<?xml version="1.0" encoding="UTF-8"?>
<item xmlns="http://omeka.org/schemas/omeka-xml/v5" itemId="2335" public="1" featured="0" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://omeka.org/schemas/omeka-xml/v5 http://omeka.org/schemas/omeka-xml/v5/omeka-xml-5-0.xsd" uri="https://sleepyhollow.localarchives.org/items/show/2335?output=omeka-xml" accessDate="2026-09-19T09:24:45+00:00">
  <fileContainer>
    <file fileId="2335">
      <src>https://sleepyhollow.localarchives.org/files/original/328f82da38226151975a0b7a16a62469.pdf</src>
      <authentication>35136c0e8491630ac5723d72cb34455f</authentication>
      <elementSetContainer>
        <elementSet elementSetId="4">
          <name>PDF Text</name>
          <description/>
          <elementContainer>
            <element elementId="52">
              <name>Text</name>
              <description/>
              <elementTextContainer>
                <elementText elementTextId="20822">
                  <text>REGULAR MEETING

NORTH TARRYTOWN, NEW YORK
APRIL 28th, 1994

A regular meeting of the North Tarrytown Planning Board
was held on April 28th, 1994 at 8:00 P.M. in the Village Hall,
28 Beekman Avenue, North Tarrytown, New York.
PRESENT:

George Hritz, Chairman
Donald Caetano
Ellen Tsangaris
James Donovan
David Perlmutter

ABSENT:

Steve Salman
Edward McCarthy

ALSO PRESENT:

Janet Gandolfo, Attorney
Barnes Margotta, Building Inspector
Joe Gulino, CAMCE
Tom Gissen, Clark Assoc.

Mr. Hritz called the meeting to order at 8:00 P.M.
and thanked outgoing Board member, Ray Windas whose term has
expired.and stated that he will be missed. He welcomed Mr.
David Perlmutter, a resident of the Village for many years.
1.

Rock of Salvation, Cortlandt Street-Continuation.

Ron Turnquist, Architect for the Project addressed
and the Board and presented drawings for the Board to review.
Mr. Turnquist described the building as it now is and outlined
the proposed projects. He stated the building would be completed
in stages with the first stage to be the completion of a Sanctuary
with a capacity of 300 people. He also stated that eventually
meeting rooms, day care center and kitchen would be added.
Ms. Gandolfo stated that the Union Hose Fire House,
which is adjacent to the proposed project is concerned about
the increased flow of traffic and would like to review the plans
before the Public Hearing.
After a discussion regarding the Day Care Center,
Rev. San Diego stated that application will be made to the
State and they will determine the number of children and the
size of the center.
Mr. Gissen stated that a Full Environmental Assessment
Form will have to be submitted for their review.
Mr. Gulino, Engineer for the Village stated he has
reviewed the proposed site plan dated December 6th, 1993 and
offerred several comments in a memo dated April 28th, 1994.
(Copy in Official Minutes).

�-2Mr. Hritz suggested that the Architect submit site
plan to the Police and Fire Departments for their comments.
Mr. Caetano moved, seconded by Mr. Donovan that a
Public Hearing be set for the meeting to be held on May 19th,
1994. Carried.
2.

Petry Subdivision, Amos Street-Two Lots.

Mr. Hritz read the notice of Public Hearing for the
application of John and Maureen Petry seeking a subdivision for
a parcel of land located at 41 Amos Street, North Tarrytown, N.Y.
The applicants are proposing to subdivide the property into two
lots. Lot one would be 6,567.4 square feet in size and lot two
would be 6,013.4 square feet in size.
Mr. Hritz asked if there was anyone present who would
like to address the Board.
Mrs. Petry stated she had submitted a revised plot
plan to show present house, driveway and the garage that will
be torn down. It is their intention to create another lot,
and to erect a new house on the new lot.
Glen Weeks, 174 Webber Avenue stated he would like
to be able to review the Site Plan as submitted and asked
several questions regarding drainage, asbestos on the old
garage and the removal of same, erosion and stated he would
like assurances from the owners and the village that his
property would be protected during construction.
Mr. Hritz stated that the Building Inspector would
inspect and make sure that necessary precautions were taken
to protect his property.
Mr. Gulino stated he has reviewed the subdivision plan
dated April 7, 1994 and offered several comments regarding
drainage and water and sewer locations. (Copy in official minutes)
Mr. Gissen stated he has reviewed the subdivision plans
dated April 7th, 1994 and offered several comments regarding
parking and curb cut on Webber Avenue. (Copy of memo in offical
minutes) .
Mr. Weeks asked for further information regarding the
size of the proposed house and its location on the new lot.
Mr. Hritz stated that the Zoning Board will be meeting
on the matter at their May meeting and the couples should meet
to discuss the matter before then. He stated the Planning Board
would meeting after the Zoning Board meeting and would review
the matter.
Discussion followed regarding the retaining wall
and the Building Inspector stated it was in poor condition and
will have to be repaired or replaced.

�After a discussion, Mr. Perlmutter moved, seconded
by Ms. Tsangaris that the matter be adjourned to the May
meeting. Carried.
3.

Viscogliosi-176-178 North Washington Street.-Subdivision»

Mr. John Hughes, Attorney stated that the property
at 176 North Washington Street was a 4-family residence and ,
the 178 North Washington Street was a 1-family residence. He
stated it was the intent of his client to sub-divide the property
and sell one or both buildings. He stated the four family
residence has been there many years and the one family residence
was built in the 1950's. Mr. Hughes stated he would submit
a survey and an EAF for the Board to review.
Mr. Gissen stated they have reviewed the application
and stated the Zoning Board of Appeals has granted the necessary
variances and submitted a memo with their comments. (Memo in
official minutes). CAMCE memo in official minutes.
Ms. Tsangaris moved, seconded by Mr. Perlmutter to
declare the Planning Board the Lead Agency. Carried.
Mr. Caetano moved, seconded by Mr. Perlmutter that
a Public Hearing be held at the May 19th meeting to discuss
the matter. Carried.
4.

