (300) feet, and
provisions for signs, for drainage and for
access shall be submitted to the Planning
Board as provided in § 62-29."
As required, the Applicant should provide a drawing
illustrating the dimensional relationship between the subject
property, the Valley Plaza site and public and quasi-public
uses within 300 feet of the subject property. The Applicant
should also explain the route Valley Plaza residents will take
to walk to this site and pick up their cars.

7.

Environmental Review: According to Part 617.12 of the State
Environmental Quality Review Act (SEQR), the site plan and
variances (if the plan is not revised to comply with the
Zoning Code) for the subject property constitute a Type I
action because the property is located within the Hudson River
Shoreline Critical Environmental Area.
The Applicant has
submitted a full Environmental Assessment Form (EAF), Part 1.
Our comments on Part 1 include the following:
Question

A2:

The Applicant should indicate the amount of
landscaping on the site after completion of
the project.

A5:

The Applicant should indicate the slope
categories of the other 20% of the site.

Big: The number of vehicular trips per peak hour is
26.
B23: The approximate water usage is 5,400 gallons
per day.
B25: Planning Board approval of a subdivision plat
may be required.
County Health Department
approval may also be required.

7

�FREDERICK P. CLARK ASSOCIATES, INC.
Planning/Development/Environment/Transportation

CI:

Planning Board approval of a subdivision plat
may be required.

C3:

The answer should be amended to note that a
commercial building of approximately 10,000
square feet may be permitted under existing
zoning.

C4:

The answer should be changed to "No change."

C5:

The answer should be changed to "NA."

C7:

The answer should be amended to note that the
zoning districts include C-l, C-2, R-3, R-5
and R-6.

A Type I action is required to undergo a "coordinated review"
by the involved agencies, i.e., agencies with approval
authority such as the ZBA. The Planning Board has declared
its intent to be Lead Agency in the review of this action and
a Notice of Intent to be Lead Agency was circulated to the
involved and interested agencies on December 19, 1994. After
30 days or receipt of the responses from the other agencies,
whichever comes first, the Planning Board may declare itself
Lead Agency, provided no other involved agency objects, and
make a Determination of Significance.
The Lead Agency's
preparation of a Negative Declaration or a Findings Statement
(following a Positive Declaration and the preparation of an
Environmental Impact Statement) will complete the SEQR review
process. The ZBA should defer its final decision until the
SEQR process is completed.
In anticipation of there being no objections to the Planning
Board's intent to be the Lead Agency, we have prepared Part 2
of the EAF and enclosed it for your review.
8.

Further Information: The plans should be revised to respond
to the above comments.
In addition, the plan should be
revised to label the names of the neighboring property owners
and to show the locations of the existing buildings on the
properties adjacent to the subject property. Also, we note
that there is no scale on the location map.
As requested by the Planning Board, an elevation drawing of
the proposed building and neighboring buildings from Chestnut
Street should be provided. The Board may also want to request
a similar drawing of the proposed view from Depeyster Street.
In addition, the Board may request that the Applicant submit
8

�FREDERICK P. CLARK ASSOCIATES, INC.
Planning/Development/Environment/Transportation

information which would
proposed retaining wall.

describe

the

aesthetics

of

the

Susan J. Portman, AICP, Associate/Planning
Enclosure
cc:

Sean Treacy, Mayor
Linda E. David, Village Administrator
Janet A. Gandolfo, Esq., Village Attorney
James T. Margotta, Building Inspector
Mark DiGennaro, Village Engineer
Zoning Board of Appeals
Ronald Turnquist

500\not4-003.sjp:ev

�±

CH6iTM0T RID6E
Part 2—PROJECT IMPACTS AND THEIR MAGNITUDE
Responsibility of Lead Agency

Genera! I n f o r m a t i o n (Read Caretui'v)
'
• In completing the form the reviewer s h o u l d be guided by the quest fen: H a \ e my responses 2nd d e t e r m i n a t i o n s been
•reasonable? The reviewer is net expected to be an expert environmental analyst.
• Identifying that an impact v. ill he p o t e n t i a l l y large (column 2) dees net mean that it is also necessarily significant.
Any large i m p a c t must be evaluated in PART 3 to determine significance. I d e n t i f y i n g an i m p a c t in c o l u m n 2 simply
asks that it be l o c k e d at further.
• The Examples provided are to assist the reviewer by showing types of impacts zr.c wherever possible the threshold of
magnitude that w o u l d trigger a response in c o l u m n 2. The examples are generally applicable t h r o u g h o u t the State and
for most situations. But. for any specific p r o j e c t or site other examples and/or lower thresholds m a y be a p p r o p r i a t e
for a Potential Large Impact response, thus requiring evaluation in Part 3.
• The impacts of each project, en each site, in each locality, w i i l vary. Therefore, the examples are i l l u s t r a t i v e and
have been offered as guidance. They do not constitute an exhaustive list cf impacts and thresholds to answer each question.
• The number cf examples per question does not indicate the importance of each question.
• In identifying impacts, consider long t e r m , short term and c u m l a t i v e effects.
Instructions (Read carefully)
a. Answer each cf the 19 questions in PART 2. Answer Yes if there w i l l be any impact.
b. Maybe answers shou-'d be considered as Yes answers.
c. If answering Yes to a question then check the appropriate box (column 1 or 2) to indicate the p o t e n t i a l size of the
impact. If impact threshold equals or exceeds any example provided, check c o l u m n 2. If i m p a c t w i l l o c c u r b u t threshold
is lower than example, check c o l u m n 1 .
d. If reviewer has d o u b t about sire of the i m p a c t then consider the impact as p o t e n t i a l l y large and p r o c e e d to PART 3.
e. If a potentially large impact checked in c o l u m n 2 can be mitigated by change&lt;s) in the project t o a s m a l l t o m o d e r a t e
impact, also check the Yes box in c o l u m n 3. A S'o response indicates that such a r e d u c t i o n is n o t possible. This
must be explained in Part 3.

IMPACT ON L A N D
1 . W i l l the proposed action result in a physical change to the project site?
CNO
KYS5
Examples that w o u l d apply to c o l u m n . 2
• Any construction on slopes of "5z/o or greater, ("5 foot rise ptr 100
foe* of length), or where the general slopes in the project area exceed
1C%.

1
Small to
Moderate
Impact

2
Fotentia
Large
Impact

2)

a

D Y es

UNo

D

DYes

LNo

DYes
DYes

CNO

• Construction on land where the depth to the water table is less than
3 feet.

Can Impact 5e
Mitigated 3y
P r o j e c t Ch.ange

• Construction cf paved pa-king area for 1,000 cr more vehicles.

LJ

• Construct.en on land &gt; here bedrock is exposed or generally w i t h i n
3 feet of sxisti.-g ground surface.

D

D
n

• Construction ;hat will continue for more t h a n 1 year or involve more
than one phase or stage.

D

D

DYes

DNO

a

'

l_J&gt;es

CNO

•

Excavation for mining purposes that w o u l d remove mere than 1,000
tc.ns of natural' material (: e . rock or seii) per
\zi:

• Construction cr expansion ci a sanitary l a n c f i l l .

D

• Construction in a designated fiocc'way.

i '

• Other impacus

\

D

' v.

LNo

D
D
n

DYes
DYes

CNO

DYes

C'Nc

D

DYes

C'No

DN'O

W i l l there be an effect \&lt;. ...&lt;y un.que or u n u s u a l land forms found en
the sue? (i e.. o'itfs, dunes, geological f o r m a t i o n s , etc.)|SNO
C'YES
i&lt;?t n » r ;

4

it.

• 5.

�2

1
Small to
Moderate
Impact

IMPACT ON WATE.R
3. Will proposed action affect any v»ater body designated as protected?
(L'.-.c'er Artic'es 15. 2-i, 25 cf the Environmental Conservation Law, ECL)
&amp;NO
C^ES
Examples that would apply to column 2
• Developable area of site contains a protected water body.

Potential
Large
Impact

Can Impact Be
Mitigated By
Project Change

D
D

n

C'Yes

CNO

D

DYes

DNo

D
D
D

D
D
D

DYes

DNo

DYes

DNo

DYes

CNo

D

D

DYes

DNo

D
D

D

I DYes

DNo

D

I DYes

DNo

D
D

D
D

DYes

DNo

DYes

DNo

• Proposed Action requires water supply from wells with greater than -5
gallons per minute pumping capacity.

D

D

DYes

DNo

• Construction or operation causing any contamination of a water
supply system.

D

D

DYes

DNo

• Proposed Action will adversely affect groundwater.
• Liquid effluent will be conveyed off the site to facilities which presently
do not exist cr have inadequate capacity.

D
D

D

DYes
DYes

DNo
DNo

• Proposed Action would use water in excess cf 20,COO gallons oer
day.

D

D

C'Yes

DNo

• Proposed Action will likely cause siltation or other discharge into an
existing body of water to the extent that there will be an obvious visual
contrast to natural conditions.

D

D

C'Yes

DNQ

• Prepaid Action will require the storage of petroleum or chemical
products greater than 1,100 gallons.

D

D
G

j C'Yes

DNo

1

Proposed Action will allow residential uses in areas without water
and/cr sewer services.

D

D

CYes

DNo

Proposed Action locates commercial and/cr industrial uses which may
require new or expansion of existing waste treatment and/or storage
facilities.

D

D

UYes

C'No

Other

D

D

DYes

DNo

D

D

• Dredging mere than "00 cubic yards of material from channel of a
protected stream.
• Extension cf utility distribution facilities through a protected water body.
• Construction in a designated freshwater or tidal wetland.
• Other impacts:

4. Will proposed action affect any ncn-prctected existing or new body
of water?
gNO
DYES
Examples that would apply to column 2
• A 10% increase or decrease in the surface area of any body of water
or more than a 10 acre increase or decrease.
• Construction of a body of water that exceeds 10 acres of surface area.
• Other impacts:

5. Will Proposed Action affect surface or groundwater
quality or quantity?
K'NO
Examples that would apply to column 2

DYES

• Proposed Action will require a discharge permit.
• Proposed Action requires use of a source cf water that does not
have approval to ser.-e proposed (project) action.

impacts:

;

. Will proposed action alter drainage flow or patterns, or surface
water runoff?
DNO
JS'YES
Examples that would apply to column 2
• Proposed Action would change flood water flows.
.

••

7

DYes

DNo

�1
Srr.aM to
Moderate
Impact

Fcter.tlal
Large
Impact

fcj

• P-repcsec Action may cause suestar.tiai erosion.
• Proposed Action is incompatible wi;h exist.ng drainage patterns.

L~Yes

•
•

• Proposed Action will allow development in a designated flcodway.

Car. Impact 5e
M i t i g a t e d By
Project Change
C'No

LJYes

Cs'o

LJYes

C N O

D

D

DYes

CNo

D

D

DYes

DNo

D

D

DYes

DNo

• Emission rate of total contaminants will exceed 5 ibs. per hour or a
heat source producing more than "0 million 3TU's zer hour.

D

D

DYes

DNo

• Proposed acticn will allow an increase in the amount cf 'and.committed
to industrial use.

D

D

DYes

Ds'o

• Proposed acticn will allow an increase in the density of industrial,
development within existing industrial 2reas.

D

D

DYes

DNo

• Other impacis:

D

D

DYes

DNo

• Reduction of one cr mere species listed en the New York or Federal
list, using the site, over cr near site cr found en the site.

a

D

D'Yes

DNo

• Removal cf any pcrJ.cn

D

DYes

DNo

DYes

DNo

Other impacts:
IMPACT ON AIR
£NO
CYES
7. Will proposed acticn affect air quality?
Examples that would apply to column 2
• Proposed Action will induce 1.0CO cr mere vehicle trips in any given
hour.
• Proposed Action will result in the incineration of more than 1 ten of
refuse per hour.

IMPACT ON PLANTS AND ANIMALS
8. Will Proposed Action affect any threatened or endangered
species?
K'NO
Examples that would apply to column 2

CYES

• Application c: pesticide or herbicide mere than twice a year, ether
th2n for agricultural purposes.

a

D
D

• Other

D

D

DYes

C'No

• Proposed Action would substantially interfere wi;h £.-.y resident or
migrator/ fish, shellfish or wildlife species.

D

DYes

DNo

• Proposed Act : on requires the removal cf mere than "0 acres
ci mature fcrest [ever "00 years cf age) cr ether locally impcr:ant
vegetation..

D

D'Yes

C'No

D

DYes ' DK«

of a critical cr significant wildlife habitat.

impacts:

9. Will Proposed Action substantially affect ncn-threatened cr
non-e.ncange'ed species?
(&amp;NO
Examples that v.culd acpiy to column 2

CYES

IMPACT ON AGRICULTURAL LAND RESOURCES
10. Wiil the Prcccsed Action affect agricultural land resources?
D5NO
CYES
Examples that would apply to column 2
'he proposed action would sever, cross cr limit access to agricultural
land (includes cropland, hayfields, pasture, vineyard, orchard, etc.)
8

D

�Construction ac:
•

c.

or c 2 m " 2 c t i n s 5c:

e^c:

T h e p r o p o s e d a c t i o n w o u l d irreversibly c o n v e r t m o r e i h a n 10 acres
cf

agricultural

land

c r , if l o c a t e d

t h a n 2.5 a c r e s c f a g r i c u l t u r a l
•

in a n A g r i c u l t u r a l

District,

more

land.

T h e p r o p o s e d a c t i o n w o u l d d i s r u p t cr p r e v e n t installation of a g r i c u l t u r a l
l a n d m a n a g e m e n t s y s t e m s ( e . g . , s u b s u r f a c e d r a i n lir.es, o u t l e t d i t c h e s ,
strip c r o p p i n g ) ; c r c r e a t e a n e e d f o r s u c h measures (e.g. cause a f a r m
field to d r a i n p o c r l y d u e t o increased

•

Other

runoff)

imcacts:

IMPACT O N AESTHETIC

RESOURCES

11 . W i l l p r o p o s e d a c t i o n a f f e c t a e s t h e t i c r e s o u r c e s ?
(if

necessary,

Appendix

us*

the Visual

EA? A d d e n d u m

JJ5NO

DYES

in S e c t i o n

617.21,

3.)

Examples that w o u l d 2 p p l y t o column 2
•

P r o p o s e d l a n d uses, c r p r o j e c t c o m p o n e n t s o b v i o u s l y d i f f e r e n t

fro'm

c r i n s h a r p c o n t r a s t t o c u r r e n t s u r r o u n d i n g l a n d use p a t t e r n s , w h e t h e r
man-mace or natural.
•

Proposed
aesthetic

land

-jses,

cr

project

compcnenis

visible

to

users

r e s o u r c e s w h i c h w i l l e l i m i n a t e or significantly reduce

of

their

• e n j o y m e n t c f t h e a e s t h e t i c q u a l i t i e s ci t h a t r e s o u r c e .
Project c o m p o n e n t s

t h a : w i i l r e s u l t i n t h e e l i m i n a t i o n or s i g n i f i c a n t

s c r e e n i n g c f s c e n i c v i e w s k n o w n t o be i m p o r t a n t to the area.
•

Other

imcact-S:

IMPACT O N HISTORIC A N D ARCHAEOLOGICAL
12.

Wiil Proposed Action

impact

historic cr pa.'ecr.tclcg^cal

RESOURCES

a n y site c r s t r u c t u r e o f h i s t o r i c ,
&amp;-sO

impcr.ar.ee?

pre-

CYES

Examples that w o u l d a p o l y to c o l u m n 2
•

P r o p o s e d A c t i o n o c c u r r i n g w h o l l y cr p a r t i a l l y w i t h i n cr s u b s t a n t i a l l y c o n t i g u o u s t o a n y f a c i l i t y c r site listed on the State cr N a t i o n a l R e g i s t e r
ci

•

historic

— •'r~
. ai- '
v-^ - w .
r

•

places.

A n y i m p a c t t o a n a r c h a e o l o g i c a l site z: f o s s i l b e d ' c c a t e d w i t h i n t h e
c * a

} • &gt; _ .

r-zzcad.

.- c t . c n

.s'i! occur

in an area

e'es'gnated

as s e - s i t i v e

for

a r c h a e o l o g i c a l s.t = s c.n t h e N Y S Site '."•'. e n t o r y .
•

Other

imocCts:

IMPACT
'/•.'] P r o o c s e d

ON OPEN
Action

SPACE A N D RECREATION

a f f e c t the quantity

-ture c : e n &lt;caces cr recreational
::^rr.pies

t:

"• e ^ e r m a. r ^ :
A majcr r e c u c t i c n
Other

cu;c

a o o i v t o c;

cr q u a l i t y c f e x i s t i n g c r

crccrtunities?
A NO

'.n J

. c s u r e cr a ruture recreational

ccen

soace

octant

l—.VC:

opocrtumtv.

to tne

community.

i m o a c t s.

