<?xml version="1.0" encoding="UTF-8"?>
<item xmlns="http://omeka.org/schemas/omeka-xml/v5" itemId="2352" public="1" featured="0" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://omeka.org/schemas/omeka-xml/v5 http://omeka.org/schemas/omeka-xml/v5/omeka-xml-5-0.xsd" uri="https://sleepyhollow.localarchives.org/items/show/2352?output=omeka-xml" accessDate="2026-09-19T10:18:37+00:00">
  <fileContainer>
    <file fileId="2352">
      <src>https://sleepyhollow.localarchives.org/files/original/49a49cf07b984ec4679c72439b5b120a.pdf</src>
      <authentication>3454db3c74092363042d982cecd16caa</authentication>
      <elementSetContainer>
        <elementSet elementSetId="4">
          <name>PDF Text</name>
          <description/>
          <elementContainer>
            <element elementId="52">
              <name>Text</name>
              <description/>
              <elementTextContainer>
                <elementText elementTextId="20839">
                  <text>*~_J=^1 -•-A-/- ^ ' &lt;^*&lt;r_ .fA ^

REGULAR MEETING

y • 2.. -rz

NORTH TARRYTOWN, NEW YORK
OCTOBER 21st, 1993

A regular meeting of the North Tarrytown Planning
Board was held on October 21st, 1993 at 8:15 P.M. in the Village
Hall, 28 Beekman Avenue, North Tarrytown, New York 10591.
PRESENT:

George Hritz, Chairman
Ellen Tsangaris
Donald Caetano
Edward McCarthy
Roman Windas
James Donovan

ABSENT:

Steven Salman

ALSO PRESENT:

Janet Gandolfo, Attorney
Susan Portman, Clark Assoc.
Joe Gulino, CAMCE
James Margotta, Building Inspector
Chairman Hritz called the meeting to order at 8:15 P.M.

1.

C M . Pateman, F. Racanelli, T. Lupetin, North Broadway
Car Wash Continued.

Chairman Hritz stated that a letter had been received
from the applicant's attorney requesting that the matter be
adjourned sine die until it is determined what final action will
be taken by the Board of Trustees regarding the moratorium.
Mr. Caetano moved, seconded by Mr. Donovan that the matter be
adjourned as requested. Carried.
2.

Mr. &amp; Mrs. A. Ruivo, 39 Depeyster Street-Public Hearing
Three family residence.

Mr. Hritz read the public notice hearing upon the
application of Mr. and Mrs. Arlindo Ruivo for approval of a
sub-division of property located at 39 Depeyster Street, North
Tarrytown, New York and for approval of a Site Plan Application
for the construction of a two and one-half story, three family
residence at the site of one of the sub-divided parcels. The
number of parking spaces proposed at the site of the three family
residence is six (6).
Mr. Hritz stated that a Memo was received by the Board
from Clark Associates stating they had reviewed the application
and recommended several minor changes. (Copy in official minutes).
&lt;•

Mr. Hritz stated that a memo was received from the
consulting engineers with several recommendations concerning
storm water, potable water and sewerage. (Copy in official minutes).

�-2Mr. Sam Vieira, Architect for the project stated that
a revised set of drawings was submitted for the Borad to review.
Plans were for the new construction on the "new" sub-divided
lot.
c

. •:•

:

;

Discussion followed on trees that would be removed
and the number of parking; spaces needed.
Mr. Vieira stated there would be three garages and
three parking spaces on the property.
Mr. Hughes, Attorney for the applicant stated that they
will comply with the recommendations of the Planner. Mr. Hughes
stated that the applicant has submitted a full Environmental
Assessment form for the Board to review.
Discussion followed regarding a wall to be constructed
at the rear of the property and the type of fencing to be installed.
Mr. Vieira stated the property would be landscaped and
there will be sufficient lighting on the east side of the house
for the parking area. Mr. Vieira stated there will be dry wells
for drainage and the property will be regraded. He also stated
that the N.Y.S. Building Code requires a turnaround on the property.
Ms. Tsangaris moved, seconded by Mr. McCarthy that the
Planning Board be named the Lead Agency in the review of this
Type I Action. Carried.
The Board reviewed the environmental impact statement
and Ms. Tsangaris moved, seconded by Mr. McCarthy that no
significant impacts have been identified and recommends that
the Board make a Negative Declaration. Carried.
Mr. Margotta stated that due to changes in the Site
Plan required by the N.Y.S. Housing Code that the matter be
referred to the Zoning Board.
Mr. Caetano moved, seconded by Mr. Donovan that the
plans be accepted as submitted. Carried.
3.

Phelps Memorial Hospital Center, North Broadway,-New Parking
Spaces-Continued.

Mr. Hritz read the Public Notice Hearing upon the
application of Phelps Memorial Hospital Center, for approval of
an amendment to a dite plan which was approved by the Village of
North Tarrytown Planning Board on April 14, 1992.
The land on said site plan being located at 701 North
Broadway, North Tarrytown, New York within the H Hospital District.
The applicant proposes to amend the site plan to change the
location and number of parking spaces at the site and to reduce
the size of the proposed Phelps Professional Building. The

�-3original approval was for the development of a 62,000 square
foot medical office building and approximately 300 additional
parking spaces.
Representatives for the Hospital stated that a new
ite Plan and Drainage Plan has been submitted along with an
Envirionmental Assessment Form. It was stated that the new
plans submitted are the actual plans they will be using during
construction, and the number of parking spaces are the same as
originally submitted.
Mr. Hritz stated a memo was received from Clark
Associates dated October 20th, 1993 with their review comments
on the Amended Site Plan. Ms. Portman stated that various changes
had been made in parking and islands located on the property.
Ms. Portman stated their concerns appear to be parking and
traffic circulation and they recommend that wider travel lanes
be constructed and appropriate STOP signs be installed. (Copy
in official minutes).
Mr. Hritz stated that a memo was received from the
Consulting Engineers dated October 14, 1993 stating they have
reviewed the drawings as submitted and recommended that a written
agreement between IBM and Phelps Memorial Hospital be drated on
the proposed reduction in sewerage entering the Village through
the IBM force main due to existing problems with the Village
sewer system (i.e. surcharging). He also stated that storm
water runoff calculations, pipe sizing and pipe profiles should
be submitted for review. (Copy of memo in official minutes).
Mr. Hritz stated he was concerned with the changes
being made that the Board was not aware of.
Mr. Caetano stated that the meeting should be adjourned
in order to confer with the Building Inspector and the Village
Planning Consultants and the matter be resoleved before the plans
were approved.
Mr. Margotta stated that all construction should be
halted until the matter is resolved.
Mrs. Martha Bick, Terrace Close stated she is the
nearest neighbor to the construction site and that many promises
made by the hospital have not been kept.
Mr. Caetano moved, seconded by Mr. Donovan that the
matter be adjourned in order to confer with the Building Inspector,
the Engineer and the Planning Consultants and the Representatives
of the Hospita; that the Building Inspector meet and inspect the
construction area and the various parking areas-«and the matter be
resolved before the amended site plans are approved, thaf the
hospital may proceed with construction of the building but there
be no further construction on the parking areas in question,
specifically the parking area containing 62 parking spaces.

�-4If the Building Inspector finds any deviation from the
motion as agreed the Building Inspector was to halt all work on
the Building and the parking lots, and the Building Inspector
was instructed to notify the hospital of any corrections to be
made and that they be corrected before the next meeting with the
Board. Unanimously carried.
Mr. Margotta was to meet with the Hospital representatives
on the following Monday.
Discussion followed regarding the various changes
proposed by the hospital and it was noted that the building
has been moved ten feet from the approved site. Mr. Hritz stated
the hospital has made changed and not informed the Board and
he was very concerned.
Mr. Margotta stated that the Building with the changes
still conformed to the Building Code, and Zoning Ordinance.
Representative for hospital stated they were redoing
the parking lot and the lot will be restriped and they will
meet the requirements. He also stated the existing parking lot
has been there for many years.
Representative stated that the building was moved so
that the Emergency Room waiting area could be enlarged.
Mr. Hritz stated if the hospital and Mr. Margotta
resolved the matter at their meeting on Monday the Board would
call for a Special Meeting and review the plans for the revised
site plans.
Mr. Gulino was directed to continue to resolve the
matter of sewage treatment and that an agreement between IBM and
the hospital be obtained by October 31st, 1993 and presented to
the Board for their approval.
Mr. Donovan moved, seconded by Mr. Caetano that the
issued raised by Mrs. Bick be resolved and that all correspondance
on the matter be submitted to the Board for their review. Carried.
Mr. McCarthy moved, seconded by Ms. Tsangaris that the
Planning Board declare itself the Lead Agency in the review of
this action. Carried.
Ms. Gandolfo stated that certain legal requirements
must be met and informed the hospital representatives to notify
all agencies that were involved.
Mr. Hritz stated that the next regular meeting of the
Board would be held on November 18th, 1993.
Discussion followed regarding ownership of the proposed
building and Ms. Tsangaris stated it was her understanding that
the hospital would not own the building but it would be privately
owned by a group of Doctors, and therefore it would not be a non-