Phelps Memorial Hospital Office Building Discussion.

Mr. Gulino reported CAMCE had received a letter
from Phelps Memorial Hospital stated they have negotiated
the reduction of flow from the IBM forced main at their
World Trade Center Pump Station. (Copy in official minutes).
Discussion followed regarding the six foot fence to
be installed. Mr. Hritz stated the hospital would like the
fees waived and the matter was referred to the Village Board.
Discussion followed regarding variances that would
be needed to erect a six-foot fence. Also discussed was the
significant number of fees that the Hospital has not paid.
There being no further business to come before the
meeting Mr. Caetano moved, seconded by Ms. Tsangaris that the
same be duly adjourned. Carried.
ctfully submitted
submitted
ne Amato
ing Clerk

/j

\

�s
C H A R L E S
A . M A N G A N A R O
C O N S U L T I N G
E N G I N E E R S

MEMORANDUM
TO:

Village of North Tarrytown Planning Board

FROM:

Mr. Joseph A. Gulino, P.E.
Project Engineer

DATE:

April 28, 1994

RE:

DeCarip/PetQLSubdivision on Amos Street
Village of North Tarrytown, New York
CAMCE No. 800-22

As requested, we have reviewed the latest revised subdivision plan dated April 7, 1994
by John J. Muldoon, L.S. and offer the following comments or recommendations.

Court Pla^a North. 25 Main Street

A)

A storm drainage design for the house and driveway should be submitted for
review consisting of a dry well and piping. This will require a percolation test
signed and sealed by a New York State licensed engineer.

B)

The house connections sizes for water and sewer and location should be shown
on the drawing. The 4-inch water line should be replaced with a minimum of
6-inch pipeline, preferably an 8-inch pipeline as per the "Ten States Standards"
for water supply.

C)

A fire flow test should be performed to ascertain fire flow capacities for this
area.

Once the above information is submitted, final recommendations will be made to the
Board. If you should have any questions, please let us know.

Hackensack, NJ 07601-7032
201 342 4200 lax 201 342.0790

JAG/jr

120E 75thSI.Suite8C
New York. NY10O21
212 683 7712
PO Box io07
East Stroudsburg. PA 18301
717 421 1499

cc:

Ms. Linda David, Village Administrator
Janet A. Gandolfo, Esq., Village Attorney
Mr. James T. Margotta, Building Inspector
Ms. Susan J. Portman, Associate, Frederick P. Clark Associates
Mr. and Mrs. John Petry, Owner

VNT\800-22\JG042H4M.JR I

�FREDERICK P. CLARK ASSOCIATES, INC.
Planning/Development/Environment/Transportation
Rye, New York and Southport, Connecticut

David J. Portman, A,CP
Howard I. Reynolds, PE
David H. Stolman, AICP

350 Theodore Fremd Avenue
Rye, New York 10580
(914) 967-6540

Michael A. Galante
Joanne P. Meder, AICP
Jim Donovan, RLA. ASLA

MEMORANDUM
To:

Village of North Tarrytown Planning Board

Date:

April 22, 1994

Subject:

Review of Petrv/DeCarlo Subdivision

As requested, we have reviewed the subdivision application
submitted by John and Maureen Petry, as contract vendee, for a
property which is approximately 0.29 acres in size, located at 41
Amos Street on the western side of Amos Street and the eastern side
of Webber Avenue in the R-3 Residence District.
The site (a
"through lot") presently contains a two-story dwelling and a
detached garage with a short macadam driveway off of Amos Street.
The Applicants are proposing to subdivide the property into two
lots. Lot 1 would be 6,554.4 square feet in size and would contain
the existing dwelling. Lot 2 would be 5,999.7 square feet and
would contain the existing garage. The Plan shows that the garage
would be removed from Lot 2 and a new macadam driveway is proposed
to be constructed off of Webber Avenue to serve Lot 1.
The Applicants have submitted the following plan:
"Subdivision of Lands of the Estate of Anna DeCarlo Situate at
North Tarrytown, Town of Mount Pleasant, Westchester County,
N.Y.," scale 1" = 2 0 ' , dated April 7, 1994, prepared by John
J. Muldoon, Professional Land Surveyor.
REVIEW COMMENTS
1.

Application Status:
The Planning Board made a negative
declaration regarding the potential environmental impacts of
this subdivision and approved the preliminary subdivision at
the meeting in March. We distributed the draft resolution of
preliminary subdivision approval by mail on April 1, 1994.

2.

Subdivision Regulation Compliance:
The recent submission
generally complies with the requirements of information to be
supplied for a final subdivision plan.

3

Parking: The issue of the provision of parking for Lot 1 has
been resolved with the location of a proposed 12 ' wide macadam
driveway off of Webber Avenue.
Since Webber Avenue is a

-

Connecticut • (203) 255-3100

FAX • (914) 967-6615

Long Island • (516) 364-4544

�FREDERICK P. CLARK ASSOCIATES, INC.
Planning/Development/Environment/Transportation

County road, approval of a curb-cut along Webber Avenue will
be subject to the Westchester County Department of Public
Works. Additional comments were provided by the Department of
Public Works in the March 30, 1994 letter from the Westchester
County Planning Board to James T. Margotta.
4.