9

�IMPACT ON TRANSPORTATION
1-4. Will there be an effect to existing transportation $\$tems?
gNO
Examples that would apply to column 2

CYEi

1

2

3

Small to
Moderate
Impact

Potential
Large
Impact

Can Impact Be
Mitigated By
Project Chanc

D
D

D
D
D

D

D

DYes

DNo

D '

D

DYes

DNo

D

D

DYes

DNo

D

D

DYes

DNo '

D
D

D
D"

DYes
DYes

GNo
DNo

D

D

DYes

GNo

a

•

DYes

DNo

D

D

DYes

GNo

D

D

DYes

UNo

D

D

DYes

GNo

n

D

GYes

JD.NO

D

D

DYes

GNo

• Alteration of present patterns cf movement of people and/or goods.
• Proposed Action will result in major traffic problems.
• Other impacts:

°

\ rDYes
GYes
DYes

" •

rm
DNo
CNo
DNo

IMPACT ON ENERGY
15. Will proposed action affect the community's sources of fuel or
energy supply?
(£NO
GYES
Examples that would apply to column 2
• Proposed Action will cause a greater than 5% increase in the vse of
any form of energy in the municipality.
• Proposed Action will require the creation or extension cf an energy
transmission or supply system to ser*e more than SO single or two family
residences or to sen'e a major commercial or industrial use.
• Other impacts:
NOISE AND ODOR IMPACTS
16. Will there be objectionable odors, noise, or vibration as a result
of the Proposed Action?
• 8N0
GYES
Examples that would apply to column 2
• Blasting within 1,500 feet of a hospital, school or other sensitive
facility.
• Odors will occur routinely (more than one hour per cay).
• Proposed Action will produce operating noise exceeding the local
ambient noise levels for noise outs ice of structures.
• Proposed Action will remove natural barriers that would act as a
ncise screen.
• Other imoacts:
IMPACT ON PUBLIC HEALTH
17. Will Proposed Action affect public health and safe:&gt;?
IS NO
CYES
Examples that would apply to column 2
• Proposed Action may cause a ris* of exoicsion or release cf hazardous
substances (i.e. oil, pesticides, chemicals, radiation, etc.) in the even: of
accident or upset conditions, or there may be a chronic lew level
discharge cr emission.
• Proposed Action may result in the burial of "hazardous wastes" in any
form (i.e. toxic, poisonous, highly reactive, radioactive, irritating,
infectious, etc.)
• Storage facilities for one million cr more gallons of liquified natural
gas or other flammable liquids.
• Proposed action may result in the excavation or other disturbance
within 2,CCO feet of a site used for the disposal cf solid or hazardous
waste.
' Other impacts:
10

1

�1

2

3

Small to
Moderate
Impact

Potential
Large
Impact

Can Impact Be
Mitigated By
Project Change

• The permanent population of the city, town or village in which the
project is located is likely to grew by mere than 5%.

D

D

DYes

DNo

• The municipal budget for capital expenditures or operating services
will increase by more than 5% per year as a result cf this project.
• Proposed action will conflict with officially adopted plans or goals. '

D

D

DYes

DNo

D

DYes
DYes
DYes

DNo
DNo
DNo

IMPACT ON GROWTH AND CHARACTER
OF COMMUNITY OR NEIGHBORHOOD
n

. Will proposed

action affect the character of the existing community?

Examples th.2t would apply to cc'urr.n 2

a

• Proposed Action wii! replace or eliminate existing facilities, structures
or areas of historic importance to the community.

D

D
D
D

• Development will create a demand fcr additional community services
(e.g. schools, police and fire, etc.)

D

D

DYes

DNo

• Proposed Action will set- an important precedent for future projects.

D
D
D

D
D
D

DYes
DYes
DYes

DNO

• Proposed action will cause a change in the density of land use.

• Proposed Action wiil create or eliminate employment
• Other

impacts:

-

DNo
DNO

1 9 . Is there, or is there likely to be, pubjic controversy related to
potential adverse environmental impacts?
(JSNO
DYES

If Any Action in Part 2 Is Identified as a Potential Large Impact or
If You Cannot Determine the Magnitude of Impact, Proceed to Part 3

Part 3 — EVALUATION OF THE IMPORTANCE OF IMPACTS
Responsibility of Lead Agency
Part 3 must be prepared if one or more impact(s) is considered to be potentially large, even if the impact(s) may be
mitigated.
Instructions
Discuss the following fcr each impact identified in Column 2 cf Part 2:
1 . Briefly describe t h e impact.
2. Describe (if applicable) hew the impact could be mitigated or reduced to a small to moderate impact by project changes).
3. Based on the information available, decide :f it is reasonable to conclude t h a t this impact is important.
To answer the question cf importance, consider:
• The probability cf the impact occurring
—
• The duration cf the impact
• It_s irreversibility, including permanently lest resources cf value
• W h e t h e r t h e impact can or will be controlled
• The regional consequence of the impact
• Its potential divergence from local needs and goals
• W h e t h e r knewn objections to the project relate to this impact.
(Continue e n a t t a c h m e n t s ]

1 1

�i— . C

SEX'
!.&gt;••.

:

.i;or.r.,£-,li! CLT',*.)' Rc\itv.

FULL LKVIF.ONWENTAL ASSESSMENT FORM
Purpose: The f u l l EAF is designed to help applicants and agencies determine, in a n o r d e r l y manner, whether a p r r v p r t
.

, . - . . _ • . n . a s L-.

K

. • . . ' " •

'

c'.;-

'. S"&gt; I r . a c j ; * K '

;:•*-'.»••'

'

r

&lt; = C t , C : . r. .

.

•' - •

•

•

.

•

- pa?". •&lt;• &gt;- •

•

...:.; l i r e

t

a-c s i l -_cv-.t i - . p T : f a r . •-. . : •

t!,e:r- are a s r i : : - of r r ' c - -

•

..'•-,-

:• •: .•&gt;!•.- ^-.cV • •.
;

-

• ' ••• i ^ i ' i CI '. ••. i

: -

&gt; ' '

.... ;

t w

. .

• - r • cr\f-r~.

--

--

.« •:

„'•...'.•

• .
4

the q u e s t i o n of significance
The f u l l EAF is intended to provide a m e t h o d whereby applicants and agencies can be assured t h a t the d e t e r m i n a t i o n
process has been orderly, comprehensive in nature, yet flexible to a l l o w introduction of i n f o r m a t i o n t o f i t a project or action
Full EAF Components: The f u l l EAF is c o m p r i s e d of three parts:
Part 1 : Provides objective data and i n f o r m a t i o n about a given project and its site. By i d e n t i f y i n g basic project
data, it assists a reviewer in the analysis that takes place in Parts 2 and 3.
Part 2: Focuses on identifying the range of possible impacts that may occur f r o m a p r o j e c t o r action It provides
guidance as t o whether an i m p a c t is likely t o be considered small to m o d e r a t e or w h e t h e r it is a potentiallylarge impact. The f o r m also identifies whether an impact can be m i t i g a t e d c r r e d u c e d .
Part 3: If any i m p a c t in Part 2 is i d e n t i f i e d as potentially-large, then Part 3 is used t o e v a l u a t e whether o r not the
impact is actually important.

DETERMINATION OF S I G N I F I C A N C E - T y p e 1 and Unlisted Actions
I d e n t i f y the Portions of EAF completed f o r this p r o j e e l :

^

Part 1

} g f Part 2

DPart 3

U p o n review o f the information recorded on this EAF (Parts 1 and 2 and 3 if appropriate), a n d any other s u r p o r t i n p
i n f o r m a t i o n , and consic'c rir,£ b e / . *.r.c m a f t u e ' e and importar.ee of each impact, it is reasonably c!c;e-;rr.ined b , the
lead agency that:
A. The project w i l l net result in any large and i m p o r t a n t i m p a c t s ) a n d , t h e r e f o r e , is o n e w h i c h w i l l not
have a significant impact o n the e n v i r o n m e n t , therefore a negative d e c l a r a t i o n w i l l be prepared.
D

B. A l t h o u g h the project c o u l d have a significant effect o n the e n v i r o n m e n t , t h e r e w i l l n o t be a significant
effect for this Unlisted A c t i o n because the m i t i g a t i o n measures described i n PART 3 h a v e been required,
therefore a C O N D I T I O N E D negative d e c l a r a t i o n w i l l be prepared.*

•

C. The project m a y result in one o r m o r e large a n d i m p o r t a n t impacts t h a t m a y h a v e a significant i m p a c t
o n the environment, therefore a positive d e c l a r a t i o n w i l l be p r e p a r e d .
* A C o n d i t i o n e d Negative Declaration is o n l y v a l i d f o r Unlisted Actions

Shrobfr

TViQ-lO'f

J k &amp; c i / ' J »'*!/*
Name of Action

N a m e o f Lead A c e n c v

Stent

^ . H^'f-g-

^-J

fAa\fvw\

Print or Type/K8|ne of Responsibl| O f f i c e r ^ Lead Agency

Title of Responsible O f f i c e r

Agency

Signature of P r e p a r e ^ ! d i f f e r e n t f r o m responsible officer)

Date

1

�[,-. . j -,--» » \ 0 J L L : " I

IK? Gr.i-.'.ATiON

••011Ci ~i •' -.•«.-'••. : •&gt; &lt;. .
;
•'• • '
. • r• p - r- w - ~ •" '" • • * *' *• " / ' ' v c-'t C'.'.K c:
en the e m irr - •• • r: r i t - . n f - c c f ;
• .&gt; &lt;
...
.'.
- , ,• ' • ••:: t o thf&gt;i put &lt;.c r.«- * . , :.c co.-.Mfc n .
as part of the r.pplicatior, for a p ^ r c » ; ; f.-.c i n i . :•(. sji';« •:: to fur'J.cf veriticat.cn and public review Piu\ idc ar.) additional
i n f o r m a t i o n \ c u be n&lt; \ c '»ill b i ru-&lt;:.'&lt;. &gt;:' t o c o ' ^ p ' t i c P.irts 2 and 3
It is expected that completion of the full EAF will be dependent on information currently available and will not involve
re .•• s: •„;•'.•. i. u .,.-.:,.'. c- ; . &lt;. &gt;: t .
ii i-.-. •• .
• ..
: &gt; . . . . 7: ' &lt; &lt; - • . - . • •
.
t

K/

»• t c -

A

:

\f jrJoe^t

SUM 6ft

LOCATION OF ACTION (Include S t r ^ Add-ess. Municipality and Couniy)

*i i ^W^|
^

HflU^ fU.} A, T f A m t o ^ ^ , fV/ - W£VT(ftfcfrf£ft
BUSINESS TELEPHONE

SPONSOR
NAME OF APPLICANT/S&gt;Oj*SpR

\o.

f-o f . i n A

A

JfL

ADDRESS

^ _ _ A v * oAinA
STATE

CITY/PO
NAME OF OWNER (H dillereni)
ADDRESS

ZIP CODE

BUSINESS TELEPHONE

w

(

)

STA1

CITY/PO
L'tSCr.,"' iC

Z;P CODE

tferp^ - / U A * ^
^ A A A ; fiA'NTVM,c^

Please Complete Each Question—Indicate N.A. if not applicable

^»

' ^

JL

A. Site Description
Physical setting of overall project, both developed and undeveloped areas.
1. Present land use:
Durban
Dlndustrial
DCommercial
^ R e s i d e n t i a l (suburban)
CForer.l

DAgricuIture

2. Total acreage of project area:
APPROXIMATE ACREAGE
Meadow or Brushland (Non-agricultural)

DRural (non-farm)

COther
acres.

acres

AFTER COMPLETION
acres
acres
i
acres

acres

acres

acres
acres
acres

acres
acres
acres
_ acres

PRESENTLY
acres
acres

Forested
Agricultural (Includes orchards, cropland, pasture, etc.)
Wetland (Freshwater or tidal as per Articles 24. 25 of ECL)
Water Surface Area
Unvegetated (Rock, earth or fill)
Roads, buildings and other paved surfaces
Other (Indicate type)
&lt; &amp; £ \ C L ^ &lt; V fl I

_ A O ^ _ i i _ L _ acres

3&amp;

*00

3. What is predominant soil type^s) on project site?
% of site
II drained
\ ^ &gt; ^ % of site
DModerately well drained
DPoorly drained
% of site
b. If any agricultural land is involved, how many acres of soil are classified within soil group 1 through 4 of the NY.
Land Classification System? V*S_. acres. (See 1 NYCRR 370).
a. boil drainage:

4. Are there bedrock outcroppings on project site?
a. What is depth to bedrock?

DYes / _ 4 ^ o
(in feet)
2

�n r ^ o w

-••

• ".. . -

•

/ \

Is project SLit&gt;i!^ri'..».•••&gt; ttn.;: 6 ^;*.. ic- ^ iiic .i/.cJ o-. ?;.&lt;. ;.-. t. . U : c'', *\. '.'•:••.;' *&gt;:

#

What is the depth of the water tab-t ?
!.• site io'f.'.td ov, • .- —

--,

r

(m fcell

- • - - ! or &lt;"'' f r - . ' c f : : - V

;;

M

['•(•' Hunting tish.'.i •:: she : ' •. c: ; : ".U

•r

M?&lt;

PVr

« "

A&gt;

K.

'.') ev:«.' in V

CYes yS&amp;&lt;o
According to
Identify each species
12. Are there any unique or unusual land forms on the project site? (i e.. cliffs, dunes, other geological formations)
DYes

p^p

Describe

.

13. Is the project site presently used by the community or neighborhood as an open space or recreation area?
DYes
/&amp;&amp;o
If yes. explain
14.

Does the present site include scenic views known to be important to the community?

DYes

Jg$io

15. Streams within or contiguous to project area:
a. Name of Stream and name of River to which it is tributary
lb

Lakes, ponds. v.cJ-nd areas v. ;;•..:. or cor.*..gj'.„; to p:c;cct £:c-c
a. Name

•

^

b. Size (In acres)

^

17. Is the site served by existing public utilities?
Jo^Yes
DNo
a) If Yes, does sufficient capacity exist to allow connection?
/E^es
b) If Yes, will improvements be necessary to allow connection?
DYes

DNo
JjQ^'o

18. Is the site located in an agricultural district certified pursuant to Agriculture and Market* Lav., Article 2S-AA,
Section 303 and 304?
DYes
JEWo
19. Is the site located in or substantially contiguous to a Critical Environmental Area designated pursuant to Article 8
of the ECL. and 6 NYCRR 617?
DYes
y^'o
20. Has the site ever been used for the disposal of solid or hazardous wastes?

DYes

/DNo

B. Project Description
1. Physical dimensions and scale of project (fill in dimensions as appropriate)

QK

QN\ ^ Q

a. Total contiguous acreage owned or controlled by project sponsor
b. Project acreage to be developed: ^ *

*v*\

c.
acreage to
to remain
remain undeveloped
c. Project
r r o j e c i acreage
unaeveiop
d. Length of project, in miles:
U\&amp;

acres ultimately.

acres.

(If appropriate)

\

e. If the project is an expansion, indicate percent of expansion proposed
f. Number of off-street parking spaces existing

}£ C-fiftS; proposed

g. Maximum vehicular trips generated per hour

* *&amp;

Initially

V^~
^

w^-fi

%;
-

(upon completion of project)?

h. If residential: Number and type of housing units:
One Family
Two Family
Ultimately

.MUGS.

acres initially;

V*rft

K ^

Multiple Family

Condominium

- _
__j

...

i. Dimensions (in feet) of largest proposed structure

'
^S

height;

j . Linear feet of frontage along a public thoroughfare project will occupy is?
3

width;
IftO

length
ft.

�.1

2 Hov. much natural material li e

-cck. earth, etc J will be removed from the $ite&gt;

i3, Will disturbed areas be reclaimed'

DYes

_^&gt;^^o

^/K3N/A
DYes

N I »"*

DNo

c. Will upper subsoil be stockpiled for reclamation?

»

tons/cubic &gt;ards

j

a. If yes, for what i n t e n d . , purpose is the site being reclaimed'
b. Will topsoil be stockpiled for reclamation?

N {"U

DYes

DNo

iJIfl

4. How many acres of vegetation (trees, shrubs, ground covers) will be removed from site?

acres.

5 Will any mature forest (over 100 years old) or other locally-important vegetation be removed by this project?
DYes ^ . o
1
6. If single phase project: Anticipated period of construction
7. If multi-phased:

N 1 ]\

months, (including demolition).

\

a. Total number of phases anticipated .

. (number).

b. Anticipated date of commencement phase 1
c. Approximate completion date of final phase

m

month

year, (including demolition)

month

year.

d. Is phase 1 functionally dependent on subsequent phases?
8. Will blasting occur during construction?

DYes

. 9. Number of jobs generated: during construction
10. Number of jobs eliminated by this project

DYes

DNo

^JuNo

.y^yft

; after project is complete

vMfl

11. Will project require relocation of any projects or facilities?
12. Is surface liquid waste disposal involved?

DYes

DYes

jQ$*0

'f Y es . explain

__

Q^Jo

a. If yes, indicate type of waste (sewage, industrial, etc.) and amount
b. Name of water body into which effluent will be discharged .
13. Is subsurface liquid waste disposal involved?
#

DYes

HZJ&amp;o

Type

14. Will surface area of an existing water body increase or decrease by proposal?

DYes

Explain
15. Is project or any portion of project located in a 100 year flood plain?

}QPo

16. Will the project generate solid waste?

DYes

DYes

a. If yes, what is the amount per month

tons
DYes

c. If yes, give name .

DNo

; location ______

d. W i l l any wastes not go into a sewage disposal system or into a sanitary landfill?
e. If Yes, explain
17. Will the project involve the disposal of solid waste?

DYes

a. If yes, what is the anticipated rate of disposal?

^JS$4O
tons/month.

b. If yes, what is the anticipated site life? ___________ years.
18. Will project use herbicides or pesticides?

DYes

yaSfJo

19. Will project routinely produce odors (more than one hour per day)? DYes

J_tNo

20. Will project produce operating noise exceeding the local ambient noise levels?
21.-Will project result in an increase In energy use?
If yes , indicate type(s)

DYes

'

Total anticipated water usage per day

24. Does project involve Local, State or Federal funding?
If Yes. explain

DYes

T3-No

22. If water supply is f r o m wells, indicate pumping capacity
|jjj 23.

'.

No

^J_|No

b. If yes, will an existing solid waste facility be used?

,

X

V yft

gallons/minute.

gallons/day.
DYes
.