�-5profit project. Mr. M^rgotta stated that the building would be
assessed and would pay property taxes.
There being r*o further business to come before the
Board Mr. McCarthy mov^d, seconded by Mr. Donovon that the same
be duly adjourned. Carried.
Respectfully submitted,

Irene Amato
Acting Clerk

�03/1-P/94

11:34

2-

JEANNE E METTLER

PAGE

r

RESOLUTION
Adopted at the October 21, 1993 Meeting of the
Village of North Tarrytown Planning Board
RESOLUTION:

S I T E PLAN A N D S U B D I V I S I O N A P P R O V A L
PROPOSED:
2-LOT S U B D I V I S I O N A N D C O N S T R U C T I O N O F
THREE-FAMILY R E S I D E N C E I N 2 1/2 S T O R Y B U I L D I N G
OWNER:
MR. AND M R S . A R L I N D O R U I V O
LOCATION:
39 D E P E Y S T E R S T R E E T (AT N O R T H W E S T C O R N E R
WITH WASHINGTON STREET)
TAX DESIGNATION:
S E C T I O N 16, B L O C K 12, L O T 2
ZONING:
R-5 R E S I D E N T I A L

WHEREAS, the Planning Board of the Village of North Tarrytown
has reviewed an application for site plan and subdivision approval
pursuant to the Subdivision Regulations of the Village of North
Tarrytown, Chapter 62, Zoning, of the Code of the Village of North
Tarrytown and other requirements of the Village Code considered
pertinent to the application, which application is to subdivide a
property that is approximately 14,000 square feet in size and is
located at the northwest corner of Washington Street and Depeyster
Street, and is known as tax Lot 16A of Section 15, Block 13, into
two lots, to construct a three-family 2 1/2-story residence with
three paved parking spaces and three garage spaces on the smaller
lot, and to construct three paved parking spaces and to provide for
the potential future development of three landbanked spaces on the
larger lot, which contains an existing three-family residence, as
shown on the drawing prepared in the office of Samuel F. Vieira,
R.A., and further identified as follows:
"Site Plan, Proposed Sub-division for: Mr. &amp; Mrs. Arlindo
Ruivo, 39 Depeyster St., N. Tarrytown, NY,H dated 9/7/93 and
last revised 10/19/93, scale l" « 20'; and
WHEREAS, the plan proposes the subdivision of the property
into two lots, the larger to be approximately 8,100 square feet and
the smaller to be approximately 5,800 square feet in size; and
WHEREAS, the larger lot will contain the existing three-family
three-story frame residence and the Applicant proposes to build a
new macadam driveway and three paved spaces shown as P4, P5 and P6
on the plan, with spaces PI, P2 and P3 to be shown as "future
parking" and to be landscaped until they may be needed or required
by the Planning Board in the future; and
WHEREAS, the Applicant proposes to construct a 2 1/2 story
three-family residence with three garage parking spaces, a macadam
driveway and three paved parking spaces on the smaller lot; and
WHEREAS, evergreen hedges will be placed along the Washington
street side of the property to screen the view of the paved parking
spaces on the larger lot as shown on the plan; and

02

�03/1/,••'94

11:34

2-

JEANNE E METTLEP

P««SE 03

WHEREAS, the smaller lot will be landscaped and a 5-foot high
attractive fence will be located on the western boundary of the lot
to screen parking spaces Pi, P2 and P3; and
WHEREAS, fencing, for safety purposes, will also be provided
on the top of the proposed retaining walls; and
WHEREAS, the Applicant has stated that the lighting in the
parking areas will be controlled with motion detectors for energyefficiency and that the fixtures will be directed downward onto the
property so that there will not be glare onto other properties; and
WHEREAS, the Applicant has received an area variance for the
size deficiency of the rear yard of the larger lot from the Zoning
Board of Appeals of the Village of North Tarrytown; and
WHEREAS, the site has been visited by the Village's Planning
and Engineering Consultants and the Planning Board is thoroughly
familiar with the site and all aspects of the proposed project; and

^

WHEREAS, a duly advertised public hearing was held at the
Village Hall on October 21, 1993, at which time those wishing to be
heard were given the opportunity to be heard; and
WHEREAS, in the course of its review and acting as Lead Agency
pursuant to Part 617 of the implementing regulations pertaining to
Article 8 of the Environmental Conservation Law, the Planning Board
has made the following findings and caused, noted, or conducted the
following activities:

}

1.

Received an application fee of $250;

2.

Caused field inspections to be made of the property and of the
surrounding areas;

3»

Requested, received and considered comments from the Village
Planning and Engineering consultants and the Building
Inspector?

4.

Acting as Lead Agency, requested, received and reviewed a Full
Environmental Assessment Form (EAF) in compliance with the New
York State Environmental Quality Review Act (SEQRA);

5.

After review of the application, EAF, and property as well as
other information submitted by the Applicant, the Planning
Board declared itself Lead Agency and circulated a "Negative
Declaration," dated October 21, 1993, in which the Planning
Board stated its determination of non-significance of
environmental impact for this Type I action;

NOW, THEREFORE, BE IT RESOLVED, that said application for site
plan and subdivision approval and the plan noted above be and
hereby are granted site plan and subdivision approval and that the
Applicant may obtain the endorsed approval of the Planning Board
Chairman or, as an alternate, the Village Administrator, on a copy

�;:/17/\4

11:34

2-

JEANNE E METTLER

PAGE

r

of this site plan and subdivision resolution and upon the final
mylar copy of the site plan and the final mylar copy of the
subdivision plat drawing revised as necessary to show compliance
with the following conditions, and the Applicant may obtain the
endorsement of the Westchester County Department of Health on the
final subdivision plat which endorsements shall permit filing in
the offices of the Village Building Department, for purposes of
obtaining a building permit in accordance with this resolution and
all building code requirements, and the offices of the Westchester
County clerk, provided, however, that this site plan approval shall
expire within twelve (12) months of the date of this resolution if
the following modifications and conditions have not been completed
to the satisfaction of the Planning Board and/or the Applicant has
not obtain a building permit and the subdivision approval shall
expire within ninety (90) days from the date of this resolution if
the following modifications and conditions have not been completed
to the satisfaction of the Planning Board:
1.

All references to the "Applicant"
Applicant's successor and assigns.

2.

Fees - The Applicant
Tarrytown:

3.

shall

include

the

shall pay to the Village of North

2.1

An inspection fee for construction inspection of the
property for compliance with the approved site plan in
accordance with the Village of North Tarrytown Zoning
Code;

2.2

A recreation fee in the amount of
subject to
the approval of the Village Board of Trustees;

2.3

The reimbursement of all application review fees as noted
and required in Section 62-30(f) of the Village Zoning
Code, as approved by the Village Attorney.

Revision of the above noted plan, to the satisfaction of the
Planning and Engineering Consultants, to demonstrate the
following:
3.1

The signature block shall be revised to comply with the
wording in Section HA(l)c(14c) of the Subdivision
Regulations and to provide a line for the endorsement of
the Westchester County Department of Health;

3.2

Parking spaces PI, P2 and P3 shall be shown on the plan
as "future parking" to be implemented by the Applicant as
needed or within 18• days of being determined necessary
by the Planning Board;

3.3

The plan drawing shall be revised and titled "Final Site
Plan" and a separate drawing showing the subdivision line
but not including the proposed development shall be
submitted and titled "Final Subdivision Plat";

�03/17/94

11:34

3.4

2-

JEANNE E METTLEP

PAGE

The date of this resolution shall be noted on the final
subdivision plat and on the final site plan.

4.

The landscaping to be provided on the smaller lot and the
additional hedges and other landscaping materials shown to be
provided on the larger lot shall be maintained in a healthy
growing condition. There shall be diversity in the species of
vegetation planted.

5.

