<?xml version="1.0" encoding="UTF-8"?>
<item xmlns="http://omeka.org/schemas/omeka-xml/v5" itemId="1877" public="1" featured="0" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://omeka.org/schemas/omeka-xml/v5 http://omeka.org/schemas/omeka-xml/v5/omeka-xml-5-0.xsd" uri="https://sleepyhollow.localarchives.org/items/show/1877?output=omeka-xml" accessDate="2026-09-19T10:25:08+00:00">
  <fileContainer>
    <file fileId="1877">
      <src>https://sleepyhollow.localarchives.org/files/original/3c1b6ef052778637b03a4cb76b5a03e9.pdf</src>
      <authentication>bce45c656bb9ff804b7e96c660fb72d2</authentication>
      <elementSetContainer>
        <elementSet elementSetId="4">
          <name>PDF Text</name>
          <description/>
          <elementContainer>
            <element elementId="52">
              <name>Text</name>
              <description/>
              <elementTextContainer>
                <elementText elementTextId="20365">
                  <text>Meeting Date: 10/27/2020
Resolution #: 10/96/2020
Resolution of the Mayor and Board of Trustees of the Village of Sleepy Hollow
Authorizing Change Orders 1 thru 5 for the Continental Street Sewer Projert
™ " E * E A S / t h f Village of Sleepy Hollow has entered into a construction contract with
Infrastructure LLC for the Continental Street Sewer Project: and
WHEREAS, the construction contract for this work now requires approval of Chanae
Orders o include additional construction costs as detailed in the attached Change
uraers 1 thru 5; and
WHEREAS, Dolph Rotfeld Engineering, the Village's Consulting Engineer for this
project, has recommended that these change orders be approved; and
WHEREAS, the costs of these change orders totals $ $39,752.80.
K " ! f R E ™ R E ' B E I T ^ S O L V E D that the Board of Trustees herein authorizes
the administrator to execute Change Orders 1 thru 5 as attached; and
BE IT FURTHER RESOLVED that the Village Treasurer will adjust the project budget
to reflect an increase of $39,752.80.
Moved: Trustee Leavy

Seconded: Trustee Scaglione

Vote: Unanimous

�Change Order #1 - While excavating to install the sheeting and shoring/trench protection for the
installation of the pipe, the contractor encountered several large boulders that had not been picked up
in the original exploratory borings or geotechnical report. The effort to perform a wider excavation,
remove the boulders, and handle the material resulted in an increase in labor and time to the
contractor. CO #1 cost is $5,000. This was an unforeseen field condition, we think the request is
reasonable, and we recommend that the Village approve this change order.
Change Order #2 is the cost to replace the 60 linear feet of sewer. The additional 60 feet of sewer to be
replaced wasn't part of the original plan. By the time we decided that we need to replace the pipe its
cost increased by $34.20 per linear foot. Overall, it is about $2,000 more than it would have been at the
unit price bid. CO #2 cost is $20,897.80 and it includes the complete furnishing and installing of the pipe
between PSMH A1 and the next manhole upstream as shown on the plans. With the state of the
availability of material during these unprecedented times, we were fortunate that the pipe is available
at all. Therefore, we feel that the increase of $2,000 over what would have been the cost at unit prices
for the entire 60-foot run is reasonable and we recommend that the Village approve this change order.
Change Order #3 described in the previous email, the contractor excavated several large boulders from
the trench and now must dispose of them as they cannot be used as backfill for the pipe. Rick Torres
from HHV has asked for 35 of the boulders but requested that they be brought to HHV's Van Cortlandt
site in Croton. CO #3 is the contractor's cost to load and transport the boulders. Based on discussions
with the contractor, he has not worked any profit into this change order. Since it benefits the project
(not to be used as backfill) and will satisfy a portion of the Village's obligation to provide landscaping
restoration to HHV we recommend that the Village approve this change order.
Change Order #4 - As the work continues downstream and gets into Continental Street we are working
with the contractor to minimize disturbance in the right of way. In the contractor has proposed a
method that will reduce construction time, provide a cleaner job, and minimize excavation. While the
CO is for $6,630, it is intended to replace Item 103 for which the contractor had bid $5,000. Since it is
therefore a difference of $1,630 and will allow the contractor to work quickly, more cleanly, and with
less disruption to Continental Street we recommend that the Village approve this change order.