J - 3 No

DYes

DNo

�25. Approvals Required:

Submittal
Date

T&gt;pc
C.ty. Town. Village Board

^ 7 \ A e s

City. Town, Village Planning B o a r d - / ^

DYes

City. Town Zoning Board

DYes / D N o

City. County Health Department

V

GNo
"SNo

J§Ves
DYes

/§^o

Other Regional Agencies

GYes

jQNo

State Agencies

DYes

jCWo

Federal Agencies

DYes

tStio

(S 1 * "

^ p n Y

,

DNo

Other Local Agencies

S U'J&gt;W

-V* 6 0 I¥f5 I

W

C. Zoning and Planning Information
1

Does proposed action involve a planning or zoning decision?

yON&lt;

CYes

If Yes. indicate decision required:
Dzoning amendment

Ozoning variance

Dnew/revision of master plan

Dspecial use permit

Dresource management plan

2 . What is the zoning c l a s s i f i c a t i o n ^ the site?

\

^subdivision

Dsite plan

Dother

jffrrllVW

&amp;4.S / P E r t f 1 flL

3. What is the maximum potential development of the site if developed as permitted by the present zoning?

i4 . What is the proposed zoning of the site?

^ n D c

5. What is the maximum potential development of the site if developed as permitted by the proposed zoning?

)Q{ei

6. Is the proposed action consistent with the recommended uses in adopted local land use plans?

DNo

7. What are the predominant land use{s) and zoning classifications within a V* mile radius of proposed action?

S ft HE
8. Is the proposed action compatible with adjoining/surrounding land uses within a V* mile?

/S^es

DNo

DYes

P^°

9. If the proposed action is the subdivision of land, how many lots are proposed?
a. What is the minimum lot size proposed?

o ^ QVJVJ

~V^ -

r

»•

10. Will proposed action require any authorization^) for the formation of sewer or water districts?

1 1 . Will the proposed action create a demand for any community provided services (recreation, education, police,
fire protection)?
DYes
JS^o
a. If yes. is existing capacity sufficient to handle projected demand?

CYes

DNo

12. Will the proposed action result in the generation of traffic significantly above present levels?
a. If yes. is the existing road network adequate to handle the additional traffic?

DYes

DYes

Xjfo

DNo

D. Informational Details
Attach any additional information as may be needed to clarify your project. If there are or may be any adverse
impacts associated with your proposal, please discuss such impacts and the measures which you propose to mitigate or
avoid them.

E. Verification
I certify that the information provided above is true to the best of my knowledge.

I

.

Applicant/Sponsor Name ___

nx^/ci/ / &gt; AMrfrK

™ie. . frying

signature
If the action is in the Coastal Area, and you are a state agency, complete the Coastal Assessr.unt Form before proceedin
with this assessment.
5

�Part 2—PROJECT IMPACTS A N D 1 HEiR
Responsibility of Lrad Agenc&gt;

N'.AGNuUuL

General Information (Read Carefull&gt;)
• In completing the form the reviewer should be guided by the question Have my responses and determinations been
reasonable? The reviewer is not expected to be an expert environmental analyst
*

• Identifying that an impact will be potentially large (column 2) does not mean that it is also necessarily significant.
Any large impact must be evaluated in PART 3 to determine significance. Identifying an impact in column 2 simply
asks that it be looked at further.
• The Examples provided are to assist the reviewer by showing types of impacts and wherever possible the threshold of
magnitude that would trigger a response in column 2. The examples are generally applicable throughout the State and
for most situations. But, for any specific project or site other examples and/or lower thresholds may be appropriate
for a Potential Large Impact response, thus requiring evaluation in Part 3.
• The impacts of each project, on each site, in each locality, will vary. Therefore, the examples are illustrative and
have been offered as guidance. They do not constitute an exhaustive list of impacts and thresholds to answer each question
• The number of examples per question does not indicate thejmportance of each question
• In identifying impacts, consider long term, short term and cumlative effects.
Instructions (Read carefully)
a. Answer each of the 19 questions in PART 2. Answer Yes if there will be any impact.
b. Maybe answers should be considered as Yes answers.
c. If answering Yes to a question then check the appropriate box (column 1 or 2) to indicate the potential size of the
impact. If impact threshold equals or exceeds any example provided, check column 2. If impact will occur but threshold
is lower than example, check column 1.
d. If reviewer has doubt about size of the impact then consider the impact as potentially large and proceed to PART 3.
e. If a potentially large impact checked in column 2 can be mitigated by changes) in the project to a small to moderate
impact, also check the Yes box in column 3. A No response indicates that such a reduction is not possible. This
must be explained in Part 3.

i

coa&amp;etTM^\A&amp;&amp;

•oiu-tffr

ai*^&lt;m

IMPACT ON LAND
1 . Will the proposed action result in a physical change to the project site?
yQNO
DYES
Examples that would apply to column 2
• Any construction on slopes of 15% or greater, (15 foot rise per 100
foot of length), or where the general slopes in the project area exceed
10%.

1

2

Small to
Moderate
Impact

Potential
Large
Impact

Can Impact Be
Mitigated By
Project Change

•

•

DYes

DNo

• Construction on land where the depth to the water table is less than
3 feet.

•

•Yes

DNo

• Construction of paved parking area for 1,000 or more vehicles.

n

•
•
•
•
•
•

•
•
•
•
•
•
•
•

•

•

• Construction on land where bedrock is exposed or generally within
3 feet of existing ground surface.
• Construction that w i l l continue for more than 1 year or involve more
than one phase or stage.
• Excavation for mining purposes that would remove more than 1.000
tons of natural material (i.e., rock or soil) per year.
• Construction or expansion of a sanitary landfill.
• C o n s t r u c t i o n in a designated floodway.
• Other impacts

LJYes

• NO

•Yes

• No

•Yes

• NO

•Yes

• NO

•Yes.

• NO

•Yes

• NO

•Yes

• NO

•Yes

DNo

h.2

W i l l there be an effect V. ...iy un.que or unusual land forms found on
the site? (i.e.. cliffs, dunes, geological formations. etc.jfoNO
DYES
• Specific land forms:

�IMPACT ON WATER
. Will proposed action affect any water body designated as protected'
(Under Articles 15, 24, 25 of the Environmental Conservation Law. PCD
/S^O
DYES
Examples that would apply to column 2
Developable area of site contains a protected water body.

1
Small t o
Moderate
Impact

2
Potential
Large
Impact

D
D

D
D

D
D

D
D

Dredging more than 100 cubic yards of material from channel of a
protected stream.
Extension of utility distribution facilities through a protected water body.
Construction in a designated freshwater or tidal wetland.

•

Other impacts:

W i l l proposed action affect any non-protected existing or new body
DYES
of water?
/ty&gt;°
Examples that would apply to column 2
• A 1 0 % increase or decrease in the surface area of any body of water
or more than a 10 acre increase or decrease.

•

Can Impact Be
Mitigated By
Project Change

•Yes

DNO

• Yes

CNo

DYes

DNo

•Yes

DNo

DYes

DNo

•Yes

DNo

4

D
D

•

•Yes

DNo

D

•Yes

DNO

D
D

D
D

•Yes

DNo

•Yes

DNo

• Proposed Action requires water supply from wells with greater than 45
gallons per minute pumping capacity.

D

•

• Yes

DNo

• Construction or operation causing any contamination of a water
supply system.

D

D

•Yes

DNo

• Proposed Action will adverseK affect groundwater.
• Liquid effluent will be conveved off the site to facilities which presently
do not exist or have inadequate capacity.

D
D

D
D

•Yes
•Yes

DNo
DNo

• Proposed Action would use water in excess of 20,000 gallons per
day

D

D

•Yes

DNo

• Proposed Action will like'v ca .-.-- siltation or other discharge into an
..existing body of water to \\i ex;*-';: that there will be an obvious visual
.contrast to natural conditions.

D

D

-Nes

J No

• Proposed Action will require the storage of petroleum or chemical
products greater than 1.100 gallons.

D

D

•Yes

' DNo

• Proposed Action will allow residential uses in areas without water
and/or sewer services.

D

•

•Yes

DNo'

• Proposed Action locates commercial and/or industrial uses which may
require new or expansion of existing waste treatment and/or storage
facilities.

D

D

•Yes

DNo

•

D

•Yes

DNo

G

D

•Yes

CNo

• Construction of a body of water that exceeds 10 acres of surface area.
• Other impacts:

5. W i l l Proposed Action affect surface or groundwater
quality or quantity?
Examples that would apply to column 2

!^°

DYES

• Proposed Action will require a discharge permit.

P

• Proposed Action requires use of a source of water that does not
have approval to serve proposed (project) action.

• Other

impacts:

6 . W i l l proposed action alter drainage flow or patterns, or surface
DYES
water runoff?
/ ^ °
Examples that would apply to column 2
* Proposed Action would change flood water flows.
7

£ *"*•" «

D

�Small to
Moderate
Impact

2
Potential
Large
Impact

D
D
D
D

D
D
D
D

D

• Proposed Action will result in the incineration of more than 1 ton of
refuse per hour.

Proposed Action may cause substantial erosion

•

• Proposed Action is incompatible with existing drainage patterns
• Proposed Action will allow development in a designated floodway.

Can Impact Be
Mitigated By
Project Change
DYes

DNO

DYes

DNo

DYes

DNo

DYes

DNo

D

DYes

DNo

D

D

DYes

DNO

• Emission rate of total contaminants will exceed 5 lbs. per hour or a
heat source producing more than 10 million BTU's per hour.

D

D

DYes

DNO

• Proposed action will allow an increase in the amount of land committed
to industrial use.

D

D

DYes

DNO

• Proposed action will allow an increase in the density of industrial
development within existing industrial areas.

D

D

DYes

DNO

• Other impacts:

D

D

DYes

DNO

• Reduction of one or more species listed on the New York or Federal
list, using the site, over or near site or found on the site.

D

D

DY es

DN(

• Removal of any portion of a critical or significant wildlife habitat.

D
D

•

DYes

DNo

D

DYes

DNo

D

D

DYes

DNo

D

D

DYes

DNo

•

D

DYes

DNo

D

•

DYes

DNo

• Other impacts:

IMPACT ON AIR
7. Will proposed action affect air quality?
j_£MO
DYES
Examples that would apply to column 2
/
• Proposed Action will induce 1,000 or more vehicle trips in any given
hour.

IMPACT ON PLANTS AND ANIMALS

^__

8. Will Proposed Action affect any threatened or endangered
species?
) ^ °
Examples that would apply to column 2

GYES

• Application of pesticide or herbicide more than twice a year, other
than for agricultural purposes.
• Other

impacts:

:

Will Proposed Action substantially affect non-threatened or
non-endangered species?
fc^JHO
Examples that would apply to column 2

DYES

• Proposed Action would substantially interfere with any resident or
migratory fish, shellfish or wildlife species.
• Proposed Action requires the removal of more than 10 acres
of mature forest (over 100 years of age) or other locally important
vegetation.
IMPACT ON AGRICULTURAL LAND RESOURCES
10

Will the Proposed Action affect agricultural land resources?
fc^O
DYES
Examples that would apply to column _
/
:• The proposed action would sever, cross or limit access to agricultural
land (includes cropland, hayfields. pasture, vineyard, orchard, etc.)
8

�• Construction activity would excavate or compact the soil profile of
agricultural land.
• The proposed action would irreversibly convert more than 10 acres
of agricultural land or. if located in an Agncultutal District, more
than 2.5 acres of agricultural land
• The proposed action would disrupt or prevent installation of agricultural
land management systems (e.g.. subsurface drain lines, outlet ditches,
strip cropping); or create a need for such measures (e g. cause a farm
field to drain poorly due to increased runoff)
• Other impacts.
:

•

IMPACT ON AESTHETIC RESOURCES
1 1 . Will proposed action affect aesthetic resources? yoSNO
DYES
(If necessary, use the Visual EAF Addendum in Section 617.21,
Appendix B )
Examples that would apply to column 2
• Proposed land uses, or project components obviously different from
or in sharp contrast to current surrounding land use patterns, whether
man-made or natural.
• Proposed land uses, or project components visible to users of
aesthetic resources which will eliminate or significantly reduce their
enjoyment of the aesthetic qualities of that resource.
• Project components that will result in the elimination or significant
screening of scenic views known to be important to the area.
• Other impacts.

1
Small to
Moderate
Impact

2
Potential
Large
Impact

D

D

•Yes

DNo

D

D

DYes

DNO

D

D

•Yes

DNo

D

•

•Yes

DNo

D

D

• Yes

DNo

D

D

•Yes

DNo

D

•

•Yes

DNo

D

D

• Yes

QNo

D

•

•Yes

DNo

D

D

•Yes

DNn

Can Impact Be
Mitigated By
Project Change

IMPACT ON HISTORIC A N D ARCHAEOLOGICAL RESOURCES
12. Will Proposed Action impact any site or structure of historic, prehistoric or paleontological importance?
/f__^IO
DYES
Examples that would apply to column 2
'
• Proposed Action occurring wholly or partially within or substantially
contiguous to an\ facility or site listed on the State or National Register
of historic places.
• Any impact to an archaeological site or fossil bed located within the
project site.
• Proposed Action will occur in an area designated as sensitive for
archaeological sites on the NYS Site Inventory.
• Other imparts:

D

D

•Yes

DNo

D

D

•Yes

DNo

IMPACT O N OPEN SPACE AND RECREATION
Will Proposed Action affect the quantity or quality of existing or
future open spaces or recreational opportunities? y
Examples that would apply to column 2
/GJNO
DYES
• The permanent foreclosure of a future recreational'opportunitY.
• A major reduction of an open space important to the community.
• Other impacts:

D
D
D

D
D

•Yes
•Yes
•Yes

DNo
DNo
' DNo

13

•

�1
Small to
Moderate
Impact

2
Potential
Large
Impact

D
D
D

D
D
D

D

D

DYes

DNo

• Proposed Action will require the creation or extension of an energy
transmission or supply system to serve more than 50 single or two family
residences or to serve a major commercial or industrial use.

D

D

DYes

DNo

• Other impacts:

D

D

DYes

DNo

• Blasting within 1,500 feet of a hospital, school or other sensitive
facility.

D

D

DYes

DN&lt;

• Odors will occur routinely (more than one hour per day).

D
D

D
D

DYes
DYes

DNo
DNO

• Proposed Action will remove natural barriers that would act as a
noise screen.

D

D

DYes

DNO

• Other

D

D

DYes

DNO

• Proposed Action may cause a risk of explosion or release of hazardous
substances (i.e. oil. pesticides, chemicals, radiation, etc.) in the event of
accident or upset conditions, or there may be a chronic low level
discharge or emission.

D

D

DYes

. DNo

• Proposed Action may result in the burial of "hazardous wastes" in any
f o r m (i.e. toxic, poisonous, highly reactive, radioactive, irritating,
infectious, etc.)

D

D

DYes

DNo

• Storage facilities for one million or more gallons of liquified natural
gas or other flammable liquids.

D

D

DYes

DNo

• Proposed action may result in the excavation or other disturbance
within 2.000 feet of a site used for the disposal of solid or hazardous
waste.

D

D

DYes

DNO

• Other impacts:

D

D

DYes

DNo

TMPACT ON TRANSPORTATION

•

14. W i l l there be an effect to existing transportation systems'
J^NO
Examples that would apply to column 2

DYES

• Alteration of present patterns of movement of people and/or goods
• Proposed Action will result in major traffic problems
• Other impacts:

3
Can Impact Be
Mitigated By
Project Change

DYes

DNO

DYes

D N O

DYes

DNo

IMPACT ON ENERGY
15. W i l l proposed action affect the community's sources of fuel or
DYES
energy supply?
/ ^ S °
Examples that would apply to column 2
• Proposed Action will cause a greater than 5% increase in the use of
any form of energy in the municipality.

NOISE A N D ODOR IMPACTS
16. W i l l there be objectionable odors, noise, or vibration as a result
of the Proposed Action?
J-^O
DYES
Examples that would apply to column 2
/
•

• Proposed Action will produce operating noise exceeding the local
ambient noise levels for noise outside of structures.

impacts:

,,

,

IMPACT ON PUBLIC HEALTH
17. Will Proposed Action affect public health and saffeAy?
yS^O
Examples that would apply to column 2
/

10

DYES

�• The permanent population of the city, town or village in which the
project is located is likely to grow by more than 5%.

D

D

DYes

DNo

• The municipal budget for capital expenditures or operating services
will increase by more than 5% per year as a result of this project.
• Proposed action will conflict with officially adopted plans or goals.

D

D

DYes

DNo

D
D
D

DDD

DYes
DYes
DYes

DNo
DNo
DNo

D

D

DYes

DNo

DYes
DYes
DYes

DNo
DNo
DNo

IMPACT ON GROWTH AND CHARACTER
OF COMMUNITY OR NEIGHBORHOOD
Will proposed action affect the character of the existing community 7
^ ' O
DYES
Examples that would apply to column 2
/ v

• Proposed action will cause a change in the density of land use.
• Proposed Action will replace or eliminate existing facilities, structures
or areas of historic importance to the community.
• Development will create a demand for additional community services
(e.g. schools, police and fire, etc.)
• Proposed Action will set an important precedent for future projects.
• Proposed Action will create or eliminate employment.
• Other

impacts:

19

DDD

2
Potential
Large
Impact

18

•

•

DDD

• ~

1
Small to
Moderate
Impact

3
Can Impact Be
Mitigated By
Project Change

Is there, or is there likely to be. public controversy related to
potential adverse environmental impacts?
&gt;0NO
DYES

If Any Action in Part 2 Is Identified as a Potential Large Impact or
If You Cannot Determine the Magnitude of Impact, Prnceed to Part 3

Part 3-EVALUATION OF THE IMPORTANCE OF IMPACTS
Responsibility of Lead Agency
Part 3 must be prepared if one or more irnpacl(s) is considered to be potentially large, even if the impact(s) may be
mitigated.
Instructions
Discuss the following for each impact identified in Column 2 of Part 2.