Dedication: The Applicants' plan indicates that Webber Avenue
is 49.5 feet in width. In compliance with Section 12B(2)(b)
of the Village Subdivision Regulations, a strip of land 0.25
feet in width has been shown on the plan for dedication along
Webber Avenue on both lots.
Susan J. Portman, AICP
Associate/Planning

cc:

Linda David, Village Administrator
Janet A. Gandolfo, Esq., Village Attorney
James T. Margotta, Building Inspector
Joseph A. Gulino, PE, Village Engineer
John and Maureen Petry
John J. Muldoon

500\notA-005.sjp

2

�V
x

617.21
Appendix A
State Environmental Quality Review
FULL ENVIRONMENTAL ASSESSMENT FORM

SEQR

t

: The full EAF is designed to help applicants and agencies determine, in an orderly manner, whether a project
n may be significant. The question of whether an action may be significant is not always easy to answer. Frequenti are aspects of a project that are subjective or unmeasureable. It is also understood that those who determine
inificance may have little or no formal knowledge of the environment or may be technically expert in environmental
aalysis In addition, many who have knowledge in one particular area may not be aware of the broader concerns affecting
* question of significance
The full EAF is intended to provide a method whereby applicants and agencies can be assured that the determination
•ocess has been orderly, comprehensive in nature, yet flexible to allow introduction of information to fit a project or action.
«fl EAF Components: The full EAF is comprised of three parts:
Part 1: Provides objective data and information about a given project and its site. By identifying basic project
data, it assists a reviewer in the analysis that takes place in Parts 2 and 3.
Part 2: Focuses on identifying the range of possible impacts that may occur from a project or action. It provides
guidance as to whether an impact is likely to be considered small to moderate or whether it is a potentiallylarge impact. The form also identifies whether an impact can be mitigated or reduced.
Part 3: If any impact in Part 2 is identified as potentially-large, then Part 3 is used to evaluate whether or not the
impact is actually important.

DETERMINATION OF SIGNIFICANCE-Type 1 and Unlisted Actions
Identify the Portions of EAF completed for this project:

IS

Part 1

B

Part 2

QPart 3

Upon review of the information recorded on this EAF (Parts 1 and 2 and 3 if appropriate), and any other supporting
nation, and considering both the magitude and importance of each impact, it is reasonably determined by the
agency that:
•
"B A. The project will not result in any large and important impacts) and, therefore, is one which will not
have a significant impact on the environment, therefore a negative declaration will be prepared. D

B. Although the project could have a significant effect on the environment, there will not be a significant
effect for this Unlisted Action because the mitigation measures described in PART 3 have been required,
therefore a CONDITIONED negative declaration will be prepared.*

0

C. The project may result in one or more large and important impacts that may have a significant impact
on the environment, therefore a positive declaration will be prepared.
* A Conditioned Negative Declaration is only valid for Unlisted Actions

M a t t e r of V l s c o g l i o s l ~T\MQ LOt
Name of Action

J*ubd«^»^ioA

P l a n n i n g Board - V i l l a g e of North Tarrytown
Name oi Lead Agency .

f ResponsibleOfficuJriUaidAgency

tfeof
' Title
of Responsible Officer

iature of Responsible Officer in LeadXgepcy
Signature of Preparer (If different from responsible officer)
'
JOHN J. HUGHES, JR.
May 16, 1994
Date

�i Ap

PART 1—PROJECT INFORMATION
Prepared by Project Sponsor

fc

NOTICE: This document is designed to assist in determining whether the action proposed may have a significantd RRe
(
o n the environment. Please complete the entire form, Parts A through E. Answers to these questions will be conui
^as part of the application for approval and may be subject to further verification and public review. Provide any addrtf Is
Information you believe will be needed to complete Parts 2 and 3
i Wl
It is expected that completion of the full EAF w i l l be dependent on information currently available and will notiml
new studies, research or investigation. If information requiring such additional work is unavailable, so indicate andsp ' ' $
each instance.
IQ Q
11 D

NAME OF ACTION

Matter of V l s c o g l i o s i Tuud lo-f- i u b c W t ^ C M
LOCATION OF ACTION (Include Strefll Address, Municipality and County)
1 7 6 - 1 7 8 North Washington S t r e e t , North Tarrytown, W e s t c h e s t e r

County

NAME OF APPLICANT/SPONSOR
Marcello Visjpogliosi

12 Ai

BUSINESS TELEPHONE

( 9 1 4 ) 631-8855

AOORESS

c / o J . Hughes, J r . , Esq.

49 Beekman Avenue

CTTY/FO

STATE

North Tarrytown, NY

ZIP CODE

10591

NY

NAME OF OWNER (If different)

14

BUSINESS TELEPHONE

same as owner

(

•)

:„„
C

N/A

AOORESS

15 St:

N/A
crrv/po
N/A

STATE

ZIP CO0E

N/A

N/A
16 La

DESCRIPTION OF ACTION

Subdivision - 2 lots

17 Is
a)
b)
18 Is
Se

Please Complete Each Question—Indicate N.A. if not applicable

A. Site Description
Physical setting of overall project, both developed and undeveloped areas.
1. Present land use:
OUrban
DIndustrial
•Commercial
CSResidential (suburban)
DForest

OAgriculture

2. T o t a l acreage of project area:

\ ^

0&gt;\5

19 Is
of
• R u r a l (non-ft 20 Ha

-DOther
acres.
PRESENTLY

AFTER COMPLETION

arres

arm

Forested

acres

arm

Agricultural (Includes orchards, cropland, pasture, etc

acre*

arm

W e t l a n d (Freshwater or tidal as per Articles 24, 25 of ECL))

acres

arm

W a t e r Surface Area

acres

acre?

Unvegetated (Rock, earth or fill)

acres

APPROXIMATE ACREAGE
M e a d o w or Brushland (Non-agricultural)

Roads, buildings and other paved surfaces\A\nAS£apiA&lt;i(A.C)2.J
J
Other (Indicate type! R e s i d e n t i a l
3. W h a t is predominant soil type(s) on project site?