Prior to the issuance of a certificate of occupancy, the
Applicant shall submit to the Village Building Inspector a
mylar reproduction of the site plan complete with the
certification
of a professional
architect and/or a
professional engineer attesting to construction of the site
plan and its improvements as shown thereon.

6.

All elements of this approved site plan shall be completed to
the satisfaction of the Village Building Inspector within a
period of eighteen (18) months from the date of the issuance
of the building permit and prior to the issuance of a
certificate of occupancy. The Planning Board may issue an
extension on this time limit, or may modify any of the above
conditions with respect thereto, for good cause.

7.

The Planning Board reserves the right to make a final field
inspection of the project after construction of the
facilities, upon notice of the Building Inspector, and before
the issuance of a certificate of occupancy. The purpose of
this final inspection is to review the development and to
require any modifications to parking, drainage, access, paving
and other site plan details, which do not comply with the
approved plan and Interest of safety, convenience, aesthetics
and the enjoyment and peace and quiet of adjacent neighbors.

PLANNING BOARD
VILLAGE OF NORTH TARRYTOWN

By:

.^^r

1

\

•
/ 7
Date:
•itz, Chairman
forth Tarrytown Planning Board

500\not3-045.«Jp.crc

4

r/n/tv

�F R E D E R I C K P. C L A R K A S S O C I A T E S , I N C .
Planning/Development/Environment/Transportation
Rye, New York and Southport, Connecticut

David J. Portman, A,CP
Howard I. Reynolds, PE
David H. Stolman, AICP

350 Theodore Fremd Avenue
Rye, New York 10580
(914)967-6540

Michael A. Galante
Joanne P. Meder, AICP
Jim Donovan, RLA ASLA

MEMORANDUM
To:

Village of North Tarrytown Planning Board

Date:

October 20, 1993

Subject:

Review of Amended Site Plan Application for Phelps
Professional Office Building

!•

Introduction

As requested, we have reviewed the amended site plan application
for the proposed medical office building on the Phelps Memorial
Hospital Center property. The Applicant proposes to reduce the
size of the building from 62,000 square feet to 45,700 square feet
and from 4 stories to 3 stories (by 10 feet in height) , re-arrange
the proposed locations of parking areas and reduce the number of
parking spaces to be added.
The Applicant has submitted the following items:
1.

"1A, Campus Site Plan, Phelps Professional Building, Phelps
Memorial Hospital Center, North Tarrytown, New York," dated
5/16/91 and last revised 11/6/91, scale 1" = 50', prepared by
Mediplex Medical Building Corporation;

2.

"1, Existing Hospital Site Plan, Proposed Medical Office
Bldg., Phelps Memorial Hospital Ctr., North " Tarrytown,
New York," dated 2/21/91 and last revised 11/6/91, scale 1" =
50', prepared by Mediplex Medical Building Corporation;

3.

"IB, Amended Campus Site Plan, Phelps Professional Building,
Phelps Memorial Hospital Center, North Tarrytown, New York,"
dated 10/6/93, scale 1" = 5 0 ' , prepared by Mediplex Medical
Building Corporation;

4.

"Revised Grading Plan, West Parking Expansion," dated 8/23/93
and last revised 9/21/93, scale 1" = 3 0 ' , prepared by Mediplex
Medical Building Corp.;

5.

Aerial photo, scale 1" = 200'; and

6.

Full Environmental Assessment Form.

Connecticut • (203) 255-3100

FAX • (914) 967-6615

Long Island • (516) 364-4544

�FREDERICK P. CLARK ASSOCIATES, INC.
Planning/Development/Environment/Transportation

II-

REVIEW COMMENTS
1.

Amended Site Plan - The Applicant proposes to have 98
fewer parking spaces on the site than were proposed in
the approved site plan.
The proposed medical office
building has been reduced in size and height as noted
above. The building has also been moved approximately 10
feet to the west. The existing MRI building and its
improvements have been added to the site plan. Some of
the parking spaces previously proposed near the speech
center have been removed and spaces have been added to
the northeast parking lot. A new parking lot has been
proposed approximately 50 feet to the northwest of the
proposed building and approximately 100 feet to the
southwest of the James House, which will have one point
of access and 62 parking spaces. The parking spaces
previously proposed to the northeast of the medical
office building (near the connector to the Hospital) have
been removed. The 10 existing parallel parking spaces
opposite the main entrance to the Hospital appear to have
been removed. The parking in front of the Hospital has
been changed to angle parking as opposed to the 90-degree
parking which was previously approved. The emergency
room drop-off area has been enlarged, made more square in
shape, redesigned to eliminate the planted island and
seven parking spaces have been added. A large tree to
the south of the James House will apparently be preserved
through the construction of a retaining wall. This will
result in the loss of at least six of the previously
approved parking spaces.
The location of the proposed west parking lot will cause
the removal of some of the vegetation which may currently
assist in blocking the view of the Hospital facility from
the Hudson River. However, combined with the reduction
in height of the building, this minimal removal of
vegetation should not significantly impact any views of
the property from the Hudson River shoreline. Also, the
proposed parking area is at least 500 feet from the
nearest residence. The newly proposed west parking lot
will be more convenient to the medical office building
than was the previously proposed parking located near the
speech center.
Many of the parking islands throughout the site have been
changed in shape from what was previously approved. Some
of the proposed shapes appear to be more similar to the
shape of the existing islands rather than what was
approved. For example, the island at the main entrance

2

�FREDERICK P. CLARK ASSOCIATES, INC.
Planning/Development/Environment/Transportation

to the Hospital has been reduced in size and the island
at the emergency room drop-off area has been removed.
The shapes approved in the previous application were
superior to the existing islands as they better aided
traffic circulation.
These islands should be made
consistent with those previously approved, where
possible.
A review of the amended site plan shows that many of the
parking aisles measure less than 22 feet wide. In some
cases the aisles actually measure 18 feet and in one
instance, at the entrance to the James House, a few
parking spaces would only have an aisle which measures
approximately 12 feet in width. Parking aisles less than
22 feet wide will create problems for motorists entering
and exiting individual parking spaces. Therefore, the
plan should be modified to reflect a standard 22-foot
wide aisle with a perpendicular parking space that
measures 9 x 20 feet.
The site plan has been amended to reduce the number of
parking spaces in the speech center parking area. It is
our recommendation that "dead end" parking aisles not be
built and that circulation be provided between aisles to
eliminate vehicles backing up or turning around within
aisles. Also, in the speech center area and the parking
lot opposite the north-south roadway, the parking islands
have been relocated and are now offset. Although this
may be more aesthetically pleasing, it is our opinion
that the aisles should be aligned to improve traffic flow
between parking areas.
By the speech center, where curb parking has been
provided, the parking spaces measure 9 x 18 feet and
should be 9 x 22 feet. An 18-foot parking space will be
too tight and motorists will tend to take up "two parking
spaces for one vehicle.
The proposed new west parking lot is a long dead end lot
which, in our opinion, should be avoided. The Applicant
should study the feasibility of connecting this parking
lot back into an existing parking area to create better
circulation.
The revised amended site plan should include adequate
information to show where each proposed directional sign
will be placed and a detailed description of each sign
should be provided. For example, the type and size of
sign as well as its height should be provided for review.
3

�FREDERICK P. CLARK ASSOCIATES, INC.
Planning/Development/Environment/Transportation

Between the Environmental Assessment Form (EAF) and the
proposed amended campus site plan, it is difficult to
understand the number of parking spaces to be added.
Question B.f on the EAF states that there are 688
existing spaces and 178 will be added for a total of 876
spaces.
That actually adds up to 866 spaces.
The
amended site plan states that 188 spaces are proposed to
be added for a total of 876. Our count of the parking
added up to 886 spaces as opposed to either 876 or 866
spaces (not including the three-service vehicle parking
spaces). Similarly, we counted 806 spaces as opposed to
the 796 spaces stated on the plan under "total hospital
parking."
Although the parking summary on the amended site plan
states that there are 35 spaces at the child care center,
it appears that there is only enough space for 21 or 22
spaces.
On the plan, the reference to "City" should be changed to
"Village."
2.

Lighting and Landscaping - The Applicant
should
distinguish between the existing and proposed trees and
shrubs and mark any proposed plantings on the plan. The
Applicant should provide information regarding the
number, type and size of the plantings. We suggest that
plantings be added to the islands and recommend that the
Applicant locates any such plantings carefully so as not
to block sight distances. In addition, the Applicant
should provide diversity in planting.
Lighting should be coordinated with the existing and
proposed planting.
The light from the existing pole
light which is being relocated to the parking area to the
north will be blocked by the tree next to it." Also, the
new pole shown below the word "center" in speech center
should be relocated closer to the proposed parking area.