1. Briefly describe the impact.
2 . Describe (if applicable) how the impact could be mitigated or reduced to a small to moderate impact by project change{s).
S—

3. Based on the information available, decide if it is reasonable to conclude that this impact is important.
To answer the question of importance, consider:
• The probability of the impact occurring
• The duration of the impact
• Its irreversibility, including permanently lost resources of value
• Whether the impact can or will be controlled
• The regional consequence of the impact
• Its potential divergence from local needs and goals
• Whether known objections t o the project relate to this impact.
(Continue on attachments)

11

-

�RESOLUTION
Adopted at the January 19, 1995 Meeting of the
Village of North Tarrytown Planning Board
RESOLUTION

SUBDIVISION AND SITE PLAN APPROVAL
PROPOSED ACTION: SUBDIVISION OF PROPERTY INTO
TWO (2) LOTS
OWNER AND APPLICANT: MARGARET M. AND VINCENT
S. SHROBA
LOCATION: 81 SLEEPY HOLLOW ROAD
TAX DESIGNATION: SECTION 17, BLOCK 6, LOT 14
ZONING: R-3 RESIDENTIAL
WHEREAS, the Planning Board of the Village of North Tarrytown
has reviewed an application for subdivision approval (the
application) pursuant to the Subdivision Regulations of the Village
of North Tarrytown, Chapter 62, Zoning, of the Code of the Village
of North Tarrytown and other requirements of the Village Code
considered pertinent to the application, which application is also
considered an application for site plan approval as required in
Section 62-29 of the Zoning Code, and which application is to
subdivide property located at 81 Sleepy Hollow Road into two (2)
lots for residential development; and
WHEREAS, Lot 1A would be 6,235.2 square feet in size and Lot
IB would be 14,537.5 square feet in size and would contain the
existing dwelling at 81 Sleepy Hollow Road, as shown on the drawing
prepared by John J. Muldoon, Professional Land Surveyor, and
further identified as follows:
"Subdivision Map Prepared For Vincent S. &amp; Margaret M. Shroba,
Situate Village of No. Tarrytown, Town of Mt. Pleasant,
Westchester Co., N.Y.," scale 1" = 20', dated October 10,
1994; and
WHEREAS, all references to the "Applicant" shall include the
Applicant's successor and assigns; and
WHEREAS, the site has been visited by the Village's Planning
Consultant and the Planning Board is thoroughly familiar with the
site and all aspects of the proposed subdivision; and
WHEREAS, a duly advertised public hearing was held at the
Village Hall on October 20, 1994, at which time those wishing to be
heard were given the opportunity to be heard; and
WHEREAS, the Planning Board considered this a minor
subdivision and treated the preliminary and final as a single
approval; and

�WHEREAS, in the course of this review and acting as Lead
Agency pursuant to Part 617 of the implementing regulations
pertaining to Article 8 of the Environmental Conservation Law, the
Planning Board has made the following findings and caused, noted or
conducted the following activities:
1.

Received an application fee;

2.

Caused field inspections to be made of the property and of the
surrounding areas;

3.

Requested, received and considered comments from the Village
Planning Consultant, the Village Engineering Consultant and
the Building Inspector;

4.

Requested, received and reviewed a full Environmental
Assessment Form (EAF) in compliance with the New York State
Environmental Quality Review Act (SEQRA);

5.

After review of said field conditions, recommendations and
EAF, as well as other materials and matters noted above, the
Planning Board, acting as Lead Agency, has determined that the
proposed action is an Unlisted Action and made a Negative
Declaration on January 19, 1995, and noted on the EAF its
determination of non-significance of environmental impact.

NOW, THEREFORE, BE IT RESOLVED, that said application for
subdivision and site plan approval for a two (2) lot subdivision,
as shown on the drawing entitled "Subdivision Map Prepared For
Vincent S. &amp; Margaret M. Shroba, Situate Village of No. Tarrytown,
Town of Mt. Pleasant, Westchester Co., N.Y.," scale 1" = 20', dated
October 10, 1994, prepared by John J. Muldoon, Professional Land
Surveyor, be and is hereby granted subdivision and site plan
approval and that the Applicant may obtain the endorsed approval of
the Planning Board Chairman or, as an alternate, the Village
Administrator, on a copy of this subdivision and site plan
resolution and upon the final mylar copy of the subdivision plat
drawing revised as necessary to show compliance with the following
conditions and the Applicant may obtain the endorsement of the
Westchester County Department of Health on the final mylar
subdivision plat which endorsements shall permit filing in the
offices of the Westchester County Clerk, provided, however, that
this subdivision approval shall expire within one hundred eighty
(180) days from the date of this resolution if the following
conditions have not been completed to the satisfaction of the
Planning Board:
1.

The Applicant shall pay to the Village of North Tarrytown the
reimbursement of all application review fees as noted and
required in Section 62-30F of the Village Zoning Code.

2.

Revision of the above noted plat to demonstrate the following:
2

�2.1

The plat shall be revised and titled Tinal Subdivision
Plat;"

2.2

The existing section, block and lot numbers shall be
provided on the plat;

2.3

The final plat shall comply with the requirements of
Section 11 of the Village of North Tarrytown Subdivision
Regulations;

2.4

The signature block for the endorsement of the Planning
Board Chairman shall be revised to comply with Section
ll.A(l)(c)(14c);

2.5

The date of this resolution shall be noted on the final
subdivision plat.

PLANNING BOARD
VILLAGE OF NORTH TARRYTOWN

By:

V1&lt;£\
Date: frfr * * ]
Chairman
(
^
^
Q
George F. Hri
Tarrytown
PJIaTrning
Board
forth Tarrytown PiaHTTing Board

500\not5-004.sjp:ev

3

W

�C H A R L E S A.
CONSULTING

MANCANARO
ENGINEERS

July 24, 1995
Mr. James T. Margotta, Bldg. Inspector
Village of North Tarrytown
Village Hall
28 Beekman Avenue
North Tarrytown, NY 10591
RE:

Margaret M. and Vincent S. Shroba
81 Sleepy Hollow Road
Section 17, Block 6, Lot 14
CAMCE NO. 800-26

Dear Mr. Margotta:
In connection with the available utility services for the above referenced project please
be advised that based on the available information reviewed, there currently are
sufficient system capacities to handle the proposed subdivisions potable water demand
and sanitary sewer flows.
If there are any questions or additional information is required, please do not hesitate
to contact us.
Very truly yours,
CHARLES A. MANGANARO
CONSULTING ENGINEERS, P.C.
Court Plaza North, 25 Main Street
Hackensack, NJ07601-7032
201.342.4200 fax 201.342.0790
120 E 75th St., Suite 8C
New York, NY 10021
212 683.7712
P.O. Box 1007
East Stroudsburg, PA 18301
717 421 1499
689 Little Britain Road
PO. Box 10924
Newburgh, NY 12552
914.567 9400 fax 914.567.9406

Arshad Jalil, P.E.
Project Manager
AJ/jr
cc:

Ms. Linda David, Village Administrator

F:\AWNT\800-26\AJ07245LJR 1

�D R A F T

1/13/95

RESOLUTION
Adopted at the December 15, 1994 Meeting of the
Village of North Tarrytown Planning Board
RESOLUTION

SUBDIVISION APPROVAL
PROPOSED ACTION: RESUBDIVISION TO REMOVE ONE
BUILDING LOT
OWNER: JAMES AND MARTHA BICK, ET AL
APPLICANT: JAMES AND MARTHA BICK
LOCATION: TERRACE CLOSE, BIRCH CLOSE
TAX MAP DESIGNATIONS:
11/1A/1, 11^/1S/2A,
11/1S/2B1, 11/1S/6, 11/1S/8
ZONING: R-2A RESIDENTIAL
Prior to approval of this resolution by the Planning- Board,
the Applicant shall confirm that the tax designations and
sizes of parcels indicated on page 1 are correct and t^liat the
description includes all of the involved tax lots.

�*

Approved with/)respect Jto substance and form:

Villagfe A t t b r n e y
Datedtf lUqiqf '

Approved by t h e Planning Board

Chair
Dated'

Filed with Village Clerk

a
^ejbork o r Deputy
Dated:: mftfzojW
i*^

Clerk

tJUecam^ /f}t??y

Date of Meeting

�</text>
                  </elementText>
                </elementTextContainer>
              </element>
            </elementContainer>
          </elementSet>
        </elementSetContainer>
      </file>
    </fileContainer>
    <collection collectionId="136">
      <elementSetContainer>
        <elementSet elementSetId="1">
          <name>Dublin Core</name>
          <description>The Dublin Core metadata element set is common to all Omeka records, including items, files, and collections. For more information see, http://dublincore.org/documents/dces/.</description>
          <elementContainer>
            <element elementId="50">
              <name>Title</name>
              <description>A name given to the resource</description>
              <elementTextContainer>
                <elementText elementTextId="14839">
                  <text>Planning Board Minutes &amp; Resolutions-1995</text>
                </elementText>
              </elementTextContainer>
            </element>
          </elementContainer>
        </elementSet>
      </elementSetContainer>
    </collection>
    <itemType itemTypeId="1">
      <name>Text</name>
      <description>A resource consisting primarily of words for reading. Examples include books, letters, dissertations, poems, newspapers, articles, archives of mailing lists. Note that facsimiles or images of texts are still of the genre Text.</description>
    </itemType>
    <elementSetContainer>
      <elementSet elementSetId="1">
        <name>Dublin Core</name>
        <description>The Dublin Core metadata element set is common to all Omeka records, including items, files, and collections. For more information see, http://dublincore.org/documents/dces/.</description>
        <elementContainer>
          <element elementId="50">
            <name>Title</name>
            <description>A name given to the resource</description>
            <elementTextContainer>
              <elementText elementTextId="13937">
                <text>MINS_PLAN_1995-01-19</text>
              </elementText>
            </elementTextContainer>
          </element>
          <element elementId="49">
            <name>Subject</name>
            <description>The topic of the resource</description>
            <elementTextContainer>
              <elementText elementTextId="13938">
                <text>Planning Board Minutes &amp; Resolutions-1995</text>
              </elementText>
            </elementTextContainer>
          </element>
          <element elementId="40">
            <name>Date</name>
            <description>A point or period of time associated with an event in the lifecycle of the resource</description>
            <elementTextContainer>
              <elementText elementTextId="13939">
                <text>1995</text>
              </elementText>
            </elementTextContainer>
          </element>
        </elementContainer>
      </elementSet>
    </elementSetContainer>
  </item>
  <item itemId="2329" public="1" featured="0">
    <fileContainer>
      <file fileId="2329">
        <src>https://sleepyhollow.localarchives.org/files/original/1100322bd66b7781228baa8ae2e04943.pdf</src>
        <authentication>875648bd60e13062f80a608adaa63173</authentication>
        <elementSetContainer>
          <elementSet elementSetId="4">
            <name>PDF Text</name>
            <description/>
            <elementContainer>
              <element elementId="52">
                <name>Text</name>
                <description/>
                <elementTextContainer>
                  <elementText elementTextId="20816">
                    <text>REGULAR MEETING

NORTH TARRYTOWN, NEW YORK
June 15, 1995

A regular meeting of the North Tarrytown Planning Board was held on
June 15, 1995 at 8:00 P.M. in the Village Hall, 28 Beekmav&gt; Avenue,
North Tarrytown, New York.

PRESENT:

George Hritz, Chairman
Donald Caetano
Joanne Becker
Edward McCarthy
David Perlmutter

ALSO PRESENT:

Janet A. Gandolfo, Attorney
James Margotta, Building Inspector
Mark A. DiGennaro, CAMCE
Susan J. Portman, Assoc./Planning

Chairman Hritz called the meeting to order at 8:05 p.m.
Chairman Hritz stated that Ms. Ellen Tsangaris had resigned and that he
had sent a letter to the Mayor requesting appointments for the two
vacancies.
PETER and COLLETTE WEINSTEIN - 41 Amos Street.
Mrs. Weinstein came forward and distributed maps to the Board of the
property. She stated that the next day was the closing on the house.
She indicated that there wasn't much of a yard in the fcont or in the
back of the house.
Chairman Hritz explained that the problem before was that someone wanted
to put a driveway in the back. The idea of putting it along the side way
never raised.
Ms. Portman commented that they had suggested a common driveway before.
Mrs. Weinstein commented that in any event they wanted to create another
path from the back to the front of the house and that would be another
45 feet. They figured it would be much more concrete in keeping the
integrity of the house. The driveway would be addressed and also thece
is a side door on the right.
Chairman Hritz asked Mrs. Weinstein to draw a picture and also asked
if they had any plans to do landscaping around the house.
She answered that perhaps some shrubbery, hedges.
Chairman Hritz asked if they were willing to put shrubbery along the driveway.
Mrs. Weinstein said absolutely.
Mr. Perlmutter moved to accept this application.

�Ms. Becker seconded.
Ms. Gandolfo pointed out that the driveway was going to be 1 1/2 feet
from the sideline.
Mr. Margotta stated that he had no problea with that.
Chairman Hritz asked the Board
the application.

to vote on the motion to approve

Motion to approve the application carried unanimously.
Ms. Portman stated that they had original resolution and that they
could possibly -^rnend certain items on that.
Ms. Gandolfo commented that first they should put on the record that the
original resolution read that the driveway and the parking space on lot 1
should be completed to the satisfaction of the Building Inspector,
"that the original sub-division resolution was to delete the condition
that the driveway should come off Webber Avenue and instead should be
replaced with shrubbery.
Mr. DiGennaro pointed out that the Village ssiaintained a zero-net
increase policy for storm water runoff on all sub-divisions and/or
improvement, "which basically means that when you do something like
this you are changing the existing character of the torain and you
are putting in pervoris layers down which generally increases the speed
of the runoff which increases the volume".
Mr. DiGennaro asked if they were going to be able to put the driveway in
without touching the basin.
Mrs. Weinstein answered that there shouldn't be a problem.
Chairman Hritz stated that Mr. Margott:i knew about the policy.
The driveway for lot 2 should be graded so as to slope towards the
south, away from the neighboring property to the north
Chairman Hritz asked for a motion to amend the resolution.
Mr. Perlmutter made the motion.
Ms. Becker seconded.
Motion carried unanimously.

Chairman Hritz gave a brief summary on the Hudson Recycling site hearing
at the Tarrytown Planning Board meeting. He commented that everybody at
the meeting spoke against it and said it was a real threat to our water
front.
Ms. Portman stated that she got a call from the Westchester County Planning
Department about the project and that she sent them a copy of the Memo
that they had prepared.

-2-

�Mr.McCarthy moved to approve the minutes of May 18, 1995.
Ms. Becker seconded.
Motion carried unanimously.
There being no further business, the meeting was adjourned.

Respectfully submitted,

CARMEN G. MARIANO
Recording Secretary

�* C H A R L E S A.
MANGANARO
. CONSULTING
ENGINEERS

MEMORANDUM
TO:

Village of North Tarrytown Planning Board

FROM:

Mark A. DiGennaro

DATE:

June 15, 1995

RE:

/; 6

A1 &lt;" ^ '

A

S

41 Amos Street
Driveway\Parking
Village of North Tarrytown
CAMCE No. 800-22B

As requested, we have reviewed this proposed Driveway plan and offer the following
recommendations:
1.

The Village maintains a zero-net increase policy for storm water runoff on all
subdivisions and/or improvements, therefore, it is required that the applicant evaluate the
hydrologic impact of the site and comply with the Village's policy.

2.

Landscaping and grading should pitch away from adjacent property lines. Storm water
runoff should not be permitted to flow onto neighboring properties.

FAAWNTy80O.22ByHDO6155M.VLS

,*

�1&lt; l6i4»(2/57)-:T«xt A2

SEQR

617.21

PROJECT I 0. NUMBER

Appendix C

State Environmental Quality Review

SHORT ENVIRONMENTAL ASSESSMENT FORM
For UNLISTED ACTIONS Only
PART 1—PROJECT INFORMATION (To be completed by Applicant or Project sponsor)
1 1 . APPLICANT /SPONSOR

2. PROJECT NAME 5 2 0 . 0 3 4 D e C a r l o S u b d i v i s i o n
D r i v e w a y &amp; p a r k i n g - 41 Amnc &lt;z+rao+

Peter and Collette Weinstein
3. PROJECT LOCATION:

Municipality V i l l a g e o f North Tarrytown

County

Westchester

4. PRECISE LOCATION (Strut address and road Interactions, prominent landmark*, ale, or provlda map)

41 Amos Street, North Tarrytown, New York

5. IS PROPOSE0 ACTION:
ONew
Q Expansion

CSMsdmeallon/eiteraiion

6. DESCRIBE PROJECT BRIEFLY:

Change of location of proposed driveway and parking to be built
on lot #1 of Subdivision of lands of the Estate of Anna DeCarlo
to side of house as shown on survey attached.
7. AMOUNT OF LAND AFFECTED:

Initially

* 150

acres

Ultimately

.Tin

acres

8. WILL PROPOSED ACTION COMPLY WITH EXISTING ZONING OR OThER EXISTING LAND USE RESTRICTIONS?
jpYi!

D No

If No, describe briefly

9. WHAT IS PRESENT LAND USE IN VICINITY OF PROJECT?

C^ResldtfltlaJ
Dascrlb*:

O Industrial

Dcommerclat

LJ Agriculture

LJ Park/Fcest/Open space

U Other

10. DOES ACTION INVOLVE A PERMIT APPROVAL. OR FUNDING, NOW OR ULTIMATELY FROM ANY OTHER GOVERNMENTAL AGENCY (FEDERAL,
STATE OR LOCAL)?