0« l i s
-J**

U rlo&amp;n IflrtrJ - f" htor\-ton

• •

B. Pr
Phys
a.
b
c.
d

*cr«*

acres
acres

; &amp;

acre

(bw\(ikA

a. Soil drainage:

B W e l l drained
100
% of site
DModerately well drained
% of site
• Poorly drained
% of site
If any agricultural land is involved, how many acres of soil are classified within soil group 1 through 4 of theN
Land Classification System'
acres (See 1 NYCRR 370) N/A

4. A r c there bedrock outcroppings on project site?
a. W h a t is depth to bedrock' A p p r o x . 1 0 - 1 5

r

*r

DYes
(in

(£;No
feet)

In
V
i. 1
I I

�slopes.

#0-16%
D15%

/oft

or greater

_ %

!s project substantially contiguous to. or contain a building, site, or district, listed on the State or the National
icant effec Registers of Historic Places?
DYes
2lNo
consider
DYes
IS No
addition Is project substantially contiguous to a site listed on the Register of National Natural Landmarks?
What is the depth of the water tahlp?APP.10- {in feet)
otHBfoto
DYes
QNo
a n d specif Is site located over a primary, principal, or sole source aquifer?
i Do hunting, fishing or shell fishing opportunities presently exist in the project area?

DYes

CSNo

Does project site contain any species of plant or animal life that is identified as threatened or endangered?
DYes
BNo
According to
Identify each species
Are there any unique or unusual land forms on the project site? (i.e., cliffs, dunes, other geological formations)
DYes
®No
Describe
:

20DE

) Is the project site presently used by the community or neighborhood as an open space or recreation area?
DYes
©No
If yes, explain _ ^ _ &gt; _ _ _ _ _ _ _ _ _ — _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ » _ _ _ _
4 Does the present site include scenic views known to be important to the community?
DYes
®No

:OOE

5 Streams within o r contiguous t o project area:
None
a. N a m e o f Stream a n d name of River to which it is tributary
I Lakes, ponds, w e t l a n d areas within or contiguous t o project area:
a. N a m e None

N/A

b. Size (In acres)

N/A

7 Is the site served by existing public utilities?
OYes
DNo
a) If Yes, does sufficient capacity exist to allow connection?
DYes
DNo
b) If Yes, w i l l improvements be necessary to allow connection?
S9Yes
DNo
I Is the site located in a n agricultural district certified pursuant t o Agriculture a n d M a r k e t s Law, Article 25-AA,
Section 303 and 304?
DYes
K)No
' Is the site located in or substantially contiguous to a Critical Environmental Area designated pursuant to Article 8
of the ECL, and 6 NYCRR 617?
@Yes
DNo
( n o n - f a n * Has the site ever been used for the disposal o f solid or hazardous wastes?

LETION

DYes

CSNo

(J, Project Description
Physical dimensions and scale of project (fill in dimensions as appropriate)
a. Total contiguous acreage owned or controlled b y project sponsor
b. Project acreage to be developed:
']^ 0*\* acres initially;
y ^ O ' * ^
u
c.'-Project acreage to remain undeveloped
acres.

acres ultimately.
acn

d. Length of project, in miles: N/A

(If appropriate)
e. If the project is an expansion, indicate percent o f expansion proposed
f. Number of off-street parking spaces existing
-frMaxmium-wmetHai^rips^enerated -per hopr —

6
N

," ^

h. If residential: Number and tyt&amp;of housing; units;) *&amp;.
One Family
'*•
Two Family
oftl

Initially

*

Ultimately

1

...

%v

6 -fQfo.1

; proposed
(upon completion of 'project)? N^" CM&amp;totf&amp;
Multiple Family
1

Condominium

_

J. Dimensions (in feet) of largest proposed structure

35

height;

20*

j Jffi lehgth.

width

j. Linear feet of frontage along a public thoroughfare project will occupy u?APP iwfabit
3

�2. How much natural material (i.e., rock, earth, etc.) will be removed from the site?
3. Will disturbed areas be reclaimed?

DYes

DNo

N/A

tons/cub

0N/A

a. If yes. for what intend., purpose is the site being reclaimed?
b. Will topsoil be stockpiled for reclamation?

DYes

•

©No

c. Will upper subsoil be stockpiled for reclamation?

DYes

ENo

4. How many acres of vegetation (trees, shrubs, ground covers) will be removed from site? None

ac

5. Will any mature forest (over 100 years old) or other locally-important vegetation be removed by this pre
DYes
0No
6. If single phase project: Anticipated period of construction

N/A

months, (including demolition).

7. If multi-phased:
a. Total number of phases anticipated

N

^A

(number).

b. Anticipated date of commencement phase 1

N

/A

month

N

c. Approximate completion date of final phase

N

A

month

N/A

/

d. Is phase 1 functionally dependent on subsequent phases?
0. Will blasting occur during construction?

DYes

9. Number of jobs generated: during construction
.10. Number of jobs eliminated by this project

/A

DYes

yssr, (including derr
y^.
QNo

EJNo
N/A

; after project is complete . N/A

N/A

11. Will project require relocation of any projects or facilities?

12. Is surface liquid waste disposal involved?

DYes

DYes

0No

(SNo

a. If yes, indicate type of waste (sewage, industrial, etc.) and amount
b. Name of water body into which effluent will be discharged
13. Is subsurface liquid waste disposal involved?

I yes, explain

DYes

N/A

,

N/A

QNo

Type

14. Will surface area of an existing water body increase or decrease by proposal?
Explain
15. Is project or any portion of project located in a 100 year flood plain?
16. Will the project generate solid waste?

DYes

a. If yes, what is the amount per month

DYes

(SNo

C&amp;Nc

03No

N/A

tons

b. If yes, will an existing solid waste facility be used?
c. If yes, give name

OYss

No

a d d i t i o n a l waste

GO Yes

N/A

DNo

; location

N

/A

d. Will any wastes not go into a sewa'ge disposal system or into a sanitary landfill?