3.

Environmental Assessment Form - We have a few comments
concerning the EAF (see enclosed). Question A. 19 was
revised, since the property is located within the Hudson
River shoreline critical environmental area. Question
B.l.g., regarding maximum number of vehicle trips per
hour, was not answered by the Applicant. However, since
the proposed site plan calls for a reduction in the size
of the building and the previously approved plan received
a negative declaration, it is not likely that a
significant traffic impact will result. Question B.f was

4

�FREDERICK P. CLARK ASSOCIATES, INC.
Planning/Development/Environment/Transportation

discussed above. Question C.7, regarding adjacent land
uses, was revised to add "park" and to add the R-l and R2A residential zoning districts. Under Section E, we
assume that the date is October 10, 1993, not 1991.
4.

Environmental Review - The application is a Type I action
under the State Environmental Quality Review Act (SEQRA) .
We recommend that the Planning Board declare its intent
to be the Lead Agency and circulate a notice of its
intent to the recommended circulation list provided
below. Following the 30-day circulation period, assuming
no involved agency objects, the Planning Board may
declare itself the Lead Agency in the review of this
matter. Based upon our review of the EAF, there do not
appear to be any significant environmental impacts that
should result from this proposal. Unless new information
surfaces during the circulation period which indicates
otherwise, we would recommend that, after the Planning
Board becomes the Lead Agency, the Board makes a Negative
Declaration determination of non-significance of the
potential impacts.
Circulation List for Coordinated Review
Ms. Jean-Ann McGrane, Regional Director
New York State Department of Environmental Conservation
Department of Regulatory Affairs
21 South Putt Corners Road
New Paltz, New York 12561
Mr. Richard Peters, Planning and Program
Management Director
New York State Department of Transportation
4 Burnett Boulevard
Poughkeepsie, New York 12603
Mr. Al Caccese
New York State Department
Historic Preservation
Empire State Plaza
Agency Building 1
Albany, New York 12238

of Parks, Recreation and

Westchester County Planning Board
c/o Ms. P. Lynn Oliva, Commissioner
Westchester County Planning Department
432 Michelian Office Building
White Plains, New York 10601
5

�FREDERICK P. CLARK ASSOCIATES, INC.
Planning/Development/Environment/Transportation

Ms. Laura E. Tessier, District Manager
Westchester County Soil and Water Conservation District
414 Michelian Office Building
White Plains, New York 10601
Dr. Mark Rappaport, Commissioner of Health
Westchester County Health Department
19 Bradhurst Avenue
Hawthorne, New York 10532
Ms. Kathryn Fries, Town Clerk
Town of Mount Pleasant
1 Town Hall Plaza
Valhalla, New York 10595
III. Conclusion
The most important issues at this time appear to be parking and
traffic circulation. It is recommended that the Applicant modify
the amended site plan to incorporate the comments noted above. The
plan should show wider travel lanes and parking areas and
sufficient information with regard to directional sign location and
type. The plans should incorporate, where appropriate, STOP signs
and any other directional signs. These signs must conform to the
New York State Department of Transportation Manual of Uniform
Traffic Control Devices.

Michael A. Galante
Vice President/Transportation

Susan J. Portman, AICP
Associate/Planning

Enclosure
cc:

William T. Regan, Village Administrator
Janet A. Gandolfo, Esq., Village Attorney
James T. Margotta, Building Inspector
Joseph A. Gulino, P.E., Village Engineer
Vincent DelBagno
Todd Jack

500\not3-007„sjp:ev

6

�»

14-lb-i U 67)-7c
•17.*.
AppenJIx A
Stat* Envlronnwiial Quality Review

I

4

SEQF

FULL ENVIRONMENTAL ASSESSMENT FORM
Purpose: The full EAF is designed to help applicants and agencies determine, in an orderly manner, whether a projec
or action may be significant. The question of whether an action may be significant is not always easy to answer Frequent
ly. there are aspects of a project that are subjective or unmeasureable It is also understood that those who determine
significance may Have little or no formal knowledge of the environment or may be technical expert in environmenta
analysis In addition, many who have knowledge in one particular area may not be aware of the broader concerns affecting
the question of significance.
The full EAF is intended to provide a method whereby applicants and agencies can be assured that the determination
process has been orderly, comprehensive in nature, yet flexible to allow introduction of information to fit a project or action
Full EAF Components: The full EAF is comprised of three parts:
Part 1: Provides objective data and information about a given project and its site By identifying basic project
data, it assists a reviewer in the analysis that takes place in Parts 2 and 3.
Part 2: Focuses on identifying the range of possible impacts that may occur from a project or action. It provides
guidance as to whether an impact is likely to be considered small to moderate or whether it is a potentiall\large impact. The form also identifies whether an impact can be mitigated or reduced.
Part 3: If any impact in Part 2 is identified as potentially-large, then Part 3 is used to evaluate whether or not the
impact is actually important.

DETERMINATION OF SIGNIFICANCE-Type 1 and Unlisted Actions
Identify the Portions of EAF completed for this project:

JS

Part 1

JQ

Part 2

OPart 3

Upon review of the information recorded on this EAF (Parts 1 and 2 and 3 if appropriate), and any other supporting
information, and considering both the magitude and importance of each impact, it is reasonably determined by the
lead agency that:
D

A The project will not result in any large and important impacKs) and, therefore, is one which will not
have a significant impact on the environment, therefore a negative declaration will be prepared.

O

B. Although the project could have a significant effect on the environment, there will not be a significant
effect for this Unlisted Action because the mitigation measures described in PART 3 have been required,
therefore a CONDITIONED negative declaration will be prepared.*

•

C. The project may result in one or-more large and important impacts that may have a significant impact
on the environment, therefore a positive declaration will be prepared.
* A Conditioned Negative Declaration is only valid for Unlisted Actions

HecVia^ office $*;&amp;«*^

pfceys He***.M U&amp;fJT*i Ct^t^
Name of Action

Name of Lead Agency

Print or Type Name of Responsible Officer in Lead Agency

Title of Responsible Officer

Signature of Responsible Officer in Lead Agency

Signature of Preparer (If different from responsible officer)

Date

1

�PART 1-PROJECT INFORMATION
Prepared by Project Sponsor
NOTICE This document is designed to assist in determining whether the action proposed may have a significant eft
on the environment Please complete the entire form. Parts A through E Answers to these, questions will be c o m i d e
as part of the application for approval and may be subject to further verification and public re v i e * Provide any addit&gt;o
information you believe will be needed to complete Parts 2 and 3
It is expected that completion of the full EAF will be dependent on information currently available and will not m \ c
new studies, research or investigation If information requiring such additional work is unavailable, so indicate and spec
each instance. '
NAME OF ACTION
LOCATION OF ACTION (Includt StrMt Addrmt. Municipality and County)
NAME OF APPLICANT/SPONSOR

BUSINESS TELEPHONE

VlN&amp;feMT C*±. g * f i N P ; D t e C } f t g cP OJftiMgPglNgi

1 ^ - 3 6 6 - \OQO

ADDRESS

io i NcTcra aeoApWAY

CITY/PO
IPO

STATE

NAME OF OWNER (If difl*r«Qt)

BUSINESS TELEPHONE

feuiLPtNfi
ADDRESS

/

^_

.

Co.fL.r

I

rtl*-g6fe-IOCg

\

( e A M £ Ae Afrgyg )

CITY/PO

ZIP CODE

STATE

ZIP CODE

DESCRIPTION OF ACTION

wew MftacAL- or&amp;c-e. eojL.piNci, 2&gt;-erc*it*, 4z.f&gt;1*&gt;
&amp;6p4e&gt; 4QUM&amp;- F&amp;er T &amp; ACCOMMC?PATT&amp; A f p ^ x i M A T E i - r
&lt;LO - 2 5 PHYSICIAN'S . F&gt;UX-&gt; ©UTPArT»ENr AhctU-AZf
Please Complete Each Question—Indicate N.A. if not applicable

A. Site Description
Physical setting of overall project, both developed and undeveloped areas
1

2

Present land use:

DUrban

Dlndustrial

DForest

DAgnculture

T o t . , acreage of project area:

OCommercial

DResidential (suburban)

JSOther ffrril&amp;^M-

C f r

acres.