(23 Yes

LJNo

It yes, list agency(s) and permit/approvals

Village of North Tarrytown Building Department
Building permit to construct driveway and parking space
11.

DOES ANY ASPECT OF THE ACTlCN HAVE A CUHRENTU VALID PERMIT OR APPROVAL?
C&amp;Yas

O No

U yea, list agency nam* and permlUapproval

Village of North Tarrytown Building Permit #3682
12. AS A RESULT OF PROPOSEO ACTION WILL EXISTING PERMIT/APPROVAL REOUIRE MODIFICATION?

QY.J

CNO
I CERTIFY THAT THE INFORMATION PROVIDED ASOVE IS TRUE TO THE BEST CF MY KNOWLEDGE

Appiica^sponsor «&gt;™/£ollette

Weinstein

If the action is in the Coastal Area, and you are a state agency, complete the
Coastal Assessment Form before proceeding with this assessment
OVER
1

�PART ll-ENVIRONMENTAL ASSESSMENT (To be completed by Agency)
A. DOES ACTION EXCEED ANY TYPE I THRESHOLD IN 6 NYCRR, PART 617.12?

* QYe's

It yes, coordinate the review process and use the FULL EAR.

K)NO

B. WILL ACTION RECEIVE COORDINATED REVIEW AS PROVIDED FOR UNLISTED ACTIONS IN 6 NYCRR, PART 617 6?
may be supersedeo by another involved agency.

• Yes

If No, a negative decl»r&gt;|lon

jS No

C. COULD ACTION RESULT IN ANY ADVERSE EFFECTS ASSOCIATED WITH THE FOLLOWING: (Answers may be handwritten. If legible)
C1. Existing air quality, surface or groundwater quality or quantity, noise levels, existing traffic palterns. solid waste production or disposal,
potential for erosion, drainage or flooding problems? Explain briefly:
.
,

; ^ J .

^dv-.^e^

u-.il W e

access iff

ct ^ / c c ^ l ^ e 4 - C*m°t'+*£*&gt;

" - J ^ ^ c£ *-

L\J&amp;&gt;tr
^cu.iifu% read
{^Bbkx^
AwCwt/C-3
C2. Aesthetic, agricultural, archaeological, historic, or other natural or cultural resources; or community or neighborhood character? Explain brl«'hK

»-i'i •^«3+- «c*»«^ef-,

KJD- 1^e reioccLtic* cf- *UL apposed dnJZi*j*&lt;*

tl+-f&gt;*u-K*^

t£i+jL o^cve

C3. Vegetation or fauna, fish, shellfish or wildlife species, significant habitats, or threatened or endangered species? Explain briefly:

Wo
C4. A community's existing plans or goals as officially adopted, or a change In use or Intensity of use of land or other natural resources? Explain briefly

NO
C5. Growth, subsequent development, or related activities likely to be induced by the proposed action? Explain briefly.

Mo

.

_

C6. Long term, short term, cumulative, or other effects not Identified in C1-C5? Explain briefly.

C7. Other Impacts (including changes In use of either quantity or type of energy)? Explain briefly.

do
D. IS THERE, OR IS THERE LIKELY TO BE, CONTROVERSY RELATED TO POTENTIAL ADVERSE ENVIRONMENTAL IMPACTS?
D Yes

E No

If Yes, explain briefly

P A R T l l l - D E T E R M I N A T I O N O F S I G N I F I C A N C E (To be c o m p l e t e d by Agency)
INSTRUCTIONS: For each adverse effect identified above, determine whether it is substantial, large, important or otherwise significant.
Each effect should be assessed in connection with its (a) setting (i.e. urban or rural); (b) probability of occurring; (c) duration; (d)
irreversibility; (e) geographic scope; and (f) magnitude. If necessary, aod attachments or reference supporting materials. Ensure that
explanations contain sufficient oetail to show that all relevant adverse impacts have been identified and adequately aodressed.

C h e c k this box &gt;f you r.sve identified o n e or more p o t e n t i a l l y large or significant adverse i m p a c t s w h i c h
occur. T h e n proceed directly to the F U L L E A F and-'or p r e p a r e a positive d e c l a r a t i o n .

MAY

Check this box if you have d e t e r m i n e d , b a s e d on t h e i n f o r m a t i o n and analysis above and any s u p p o r t i n g
a o c u m e n t a ' J o n , that the proposed a c t i o n W I L L N O T result in any s i g n i f i c a n t a v e r s e e n v i r o n m e n t a l i m p a c t s
A N D provide on a t t a c h m e n t s as n e c e s s a r y , the r e a s o n s s u o p o n i n g this d e t e r m i n a t i o n :

l:,U &gt;.:..- , * r\k-.-H-&gt;

Pi*

Hl&lt;y,

S i n e o: lead *»pc&gt;c&gt;i

6tX r-:&lt;? f

*-ir.f-gr

f^d
]

C ilC ' '~*ni ,-v
"•• t

ct

R t &lt; • : • : ' ' :••«•

/(•f^tC4^K U - ic^
5 i'f-

Ts-«*

I''*'1*'

'•*,

2

e C-

p

-'jt«-c

" C ••&lt;r-cr:

v

&gt;

••,.«•!•

^-

'rpr-

- f s ^ r - s b''t

0! ' . - f

�RESOLUTION
Adopted at the May 19, 1994 Meeting
of the Village of North Tarrytown Planning Board
RESOLUTION:

SUBDIVISION APPROVAL
PROPOSED ACTION: SUBDIVISION OF PROPERTY INTO TWO
(2) LOTS
OWNER: ESTATE OF ANNA DE CARLO
APPLICANT: JOHN AND MAUREEN PETRY
LOCATION: 41 AMOS STREET AND THE EASTERN SIDE OF
WEBBER AVENUE
TAX DESIGNATION: SECTION 17, BLOCK 7, LOT 18
ZONING: R-3 RESIDENTIAL
WHEREAS, the Planning Board of the Village of North Tarrytown
has reviewed an application for subdivision approval (the
Application) pursuant to the Subdivision Regulations of the Village
of North Tarrytown, Chapter 62, Zoning, of the Code of the Village
of North Tarrytown and other requirements of the Village Code
considered pertinent to the application, which application is to
subdivide property located on the western side of Amos Street and
the eastern side of Webber Avenue at 41 Amos Street into two (2)
lots for single-family residential development; and
WHEREAS, Lot 1 would be approximately 6,554.4 square feet in
size and would contain the existing dwelling and Lot 2 would be
approximately 5,999.7 square feet in size, as shown on the drawing
prepared by John J. Muldoon, Professional Land Surveyor, and
further identified as follows:
"Subdivision of Lands of the Estate of Anna DeCarlo, Situate
at North Tarrytown, Town of Mount Pleasant, Westchester
County, N.Y.," scale 1" = 2 0 ' , dated April 7, 1994; and
WHEREAS, the Applicant proposes to remove the existing garage
and driveway from Lot 2; and
WHEREAS, the Applicant will provide a driveway and a parking
space for the existing house on Lot 1 off of Webber Avenue; and
WHEREAS, as per Section 12B(2)(b) of the Subdivision
Regulations, the Applicant has shown on the plat a strip of land to
be dedicated which is 0.25 feet wide extending along the entire
frontage of both Lots 1 and 2 along Webber Avenue; and
WHEREAS, the site has been visited by the Village's Planning
Consultant, Engineering Consultant and the Planning Board is
thoroughly familiar with the site and all aspects of the proposed
subdivision; and

�WHEREAS, a duly advertised public hearing was held at the
Village Hall on May 19, 1994, at which time those wishing to be
heard were given the opportunity to be heard; and
WHEREAS, in the course of this review and acting as Lead
Agency pursuant to Part 617 of the implementing regulations
pertaining to Article 8 of the Environmental Conservation Law, the
Planning Board has made the following findings and caused, noted or
conducted the following activities:
1.

Received an application fee of $2,510;

2.

Caused field inspections to be made of the property and of the
surrounding area;

3.

Referred the application to the Westchester County Planning
Board pursuant to Sections 239-1, m and n of the General
Municipal Law because the subject property is located on a
County road (Webber Avenue) ;

4.

Requested, received and considered comments from the Village
Planning Consultant, the Village Engineering Consultant and
the Building Inspector;

5.

Requested, received and reviewed a short Environmental
Assessment Form (EAF) in compliance with the New York State
Environmental Quality Review Act (SEQRA);

6.

After review of said field conditions, recommendations and
EAF, as well as other materials and matters noted above, the
Planning Board has determined that the proposed action is an
Unlisted Action and made a Negative Declaration on March 17,
1994, and noted on the EAF its determination of nonsignificance of environmental impact.

NOW, THEREFORE, BE IT RESOLVED, that said application for
subdivision approval for a two (2) lot subdivision, as shown on the
drawing entitled "Subdivision of Lands of the Estate of Anna
DeCarlo Situate at North Tarrytown, Town of Mount Pleasant,
Westchester County, N.Y.", scale 1" = 2 0 ' , dated April 7, 1994,
prepared by John J. Muldoon, Professional Land Surveyor, be and is
hereby granted subdivision approval and that the Applicant may
obtain the endorsed approval of the Planning Board Chairman or, as
an alternate, the Village Administrator, on a copy of this
subdivision resolution and upon the final mylar copy of the
subdivision plat drawing revised as necessary to show compliance
with the following conditions, and the Applicant may obtain the
endorsement of the Westchester County Department of Health on the
final subdivision plat which endorsements shall permit filing in
the offices of the Village Building Department, for purposes of
obtaining a building permit in accordance with this resolution and
all building code requirements, and the offices of the Westchester
2

�County Clerk, provided, however, that this subdivision approval
shall expire within one hundred eighty (180) days from the date of
this resolution if the following conditions have not been completed
to the satisfaction of the Planning Board and the Applicant has not
obtained a building permit for construction of the driveway and
parking space on Lot 1:
1.

All references to the "Applicant"
Applicant's successor and assigns.

2.

The Applicant shall pay to the Village of North Tarrytown:

3.

shall

include

the

2.1

An inspection fee for construction inspection of the
property for compliance with this resolution, including
the provision of a driveway and parking space on Lot 1,
in accordance with the Village of North Tarrytown Zoning
Code;

2.2

The reimbursement of all application review fees as noted
and required in Section 62-30(f) of the Village Zoning
Code.

Revision of the above noted plat to demonstrate the following:
3.1

The plat shall be revised and titled "Final Subdivision
Plat;"

3.2

The dimensions of the parking space and driveway for Lot
1 shall be shown on the plat;

3.3

A line shall be provided for the endorsement of the
Westchester County Department of Health;

3.4

The date of this resolution shall be noted on the final
subdivision plat.

4.

The Applicant shall obtain all necessary approvals being
granted by the appropriate Westchester County approval
authorities with regard to the driveway to be constructed on
Lot 1 off of Webber Avenue.

5.

The Applicant shall comply with the requests of the
Westchester County Department of Public Works as described in
the letter from the Westchester County Planning Board to James
T. Margotta dated March 30, 1994.

6.

The Applicant shall comply with the requests of the Village
Engineering Consultant as described in his memorandum to the
North Tarrytown Planning Board dated April 28, 1994.

3

�7.

The owners of the adjacent property shall be permitted to
submit a report prepared by their consultant for review by the
Village Engineering Consultant.

8.

The driveway and parking space on Lot 1 and any future
improvements on Lot 2 shall be constructed so as to yield no
net increase in stormwater runoff. The drainage plan for Lot
1 and, at that time that a house and driveway may be proposed
for construction on Lot 2, the drainage plan for Lot 2 shall
be prepared to the satisfaction of the Village Engineering
Consultant. The driveway for Lot 2 shall be graded so as to
slope towards the south, away from the neighboring property to
the north.

9.

Prior to the issuance of a certificate of occupancy for the
driveway and parking space on Lot 1, the Applicant shall
submit to the village Building Inspector a mylar reproduction
of the plat complete with the certification of a professional
architect
and/or
professional
engineer
attesting
to
construction of the site improvements as shown thereon.

10.

The driveway and parking space on Lot 1 shall be completed to
the satisfaction of the Village Building Inspector within
eighteen (18) months from the date of the issuance of a
building permit and prior to the issuance of a certificate of
occupancy. The Planning Board may issue an extension on this
time limit, or may modify any of the above conditions with
respect thereto, for good cause.

11.

The Planning Board reserves the right to make a final field
inspection of the project after construction of the
improvements, upon notice of the Building Inspector, and
before the issuance of a certificate of occupancy.
The
purpose of this final inspection is to review the development
and to require any modifications to parking, drainage, access,
paving and other details, which do not comply with the
approved plat and the interest of safety, convenience,
aesthetics and the enjoyment and peace and quiet of adjacent
neighbors.

PLANNING BOARD
VILLAGE OF NORTH TARRYTOWN ^

~^ A

H^V

Date=

Hritz, Chairman j
Village of North Tarrytown-'Planning Board
500\not4-012.sjp.crc

4

/«//f/?r
*

"

�1)3.IS

230U1

FAX 7 1 S 2 2 7 U 2 2 6

"^2vl*

i

f

1^

£. + y

^

p

1 3? 1 ^

CI
&gt;
^
V

1
rtW

v!

Y

*/a • J

ft

*

5,
*

" "

"I
\

/s.

1

SJ-4 + '

*
*

^F¥

*

d&amp;l

***-&amp;'-M-ML

/4MOS

&amp;*' *S'0£S&gt;

M A P O F PROPERTY
srrvATEAT

J O H N J. MULDOON

WORTH T A R R Y T O W N

PROFESSIONAL LAND SURVEYOR

TOWN OF MOUNT PLEASANT

WESTCHESTER COUNTY, NEW YORK

77 TAP*AN LANDING ROAD

SUKVEYED: MAY 25, 1995

TrtrmvmrfhT TrrwYnnr

UWiKA

T&gt; /J AS IXJT I ON JUX* Oh SLIBUMSION OF LANDS Oh
THE ESTATE OFASVA DECAKJO

&lt;~ *******+*
*.

r*r*+

3*3. i

* - - - • • - • . * — . +~&gt;~^**

w^w

**-+^~-*»

***-*•*•

-«—^-—^

�Approved with
respect to substance and form:
Wl

h

V i l l a g e Attorney
Dated: i/tSU^ '

Approved by the Planning Board

^. I

Cha/rman or, Acjting Chairman
DateNsL:&amp;/^i

Filed with Village Clerk

Clork or- Deputy Clerk
Dated: ^/^yI 1S^

�</text>
                  </elementText>
                </elementTextContainer>
              </element>
            </elementContainer>
          </elementSet>
        </elementSetContainer>
      </file>
    </fileContainer>
    <collection collectionId="136">
      <elementSetContainer>
        <elementSet elementSetId="1">
          <name>Dublin Core</name>
          <description>The Dublin Core metadata element set is common to all Omeka records, including items, files, and collections. For more information see, http://dublincore.org/documents/dces/.</description>
          <elementContainer>
            <element elementId="50">
              <name>Title</name>
              <description>A name given to the resource</description>
              <elementTextContainer>
                <elementText elementTextId="14839">
                  <text>Planning Board Minutes &amp; Resolutions-1995</text>
                </elementText>
              </elementTextContainer>
            </element>
          </elementContainer>
        </elementSet>
      </elementSetContainer>
    </collection>
    <itemType itemTypeId="1">
      <name>Text</name>
      <description>A resource consisting primarily of words for reading. Examples include books, letters, dissertations, poems, newspapers, articles, archives of mailing lists. Note that facsimiles or images of texts are still of the genre Text.</description>
    </itemType>
    <elementSetContainer>
      <elementSet elementSetId="1">
        <name>Dublin Core</name>
        <description>The Dublin Core metadata element set is common to all Omeka records, including items, files, and collections. For more information see, http://dublincore.org/documents/dces/.</description>
        <elementContainer>
          <element elementId="50">
            <name>Title</name>
            <description>A name given to the resource</description>
            <elementTextContainer>
              <elementText elementTextId="14169">
                <text>MINS_PLAN_1995-06-15</text>
              </elementText>
            </elementTextContainer>
          </element>
          <element elementId="49">
            <name>Subject</name>
            <description>The topic of the resource</description>
            <elementTextContainer>
              <elementText elementTextId="14170">
                <text>Planning Board Minutes &amp; Resolutions-1995</text>
              </elementText>
            </elementTextContainer>
          </element>
          <element elementId="40">
            <name>Date</name>
            <description>A point or period of time associated with an event in the lifecycle of the resource</description>
            <elementTextContainer>
              <elementText elementTextId="14171">
                <text>1995</text>
              </elementText>
            </elementTextContainer>
          </element>
        </elementContainer>
      </elementSet>
    </elementSetContainer>
  </item>
  <item itemId="2330" public="1" featured="0">
    <fileContainer>
      <file fileId="2330">
        <src>https://sleepyhollow.localarchives.org/files/original/3029177b7a88da4129dd8dc419234507.pdf</src>
        <authentication>0f11d2e5a2a7ff5404b37a9d20a875f8</authentication>
        <elementSetContainer>
          <elementSet elementSetId="4">
            <name>PDF Text</name>
            <description/>
            <elementContainer>
              <element elementId="52">
                <name>Text</name>
                <description/>
                <elementTextContainer>
                  <elementText elementTextId="20817">
                    <text>REGULAR MEETING

NORTH TARRYTOWN, NEW YORK
May 18,1995

A regular meeting of the North Tarrytown Planning Board was held on May 18,
1995 at 8:00 P.M. in the Village Hall, 28 Beekman Avenue, North Tarrytown, New
York.