Change Order #5. This is for the supply of material that we discussed prior. The material excavated
from the trench was deemed unsuitable as backfill by the geotechnical inspector for underneath the
driveway. The cost represented in this CO is for the supply and delivery of suitable backfill material. The
contractor originally requested more than 10 times what this CO shows, then he wanted almost twice as
much as where we are now. In each case as we scrutinized and questioned his numbers and approach
we were able to get him to come down. The work in this CO is necessary to provide a firm subbase for
the driveway and reduce the risk of uneven surface settlement, sinkholes, etc. The work is necessary
and the cost is reasonable. Therefore, we recommend that the Village approve this change order.
As excavation continues into the Continental Street roadway the geotechnical engineer will monitor the
material that the contractor excavates.
James Natarelli,
PE
Associate Vice President
M i

Kngintvrs

Dolph Rotfeld Engineering Division

�CHANGE ORDER 1
PROJECT TITLE
P R O J E C T NO.
C U E N T

Continental Street Sanitary Sewer Improvements
03^020

C O N T R A C T NO.

- SleePV H o l M J j V

03-2020

CONTRACT DATE

CONTRACTOR

6/12/2020

M T S Infrastructure M r .

The following changes are hereby made to the Contract Documents:

Increase in labor cost to remove existing subsurface boulders

Justification:
Downtime due to having boulders just on the edge of trench. Boulders ranged from 0.75 C Y to 1 5 C Y
t h f i i i 6 S'Ze( SU°h' S h 0 n n 9 SyStem w a s removed' a n d work w a s halted
remove the boulders and
B U l d e r S h a d n 0 t b e e n i n d i c a t e d in t h e b i d
npotthl9 f
T r e S f
°
documents' borings and
geotechnical report. Therefore, the removal of boulders had not been included in the bid cost for
excavation.

CHANGE TO CONTRACT PRICE
Original Contract Price:

$

$835,411.30

Current contract price, as adjusted by previous change orders:

$

$0.00

The Contract Price due to this Change Order will be [increased] [decreased] by
The new Contract Price due to this Change Order will be:

$

$

$5,000.00

$840,411.30

Approvals Required:
To be effective this order must be approved by the Owner if it changes the scope or objective of the project or as
may otherwise by required under the terms of the Supplementary General Conditions of the Contract

Requested by

tfka?

&lt;SiLn

( ^ M a t u r e

Recommendedby

Signature

Accepted by

Signature

.

J

^

J ^ &amp; j p w .

date

In^hotn

date

�CHANGE ORDER 2
PROJECT TITLE
PROJECT NO.
CLIENT

Continental Street Sanitary Sewer Improvements
03-2020

CONTRACT NO.

Sleepy Hollow, NY

03-2020

CONTRACT DATE

CONTRACTOR

6/12/2020

MTS Infrastructure. L L C

The following changes are hereby made to the Contract Documents:

' »-»i my ai c puoiuui icu.

Justification:

Upon excavation at PSMH A1, the condition of the existing clay pipe was found to be poor and in need of
replacement up to the next upstream manhole. However, pipe had already been ordered at the price
used in the original bid for pipe. Price increase from contract pricing due to material price increase
Material was increased by $34.20 resulting in a new unit price of $354.20 for the added linear footage.

CHANGE TO CONTRACT PRICE
Original Contract Price:

$

$835,411.30

Current contract price, as adjusted by previous change orders:

$

$840,411.30

The Contract Price due to this Change Order will be [increased] [decreased] by
The new Contract Price due to this Change Order will be:

$

$

$20,897.80

$861,309.10

Approvals Required:
To be effective, this order must be approved by the Owner if it changes the scope or objective of the project or as
may otherwise by required under the terms of the Supplementary General Conditions of the Contract.

Requested by

V i I S i I u a .

AcduMir

Signature

""

date

jo/slzefC
• g

Recommendedby

Signature

date

Accepted by

Signature

date

hoZo

�CHANGE ORDER 3
PROJECT TITLE
PROJECT NO.
CL,ENT

Continental Street Sanitary Sewer Improvements
02-2020

CONTRACT NO.

Sleepy Hollow, NY

03-2020

CONTRACTOR

CONTRACT DATE

6/12/2020

MTS Infrastructure. LI n

The following changes are hereby made to the Contract Documents:

Loading and hauling away of boulders.