LYes

©No

e. If Yes, explain
17. Will the project involve the disposal of solid waste?

DYes

a. If yes, what is the anticipated rate of disposal?
b. If yes, what is the anticipated site life?
18. Will project use herbicides or pesticides?

K)No No a d d i t i o n a l

N/A

N/A

tons/month
years.

DYes

QSNo

1g, Will project routinely produce odors (more than one hour per day)? DYes

KJNo

20. W i l l project produce operating noise exceeding the local ambient noise levels?
2 1 . Will project result in an increase in energy use?
If yes , indicate type(s)

DYes

Total anticipated water usage per day

N/A

N/A

gallons/minute

gallons/day

2 4 Does project involve Local. State or Federal funding?
If Yes. explain

E3No

N/A

22. If water supply is from wells, indicate pumping capacity
23

DYes

DYes

N/A

09No
.

4

ENo

�DYes

ED No

City. Town. Village Planning Board

3Yes
3 Yes

DNo

City. Town Zoning Board

0Yes

DNo

City, County Health Department

DYes

K)No

DYes

EJNo

Other Regional Agencies

DYes

09 No

State Agencies

DYes

©No

federal Agencies

DYes

CSNo

^ City, ^own.. Village Board

her Local Agencies

Subdivision
Variances - already granted

4794_

ion) c. Zoning and Planning Information
I Does proposed action involve a planning or zoning decision?
©Yes
DNo
If Yes. indicate decision required:
Dzoning amendment
Qflzoning variance
Dspecial use permit
Bsubdivision
Dnew/revision of master plan
Dresource management plan
Dother
R

I What is the zoning classification(s)of the site?

"5

Dsite plan

^

) What is the maximum potential development of the site if developed as permitted by the present zoning?
Five (5) r e s i d e n t i a l units fecijfi'yi«t l^/f^YtfOlflHCeTy? TIAJO hor2-FfLwiitu
JfrtffliVgS CClie
i What is the proposed zoning of the site?

R-5

MO Clyanjg,

;

pe.&lt;r , / o 4 Q

5 What is the maximum potential development of the site if developed as permitted by the proposed zoning?
5—s«cidantial units.
/si A
6 Is the proposed action consistenfwith the recommended uses in adopted local land use plans?

ED Yes

DNo

^ What are the predominant land use(s) and zoning classifications within a V* mile radius of proposed action?
Residential - multi-family. Cinq/p-flwihlf CCMMencid | Cfrrfc., 'ft^fK-Hdyttl,
(hAlt&gt;licl$M'P*WC
R . - J , p - t y g - ^ i Prbi C-ht-Z
&lt;-&gt;
r^
'
'
**
'
I Is the proposed action compatible with adjoining/surrounding land uses within a V* mile?
EDYes
DNo
9 If the proposed action is the subdivision of land, how many lots are proposed?
2
a. What is the minimum lot size proposed?

^lcnac ace attached-stag. AffftiX'Z-rfOO

10 Will proposed action require any authorization(s) for the formation of sewer or water districts?

S^-ft
DYes

BNo

11 Will the proposed action create a demand for any community provided services (recreation, education, police,
fire protection)?
DYes
QNo
HA&lt;
a. If yes. is existing capacity sufficient to handle projected demand?

GBYes

DNo

12 Will the proposed action result in the generation of traffic significantly above present levels? A/A DYes
a. If yes. is the existing road network adequate to handle the additional traffic?

EYes

GSNo

DNo

D. Informational Details
Attach any additional information as may be needed to clarify your project If there are or may be any adverse
impacts associated with your proposal, please discuss such impacts and the measures which you propose to mitigate or
avoid them.

j certify that the information provided above is true to the best of my k n ^ ) e c f | e / ^
Applicant/Sponsor
Name
Cant/bponSOr Name
ture ^j/U

,

Marcello
n a r c e x x o Viecogliosi
VXBCUKXXOSX

i&amp;td&amp;1&lt;vfk , k fak**j fc H^i

'"-'

l

h

t

Title .

flats

;

V / ^ v '''•'-'•
5/16/94

9BSJL

action is in the Coastal Area, and you are a state agency, complete the Coastal Assessment Form before proceeding
this assessment.
5

�I c-ii ^ - P R O J E C T I M P A C ' I S A N D I H h i H M A G U i ' i u U L
Responsibility of Lead Agency
General Information (Read Carefully)
' • In completing the form the reviewer should be guided by the question: Have my responses and determinations b*
reasonable? The reviewer is not expected to be an expert environmental analyst.
• Identifying that an impact will be potentially large (column 2) does not mean that it is also necessarily signifies
Any large impact must be evaluated in PART 3 to determine significance. Identifying an impact in column 2 sim:
asks that it be looked at further.
• The Examples provided are to assist the reviewer by showing types of impacts and wherever possible the threshold
magnitude that would trigger a response in column 2. The examples are generally applicable throughout the State?
for most situations. But, for any specific project or site other examples and/or lower thresholds may be appropn&lt;!
for a Potential Large Impact response, thus requiring evaluation in Part 3.
• The impacts of each project, on each site, in each locality, will vary. Therefore, the examples are illustrative i
have been offered as guidance. They do not constitute an exhaustive list of impacts and thresholds to answer each quest-:
• The number of examples per question does not indicate the importance of each question.
• In identifying impacts, consider long term, short term and cumlative effects.
Instructions (Read carefully)
a. Answer each of the 19 questions in PART 2. Answer Yes if there'will be any impact.
b. Maybe answers should be considered as Yes answers.
c. If answering Yes to a question then check the appropriate box (column 1 or 2) to indicate the potential size off
impact. If impact threshold equals or exceeds any example provided, check column 2. If impact will occur but threshc
is lower than example, check column 1.
d. If reviewer has doubt about size of the impact then consider the impact as potentially large and proceed to PARI
e. If a potentially large impact checked in column 2 can be mitigated by changes) in the project to a small to modern
impact, also check the Yes box in column 3. A No response indicates that such a reduction is not possible. V
must be explained in Part 3.