PRESENT:

George Hritz, Chairman
Donald Caetano
Joanne Becker
Edward McCarthy
David Perlmutter

ABSENT:

Ellen Tsangaris

ALSO PRESENT: Janet Gandolfo, Attorney
James Margotta, Building Inspector
Mark A. DiGennaro, CAMCE
Susan J. Portman, Assoc/Planning
Chairman Hritz called the meeting to order at 8:00 p.m.
Chairman Hritz opened the meeting by stating that Mr. James Donovan who had
served the Board ablely and well would not be able to continue. He asked to pass
a resolution thanking him for his services.
Mr. Perlmutter moved.
Ms. Becker seconded.
Carried unanimously.
Chairman Hritz introduced Dr. Richard Sweet, new member of the Board of
Trustees and stated that he had been appointed by the Mayor as the liaison of the
Board.

1.

PUBLIC HEARING: PHBLIPSE PLAZA, NO. BROADWAY
continuation of a site plan - review of a proposed MiniMall containing stores and offices.

Mr. Hughes came forward and stated that this was his first appearance in the
Philipse matter and that Louis Contadino was the architect who had to revised

�s the plans to reconvene the piece of property on Broadway. As it turned out after
research, the applicant does not own the property. Therefore, they had to
reconfigure the building.
Chairman Hritz asked who owned the property.
Mr. Hughes answered the State of New York, County of Westchester.
Louis Contadino, referring to the site plans explained the triangle portion of the
present building and the proposed building. He said "Because of that what
happened was that the site is squeezed in quite a bit, possibly 20-24 feet in that
area. What that meant was that some of the land I was counting on for parking
was no longer available to me and I had to push the building further up." He went
on to say that several things happened because of that. In order to maximize the
number of cars to make the building economically feasible for his client he had to
do away with one of the loading docks that was provided for in the existing
buildings. He relocated the loading dock from between the two buildings to against
the northern site, the northern portion of the building. Now the loading dock and
the dumpsters are not as noticeable as they were previously. Because of land not
being available there was a reduction of cars.
Chairman Hritz asked if the deletion of any work done on the road changed any
way the Landscaping plan.
Mr. Contadino answered "We will prepare, we are in the process of preparing
a Landscaping plan now. We held off because of the issue of whether we owned
it or didn't owned it".
Chairman Hritz asked the attorney if the Board had invested their intent to be
Lead Agency.
Ms. Gandolfo answered "I have asked John to resubmit an EAF and he will do
that and then you can make a motion to declare your intent to be Lead Agency at
the next meeting".
Ms. Portman stated that the Board had already declared their intent back in
December.
Chairman Hritz asked Ms. Portman for a summary of her memorandums of April
13 and May 12.
Ms. Portman stated that the April memo had to do with the earlier plans. She then
went over the plan revisions of the memo of May 12,1995.
Chairman Hritz asked whether there was anything to prevent in the future a fast

�^ food restaurant from going in.
Ms. Gandolfo answered that they will need a zoning variance because they will be
within 200 ft. of Uncle Jerry's.
Chairman Hritz asked "What if that changes?"
Ms. Gandolfo answered that there will be nothing in the Code to prevent it except
parking restrictions.
Mr. Margotta stated that one (1) parking space for each four (4) chairs.
Discussion continued on the possibility of a future restaurant.
Mr. Margotta "restaurant parking is one (1) for each five (5) seats, I was wrong.
Now, retail shops and stores are one (1) for each 200 sq. ft. offloorspace".
Chairman Hritz asked Mr. Hughes if he had a reversed reaction of approval
contioned on coming back.
Mr. Hughes answered that he will talk to Mr. Rodriguez about it.
Ms. Gandolfo asked Mr. Hughes "if you go to the State and they don't approve
the removal of the sidewalk from the entire plan, do you have a contingent plan"
Discussion ensued on the sidewalk.
Chairman Hritz asked if there were any other comments or questions.
Mr. Caetano made a motion that they be referred to the Zoning Board of Appeals.
Mr. Perlmutter seconded.
Motion carried unanimously.

Trustee Sweet gave a summary to the Planning Board members of the application
of the Hudson Recycling Plant which is before the Tarrytown Planning Board.
Trustee Sweet described their application in detail and gave the Planning Board a
list of objections North Tarrytown would be making to the application. The
Planning Board agreed that the use of a concrete recycling plant would not be an
appropriate use for the riverfront and would have a negative impact on North
Tarrytown.

�Mr. Perlmutter moved to approve the minutes of February 16,1995 as submitted.
Mr. McCarthy seconded.
Carried unanimously.
There being no further business, Mr. McCarthy move to adjourn the meeting.
Mr. Caetano seconded.
Carried unanimously.
Respectfully submitted,

CARMEN G. MARIANO
Recording Secretary

�FREDERICK P. CLARK ASSOCIATES, INC.
Planning Development/Environment/Transportation
Rye New York and Southport, Connecticut

David J. Portman, A,CP
Howard I. Reynolds, PE
David H. Stolman, AICP

350 Theodore Fremd Avenue
Rye. New York 10580
I 914) 967-6540

Michael A. Galante
Joanne P. Meder, AICP
Jim Donovan, RLA, ASLA

MEMORANDUM
To:

Village of North Tarrytown Planning Board

Date:

May 12, 1995

Subject:

Review of Philipse Plaza Site Plan

Plan:
1.

Site Plan Prepared by Contadino Architects, 5/8/95

Plan Revisions (compared to 4/6/95 Plan):
Building reduced in width and increased in length in
order to provide wider aisle in parking area in front of
building (aisle varies from 21 to 24 feet in width).
Building expanded 25 feet to the north and now located
within 36 feet of northerly property boundary with
residence on Old Broadway.
Entrance driveways increased in width from 26 to 27 feet.
Proposed building coverage is 6,440 square feet, with
4,820 square feet of retail space and 7,080 square feet
of office space.
•

Required parking spaces increased from 55 to 57.
Slightly revised layout of parking spaces. Parking in
southern portion of site shifted to keep those spaces out
of the triangular-shaped area along North Broadway.
Parking spaces to be provided reduced from 48 to 44.
Dumpster and loading space moved to northern end of site.
Provided location of freestanding sign near southern
entrance.

2.

Zoning Compliance: Variances needed for rear yard setback,
number of parking and loading spaces, and for requirement of
buffer strip in addition to rear yard setback (Section
62.9C(2)).

Connecticut • (203) 255-3100

FAX • (914) 967-6615

Long Island • (516) 364-4544

�FREDERICK P. CLARK ASSOCIATES, INC.
Planning/Development/Environment/Transportation

3.

Parking and Circulation:
v»

Recommend redesign of two spaces next to Cabinetry
building (marked with numbers "4" and "10"). Space "10"
may work if the walkway area next to that building is not
raised.

•

Since loading space was moved, can now locate two or
three handicap spaces in the area to the south of the
building (ramp would need to be moved). Could provide
one handicap space near the Cabinetry building, utilizing
space "4" as its loading aisle.
Recommend cutting back the ends of parking islands to
improve circulation and turning capability.
Recommend Applicant discuss proposed design concept with
the New York State Department of Transportation (NYSDOT) .

4.

Landscaping and Buffers:
9

Landscaping and screening plan needed.
Recommend Planning Board ask Applicant to show extension
of sidewalk along site frontage.

5.

Environmental Review: The Environmental Assessment Form (EAF)
will be circulated as soon as it has been received and
reviewed.

6.

Other: The Applicant should provide information regarding
whether a restaurant use will be included in the new building.
Susan J. Fortman, AICP, Associate/Planning

cc:

Sean Treacy, Mayor
Linda E. David, Village Administrator
Janet A. Gandolfo, Esq., Village Attorney
James T. Margotta, Building Inspector
Mark A. DiGennaro, Village Engineer
Louis Contadino, AIA
John Hughes, Esq.

500\not5-016.sjp:aj

2

�Sean Treacy, Mayor

Linda E. David
Administrator
Donal M. Walsh. Jr.
Village Counsel
Angela Everett
Deputy Village Clerk
Frank Anzovino
Treasurer

TRUSTEES
Morris Alter
Jose Blanco
John T. Hayes, Jr.
Scott P. Horecky
Michael Hyland
Greg T. Jeffers

HISTORIC PAST - GREAT FUTURE
April 18, 1995
Mr. James Bick
3 Terrace close
North Tarrytown, New York
Re: 3 Terrace Close

10591

Dear Mr. Bick:
As per your agreement with the Village of North Tarrytown,
you agreed to reimburse the village for Planning Board
fees. To date the Village has been billed $1,213.65 on
your project. This amount represents bills and payments
through April 18, 1995.
Please remit to the Village upon receipt of this invoice.
Appropriate backup has been attached for your review.
Thank you for your help as your attention to this matter
is greatly appreciated.
Yours truly,

a^h-

rames^J. Hart
Treasurers Office

cc: L. David
J. Gandolfo
J. Margott :

/

28 Beekman Avenue, North Tarrytown, New York 10591
(914) 631-1440

�18 April 1995

To: Planning Board

n

trom: James Margotta

There will be no Planning Board meeting this month.

�2 March 1995

To: Planning Boa^d
from: James Margotta

There will be no Planning Board meeting for the month of
March.

�</text>
                  </elementText>
                </elementTextContainer>
              </element>
            </elementContainer>
          </elementSet>
        </elementSetContainer>
      </file>
    </fileContainer>
    <collection collectionId="136">
      <elementSetContainer>
        <elementSet elementSetId="1">
          <name>Dublin Core</name>
          <description>The Dublin Core metadata element set is common to all Omeka records, including items, files, and collections. For more information see, http://dublincore.org/documents/dces/.</description>
          <elementContainer>
            <element elementId="50">
              <name>Title</name>
              <description>A name given to the resource</description>
              <elementTextContainer>
                <elementText elementTextId="14839">
                  <text>Planning Board Minutes &amp; Resolutions-1995</text>
                </elementText>
              </elementTextContainer>
            </element>
          </elementContainer>
        </elementSet>
      </elementSetContainer>
    </collection>
    <itemType itemTypeId="1">
      <name>Text</name>
      <description>A resource consisting primarily of words for reading. Examples include books, letters, dissertations, poems, newspapers, articles, archives of mailing lists. Note that facsimiles or images of texts are still of the genre Text.</description>
    </itemType>
    <elementSetContainer>
      <elementSet elementSetId="1">
        <name>Dublin Core</name>
        <description>The Dublin Core metadata element set is common to all Omeka records, including items, files, and collections. For more information see, http://dublincore.org/documents/dces/.</description>
        <elementContainer>
          <element elementId="50">
            <name>Title</name>
            <description>A name given to the resource</description>
            <elementTextContainer>
              <elementText elementTextId="14173">
                <text>MINS_PLAN_1995-05-18</text>
              </elementText>
            </elementTextContainer>
          </element>
          <element elementId="49">
            <name>Subject</name>
            <description>The topic of the resource</description>
            <elementTextContainer>
              <elementText elementTextId="14174">
                <text>Planning Board Minutes &amp; Resolutions-1995</text>
              </elementText>
            </elementTextContainer>
          </element>
          <element elementId="40">
            <name>Date</name>
            <description>A point or period of time associated with an event in the lifecycle of the resource</description>
            <elementTextContainer>
              <elementText elementTextId="14175">
                <text>1995</text>
              </elementText>
            </elementTextContainer>
          </element>
        </elementContainer>
      </elementSet>
    </elementSetContainer>
  </item>
  <item itemId="2331" public="1" featured="0">
    <fileContainer>
      <file fileId="2331">
        <src>https://sleepyhollow.localarchives.org/files/original/5cdef7ad55f6e36d1163755df49b6bde.pdf</src>
        <authentication>baa0535293d8f6d0893b866b59a53ec3</authentication>
        <elementSetContainer>
          <elementSet elementSetId="4">
            <name>PDF Text</name>
            <description/>
            <elementContainer>
              <element elementId="52">
                <name>Text</name>
                <description/>
                <elementTextContainer>
                  <elementText elementTextId="20818">
                    <text>t

REGULAR MEETING

NORTH TARRYTOWN, NEW YORK
October 19,1995

A regular meeting of the North Tarrytown Planning Board was held on October 19,1995
at 8:00 P.M. in the Village hall, 28 Beekman Avenue, North Tarrytown, New York.
PRESENT:

George Hritz, Chairman
Donald Caetano
Joanne Becker
Edward McCarthy
Nick Cicchetti

ABSENT:

David Perlmutter

ALSO PRESENT:

Janet A. Gandolfo, Attorney
James Margotta, Building Inspector
Mark A. DiGennaro, CAMCE
Susan J. Portman, Assoc./Planning
Christian K. Miller, Assoc./Planning

Chairman Hritz called the meeting to order at 8:10 p.m.
Chairman Hritz welcomed Mr. Nick Cicchetti to the Planning Board.
1. ALBERT PECK - 38-40 Kendall Avenue
Chairman Hritz went over a letter for the record from Mr. Peck's surveyor regarding his
two houses on 38-40 Kendall Avenue. His surveyor had researched the tax maps and
wrote a letter stating that they believed that the two houses were on two lots. The Village
records show them as a single lot even though the Westchester County records show them
as two lots.
Mr. Peck commented that Mr. Margotta said that he had to file for a sub-division because
the two houses were on one lot. His surveyor said that the Westchester County maps
showed them as two lots. He submitted a map dated 1897.
Chairman Hritz asked him if he had made a title search.
Mr. Peck answered yes.
Ms. Gandolfo commented that it was just a description of the property.
Discussion on the title followed.

�Ms. Gandolfo explained that his property descriptions were on lot 17 on the County Title
search and we had lots 9 &amp; 10 on the Village maps. His map dated back to 1897. We
didn't know if there had been any intervening changes.
Mr. Margotta said that Mr. Peck had a title search done on his own.
Discussion on whether Mr. Peck's documents proved that lots 9 &amp; 10 in the County's
maps were the same as lot 17 on the Village maps.
Chairman asked Ms. Gandolfo if she believed that a full title search would answer this
question.
Ms. Gandolfo answered that she thought it would if they traced back the parcel.
Chairman Hritz told Mr. Peck that if he got a title search done now and asked them to get
the kind of search that can be updated by his purchaser maybe he will be able to negotiate
and get credit on the sale for what they have saved on the fact that he had done the title
search and all they have to do is an update.
Mr. Margotta recommended that he go through a title search.
Discussion on the Title search continued.
Ms. Gandolfo told Mr. Peck that he could adjourn to next meeting and if it was two
parcels then the Board could take it off the agenda.
Mr. Caetano made a motion to adjourn the matter until next meeting.
Mr. Cicchetti seconded.
Motion carried unanimously.
2. CHESTNUT RIDGE - Continuation
Mr. Ron Turnquist, the Architect came forward and introduced Mr. Rodrigues, the owner,
Mr. Michael Sterlacci, Engineer and Mr. Hugh Campbell, manufacturer of the brick wall
(retaining wall). Mr. Turnquist, by referring to the model and the blueprints explained the
retaining wall. He also went over Susan Portman's July comments.
Mr. Sterlacci commented that since the building on Chestnut Street had a low carpet a
pump would be needed to get the sewers from that apartment up to Chestnut Street. So
instead of doing that they could go by gravity by putting a 6" front line to the sewer on
Depeyster Street through the parking lot and service the building that way.
Mr. DiGennaro said that he didn't have the originals for the storm drainage and asked if it
had changed. He commented that numerous drawings had been submitted. He expressed
his concerns on the man-holes on the street.

-2-

�Mr. Sterlacci stated that both buildings were tied up to the sanitary on Depeyster Street.
Mr. DiGennaro asked Mr. Margotta if they had to coordinate with the Fire Department.
Mr. Margotta answered that if they were going to put fire sprinklers in that it was a
requirement.
Chairman Hritz stated that this project had been on the calendar a long time and the delay
was the applicant's own fault. The Board had always been present and they had shown
up, but the applicant did not. Their latest submission was made 3 business days before
the meeting despite the requirements that they be submitted more than that in advance to
give the Board sufficient time to look at them. This was not conducive to speedy
approval. "If you can get the people who work with you, Mr. Rodrigues, to get their acts
together to get the materials in to us in sufficient time for us to do our job, we can get it
done on time. If everything is thrown at us at the last possible minute, its in violation of
the rules".
Mr. Turnquist commented that the procedures in the past were to file for Building permit
and provide all the calculations for the sanitary, water and septic to the Building Inspector
at that time. They had prepare those for the Board and normally it was not done.
Mr. DiGennaro answered that normally, you have a standard for a one family house. You
figure per capita volume in a household. This was a multi-family use.
Mr. Turnquist stated that Mr. Rodrigues had done other projects, be it one family or two
family and had not made any presentation to the Planning Board on these items.
Mr. Margotta commented that if Mr. DiGennaro wanted the information, he should get
the information.
Mr. Hugh Campbell explained the retaining wall. He stated that he had built this kind of
wall everywhere, in the Hudson Valley, Nyack, Consumer University Inst, in Yonkers.
Mr. DiGennaro asked him where he was proposing to put the wall.
Mr. Campbell, by referring to the model showed where the retaining wall was going to be
built
Mr. DiGennaro said that he would like to see a complete set of drawing re-submitted on
one sheet.
Mr. Turnquist explained why there are so many different drawings.