Justification:

Property owner would like to take possession of boulders on a different property and due to not havina a
contract unit price for hauling of boulders/ rocks it would cost $1,600.00 for transporting.

CHANGE TO CONTRACT PRICE
Original Contract Price:

$

$835,411.30

Current contract price, as adjusted by previous change orders:

$

$861,309,10

The Contract Price due to this Change Order will be [increased] [decreased] by
The new Contract Price due to this Change Order will be:

$

$

$1,600.00

$862,909.10

Approvals Required:
To be effective, this order must be approved by the Owner if it changes the scope or objective of the project or as
may otherwise by required under the terms of the Supplementary General Conditions of the Contract.

Requested by ' ^ I ' . p g

Si lug

(TicUA

^'signature

Recommended by

Signature

Accepted b y _ _

Signature

�CHANGE ORDER 4
P R O J E C T TITLE
P R O J E C T NO.
C U E N T

Continental Street Sanitary Sewer Improvements
03^020

CONTRACT NO.

S'eepy HollowjSjY

03-2020

CONTRACTOR

C O N T R A C T DATE

6/12/2020

M T S Infrastructure. I I n

The following changes are hereby made to the Contract Documents:

Coring and installing a watertight boot in existing manhole on Continental Street. Not in oriqinal
y
project documents/ scope.

Justification:
By coring and installing a boot it would enable for a much quicker installation, cleaner and lastly
minimizing the chance of having any future leakage.

CHANGE TO C O N T R A C T P R I C E
Original Contract Price:

$

$835,411.30

Current contract price, as adjusted by previous change orders:

$

$862,909.10

The Contract Price due to this Change Order will be [increased] [decreased] by
The new Contract Price due to this Change Order will be:

$

$

$6,630.00

$869,539.10

Approvals Required:
To be effective, this order must be approved by the Owner if it changes the scope or objective of the project or as
may otherwise by required under the terms of the Supplementary General Conditions of the Contract.

Requested by

/fi'^-'

""'Signature

-

' ~

^

date

Recommended^

Signature

date

Accepted by

Signature

date

jj j i? I zero
:

�CHANGE ORDER 5
PROJECT TITLE
PROJECT NO.
CL,ENT

Continental Street Sanitary Sewer Improvements
03-2020

CONTRACT NO.

Sleepy Hollow, NY

03-2020

CONTRACTOR

CONTRACT DATE

6/12/2020

MTS Infrastructure, LLC

The following changes are hereby made to the Contract Documents:

Supply of Recycled Portland Cement Concrete Aggregate Subbase (RCA) for installation under paved areas rouqhlv
a y
about 125 cy.

Justification:
A field condition was encountered when the geotechnical inspector determined that the excavated material was not
suitable as backfill under areas that are to be paved. The geotechnical engineer has approved the use of Recycled
Portland Cement Concrete Aggregate Subbase (RCA) as backfill in place of the excavated material. Unit pricing of
$45/ C Y to supply and haul the material to the site.

CHANGE TO CONTRACT PRICE
Original Contract Price:

$

$835,411.30

Current contract price, as adjusted by previous change orders:

$

$869,539.10

The Contract Price due to this Change Order will be [increased] [decreased] by
The new Contract Price due to this Change Order will be:

$

$

$5,625.00

$875,164.10

Approvals Required:
To be effective, this order must be approved by the Owner if it changes the scope or objective of the project, or as
may otherwise by required under the terms of the Supplementary General Conditions of the Contract.

Requested by 'n\\fx\

^iLu

(R'O^A

fl^'feidnature

^ J ^ ^

date

)tl\%'jzG?Q
IQ j l ^ j z p l ^

Recommended by

Signature

date

Accepted by

Signature

date

�Meeting Date:
Resolution #:

10/27/2020
10/97/2020

Resolution of the Mayor and the Board of Trustees of the
village of Sleepy Hollow to approve a survey for
the Clinton Street Streetscape Project
Whereas, The Westchester County Planning Department is designing the Clinton Street
Streetscape Project for the Village; and
Whereas, A survey is needed to complete the design for this Project; and
Whereas, The Westchester County Planning Department has solicited proposals for this
service and has identified as Spinelli Surveying as the lowest proposal in the amount of
$7,985.00; and
&amp;o h c rGrant FUndS f ° r

t N S Pr jeCt h3Ve bGen SeCUred th0UQh 3 Communit

°

y Development

Be I t Resolved that the Board of Trustees hereby approves the attached proposal from
Spinelli Surveying in the amount of $7,985.00 to complete a survey for the Clinton Street
Streetscape Project