IMPACT ON LAND
1. Will the proposed action result in a physical change to the project site?
G9NO
DYES
Examples that would apply to column 2
• Any construction on slopes of 15% or greater, (15 foot rise per 100
foot of length), or where the general slopes in the project area exceed
10%.
• Construction on land where the depth to the water table is less than
3 feet.
• Construction of paved parking area for 1,000 or more vehicles.
• Construction on land where bedrock is exposed or generally within
3 feet of existing ground surface.
• Construction that will continue for more than 1 year or involve more
than one phase or stage.
• Excavation for mining purposes that would remove more than 1.000
tons of natural material (i.e., rock or soil) per year.
* Construction drlespaniion oi a ^anitaty-Undfilt- J * £ —
• Construction in a'designated floodway."^fS^%:icv:--:";;' ""£:
• Other'impacts •
"r&amp;lStqKr* - "

1

2

Small to
Moderate
Impact

Potential
Large
Impact

D

D

DYes

DNc

•

D

DYes

DNc

n

D
D

DYes

DNc

DYes

DNe

D

DYes

DNc

D
D
D

!

D
GYes

-rQ-

D

Can Impact E;
Mitigated By
Project Chang

•vG-

DNOJ

-G.Yes---{3Nc;

• D
DYes'"GNO

2. Will there be an effect V .iy uiii&lt;|ui&gt; or unusual land forms found on
the site? (i.e., cliffs, dunes, geological formations, etc.)ONO
DYES
•W*A
• Specific land forms: _.

D

—"Ves • GNo

�IMPACT O N WATER
WW proposed action affect any water body designated as protected?
(Under Articles 15. 24, 25 of the Environmental Conservation Law. ECU
KNO
DYES
Examples that would apply to column 2
elopable area of site contains a protected water body.
• Iging more than 100 cubic yards of material from channel of a
protected stream.
• Extension of utility distribution facilities through a protected water body.
1

Can Impact Be
Mitigated By
Project Change

Moderate
Impact

r oieMiai
Large
Impact

D
D

D
D

DYes

DNo

DYes

DNo

D
D
D

D
D
D

DYes

DNo

D

DYes

DNo

DYes

DNo

D

DYes

DNo

D
D

D
D

DYes
DYes

DNO

D
D

D
D

DYes

DNo

DYes

DNo

D

D

DYes

DNO

D

D

DYes

DNO

Proposed Action will adversely affect groundwater.
liquid effluent will be conveyed off the site to facilities which presently
do not exist or have inadequate capacity

D
D

D
D

DYes
DYes

DNO

Proposed Action would use water in excess of 20.000 gallons per
day.

D

D

DYes

DNO

Proposed Action will likely came siltation or other discharge into an
existing body of waier io tue extent that there will be an obvious visual
contrast to natural conditions.

D

D

DYes

DNO

Proposed Action will require the storage of petroleum or chemical
products greater than 1,100 gallons.

D

D

DYes

DNo

'Proposed Action will allow residential uses in areas without water
and/or sewer services.

D

D

DYes

DNo

Proposed Action locates commei_iai and/or industrial uses which may
require new or expansion of existing waste treatment and/or storage
facilities.

D

DYes

DNo

Other

D

QYes

DNo

DYes

DNo

Construction in a designated freshwater or tidal wetland.

•Other impacts:

( Will proposed action affect any non-protected existing or new body
of water?
UNO
DYES
Eiamples that would apply to column 2
• A10% increase or decrease in the surface area of any body of water
or more than a 10 acre increase or decrease.
Construction of a body of water that exceeds 10 acres of surface area.
Other impacts:

i Will Proposed Action affect surface or groundwater
quality or quantity?
QNO
Examples that would apply to column 2

DNO

DYES

Proposed Action will require a discharge permit.
Proposed Action requires use of a sburce of water that does not
have approval to serve proposed (project) action.

«

ed Action requires water supply from wells with greater than 45
s per minute pumping capacity

•Construction or operation causing any contamination ot a water
supply system

impacts:

roposed action alter drainage flow or patterns, or surface
d ^ P runoff?
ENO
DYES
Eiamples that would apply to column 2
Proposed Action would change flood water flows

D

D

DNO

�Small to
Moderate
Impact

2
Potential
Large
Impact

Can Impact Be
Mitigated By
Project Change

D
D
D
D

D
D
D

•

DYes
DYes
DYes
DYes

DNo
DNo
DNo
GNo

D

D

DYes

DNo

• Proposed Action will result in the incineration of more than 1 ton of
refuse per hour.

D

a

DYes

GNo

• Emission rate of total contaminants will exceed 5 lbs. per hour or a
heat source producing more than 10 million BTU's per hour.

D

D

DYes

DNO

• Proposed action will allow an increase in the amount of land committed
to industrial use.

D

a

DYes

GNO

• Proposed action will allow an increase in the density of industrial
development within existing industrial areas.

D

a

DYes

GNO

• Other impacts:

D

a

GYes

GNO

a
a
a
a

a
a
a
a

GYes

GNo

GYes
GYes

GNO

GYes

GNO

a
a

a

GYes

GNO

G

GYes

GNO

a

a

GYes

GNO

'Proposed Action may cause substantial erosion.
* Proposed Action is incompatible with existing drainage patterns.
* Proposed Action will allow development in a designated floodway.
* Other impacts:

IMPACT ON AIR
7. Will proposed action affect air quality?
BNO
DYES
Examples that would apply to column 2
• Proposed Action will induce 1,000 or more vehicle trips in any given
hour.