^

U

APPROXIMATE ACREAGE
M e a d o w or Brushland (Non-agricultural)

D R u r a l (non-fa

MEOlCAl

M

A

* * * * * *
PRESENTLY

Forested

in.

Agricultural (Includes orchards, cropland, pasture, etc )

_C2_

AFTER C O M P L E T I O N

!£.

acres

SSe.
SL

acres
acres

acres
acre.;
acre*
acres

Wetland (Freshwater or tidal as per Articles 24, 25 of ECL)

acres

Water Surface Area

acres

acre*

Unvegetated (Rock, earth or fill)

acres

acre&gt;

iS.
£L

Roads, buildings and other paved surfaces
Other (Indicate t y p e L _ _ _

ie.

acres
acres

acres
acre*

What is predominant soil type{s) on project site?
D W e l l drained

\QO

% of site

Soil drainage:

b

If any agricultural land is involved, how many acres of soil are classified within soil group 1 through 4 of the \

D P o o r l y drained

% of site

E &amp; t o d e r a t e l y well drained

a

% of site

Land Classification System? f i C f c 4 f c acres (See 1 NYCRR 370)
Are there bedrock outcroppings on project site?
a

What is depth to bedrock?

Q«» t O

Yes
(in feet)

DNo

�\

? *pp f ox'"^:e percer.ii.gi c proposed project site

...w^o

•^•^»»

S O

*«,

# 1 5 9 i or greater

pClO-IS^t,

_^&amp;

P "^

*

%

r

b Is project substantially contiguous to. or contain j building, site, or district, listed on the State or the Nat ione
Registers of Historic Places?
DYes
fljNo

A

7 Is project substantially contiguous to a site listed on the Register of National Natural landmarks'

£ A

B What is the depth of the water t a b l e &gt; / L l 2 — (in feet)
9

Is site located over a primary, principal, or sole source aquifer?

DYes

CYes

^fv

$^o

10. Do hunting, fishing or shell fishing opportunities presently exist in the project area?

DYes

J4NO

11 Does project site contain any species of plant or animal life that is identified as threatened or endangered
DYes
MNO
According to « _
______
- Identify each species
12. Are there any unique or unusual land forms on the project site? (i.e., cliffs, dunes, other geological formations
DYes

• *

Jtfhlo

Describe

'

__

13. Is the project site presently used by the community or neighborhood as an open space or recreation area
DYes
J_.No
If yes, explain ____
14.

Does the present site include scenic views known to be important to the community?

JffYes

DNo

15. Streams within or contiguous to project area: _
a. Name of Stream and name of River to which it is tributary
16. Lakes, ponds, wetland areas within or contiguous to project area:
a. Name

„ b. Size (In acres)

17 Is the site served by existing public utilities?
pYes
ONo
a) If Yes. does sufficient capacity exist to allow connection?
^Yes
b) If Yes. will improvements be necessary to allow connection?
BfYes

DNo
DNo

18 Is the site located in ah agricultural district certified pursuant to Agriculture and Markets Law, Article 25-A A
Section 303 and 304?
DYes
J_(No
19 Is the site located in or substantially contiguous-** a Critical Environmental Area designated pursuant to Article 6
of the ECL. and 6 NYCRR 617?
J&amp;Yes ( W P )
20. Has the site ever been used for the disposal oTsolid or hazardous wastes?

DYes

J^No

B. Project Description
1. Physical dimensions and scale of project (fill in dimensions as appropriate)
a. Total contiguous acreage owned or controlled by project sponsor
b. Project acreage to be developed:

t»Q

acres initially;

\0&amp;&gt;

acres.

jS^Li^xabflBfafracres ultimately

c. Project acreage to remain undeveloped .
d. Length of project, in miles:

(If appropriate)

je. If the project is an expansion, indicate percent of expansion proposed
(f.^slumber of off-street parking spaces existing Q?W&amp;
g Maximum vehicular trips generated per hour
h If residential: Number and type of housing units:
One Family
Two Family

Initially

OOfeS.

HOT

L2

%;

_«_«»__

g&gt;7&lt;£&gt; ( n f t newepfcy

; proposed
(upon completion of project)?
Multiple Family

Condominium

A^fLT

Ultimately
— .
i. Dimensions (in feet) oi largest proposed structure JB£X.
height; | v C &gt;

width;

j Linear feet of frontage along a public thoroughfare project will occupy is?

\a?—

3

—i
[ y O
ft

length

�2 Hovy much natural material (i t . rock. e«r»V etc.) will be removed from the site'
3 Will disturbed areas be reclaimed'

OYes

)^go

tons'cubic yard*

ON/A

a If yes. for what intend., purpose i* the site being reclaimed?
b. Will topsoil be stockpiled for reclamation?

kfPNfe

DYes

____

f^No

c Will upper subsoil be stockpiled for reclamation?

DYes

jfiNo

4 How many acres of vegetation (trees, shrubs, ground covers) will be removed from sJCe^fiLNl^aJfexacres
5 Will any mature forest (over 100 years old) or other locally-important vegetation be removedby this project'
OYes
.JjNo
6 If single phase project Anticipated period of construction .

. months, (including demolition)

7. If multi-phased:
-

a Total number of phases anticipated

(number)

b Anticipated date of commencement phase 1

month

year, (including demolition)

c. Approximate completion date of final phase

month

year.

d Is phase 1 functionally dependent on subsequent phases?
8 Will blasting occur during construction?

OYes

DYes

DNo

)4NO

9. Number of jobs generated: during construction .

_ ; after project is complete

10. Number of jobs eliminated by this project _
11 Will project require relocation of any projects or facilities?
12 Is surface liquid waste disposal involved?

OYes

DYes

((No

If yes. explain

5JNo

a. If yes. indicate type of waste (sewage, industrial, etc.) and amount
b. Name of water body into which effluent will be discharged
13 Is subsurface liquid waste disposal involved?

DYes

^INO

Type

14 Will surface area of an existing water body increase or decrease by proposal?
Explain
.
,
15 Is project or any portion of project located in a 100 year flood plain?
16 Will the project generate solid waste?

RYes

a. If yes, what is the amount per month

OYes

JANK

"J&amp;lo

CtNo

»^»

tons

b. If yes. will an existing solid waste facility be used?
c If yes, give name

OYes

OYes

.

)E0No

; location

d Will any wastes not go into a sewage disposal system or into a sanitary landfill?
e If Yes. - p l a i n - h t e P t C A L , ' W 4 » r f e -

IS

PtSpCfrKO

f *

jtfVes

° * p H &gt; * * * I Y

- *JtOlt4-tNa WH-U U4VC A L&amp;ZC KoutXiCN
17 Will the project involve the disposal of solid waste?

DYes

tons/month

b If yes. what is the anticipated site life?

years.
DYes

J3(NO

19 Will project routinely produce odors (more than one hour per day)? DYes

|£NO

20 Will project produce operating noise exceeding the local ambient noise levels?
21 Will project result in an increase in energy use?
jtfYes
If y « . md.cate type(s)
g t - t t C T ^ C
^^fSJ.Ce.f

DNo
/^IL

22 If water supply is from wells, indicate pumping capacity
23

tMfA^T

jS&amp;lo

a If yes. what is the anticipated rate of disposal? _

18 Will project use herbicides or pesticides?

DNo

Total anticipated water usage per day

DYes

ftg&amp;O

jQNo

l-OII g g « *

gallons/minute.

gallons/day.

24 Does project involve Local, State or Federal funding?

DYes

If Yes. explain .

)^&gt;lo
.

4

_—.—___—„

—__

�t

25 Approval* Required

r

City. Town. Village Board

Submittal
Date

Type
DYes

DNo

City. Town. Village Planning Board

JSVes

DNo

City. Town Zoning Board

DYes

DNO

City. County Health Department

DYes

DNO

Other Local Agencies

DYes

DNo

Other Regional'Agencies

DYes

DNo

State Agencies

RVes

DNo

Federal Agencies

DYes

DNo

Mire g*rs PUN
VAL.

C. Zoning and Planning Information
1

Does proposed action involve a planning or zoning decision?

XYes

DNo

If Yes. indicate decision required:
Dzoning amendment

Dzoning variance

Dnew/revision of master plan

Dspecial use permit

Dresource management plan

Dsubdivision

JHsite plan

Dother

2

What is the zoning classification(s)of the site?

3

What is the maximum potential development of the site if developed as permitted by the present zoning?

What is the proposed zoning of the site?