Moved: Trustee Scaglione

Seconded: Trustee Gonzalez

Vote: Unanimous

�SPINELLI SURVEYING
SPINELLI

~ ( R T

Est. 1947

SURVEYING

(£6-31

650 Halstead Avenue
Mamaroneck, NY 10543
Tel: 914-381-2357
Fax: 914-412-9909
SpinelliSurveying@gmail.com

Proposal To:
Westchester County Department of Planning
Date: 10/12/2020
Job Location:
2610 NY-35, Katonah, NY, USA
Phone:
Email:
Contact: Suzette
sbll@westchestergov.com

Scope of Work:

Topographical Right of W a y Survey of Clinton Street in Sleepy Hollow
(see RPF attached for survey limit map)
Approx. 1140'
See RFP for details of survey needs:
- All specs as per RFP with the exception of 6.(f) only tree sizes will be noted a n d tree species will not be identified

No Property Markers will be set as per this proposal
Payment is due upon completion of the work
Proposal Cost

$7,985.00

Spinelli Surveying will furnish signed &amp; sealed survey in digital format.
Hard copies available upon request.
Additional fee may apply for additional copies or digital files
Any additional work or alteration of work specified above will become an extra charge over the above estimated cost.
Proposal is good for 14 days from the date it was issued.
If applicable, please provide our office with a deed and/or legal description of property.
Spinelli Surveying retains all rights to the work and survey completed in the above agreement.
If you wish to have the above work performed, please fill out the authorization below and return it to our office by email,
mail or fax. Once proposal has been authorized the work will be placed on our schedule.

Authorized Signature

Date

�Tectonic

TEC

Badey &amp; Watson

BergendorffCollins

ro
CC

Spinelli Surveying

Name

$0.00

$12,500.00

provided no price

exception in mapping utility

no exceptions

o
q
iri
T—1
rH
oo
&lt;/V
$12,500.00

exceptions in mapping utilites and property access
upcharge

Comments
exceptions include not identification of tree
species

OJ
&lt;u
$7,985.00

Total

5
_o
"o
X
Q.
01
&lt;D
to
MO
dJ
CUD
J5
&gt;

c
o
4-&gt;
c
u

rH

(N

ro

&lt;3-

LD

�Meeting Date: 10/27/2020
Resolution*: 10/98/2020
Resolution of the Board of Trustees of the Village of Sleepy Hollow to
Set Public Hearing for Short Term Parking
Be it Resolved that the Board of Trustees hereby schedules a public hearing to be
J - S ' Nov^mber 10
^ 7-00 P m or shortly thereafter, at Village
Hall, to hear and consider comments from members of the public regarding the
i T f ° f 1 l m i n U t e S o f o n e s P a c e t 0 b e determined on the West
Side of Cortlandt Street between Depeyster Street and Beekman Avenue from 8:00 a m
to oiuu p.m.
Residents and taxpayers of the Village of Sleepy Hollow are entitled to attend and be
heard at said hearing.
Moved: Trustee Spiro

Seconded: Deputy Mayor Rosenbloom

Vote: Unanimous

�Public Hearing Nntirp
Village of Sleepy Hollow
rUSteeS
d f0r 3 public hearin
t0 be held
SNovember
o v e m h t S10V 0 h2020
2 0 B at
^ 7
. n n Tp.m
T C , a "tthereafter,
on Tuesday,
7:00
or shortly
at Village9 Hall, 28 Beekman
Avenue in Sleepy Hollow, NY, to hear and consider comments from members of the public
regarding the installation of a parking limit of 15 minutes of one space to be determined on
S de of Cortlandt street

a.m.