_,

IMPACT O N PLANTS A N D ANIMALS
8. Will Proposed Action affect any threatened or endangered
species?
El NO
Examples that would apply to column 2
•

DYES

Reduction of one or more species listed on the New York or Federal
list using the site, over or near site or found on the site.

• Removal of any portion of a critical or significant wildlife habitat.
• Application of pesticide or herbicide more than twice a year, other
than for agricultural purposes.
• Other

impacts:

9. Will Proposed Action substantially affect non-threatened or
non-endangered species?
E3NO
Examples that would apply to column 2

GNO

DYES

• Proposed Action would substantially interfere with any resident or
migratory fish, shellfish or wildlife species.
• Proposed Action requires the removal of more than 10 acres
of mature forest (over 100 years of age) or other locally important
vegetation.
I M P A C T O N AGRICULTURAL LAND RESOURCES
LO Will the Proposed Action affect agricultural land resources?
BNO
DYES
Examples that would apply to column 2
• The proposed action would sever, cross or limit access to agricultural
land (includes cropland, hayfields. pasture, vineyard, orchard, etc.)
8

• I

�»

struction activity would excavate or compact the soil profile of
iultural land.

• The proposed action would irreversibly convert more than 10 acres
of agricultural land or, if located in an Agricultutal District, more
than 2.5 acres of agricultural land.
1
The proposed action would disrupt or prevent installation of agricultural
land management systems (e.g.. subsurface drain lines, outlet ditches,
strip cropping); or create a need for such measures (e.g. cause a farm
field t o drain poorly due to increased runoff)
• Other impacts:

IMPACT O N AESTHETIC RESOURCES
11 W i l l proposed action affect aesthetic resources?
BONO
DYES
(If necessary, use the Visual EAF Addendum in Section 617.21,
Appendix B.)
Examples that would apply t o column 2
1
Proposed land uses, or project components obviously different f r o m
or in sharp contrast to current surrounding land use patterns, whether
man-made or natural.
Proposed land uses, or project components visible to users of
aesthetic resources which will eliminate or significantly reduce their
enjoyment of the aesthetic qualities of that resource.
ct components that w i l l result in the elimination or significant
ning of scenic views known to be important to the area
»Other impacts:

»

IMPACT O N HISTORIC A N D A R C H A E O L O G I C A L RESOURCES
12 W i l l Proposed Action impact any site or structure of historic, prehistoric or paleontological importance?
ENO
DYES
Examples that would apply t o column 2
• Proposed Action occurring wholly or partially within or substantially
contiguous to any facility or site listed on the State or National Register
of historic places.
• Any impact to an archaeological site or fossil bed located within the
project site.
&gt; Proposed Action will occur in an area designated as sensitive for
archaeological sites on the NYS Site Inventory
» Other impacts:
_____

IMPACT O N O P E N S P A C E A N D RECREATION
13 Witt Proposed Action affect the quantity or quality of existing or
future open spaces or recreational opportunities?
mples that would apply t o column 2
CD NO
DYES
ermanent foreclosure of a future recreational opportunity,
•
i A major reduction of an open space important to the community
• Other impacts:

9
#

•m

2

1
Small to
Moderate
Impact

Potential
Large
Impact

D

D

DYes

DNo

D

D

DYes

DNo

D

D

DYes

DNo

D

D

DYes

DNo

D

D

DYes

DNo

D

D

DYes

DNo

D

D

DYes

DNo

D

D

DYes

DNo

D

D

DYes

DNo

D

D

CYes

DNo

.DYes

DNo

D

Can Impact Be
Mitigated By
Project Change

D

D

DYes

DNo

D
D
D

D
D
D

DYes
DYes
DYes

DNo
DNo
DNo

�IMPACT ON TRANSPORTATION
14. Will there be an effect to existing transportation systems?
ENO
Examples that would apply to column 2

DYES

• Alteration of present patterns of movement of people and/or goods.

1
Small to
Moderate
Impact

2
Potential
Large
Impact

D

D
D
D

• Proposed Action will result in major traffic problems.

•

• Other impacts:

D

Can Impact Bt
Mitigated By
Project Change 18
DYes
DYes
DYes

DNe
DNJ
DNC

IMPACT ON ENERGY
15. Will proposed action affect the community's sources of fuel or
energy supply?
ENO^. DYES
Examples that would apply to column 2
• Proposed Action will cause a greater than 5% increase in the use of
any form of energy in the municipality.
• Proposed Action will require the creation or extension of an energy
transmission or supply system to serve more than 50 single or two family
residences or to serve a major commercial or industrial use.
• Other impacts:

• T
P
• T
w
• P
• P
• P
OI

D

D

DYes

D

D

DYes

• D
(e
DNe • P
• Pi

• O

D

D

DYes

DNo

•

D

DYes

DNo

D
D

D
D

DYes

DNo

DYes

DNo

•

•

DYes

DNO

D

D

DYes

DNO

NOISE AND ODOR IMPACTS
16. Will there be objectionable QfJors, noise, or vibration as a result
of the Proposed Action?
ENO
DYES
Examples that would apply to column 2
Hasting within 1,500 feet of a hospital, school or other sensitive
facility.
• Odors will occur routinely (more than one hour per day).
• Proposed Action will produce operating noise exceeding the local
ambient noise levels for noise outside of structures.
• Proposed Action will remove natural barriers that would act as a
noise screen.
• Other

impacts:
IMPACT ON PUBLIC HEALTH

17

Will Proposed Action affect public health and safety?
BNO
Examples that would apply to column 2