SAME.

What is the maximum potential development of the site if developed as permitted by the proposed zoning'

Is the proposed action consistent with the recommended uses in adopted local land use plans?

Jftes

O

What are the predominant land use(s) and zoning classifications within a V* mile radius of proposed action'

8

Is the proposed^ action compatible with adjoining/surrounding land uses within a V* mile?

9

If the proposed action is the subdivision of land, how many lots are proposed?

J^Yes

O

a. What is the minimum lot size proposed?
DYes

10

Will proposed action require any authorization(s) for the formation of sewer or water districts?

11

Will the proposed action create a demand for any community provided services (recreation, education, pohc
fire protection)?
j^Yes
DNo
a. If yes. is existing capacity sufficient to handle projected demand?

12

JBffYes

DNo

Will the proposed action result in the generation of traffic significantly above present levels?
a. If yes, is the existing road network adequate to handle the additional traffic?

^

^Yes

DYes

J^N*

DNo

D. Informational Details
Attach any additional information as may be needed to clarify your project If there are or may be any advert
impacts associated with your proposal, please discuss such impacts and the measures which you propose to mitigate c
avoid them.

E. Verification
L

I certify that the information provided above is true to the best of my knowledge
Applicant/Spqru££-Name

jl**ft*Jn^^

If the action is in the Coastal Area, and you are a state agency, complete the Coastal Assessment Form before proceedin:
with this assessment.
5

�Part 2 — F R C J E C T * / A v - ' . S A N J '...&gt;..,.
Responsibility of Lead Agency

,»,Aw.*nuDt

General Information (Read Carefully)
• In completing the form the reviewer should be guided by the question Have my responses and determinations beer
reasonable? The reviewer is not expected to be an expert environmental analyst
• Identifying that an impact will be potentially large (column 2) does not mean that it is also necessarily significant.
Any large impact must be evaluated in PART 3 to determine significance. Identifying an impact in column 2 simpK
asks that it be looked at further.
• The Examples provided are to assist the reviewer by showing types of impacts and wherever possible the threshold o:
magnitude that would trigger a response in column 2. The examples are generally applicable throughout the State arte
for most situations. But, for any specific project or site other examples and/or lower thresholds may be appropriate
for a Potential Large Impact response, thus requiring evaluation in Part 3.
•.The impacts of each project on each site, in each locality, will vary. Therefore, the examples are illustrative anc
have been offered as guidance. They do not constitute an exhaustive list of impacts and thresholds to answer each question
• The number of examples per question does not indicate the importance of each question.
• In identifying impacts, consider long term, short term and cumlative effects.
Instructions (Read carefully)
a. Answer each of the 19 questions in PART 2. Answer Yes if there will be any impact.
b. Maybe answers should be considered as Yes answers.
c. If answering Yes to a question then check the appropriate box (column 1 or 2) to indicate the potential size of the
impact. If impact threshold equals or exceeds any example provided, check column 2. If impact will occur but threshold
is lower than example, check column 1.
d. If reviewer has doubt about size of the impact then consider the impact as potentially large and proceed to PART 3
e. If a potentially large impact checked in column 2 can be mitigated by changes) in the project to a small to moderate
impact, also check the Yes box in column 3. A No response indicates that such a reduction is not possible. This
must be explained in Part 3.

2
IMPACT ON LAND
Will the proposed action result in a physical change to the project site?
DNO BCVES
Examples that would apply to column 2
Any construction on slopes of 15% or greater, (15 foot rise per 100
foot of length), or where the general slopes in the project area exceed
10%.
Construction on land where the depth tathe water table is less than
3 feet.
Construction of paved parking area for 1,000 or more vehicles.
Construction on land where bedrock is exposed or generally within
3 feet of existing ground surface.
Construction that will continue for more than 1 year or involve more
than one phase or stage.
Excavation for mining purposes that would remove more than 1,000
tons of natural material (i.e., rock or soil) per year.
Construction or expansion of a sanitary landfill.
Construction in a designated floodway.
Other impacts
Will there be an effect t*. ...iy unique or unusual land forms found on
the site? (i.e., cliffs, dunes, geological formations, etc.))RfKJO
DYES
Specific land forms:
:

Small to
Moderate
Impact

Potential
Large
Impact

Can Impact Be
Mitigated By
Project Change

D

DYes

DNo

D

D

DYes

DNo

n

D
D

DYes
DYes

DNo
DNo

D

DYes

DNO

D

D

DYes

DNO

D
D
D

D
D
D

DYes
DYes
DYes

DNo
DNO

D

D

DY es

DNi

DNO

�T

IMPACT O N WATER
3 Will proposed action affect any water body designated as protected'
(Under Articles 15.24.25 of the Environmental Conservation Law. ECU
SfNO
DYES
Examples that would apply to column 2
• Developable area of site contains a protected water body

1

2

Small to
Moderate
Impact

Potential
Large
Impact

D

DYes

DNC

DYes

DNC

Can Impact 6
Mitigated B&gt;
Projact Chang

• Dredging more than 100 cubic yards of material from channel of a
protected stream

a

D
D

• Extension of utility distribution facilities through a protected water body.

D
D
D

D
D
D

DYes

DNC

DYes

DNC

DYes

DNC

a
a
a

D

DYes

DNC

D
D

DYes
DYes

DNC

D
D

DYes
DYes

DNC

• Proposed Action requires water supply from wells with greater than 45
gallons per minute pumping capacity.

a
a
a

D

DYes

DNC

• Construction or operation causing any contamination of a water
supply system.

a

D

DYes

DNO

• Proposed Action will adversely affect groundwater
• Liquid effluent will be conveyed off the site to facilities which presently
do not exist or have inadequate capacity.

D

D
D

DYes
DYes

DNC
DNO

• Proposed Action would use water in excess of 20.000 gallons per
day.

D

D

DYes

CNO

a

D

DYes • D N O

• Proposed Action will require the storage of petroleum or chemical
products greater than 1,100 gallons.

D

n

DYes

CNO

• Proposed Action will allow residential uses in areas without water
and/or sewer services.

D

D

DYes

I iN'o

i

DYes

CNO

D

DYes

l_'Nc

• Construction in a designated freshwater or tidal wetland.
• Other impacts:

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

4

Will proposed action affect any non-protected existing or new body
of water?
J(NO
DYES
Examples that would apply to column 2
• A 10% increase or decrease in the surface area of any body of water
or more than a 10 acre increase or decrease.

• Construction of a body of water that exceeds 10 acres of surface area.
• Other impacts:

5

Will Proposed Action affect surface or groundwater
quality or quantity?
J-JNO
Examples that would apply to column 2

GNC

DYES

• Proposed Action will require a discharge permit.
• Proposed Action requires use of a source of water that does not
have approval to serve proposed (project) action

• Proposed Action will likely cause siltation or other discharge into an
existing body of water to the extent that there will be an obvious visual
contrast to natural conditions.

a

•

• Proposed Action locates commercial and/or industrial uses which may
require new or expansion of existing waste treatment and/or storage
facilities.

a

• Other

a

impacts.

Will proposed action alter drainage flow or patterns, or surface
water runoff?
X N °
DYE5
Examples that would apply to column 2
• Proposed Action would change flood water flows
7

DNO

6

&amp;

I DYes CNO

�2

3
Can Impa
Mitlpat*
ProJactCt

Small to
Modarata
Impact

Potential
Largt
Impact

D
D
D
D

D
D
D
D

DYe$
DYes
DYes
DYes

D

D

DYes

I

• Proposed Action will result in the incineration of more than 1 ton of
refuse per hour.

D

D

DYes

I

• Emission rate of total contaminants will exceed 5 lbs. per hour or a
heat source producing more than 10 million BTU's per hour.

D

D

DYes

[

• Proposed action will allow an increase in the amount of land committed
to industrial use.

D

D

DYes

[

• Proposed action will allow an increase in the density of industrial
development within existing industrial areas.

D

D

DYes

[

• Other impacts:

D

D

DYes

C

• Reduction of one or more species listed on the New York or Federal
list, using the site, o\/er or ne*t site or found on the site.

D

D

D Y es

• Removal of any portion of a critical or significant wildlife habitat.

D
D

D
D

DYes

D

D

Dv es

L

• Proposed Action would substantially interfere with any resident or
migratory fish, shellfish or wildlife species.