'

LO » : U U

p.m.

between Depeyster Street and Beekman Avenue from 8 00

Residents and taxpayers of the Village of Sleepy Hollow are entitled to attend and be heard at
saia nearing.
Village Hall is accessible to all disabled persons.
Paula A. McCarthy Tompkins
Village Clerk
Dated: October 27, 2020
914 366 5106

{00972904.docx.}

�Paula Mccarthi
From:
Sent:

To:
Subject-

Sweet Ambateno Bakery &lt;sweetambateno@gmail.com&gt;
Thursday, October 15, 2020 7:41 PM
Diana Loja; Paula Mccarthy
Parking on Cortlandt st

M c
O ^ ' m ™ e i S F r a n C i S C 0 C o e l l ° ' 0 W n e r o f S w e e t A m b a t e n o Bakery, located at
173 Cortlandt st, Sleepy Hollow, NY, 10591.
The reason I am writing to you is to request, if possible, a 15-minute Parking, to facilitate the purchase of my

In the same, (street) it is very difficult to find a free parking and more on weekends, that's why my request
In advance, I appreciate your time and understanding.
I am looking forward to your response
Thank you

l

�Meeting Date:
Resolution #:

10/27/2020
10/99/2020

w-.i R e ^ , " t i o n o f ^ e Mayor and the Board of Trustees of the
Village of Sleepy Hollow to Retain Landscape Architect to Oversee
The Hudson Plaza Project
Whereas, The Village Board is desirous of hiring a landscape architect to oversee the
Hudson Plaza Project;
Whereas, Yost Design Landscape Architecture, LLC has submitted a proposal to
provide this service; and
Whereas, The Village Administrator has reviewed this proposal and has found it to be
acceptable; and
Whereas, Funds for this project have been secured though a Community Benefits
Grant with matching funds coming from Edge-on-Hudson
Be I t Resolved that the Board of Trustees hereby approves the attached proposal
from Yost Design Landscape Architecture, LLC in the amount $7,175 to oversee the
Hudson Plaza Project.
Moved: Trustee Scaglione

Seconded: Trustee Leavy

Vote: Unanimous

�YO ST
DESIGN

178 elizabeth st | pearl river, ny 10965 | p 845 365 4595 f 914 361 4473 | yostdesign.com

October 15, 2020
Proposal #2020 1015

.,
Proposal for:
Construction Administration Services for the
n

Edge-on-Hudson Plaza
Provide construction administration services as outlined below relating to the project described herein:

Client:

Village of Sleepy Hollow
Attn: Anthony Giaccio
28 Beekman Ave
Sleepy Hollow, NY 10591

Project:

Edge-On-Hudson Plaza
50 River Street
Sleepy Hollow, NY 10591

Description:

Construction Administration (CA) Services

Sc

Yost Design LLC shall provide CA services for the project described above. This service will be limited
to the following:

°Pe:

Submittal/Product Data/Samples/Shop Drawings review-two (2) rounds of review. The
anticipated submittal list will be limited to the following:
o
Pavers
o
o
o
o
o

Pergola (courtesy review only-Yost Design will review this submittal for overall design
intent conformance and not for structural integrity)
IPE Bench shop drawings
Mulch
Seed/Sod
Planting

Eight (8) site inspections at intervals appropriate to the stage of construction. Each site visit will
be summarized in a post inspection report that will include:
o
progress photos
o

observations of work performed to ensure general conformance with Contract
Documents

o
any defects or deficiencies observed at the time of the site visit
At the end of construction, Yost Design will perform a pre-acceptance walk thru with the Owner and
issue a punch list if deemed necessary.

Fees:
Submittal review

$2,210

Site Visits and reports

$4,965

Total
Billed monthly based on work completed.

$7,175

�October 15, 2020
Proposal #2020_1015
Reimbursables:
Additional Work:

Plotting, printing, copying costs, postage, and delivery services.
In the event significant revisions or additions to the scope of work are made, the client will be billed
at the following hourly rates unless other terms are agreed upon.
Fee Schedule

$ 125/hr Principal
$ 85/hr Associate Designer

Exclusions:

Request for Information, Change Order review, Schedule review

Responsibility:

Yost Design LLC shall not be responsible for any claims, liabilities, suits, demands, losses, costs and/or
expenses, accruing or resulting from any damages or losses to property or persons, arising out of this
project and/or this agreement for professional services except to the extent such claims are found by
a court or forum of competent jurisdiction to be caused by Landscape Architect's negligent errors or
omissions. Yost Design is authorized to take photos of the property and share any photos so long as
they do not reveal the location of the property or nature of ownership.
Yost Design shall have no responsibility for contractor's means, methods, equipment choice and
usage, work sequencing, schedule, safety programs, or safety practices, nor shall Yost Design have any
authority or responsibility to either stop or direct the work of the contractor. Yost Design's visits will
be for the purpose of attempting to provide the Client a degree of confidence that the completed
construction work will generally conform to the construction documents. Yost Design neither
guarantees the performance of contractors, nor assumes any responsibility for the contractor's failure
to perform their work in accordance with the contract documents.
Yost Design is not responsible for any additional duties other than those expressly provided for in this
Agreement. By signing this contract, the Client agrees that the contractor shall be solely responsible
for job site safety as well as their means and methods; and that the contractor shall indemnify the
Client and Yost Design for all claims and liability arising out of job site accidents; and that the Client
and Yost Design shall be made additional insureds under the contractor's general liability insurance
policy.