-3-

�Mr. Caetano said that if DiGennaro was an Engineer and he knew what he was doing he
should be able to take one drawing from the other and put it together as a whole. There
has been money spent on this project at the cost of Mr. Rodrigues. Mr. Rodrigues has
been doing a lot of building in this community and he did not see why Mr. Rodrigues had
to re-submit drawings and he didn't think for one minute that it was fair.
Mr. DiGennaro commented that it took time to look through all the drawings. He said
that time was money and his point was to protect the interests of the Village.
Chairman Hritz asked Mr. Margotta if he needed a new set of drawings.
Mr. Margotta said he needed one complete set of drawings.
Discussion on the drawings followed.
Mr. Cicchetti asked if what was already submitted was acceptable.
Mr. Margotta asked Mr. DiGennaro if he had enough information on the retaining wall.
Mr. DiGennaro answered that Wall A appeared to be satisfactory. He hesitated to
approve Wall B. He hadn't had enough time to look at it. He needed another week.
Ms. Gandolfo commented that before they started on any walls, we had to have a final set
of drawings so that they could get approved. We can't be bouncing back and forth. We
will not be able to clearly state exactly what this Board has approved without one
complete set of drawings. So you really need to get the Board a final set of drawings.
Discussion as to whether to re-draw or accept the drawings as submitted followed.
Mr. Cicchetti commented that the issue was to have something that would reflect
everything that was going on. For example, right now we were asking for them to be able
to go ahead with the wall. He needs 3 days to check out the wall. If Mr. Margotta gives
the O.K., he could start on the wall. We are not holding up anybody. As far as having
something for the record he agreed with Ms. Gandolfo.
Mr. Margotta stated that too many changes had been made. The final changes should be
on one drawing. A request was made for them to get started.
Mr. Cicchetti said if the wall can be approved and the construction could get started on
that, could it be so worded that part be subject to approval.
Ms. Gandolfo said that it was O.K. as long as the Engineers signed the approval. Just the
wall part. As long as we have an approval in writing for the retaining wall, the applicant
could start

�Mr. Cicchetti made a motion to close the Public Hearing.
Mr. McCarthy seconded.
Public Hearing closed.
Ms. Becker made a motion to make a Negative Declaration for SEQR, that this will not
have a sufficient negative impact on the environment.
Mr. McCarthy seconded.
Motion carried unanimously.
Mr. Cicchetti made a motion that the drawings be revised as recommended by the
Building Inspector, Planning Board and the Engineer and our Counsel.
The Resolution being that a single set of corrected drawings to reflect the proposed
project.
Ms. Becker seconded.
Mr. Caetano substained
Motion carried.

Mr. McCarthy moved to approve the minutes of June 15, 1995 as submitted.
Ms. Becker seconded.
Motion carried unanimously.
Mr. McCarthy moved to approve the minutes of August 17, 1995 as submitted.
Ms. Becker seconded.
Motion carried unanimously.
There being no further business, the meeting was adjourned.

Respectfully submitted,

CARMEN G MARIANO
Recording Secretary

Next Planning Board meeting is on December 21, 1995

y

�I
*

'' x /
f

FREDERICK P. CLARK ASSOCIATES, INC.
Planning/Development/Environment/Transportation
Rye, New York and Southport, Connecticut

David J. Portman, AICP
Howard I. Reynolds, PE
David H. Stolman, AICP

350 Theodore Fremd Avenue
Rye, New York 10580
(914)967-6540

Michael A. Galante
Joanne P. Meder, AICP
Jim Donovan, RLA. ASLA

MEMORANDUM
To:

Village of North Tarrytown Planning Board

Date:

October 19, 1995

Subject:

Review of Chestnut Ridge/Hillside Court Site Plan

Plan:

"Part Site Plan," sheet SD3
Architects, dated 10/3/95.

prepared

by

Turnquist

1.

Project Description: Two 3-story buildings containing a total
of 18 dwelling units (32 bedrooms).

2.

Plan Revisions:
The width and slope of the retaining walls have been
changed.
Handicap parking spaces of the appropriate size have been
provided.
Compact parking now includes parking spaces #9 to 11 and
#27 to 31.
Aisle width was reduced from approximately 22 feet to
approximately 21 feet.
Sitting areas A and C have been modified due to changes
to the retaining walls.
The parking area under the Hillside Court building does
not appear to have been altered.
Outstanding Comments from 7/13/95 Memo:
Clearance height for the parking garage off of Depeyster
Street is only proposed to be 6 feet 8 inches and the
State Code requires a minimum of 9 feet 6 inches for
access to handicap parking spaces.
The curb radius for the driveway onto Depeyster Street
should be increased.

Connecticut • (203) 255-3100

FAX • (914) 967-6615

Long Island • (516) 364-4544

�FREDERICK P. CLARK ASSOCIATES, INC.
Planning/Development/Environment/Transportation

A shade tree should be added to the parking island
between spaces #20 and 21.
Item E on the planting schedule, Pink Flowering Dogwood,
should be changed. The surrounding pavement will make
the area too hot for that species. Honey locust or other
similar species may be substituted.
4.

Environmental Review: The Planning Board is the Lead Agency.
The Board may either ask for additional information or make a
determination
of
significance
(negative
or
positive
declaration).
Susan J. Portman, AICP, Associate/Planning

cc:

Sean Treacy, Mayor
Richard Sweet, Trustee
Linda E. David, Village Administrator
Janet A. Gandolfo, Esq., Village Attorney
James T. Margotta, Building Inspector
Mark DiGennaro, Village Engineer
Ronald Turnguist

500\not5-007.sjp:aj

2

r

�^ "

SEQR
**

*

617.21
Appendix F
State Environmental Quality Review

NEGATIVE DECLARATION
Notice of Determination of Non-Significance
Project Number

Date: October 19, 1995

This notice is issued pursuant to Part 617 of the implementing regulations pertaining to Article 8 (State
Environmental Quality Review Act) off the Environmental Conservation Law.
The VHIage off North Tarrytown Planning Board, as lead agency, has determined that the proposed action
described below will not have a significant effect on the environment and a Draft Environmental Impact Statement
will not be prepared.
Name of Action: Chestnut Ridge / Hillside Court Site Plan

SEQR Status: Type I

X

Unlisted
Conditioned Negative Declaration:

Yes
X No

Description of Action:
Removal of two existing dwellings and construction of two new buildings on two combined lots. One building will be
three stories and contain 12 dwelling units and an office. The other building will be three stories and contain 6 dwelling
units. Parking will be provided at grade and under the buildings. The application also required several variances from
the Zoning Board of Appeals.

Location:

(Include street address and the name of the municipality/county. A location map of appropriate scale is
also recommended.)

76 Chestnut Street and 83 Depeyster Street, North Tarrytown, Westchester County, New York

�SEQR Negative Declaration

Page 2

Reasons Supporting This Determination:
(See 617.6(g) for requirements of this determination; see 617.6(h) for Conditioned Negative Declaration)

The proposed action wHI not cause a significant adverse impact on land, ground or surface water quality or quantity,
drainage patterns, air quality, plants and animals, agricultural land resources, aesthetic resources, historic and
archaeological resources, open space and recreation, traffic and transportation systems, solid waste production, energy,
public health, growth and character of the community, cause conflict with community plans or goals, or cause significant
adverse noise and odor. The proposed landscaping will mitigate any potential aesthetic impacts of the proposed
retaining walls.

If Conditioned Negative Declaration, provide on attachment the specific mitigation measures imposed.
For Further Information:

Contact Person:

Linda David, Village Administrator

Address:

Village Hall, 28 Beekman Avenue
North Tarrytown, New York 10591

Telephone Number:

(914) 631 -1440

For Type I Actions and Conditioned Negative Declarations, a Copy of this Notice Sent to:
Commissioner, Department of Environmental Conservation, 50 Wolf Road, Albany, New York 12233-0001
Region 3, Department of Environmental Conservation, 21 South Putt Corners Road, New Paltz, New York 12561
Mayor Sean Treacy, Village Hall, 28 Beekman Avenue, North Tarrytown, New York 10591
Village of North Tarrytown Planning Board
Village of North Tarrytown Zoning Board of Appeals, Village Hall, 28 Beekman Avenue, North Tarrytown, New York
10591
Westchester County Department of Health, 19 Bradhurst Avenue, Hawthorne, New York 10532
Ronald Turnquist
Business Environmental Publications, Inc.. 6 Sevilla Drive, Clifton Park, New York 12065-5031 (Separate form was sent
which is used for the purpose of publication of negative declaration.]

�~

October 19,1995
FORM FOR TOE PUBLICATION OF NOTICE OF:
POSITIVE DECLARATION,
SCOPING SESSION,
NEGATIVE DECLARATION.
Scoping session can be combined with Positive Declaration.
Negative Declaration may be Conditioned. Draft or Rnat Please indicate which of these, i aooicabte.

PLEASE READ AND FOLLOW GENERAL INSTRUCTIONS. FAILURE TO DO SO WILL
RESULT IN DELAY OF NOTICE PUBLICATION.
Items Received By Mail By Close Of Business Wednesday Or By Fax By 11-39 PM. Wednesday WW be
Published In The Following Weeks Issue Qf The ENB. There WM Be No Exceptions To These Deadlines.

Type of Notice:

Negative Declaration

Project Title:

Chestnut Ridge / Hillside Court Site Plan

Project Address:

76 Chestnut Street and 83 Depeyster Street. North Tarrytown, Westchester
County

Lead Agency:

Village of North Tarrytown Planning Board

Address:

Village Had, 28 Beekman Avenue, North Tarrytown, New York 10591

Project Description:

The action involves the removal of two existing oweings and construction of two
new buildings on two combined lots. One buiolng w * be three stories and
contain 12 dwelling units and an office. The other buiolng wfl be three stories
and contain 6 dwelling units. Parking w * be provided at grade and under the
buildings. The application also required several variances from the Zoning
Board of Appeals.

Contact Person:

Linda David, Village Administrator

Address:

Village Hall, 28 Beekman Avenue, North Tarrytown, New York 10591

Phone Number:

(914) 631-1440

For Conditioned Negative Declaration, indicate the following:
Conditions: NA
Final Date of Comment Period (minimum 30 days): NA
For Draft Negative Declaration, indicate the following:
Final Date of Public Comment Period: NA
For Scoping Session, indicate the following:
Location(s) where Draft Scope is available for review: NA
Final Date for Receipt of Written Comments: NA
Scoping Meeting information (if scheduled): NA
Date and Time: NA
Location: NA
500\not5-029 sjp

•

�19 September 1995

To-. Planning Board
hrom: James MargottaA ^ v /

Due to a lack ot agenda items, there will be no Planning
Board meeting on September 21, 1995.

�«

Approved with respect to substance and form:

ViltL&amp;ge Attorney

DatK:

4i}r

Approved by the Planning

Cha
Dated:

Acting Chairman (

Filed with Village Clerk

Q^

Glcrk «r Deputy Clerk
Dated: / i / ^ - / ? J ^

Date of

^xT
/?J?K
fleeting

�</text>
                  </elementText>
                </elementTextContainer>
              </element>
            </elementContainer>
          </elementSet>
        </elementSetContainer>
      </file>
    </fileContainer>
    <collection collectionId="136">
      <elementSetContainer>
        <elementSet elementSetId="1">
          <name>Dublin Core</name>
          <description>The Dublin Core metadata element set is common to all Omeka records, including items, files, and collections. For more information see, http://dublincore.org/documents/dces/.</description>
          <elementContainer>
            <element elementId="50">
              <name>Title</name>
              <description>A name given to the resource</description>
              <elementTextContainer>
                <elementText elementTextId="14839">
                  <text>Planning Board Minutes &amp; Resolutions-1995</text>
                </elementText>
              </elementTextContainer>
            </element>
          </elementContainer>
        </elementSet>
      </elementSetContainer>
    </collection>
    <itemType itemTypeId="1">
      <name>Text</name>
      <description>A resource consisting primarily of words for reading. Examples include books, letters, dissertations, poems, newspapers, articles, archives of mailing lists. Note that facsimiles or images of texts are still of the genre Text.</description>
    </itemType>
    <elementSetContainer>
      <elementSet elementSetId="1">
        <name>Dublin Core</name>
        <description>The Dublin Core metadata element set is common to all Omeka records, including items, files, and collections. For more information see, http://dublincore.org/documents/dces/.</description>
        <elementContainer>
          <element elementId="50">
            <name>Title</name>
            <description>A name given to the resource</description>
            <elementTextContainer>
              <elementText elementTextId="14177">
                <text>MINS_PLAN_1995-10-19</text>
              </elementText>
            </elementTextContainer>
          </element>
          <element elementId="49">
            <name>Subject</name>
            <description>The topic of the resource</description>
            <elementTextContainer>
              <elementText elementTextId="14178">
                <text>Planning Board Minutes &amp; Resolutions-1995</text>
              </elementText>
            </elementTextContainer>
          </element>
          <element elementId="40">
            <name>Date</name>
            <description>A point or period of time associated with an event in the lifecycle of the resource</description>
            <elementTextContainer>
              <elementText elementTextId="14179">
                <text>1995</text>
              </elementText>
            </elementTextContainer>
          </element>
        </elementContainer>
      </elementSet>
    </elementSetContainer>
  </item>
  <item itemId="2332" public="1" featured="0">
    <fileContainer>
      <file fileId="2332">
        <src>https://sleepyhollow.localarchives.org/files/original/ffca824e74e4c8949e6c3345caf86109.pdf</src>
        <authentication>546fc14eb6cc5a3f99d186747fd4ebc6</authentication>
        <elementSetContainer>
          <elementSet elementSetId="4">
            <name>PDF Text</name>
            <description/>
            <elementContainer>
              <element elementId="52">
                <name>Text</name>
                <description/>
                <elementTextContainer>
                  <elementText elementTextId="20819">
                    <text>r
REGULAR MEETING

NORTH TARRYTCWN, NEW YORK
August 1 7 , 1995

A regular meeting of the North Tarrytown Planning Board was held on
August 17, 1995 at 8:00 P.M. in the Village Hall, 28 Beekman Avenue,
North Tarrytown, New York.
PRESENT:

George Hritz, Chrairman
Joanne Becker
Edward McCarthy
David Perlmutter

ABSENT:

Donald Caetano

ALSO PRESENT:

Janet A. Gandolfo, Attorney
James Margotta, Building Inspector
Mark A. DiGennaro, CAMCE
Susan J. Portman, Assoc.Planning

Chairman Hritz called the meeting to order at 8:10 p.m.
PRELIMINARY HEARING - COLABELLA WETLANDS
This item was not a scheduled agenda item.
Mr. John Hughes came forward and stated that this application had to do
with a permit application for the wetlands. He said that he wasn't
sure what was required to be done or how the Planning Board reacts under
this local law. He asked for help from the Board.
Chairman Hritz stated that this was a project that required at least
a short EAF form.
Ms. Gandolfo stated that the Code reads that the buffer is supposed to
be 100 ft. from the wetlands. The architect or engineer includes as
part of the property the buffer area. The question to
the Board was to look at the wording as to where the buffer was
permitted to start.
Ms. Gandolfo said that the question was if the buffer was part of the
property.
Mr. David Christmas, the architect didn't know how far it extended.
Chairman Hritz pointed out the following observations:
1. looks like the 100 ft. buffer is drawn in such a way that it
doesn't follow the line of the river.
2. How many of the homes in the area will be 2 family homes.
3. There are a number of questions regarding the EAF, page 3, paragraph
13 and 14.
4. There are several items missing from the application which
must be included.
The architect stated that the site itself was not going to be used by
the community.

�f
Chairman Hritz told the architect that he needed to go through the EAF.
Mr. Hughes commented that they will revise the EAF.
Ms. Gandolfo suggested that he should look at £ 61-8 and see if any of those
activities should be marked on the plans.
Chairman Hritz asked if there were any further questions.
Mr. DiGennaro said that he would like to look at the criteria of dry
wells, 2 to 5 years and 10 years. 10 to 25 years. He explained to
the applicant what he wants to see on the plans.

L. RODRIGUES, CHESTNUT RIDGE - Continuation. Re-Review of site plans
for 2 apartment houses
Chairman Hritz noted for the record that the Chestnut Ridge applicant
has asked to be removed from the agenda on numerous times. He noted
that this was the 4th or 5th time that this applicant has taken
himself off the agenda. He stated that it wasn't fair for the
Board members to attend when this was the only agenda item and not
have Mr. Rodrigues attend.
Mr. Perlmutter suggested that Mr. Rodrigues should let the Board know
in time if he was not going to attend.
Ms. Portman read the Wetland regulations.

There being no further business, Mr. Perlmutter moved to adjourn the
meeting.
Ms. Becker seconded.
Motion carried unanimously.
Respectfully submitted,

CARMEN G. MARIAMD
Recording Secretary

-2-

�f

?

FREDERICK P. CLARK ASSOCIATES, INC.
Planning/Development/Environment/Transportation
Rye, New York and Southport, Connecticut

David J. Portman, A,CP
Howard I. Reynolds PE
David H. Stolman, AICP

350 Theodore Fremd Avenue
Rye, New York 10580
(914) 967-6540

Michael A. Galante
F . Meder&gt; AICP
Jim Donovan, RLA. ASLA
Joanne

MEMORANDUM
To:

Village of North Tarrytown Planning Board

Date:

July 13, 1995

Subject:

Review of Chestnut Ridae/Hillside Court Site Plan

Plans:

Site plan sheets SD1 and SD2 prepared by Turnquist
Architects, revised 6/8/95.

1.

Project Description: Two 3-story buildings containing a total
of 18 dwelling units (32 bedrooms).

2.

Plan Revisions:
Additional planting details (not to scale) were shown on
the plan.
Evergreens added at a few locations along new retaining
wall on easterly side of site.

3.

Parking and Circulation:
Two handicap parking spaces are shown. According to the
Department of State, «each of the spaces should have a
loading aisle of eight feet in width.
Clearance height for the parking garage off of Depeyster
Street is only proposed to be 6 feet 8 inches and the
State Code requires a minimum of 9 feet 6 inches for
access to handicap parking spaces (see enclosure).
The curb radius for the driveway onto Depeyster Street
should be increased.