DYES

• Proposed Action may cause a risk of explosion or release of hazardous
substances (i.e. oil, pesticides, chemicals, radiation, etc.) in the event of
accident or upset conditions, or there may be a chronic low level
discharge or emission.
_
•-ProposedAction may result in^he burial x&gt;f "hazardous ^vastes- in any
form (i.e. toxic, poisonous, highly reactive, radioactive, irritating,
infectious, etc.)
^uStorage facilities for one million or more gallons of liquified natural
fleas or other flammable liquids.
• Proposed action may result in the excavation or other disturbance
within 2,000 feet of a site used for the disposal of solid or hazardous
waste.
• Other impacts:
_ _ _
_

D

:g;
D
D

a

D

DYes

Part
miti
Instr
Disc
1 F
2. C
DNo
3 t

B r — - © Y e s —QNo

•
C

DYes

DNo

DYes

Dm

DYes DN«

(C

�IMPACT O N GROWTH A N D CHARACTER
OF C O M M U N I T Y OR N E I G H B O R H O O D
,18 Will'proposed action affect the character of the existing community?
I
ENO
DYES
Examples that would apply to column 2

1
Small to
Moderate
Impact

Potential
Large
Impact

•

a

DYes

DNo

D

D

DYes

DNo

D
D
D

D
D

DYes
DYes
DYes

DNo
DNo
DNo

DYes

DNo

DYes
DYes
DYes

DNo
DNo
DNo

, ^ V permanent population of the city, town or village in which the
project is located is likely to grow by more than 5%.
• The municipal budget for capital expenditures or operating services
will increase by more than 5% per year as a result of this project.
• Proposed action will conflict with officially adopted plans or goals.
• Proposed action will cause a change in the density of land use.
• Proposed Action will replace or eliminate existing facilities, structures
or areas of historic importance to the community.

2

a
a

• Proposed Action will set an important precedent for future projects.

•
•

• Proposed Action will create or eliminate employment.

D

D
D

• Other

•

a

• Development will create a demand for additional community services
(e.g. schools, police and fire, etc.)

impacts:

i

3

i

Can Impact Be
Mitigated By
Project Change

19. Is there, or is there likely to be, public controversy related to
potential adverse environmental impacts?
El N O
DYES

Iff Any Action in Part 2 Is Identified as a Potential Large Impact or
If You Cannot Determine the Magnitude of Impact, Proceed to Part 3
l

Part 3—EVALUATION OF THE IMPORTANCE OF IMPACTS
Responsibility of Lead Agency
Part 3 must be prepared if one or more impact(s) is considered to be potentially large, even if the impact(s) may be
litigated.
Instructions
Discuss the following for each impact identified in Column 2 of Part 2:
jl Briefly describe the impact.
j! Describe (if applicable) how the impact could be mitigated or reduced to a small to moderate impact by project change(s).
J Based on the information available, decide if it is reasonable to conclude that this impact is important.
To answer the question of importance, consider:
• The probability of the impact occurring
• The duration of the impact
• Its irreversibility, including permanently lost resources of value
• Whether the impact can or will be controlled
• The regional consequence of the impact
• Its potential divergence from local needs and goals
• Whether known objections to the project relate to this impact.
^•totinue on attachments)

11

7 ? ~««^tmmm~*

~~

~^~^ ~:_T~__ir~

H

�&lt;

V

Approved/iwith r e s p e c t t o substance and form:

Vifllage Attorney
D&lt;Jited:

Approved^ by t h e planning Board

&gt; i&lt;
r Acting Chairroa

F i l e d with V i l l a g e Clerk

e%g£3T=e^- Deputy Clerk

D^ted: Ifajiy

�</text>
                </elementText>
              </elementTextContainer>
            </element>
          </elementContainer>
        </elementSet>
      </elementSetContainer>
    </file>
  </fileContainer>
  <collection collectionId="135">
    <elementSetContainer>
      <elementSet elementSetId="1">
        <name>Dublin Core</name>
        <description>The Dublin Core metadata element set is common to all Omeka records, including items, files, and collections. For more information see, http://dublincore.org/documents/dces/.</description>
        <elementContainer>
          <element elementId="50">
            <name>Title</name>
            <description>A name given to the resource</description>
            <elementTextContainer>
              <elementText elementTextId="14838">
                <text>Planning Board Minutes &amp; Resolutions-1994</text>
              </elementText>
            </elementTextContainer>
          </element>
        </elementContainer>
      </elementSet>
    </elementSetContainer>
  </collection>
  <itemType itemTypeId="1">
    <name>Text</name>
    <description>A resource consisting primarily of words for reading. Examples include books, letters, dissertations, poems, newspapers, articles, archives of mailing lists. Note that facsimiles or images of texts are still of the genre Text.</description>
  </itemType>
  <elementSetContainer>
    <elementSet elementSetId="1">
      <name>Dublin Core</name>
      <description>The Dublin Core metadata element set is common to all Omeka records, including items, files, and collections. For more information see, http://dublincore.org/documents/dces/.</description>
      <elementContainer>
        <element elementId="50">
          <name>Title</name>
          <description>A name given to the resource</description>
          <elementTextContainer>
            <elementText elementTextId="14193">
              <text>MINS_PLAN_1994-04-28</text>
            </elementText>
          </elementTextContainer>
        </element>
        <element elementId="49">
          <name>Subject</name>
          <description>The topic of the resource</description>
          <elementTextContainer>
            <elementText elementTextId="14194">
              <text>Planning Board Minutes &amp; Resolutions-1994</text>
            </elementText>
          </elementTextContainer>
        </element>
        <element elementId="40">
          <name>Date</name>
          <description>A point or period of time associated with an event in the lifecycle of the resource</description>
          <elementTextContainer>
            <elementText elementTextId="14195">
              <text>1994</text>
            </elementText>
          </elementTextContainer>
        </element>
      </elementContainer>
    </elementSet>
  </elementSetContainer>
</item>