Waivers of Consequential Damages and Subrogation:
Client and Yost Design LLC waive all claims to consequential damages for any claims or disputes arising
out of or relating to this agreement.
In addition, Client and Yost Design waive all claims against each other to the extent covered by any
applicable insurance during design or construction, including but not limited to claims for subrogation.

Cancellation:

In the event the project or portions of the project are cancelled or postponed or the client is
nonresponsive for more than 90 days, Yost Design shall be entitled to fees incurred for the work
completed as described above.

Agreement:
Client or Client's Representative

(Name)

(Signature)

(Date)

Village of Sleepy Hollow
Attn: Anthony Giaccio
28 Beekman Ave
Sleepy Hollow, NY 10591

178 elizabeth st | pearl river, ny 10965 | p 845 365 4595 f 914 361 4473 | yostdesign.com

�</text>
                </elementText>
              </elementTextContainer>
            </element>
          </elementContainer>
        </elementSet>
      </elementSetContainer>
    </file>
  </fileContainer>
  <collection collectionId="99">
    <elementSetContainer>
      <elementSet elementSetId="1">
        <name>Dublin Core</name>
        <description>The Dublin Core metadata element set is common to all Omeka records, including items, files, and collections. For more information see, http://dublincore.org/documents/dces/.</description>
        <elementContainer>
          <element elementId="50">
            <name>Title</name>
            <description>A name given to the resource</description>
            <elementTextContainer>
              <elementText elementTextId="12300">
                <text>Board of Trustees Meeting Minutes &amp; Resolutions-2020</text>
              </elementText>
            </elementTextContainer>
          </element>
        </elementContainer>
      </elementSet>
    </elementSetContainer>
  </collection>
  <itemType itemTypeId="1">
    <name>Text</name>
    <description>A resource consisting primarily of words for reading. Examples include books, letters, dissertations, poems, newspapers, articles, archives of mailing lists. Note that facsimiles or images of texts are still of the genre Text.</description>
  </itemType>
  <elementSetContainer>
    <elementSet elementSetId="1">
      <name>Dublin Core</name>
      <description>The Dublin Core metadata element set is common to all Omeka records, including items, files, and collections. For more information see, http://dublincore.org/documents/dces/.</description>
      <elementContainer>
        <element elementId="50">
          <name>Title</name>
          <description>A name given to the resource</description>
          <elementTextContainer>
            <elementText elementTextId="11631">
              <text>MINS_TRUST_2020-10-27_RES-96-99</text>
            </elementText>
          </elementTextContainer>
        </element>
        <element elementId="49">
          <name>Subject</name>
          <description>The topic of the resource</description>
          <elementTextContainer>
            <elementText elementTextId="11632">
              <text>Board of Trustees Minutes-2020</text>
            </elementText>
          </elementTextContainer>
        </element>
        <element elementId="40">
          <name>Date</name>
          <description>A point or period of time associated with an event in the lifecycle of the resource</description>
          <elementTextContainer>
            <elementText elementTextId="11633">
              <text>2020</text>
            </elementText>
          </elementTextContainer>
        </element>
        <element elementId="47">
          <name>Rights</name>
          <description>Information about rights held in and over the resource</description>
          <elementTextContainer>
            <elementText elementTextId="11634">
              <text>Village of Sleepy Hollow All Rights Reserved.</text>
            </elementText>
          </elementTextContainer>
        </element>
        <element elementId="51">
          <name>Type</name>
          <description>The nature or genre of the resource</description>
          <elementTextContainer>
            <elementText elementTextId="11635">
              <text>Text</text>
            </elementText>
          </elementTextContainer>
        </element>
      </elementContainer>
    </elementSet>
  </elementSetContainer>
</item>