4.

Landscaping and Buffers:
A shade tree should be added to the parking
between spaces #2 0 and 21.

island

Item E on the planting schedule, Pink Flowering Dogwood,
should be changed. The surrounding pavement will make

Connecticut • (203) 255-3100

FAX • (914) 967-6615

Long Island • (516) 364-4544

�FREDERICK P. CLARK ASSOCIATES, INC.
Planning/Development/Environment/Transportation

the area too hot for that species. Honey locust or other
similar species may be substituted.
5.

Environmental Review; The Planning Board may either ask for
additional
information
or
make
a
determination
of
significance.
Susan J. Portman, AICP, Associate/Planning

Enclosure
cc:

Sean Treacy, Mayor
Richard Sweet, Trustee
Linda E. David, Village Administrator
Janet A. Gandolfo, Esq., Village Attorney
James T. Margotta, Building Inspector
Mark DiGennaro, Village Engineer
Ronald Turnquist

500\not5-007.sjp:aj

2

�§ 1101.1

SUBTITLE S HOUSING AND COMMUNITY RENEWAL

PART 1101
GENERAL REQUIREMENTS
(Statutory authority: Executive Law, §§ 375, 377)
Sec.
1101.1 Sites, exterior facilities and parking
1101.2 Entrances
1101.3 Interior accessible routes

Sec.
1101.4 Interior accessible facilities and elements
1101.5 Means of egress
1101.6 Assembly spaces
Historical Note
Part (§§ 1101.1-1101.6) filed Aug. 7, 1973; amd. filed Nov. 12, 1973; repealed by L.
1981, ch. 707, § 12. eff. Dec. 31.1983; new (§§ 1101.1-1101.7) filed Dec. 13,1983; repealed,
new (§§ 1101.1-1101.6) filed April 1.1994 eff. April 20, 1994.

S e c t i o n 1101.1 Sites, exterior facilities and parking, (a) At least one accessible route shall be provided within the site boundaries from public transportation stops,
accessible parking spaces, passenger loading zones, and public streets or sidewalks, to
entrances of each accessible building a s required in section 1101.2 of this Part.
(b)

Where toilet facilities or bathing facilities are provided, each shall be accessible.

(c) Where drinking fountains are provided, not less than 50 percent, but at least one,
shall be accessible.
(d) Parking areas or garages. Where parking a r e a s or garages are provided, accessible parking spaces shall be provided a s follows:
(1) in group B l and B3 occupancies; in an amount equal to not less than five percent of the number of dwelling units but at least one;
(2) in group B4 occupancies; not less than five percent of the total number of
parking spaces but at least one;
(3) in group B2, Cl, C2, C3, C4, C5 and C6 occupancies; accessible parking spaces
shall be provided in conformity with table 1-1101 and shall be dispersed and located
closest to the accessible entrances;
(4) accessible parking spaces shall conform to reference standard RS 72, except
that access aisles shall be at least 8'0" in width, and minimum vertical clearances at
accessible spaces and vehicular access routes to and from such spaces in parking
garages and open parking structures exceeding 1,000 square feet in area, shall be 9'6"
on the entry level and 8'2" on other levels; and
(5) passenger loading zones serving accessible entrances shall be accessible in
conformity with reference standard RS 72. Such accessible loading zones shall be
located in proximity to accessible building entrances.
TABLE 1-1101
REQUIRED NUMBER OF ACCESSIBLE PARKING SPACES
Total parking spaces in
lot or garage
1 to 25
26 to 50
51 to 75
?6 to 100
101 to 150

Number

'•2- 3

1
2
3
4
5
638.243

EX

4-30-94

�F R E D E R I C K P. CLARK A S S O C I A T E S , I N C .
Planning/Development/Environment/Transportation
Rye, New York and Southport, Connecticut

David J. Portman, A,CP
Howard I. Reynolds, PE
David H. Stolman, AICP

350 Theodore Fremd Avenue
Rye, New York 10580
(914) 967-6540

Michael A. Galante
Joanne P. Meder, AICP
Jim Donovan, RLA, ASLA

MEMORANDUM
To:

Village of North Tarrytown Planning Board

Date:

August 14, 1995

Subject:

Colabella Wetlands Permit

This is a supplement to the memorandum dated August 11, 1995.
It is indicated on the wetlands permit application that a portion
of the wetlands/watercourse buffer area (of the Pocantico River)
will be disturbed in order to construct a two-family dwelling. The
dwelling is shown on the plan as being located within a few feet of
the wetlands/watercourse buffer area. The buffer area will be
disturbed during construction of this dwelling.
The amount of
disturbance is not yet clear.
In the previous memorandum we
requested that the drawing be revised to specifically annotate the
limit of the wetlands area and to note the date of the wetlands
delineation and the name of the individual or firm who performed
it. The delineation will clarify the location of the boundary of
the buffer area and determine whether the dwelling itself is
actually proposed to be located within the buffer area.
Susan J. Portman, AICP, Associate/Planning
cc:

Sean Treacy, Mayor
Richard Sweet, Trustee
Linda E. David, Village Administrator
Janet A. Gandolfo, Esq., Village Attorney
James T. Margotta, Building Inspector
Mark A. DiGennaro, Village Engineer
David I. Christmas, RA

500\not5-022.sjp

Connecticut • (203) 255-3100

FAX • (914) 967-6615

Long Island • (516) 364-4544

�R E V I S E D

D R A F T

RESOLUTION
Adopted at the May 19, 1994 and Revised at the June 15, 1995
Meeting of the Village of North Tarrytown Planning Board
RESOLUTION:

SUBDIVISION APPROVAL
PROPOSED ACTION: SUBDIVISION OF PROPERTY INTO TWO
(2) LOTS
OWNER: ESTATE OF ANNA DE CARLO
APPLICANT:
JOHN AND MAUREEN PETRY; PETER AND
COLLETTE WEINSTEIN
LOCATION: 41 AMOS STREET AND THE EASTERN SIDE OF
WEBBER AVENUE
TAX DESIGNATION: SECTION 17, BLOCK 7, LOT 18
ZONING: R-3 RESIDENTIAL

�RESOLUTION
Adopted at the May 19, 1994 and Revised at the June 15, 1995
Meeting of the Village of North Tarrytown Planning Board
RESOLUTION:

SUBDIVISION APPROVAL
PROPOSED ACTION: SUBDIVISION OF PROPERTY INTO TWO
(2) LOTS
OWNER: ESTATE OF ANNA DE CARLO
APPLICANT:
JOHN AND MAUREEN PETRY; PETER AND
COLLETTE WEINSTEIN
LOCATION: 41 AMOS STREET AND THE EASTERN SIDE OF
WEBBER AVENUE
TAX DESIGNATION: SECTION 17, BLOCK 7, LOT 18
ZONING: R-3 RESIDENTIAL
WHEREAS, the Planning Board of the Village of North Tarrytown
has reviewed an application for subdivision approval (the
Application) pursuant to the Subdivision Regulations of the Village
of North Tarrytown, Chapter 62, Zoning, of the Code of the Village
of North Tarrytown and other requirements of the Village Code
considered pertinent to the application, which application is to
subdivide property located on the western side of Amos Street and
the eastern side of Webber Avenue at 41 Amos Street into two (2)
lots for single-family residential development; and
WHEREAS, Lot 1 would be approximately 6,554.4 square feet in
size and would contain the existing dwelling and Lot 2 would be
approximately 5,999.7 square feet in size, as shown on the drawing
prepared by John J. Muldoon, Professional Land Surveyor, and
further identified as follows:
"Subdivision of Lands of the Estate of Anna DeCarlo, Situate
at North Tarrytown, Town of Mount Pleasant, Westchester
County, N.Y.," scale 1" = 2 0 ' , dated April 7, 1994; and
WHEREAS, the Applicant proposes to remove the existing garage
and driveway from Lot 2; and
WHEREAS, the Applicant will provide a driveway and a parking
space for the existing house on Lot 1; and
WHEREAS, as per Section 12B(2)(b) of the Subdivision
Regulations, the Applicant has agreed to show on the plat a strip
of land to be dedicated which is 0.25 feet wide extending along the
entire frontage of both Lots 1 and 2 along Webber Avenue; and
WHEREAS, the site has been visited by the Village's Planning
Consultant, Engineering Consultant and the Planning Board is
thoroughly familiar with the site and all aspects of the proposed
subdivision; and

�WHEREAS, a duly advertised public hearing was held at the
Village Hall on May 19, 1994, at which time those wishing to be
heard were given the opportunity to be heard; and
WHEREAS, in the course of this review and acting as Lead
Agency pursuant to Part 617 of the implementing regulations
pertaining to Article 8 of the Environmental Conservation Law, the
Planning Board has made the following findings and caused, noted or
conducted the following activities:
1.

Received an application fee of $2,510;

2.

Caused field inspections to be made of the property and of the
surrounding area;

3.

Referred the application to the Westchester County Planning
Board pursuant to Sections 239-1, m and n of the General
Municipal Law because the subject property is located on a
County road (Webber Avenue);

4.

Requested, received and considered comments from the Village
Planning Consultant, the Village Engineering Consultant and
the Building Inspector;

5.

Requested, received and reviewed a short Environmental
Assessment Form (EAF) in compliance with the New York State
Environmental Quality Review Act (SEQRA);

6.

After review of said field conditions, recommendations and
EAF, as well as other materials and matters noted above, the
Planning Board has determined that the proposed action is an
Unlisted Action and made a Negative Declaration on March 17,
1994, and noted on the EAF its determination of nonsignificance of environmental impact.

NOW, THEREFORE, BE IT RESOLVED, that said application for
subdivision approval for a two (2) lot subdivision, as shown on the
drawing entitled "Subdivision of Lands of the Estate of Anna
DeCarlo Situate at North Tarrytown, Town of Mount Pleasant,
Westchester County, N.Y.", scale 1" = 20', dated April 7, 1994,
prepared by John J. Muldoon, Professional Land Surveyor, be and is
hereby granted subdivision approval and that the Applicant may
obtain the endorsed approval of the Planning Board Chairman or, as
an alternate, the Village Administrator, on a copy of this
subdivision resolution and upon the final mylar copy of the
subdivision plat drawing revised as necessary to show compliance
with the following conditions, and the Applicant may obtain the
endorsement of the Westchester County Department of Health on the
final subdivision plat which endorsements shall permit filing in
the offices of the Village Building Department, for purposes of
obtaining a building permit in accordance with this resolution and
all building code requirements, and the offices of the Westchester
2

�County cl^rk, provided, however, that this subdivision approval
shall empire within one hundred eighty (180) days from the date of
this resolution if the following conditions have not been completed
to the satisfaction of the Planning Board and the Applicant has not
obtained a building permit for construction of the driveway and
parking space on Lot 1:
1.

A l l references to the "Applicant"
Applicant's successor and assigns.

shall

include

the

2.

The Applicant shall pay to the Village of North Tarrytown:
2.3. An inspection fee for construction inspection of the
property for compliance with this resolution, including
the provision of a driveway and parking space on Lot 1,
in accordance with the Village of North Tarrytown Zoning
Code;
2. 2

3.

The reimbursement of all application review fees as noted
and required in Section 62-30(f) of the Village Zoning
Code.

Revision of the above noted plat to demonstrate the following:
3. i

The plat shall be revised and titled "Final Subdivision
Plat;"

3.2

A line shall be provided for the endorsement of the
Westchester County Department of Health;

3.3

The date of this resolution shall be noted on the final
subdivision plat.

4.

Th.e Applicant shall comply with the requests of the Village
Engineering Consultant as described in his memoranda to the
North Tarrytown Planning Board dated April 28, 1994 and June
I S , 1995.

5.

Trie owners of the adjacent property shall be permitted to
svabmit a report prepared by their consultant for review by the
Village Engineering Consultant.

6.

Trie driveway .and parking space on Lot 1 and any future
improvements on Lot 2 shall be constructed so as to yield no
n^t increase in stormwater runoff. The drainage plan for Lot
1 and, at that time that a house and driveway may be proposed
for construction on Lot 2, the drainage plan for Lot 2 shall
b&lt;s prepared to the satisfaction of the Village Engineering
Consultant. The driveway for Lot 2 shall be graded so as to
sXope towards the south, away from the neighboring property to
trie north.
3

�Prior to the issuance of a certificate of occupancy for the
driveway and parking space on Lot 1, the Applicant shall
submit to the Village Building Inspector a reproduction of the
construction drawing complete with the certification of a
professional architect and/or professional engineer attesting
to construction of the site improvements as shown thereon.
The driveway and parking space on Lot 1 shall be completed to
the satisfaction of the Village Building Inspector within
eighteen (18) months from the date of the issuance of a
building permit and prior to the issuance of a certificate of
occupancy. The Planning Board may issue an extension on this
time limit, or may modify any of the above conditions with
respect thereto, for good cause.
The Planning Board reserves the right to make a final field
inspection of the project after construction of the
improvements, upon notice of the Building Inspector, and
before the issuance of a certificate of occupancy.
The
purpose of this final inspection is to review the development
and to require any modifications to parking, drainage, access,
paving and other details, which do not comply with the
approved plat and the interest of safety, convenience,
aesthetics and the enjoyment and peace and quiet of adjacent
neighbors.

PLANNING BOARD
VILLAGE OF NORTH TARRYTOWN
2L.

^ .

/,

i t z , Chairma
o r t h Tarryto

Date:
lanning Board

500\not4-012.sjp.crc

4

10

idfiS

�C H A R L E S A.
CONSULTING

MANGANARO
ENGINEERS

MEMORANDUM
TO:

Village of North Tarrytown

FROM:

Mark A. DiGennaro
Charles A. Manganaro Consulting Engineers, P.C.

DATE:

October 19, 1995

RE:

Chestnut Ridge/Hillside Court
Village of North Tarrytown, NY
CAMCE No. 800-24

We have received some structural information from the applicant's engineer in response to our
memorandum of September 18, 1995, on October 11. This information consisted of structural
retaining wall calculations transmitted for review via fax without any plan indicating the
revisions. We attempted to contact the applicant with regard to the submittal on October 13,
1995 to discuss the submittal but were unsuccessful.
Regretfully, we were unable to perform a review of the submittal due to the following reasons:
•

The submittal was received 3 business days before the Planning Board Meeting.

•

The submittal was incomplete and did not address all of the comments in our September
18, 1995 memorandum.

•

The Plan which was received on October 13, 1995, is not complete and does not clearly
indicate any revisions.

•

From a review perspective, the project direction is unclear with respect to the retaining
wall design and the fact that the Applicant has changed his structural engineer adds to the
ambiguity.

Based on the above, we recommend that the applicant clarify all of the relevant submittals and^
resubmit to the Village, three complete sets of plans and details clearly indicating any revisions.
Once we receive a clarification from the Applicant and have a clear understanding of the
proposed project improvements, we will advise the Planning Board accordingly.
cc:

Jim Margotta
Ron Turnquist
Susan Portman
Janet Gandolfo

F \AWN-ngOO-2-4\MDIOI95MJRi

�«

Approved with respect to substance and form:

Village
Dc/ted:

Approved by the Planning Board

^r. I

Acting Chairman

Filed with Village Clerk

a. a,

Clerk or"'Deputy Clerk

Dated:

frfKJjf

U^JZ /&lt;rsi?&lt;?&lt;r
DatsLtff Meeting

+

�</text>
                  </elementText>
                </elementTextContainer>
              </element>
            </elementContainer>
          </elementSet>
        </elementSetContainer>
      </file>
    </fileContainer>
    <collection collectionId="136">
      <elementSetContainer>
        <elementSet elementSetId="1">
          <name>Dublin Core</name>
          <description>The Dublin Core metadata element set is common to all Omeka records, including items, files, and collections. For more information see, http://dublincore.org/documents/dces/.</description>
          <elementContainer>
            <element elementId="50">
              <name>Title</name>
              <description>A name given to the resource</description>
              <elementTextContainer>
                <elementText elementTextId="14839">
                  <text>Planning Board Minutes &amp; Resolutions-1995</text>
                </elementText>
              </elementTextContainer>
            </element>
          </elementContainer>
        </elementSet>
      </elementSetContainer>
    </collection>
    <itemType itemTypeId="1">
      <name>Text</name>
      <description>A resource consisting primarily of words for reading. Examples include books, letters, dissertations, poems, newspapers, articles, archives of mailing lists. Note that facsimiles or images of texts are still of the genre Text.</description>
    </itemType>
    <elementSetContainer>
      <elementSet elementSetId="1">
        <name>Dublin Core</name>
        <description>The Dublin Core metadata element set is common to all Omeka records, including items, files, and collections. For more information see, http://dublincore.org/documents/dces/.</description>
        <elementContainer>
          <element elementId="50">
            <name>Title</name>
            <description>A name given to the resource</description>
            <elementTextContainer>
              <elementText elementTextId="14181">
                <text>MINS_PLAN_1995-08-17</text>
              </elementText>
            </elementTextContainer>
          </element>
          <element elementId="49">
            <name>Subject</name>
            <description>The topic of the resource</description>
            <elementTextContainer>
              <elementText elementTextId="14182">
                <text>Planning Board Minutes &amp; Resolutions-1995</text>
              </elementText>
            </elementTextContainer>
          </element>
          <element elementId="40">
            <name>Date</name>
            <description>A point or period of time associated with an event in the lifecycle of the resource</description>
            <elementTextContainer>
              <elementText elementTextId="14183">
                <text>1995</text>
              </elementText>
            </elementTextContainer>
          </element>
        </elementContainer>
      </elementSet>
    </elementSetContainer>
  </item>
</itemContainer>