D

D

DY es

i_

• Proposed Action requires the removal of more than 10 acres
of mature forest (over 100 years of age) or other locally important
vegetation

D

D

DYes

C

D

D

DYes

• Proposed Action may cause substantial erosion
• Proposed Action is incompatible with existing drainage patterns
• Proposed Action will allow development in a designated floodway
• Other impacts:

IMPACT ON AIR
7 -Will proposed action affect air quality?
WNO DYE-S
Examples that would apply to column 2
• Proposed Action will induce 1.000 or more vehicle trips in any given
hour.

"

IMPACT ON PLANTS A N D ANIMALS
8

Will Proposed Action affect any threatened or endangered
species?
J^NO
Examples that would apply to column 2

DYES

• Application of pesticide or herbicide more than twice a year, other
than for agricultural purposes.
• Other

9

impacts:

,,.

Will Proposed Action substantially affect non-threatened or
non-endangered species?
JBNO
Examples that would apply to-column 2

DYes

DYES

IMPACT ON AGRICULTURAL LAND RESOURCES
10

Will the Proposed Action affect agricultural land resources?
pgNO
DYES
Examples that would apply to column 2
• The proposed action would sever, cross or limit access to agricultural
land (includes cropland, hayt'ields, pasture, vineyard, orchard, etc )

8

�r
Construction activity would excavate or compact the soil profile of
agricultural land.
The proposed action would irreversibly convert more than 10 acres
of agricultural.land or, if located in an Agricultural District, more
than 2.5 acres 6f agricultural land.
The proposed action would disrupt or prevent installation of agricultural
land management systems (e.g.. subsurface drain tines, outlet ditches.
•strip cropping): or create a need for such measures (e.g. cause a farm
field to drain poorly due to increased runoff)
Other impacts:
;

IMPACT ON AESTHETIC RESOURCES
Will proposed action affect aesthetic resources?
UNO
DYES
(If necessary, use the Visual EAF Addendum in Section 617.21.
Appendix B.)
Examples that would apply to column 2
Proposed land uses, or project components obviously different from
or in sharp contrast to current surrounding land use patterns, whether
man-made or natural.
Proposed land uses, or project components visible to users of
aesthetic resources which will eliminate or significantly reduce their
enjoyment of the aesthetic Qualities of that resource.
Project components that will result in the elimination or significant
screening of scenic views known to be important to the area.
Other impacts: ___^

1

2

Small to
Modtratt
Impact

Pottntial
Largt
Impact

D

D

DYes

I

D

D

DYes

I

D

DYes

[

D

D

3
Can Imps
Mitlgattc
Project Cr

D Y es

11

•

•

•
•

IMPACT O N HISTORIC AND ARCHAEOLOGICAL RESOURCES
12 Will Proposed Action impact any site or structure of historic, prehistoric or paleontological importance?
J^NO
DYES
Examples that would apply to column 2
• Proposed Action occurring wholly or partially within or substantially
contiguous to any facility or site listed on the State or National Register
of historic places.
• Any impact to an archaeological site or fossil bed located within the
project site.
• Proposed Action will occur in an area designated as sensitive for
archaeological sites on the NYS Site Inventory.
• Other impacts:

IMPACT O N OPEN SPACE AND RECREATION
Will Proposed Action affect the quantity or quality of existing or
future open spaces or recreational opportunities?
Examples that would apply to column 2
JJNO
DYES
• The permanent foreclosure of a future recreational opportunity.
• A major reduction of an open space important to the community
• Other impacts:

D

D

DYes

r

D

D

DYes

[

D

D

DYes

L

D

D

DYes

D

D

DYes

C

D

D

DYes

L

D

D

DYes

C

D

D

DY es

C

D
D
D

D
D
D

DYes
DYes
DYes

Z
Z
Z

r-

13

�IMPACT O N TRANSPORTATION

Can Impact Be
Mltigatad By
Projact Change^

Small to
Modarata
Impact

Potential
LarQt
Impact

D
D
D

D
D
D

DYes

D

D

• Proposed Action will require the creation or extension of an energy
transmission or supply system to serve more than 50 single or two family
residences or to serve a major commercial or industrial use.

D

D

• Other impacts:

D

• Blasting within 1,500 feet of a hospital, school or other sensitive
facility.
• Odors will occur routinely (more than one hour per day).

14

Will there be an effect to existing transportation systems?
*NO
Examples that would apply to column 2

DYES

• Alteration of present patterns of movement of people and/or goods.

Ohio

DYes

Ohio

DYes

D N O

DYes

DNO

DYes

DNO

D

DYes

DNO

D

D

DYes

D N O

D
D

D
D

DYes
DYes

DNO

• Proposed Action will remove natural barriers that would act as a
noise screen.

D

D

DYes

DNO

• Other

D

D

DYes

DNO

* Proposed Action may cause a risk of explosion or release of hazardous
substances (i.e oil, pesticides, chemicals, radiation, etc.) in the event of
accident or upset conditions, or there may be a chronic low level
discharge or emission.

D

D

DYes

DNo

* Proposed Action may result in the burial of "hazardous wastes" in any
form (i e. toxic, poisonous, highly reactive, radioactive, irritating.
infectious, etc.)

D

D

DYes

DNo

* Storage facilities for one million or more gallons of liquified natural
gas or other flammable liquids.

D

D

DYes

DNo

* Proposed action may result in the excavation or other disturbance
within 2,000 feet of a site used for the disposal of solid or hazardous
waste

D

D

DYCS

DNO

* Other impacts

D

D

DYes

D N O

• Proposed Action will result in major traffic problems.
• Other impacts:

_

—

IMPACT O N ENERGY
15

Will proposed action affect the community's sources of fuel or
energy supply?
JBNO
DYES
Examples that would apply to column 2
• Proposed Action will cause a greater than 5% increase in the use of
any form of energy in the municipality.

.

NOISE A N D ODOR IMPACTS
16

Will there be objectionable odors, noise, or vibration as a result
of the Proposed Action?
X N O
DYESExamples that would apply to column 2

• Proposed Action will produce operating noise exceeding the local
ambient noise levels for noise outside of structures.

impacts:

DNO

IMPACT O N PUBLIC HEALTH
17

Will Proposed Action affect public health and safety?

DNO

XYES

Examples that would apply to column 2

W "-*-

W * P t i B

TUfc

UfcdaUTUgAgg,
10

�FREDERICK P. CLARK ASSOCIATES, INC.
Planning/Development/Environment/Transportation
Rye, New York and Southport, Connecticut

David J. Portman, A,CP
Howard I. Reynolds, PE
David H. Stolman, AICP

350 Theodore Fremd Avenue
Rye, New York 10580
(914) 967-6540

Michael A. Galante
Joanne P. Meder, AICP
Jim Donovan, RLA. ASLA

MEMORANDUM
To:

Village of North Tarrytown Planning Board

Date:

October 14, 1993

Subject:

Ruivo Site Plan and Subdivision Review

As requested, we have reviewed the application of Mr. and Mrs.
Arlindo Ruivo for site plan and subdivision approval for a proposed
two-lot subdivision of a 14,000 square foot parcel, with the tax
designation Section 16, Block 12, Lot 2, located on North
Washington Street at the northwest corner of Depeyster Street in
the R-5 Residence District.
The Applicant has submitted the
following subdivision and site plan prepared by Samuel F. Vieira,
R.A. :
"Proposed Sub-division For: Mr. and Mrs. Arlindo Ruivo, 39
Depeyster St., N. Tarrytown, NY," dated 9/7/93.
REVIEW COMMENTS
1.

Proposed Subdivision: The Applicant proposes to subdivide the
property into two lots, one to be approximately 5,800 square
feet and the other to be 8,100 square feet in size. The
property contains a three-story, three-family residence which
will remain on the larger lot.
The plan generally satisfies the requirements of a preliminary
subdivision plat, although certain information, such as the
names of adjoining property owners, is not provided. Also,
the area map is not to scale.

2.

Proposed Site Plan:
On the smaller lot, the Applicant
proposes the construction of a two and a half story, threefamily residence with three outdoor parking spaces and three
garage spaces. The Applicant also proposes to provide six
parking spaces on the larger lot for the existing residence.

3.

Zoning:
The Applicant received an area variance from the
Zoning Board of Appeals (ZBA) for the rear yard of the larger
lot. The plan generally complies with the Zoning Code of the

Connecticut • (203) 255-3100

M X • (914) 96/-6615

Long Island • (516) 364-4544

�FREDERICK P. CLARK ASSOCIATES, INC.
Planning/Development/Environment/Transportation

Village of
memorandum.

North

Tarrytown,

except

as

noted

in

this

4.

Parking:
As shown on the plan, the size and number of
proposed parking spaces are consistent with the Zoning Code.
At the Planning Board meeting in September, the Applicant
questioned whether the Planning Board would want the Applicant
to provide the six proposed parking spaces on the larger lot.
The Applicant stated that the spaces are being added to serve
the needs of the residents of the property. Through the use
of landscaping, the parking area could be sufficiently
screened from the neighboring properties. Although on-street
parking is allowed in the area surrounding the site, there are
some restrictions as to permitted days and times. Still, in
order to reduce the amount of pavement and retain some of the
green space on the property, if the Board agrees with the
reduction of the number of spaces, it may request that certain
spaces be "landbanked" and shown on the plan with dashed lines
and designated as "future parking."
If at any time the
property owner or the Planning Board found that these spaces
were needed to serve the residents of the property, the spaces
would be paved in accordance with the approved layout. If the
spaces are landbanked, we recommend landbanking not more than
three of the spaces on the larger lot (specifically, PI, P2
and P3 - unless one of the other spaces contains the existing
tree). If the spaces are not landbanked, we recommend the
driveway be widened to not more than 20 feet.

5.

Buffers and Landscaping: The plan shows a solid hedge along
a portion of Washington Street to buffer the proposed on-site
parking. It is not clear whether this is an existing hedge or
a new hedge. It should be noted that a fence is not shown
within the buffer area.
It is the Planning Board's
prerogative to require a fence if the Board determines that a
fence is necessary for screening the parking area. Depending
on the type of hedge and its location, the Planning Board may
find that a hedge is sufficient for screening purposes. If
any of the parking is landbanked, it may be possible to save
the existing tree which is located on the Washington Street
side of the larger lot, near proposed spaces 3 and 4. The
landscaped area in the southeastern corner of the larger lot
should not contain plantings which may affect sight distance
from the street. A sight triangle measuring approximately 18
feet north and 18 feet west from that corner should be
maintained.
Regarding the fence that is shown along the rear lot line of
the smaller lot, the fence should be located on the inner side
of a five-foot wide buffer area, as required in Section 622

�FREDERICK P. CLARK ASSOCIATES, INC.
Planning/Development/Environment/Transportation

14D(2). This buffer area is not shown on the plan and should
be added.
The location of the existing trees near the
proposed parking area on the smaller lot should be shown on
the plan so it is clear whether the trees are on the property
and are to be removed or whether action can be taken to
safeguard and preserve these trees.
The Applicant should provide information concerning the type,
size and number of plantings to be added on the site.
Also, lighting for both parking areas should be provided in
accordance with Section 62-14D(5) and the Applicant should
affirm that the lighting will not cause a glare onto
neighboring properties.
6.

Environmental Review:
The Applicant submitted a full
Environmental Assessment Form (see attached).
We have
corrected a few of the items in Part 1, including questions
A.19, B.l(g), B.l(h), B.23, C.l and C.9.
The Planning Board should declare itself the Lead Agency in
the review of this Type I action.
As no significant
environmental impacts have been identified, we recommend that
the Board make a Negative Declaration.
Susan J. Portman, AICP
Associate/Planning

Attachment
cc:

William T. Regan, Village Administrator
Janet A. Gandolfo, Esq., Village Attorney
James T. Margotta, Building Inspector
Joseph A. Gulino, PE, Village Engineer
John Hughes, Jr., Esq.
Sam Vieira

500\not3-004.sjp

3

�1 4 - ^ 2 (2/S7)-7c
617.21
Appendix A
State Environmental Quality Review

SEQR

FULL ENVIRONMENTAL ASSESSMENT FORM
Purpose: The full EAF is designed to help applicants and agencies determine, in an orderly manner, whether a. project
or action may be significant. The question of whether an action may be significant is not always easy t o answer. Frequently, there are aspects of a project that are subjective or unmeasureable. It is also understood that those who determine
significance may have little or no formal knowledge of the environment or may be technically expert in environmental
analysis. In addition, many who have knowledge in one particular area may not be aware of the broader concerns affecting
the question of significance.
The full EAF is intended to provide a method whereby applicants and agencies can be assured that the determination
process has been orderly, comprehensive in nature, yet flexible to allow introduction of information to fit a project or action.
Full EAF Components: The i u l l EAF is comprised of three parts:
Part 1 : Provides objective data and information about a given project and its site. By identifying basic projt ct
data, it assists a reviewer in the analysis that takes place in Parts 2 and 3.
Part 2: 'focuses on identifying the range of possible impacts that may occur from a project or action. It provides
guidance as to whether an impact is likely to be considered small to moderate or whether it is a potentiallylarge impact. The form also identifies whether an impact can be mitigated or reduced.
Part 3: If any impact in Part 2 is identified as potentially-large, then Part 3 is used to evaluate whether or not the
impact is actually important.

DETERMINATION OF SIGNIFICANCE-Type 1 and Unlisted Actions
Identify the Portions of EAF completed for this project:

0

Part 1

S)

Part 2

DPart 3

'Upon review of the information recorded on this EAF (Parts 1 and 2 and 3 if appropriate), and any other supporting
information, and considering both the magitude and importance of each impact, it is reasonably determined by the
lead agency that:
13

A. The project will not result in any large and important impacts) and, therefore, is one which w i l l not
have a significant impact on the environment, therefore a negative declaration will be prepared.

D

B. Although the project could have a significant effect on the environment, there will not be a significant
effect for this Unlisted Action because the mitigation measures described in PART 3 have been required,
therefore a CONDITIONED negative declaration will be prepared.*

D

C. The project may result in one or-more large and important impacts that may have a significant impact
on the environment, therefore a positive declaration will be prepared.
* A Conditioned Negative Declaration is only valid for Unlisted Actions

ARLINDO RUIVO
Name of Action

Planning Board - Village of North Tarrytown
Name of Lead Agency

WILLIAM T. REGAN

Administrator

Print or Type Name of Responsible Officer in Lead Agency

Title of Responsible Officer

Signature of Responsible Officer in Lead Agency

c — _ x / i' s
Signature of Preparer (1f different from responsible officer)

October 1 3 , 1993
Date
1

�PART 1-PROJECT INFORMATION
Prepared by Project Sponsor
NOTICE. This document &lt; designed to assist in determining whether the action proposed may have a significant effect
on the environment Please romplete the entire form. Parts A through E. Answers to these questions will be considered
as part of the application fo* c oproval and may be subject to further verification and public review Provide any additional
information you believe will be needed to complete Parts 2 and 3.
It is expected that completion.of the full EAF will be dependent on information currently available and will not involve
new studies, research or investigation If information requiring such additional work is unavailable, so indicate and specify
each instance.
NAME OF ACTION

ARLINDO RUIVO
LOCATION OF ACTION (Includ* Straet Address. Municipality and County)

39 Depeyster S t r e e t , North T a r r y t o w n , Westchester
NAME OF APPLICANT/SPONSOR

BUSINESS TELEPHONE

( 9 1 4 ) 631-8855

ARLINDO RUIVQ
ADDRESS

Lawrence Avenue
STATE

CITY/PO

ZIP CODE

10591

NY

North Tarrytown
NAME OF OWNER (If different)

BUSINESS TELEPHONE

(

same

)

same

ADDRESS

same
CITY/PO

STATE

ZIP CODE

same
DESCRIPTION OF ACTION

Subdivision of premises to permit construction of three (3) family residence Entire premises consist of 14,000 s.f.

Please Complete Each Question—Indicate N.A. if not applicable

A. Site Description
Physical setting of overall project, both developed and undeveloped areas.
1. Present land use:

DUrban

Dlndustrial

DForest

DAgriculture

2. Total acreage of project area:

---"

DCommercial

^Residential (suburban)

DRural (non-farm)

DOther

»33

acres.

APPROXIMATE ACREAGE
Meadow or Brushland (Non-agricultural)

PRESENTLY
acres

Forested
Agricultural (Includes orchards, cropland, pasture, etc.)

acres

AFTER COMPLETION
acres
acres

acres

acres

Wetland (Freshwater or tidal as per Articles 24, 25 of ECU

acres

acres

Water Surface Area

acres

acres

Unvegetated (Rock, earth or fill)

acres

acres

Roads, buildings and other paved surfaces

acres

acres

Other (Indicate rypp)

.33

Residential

r

What is p edominant soil type(s) on project site? _
a. Soil drainage:

SWell drained
DPoorly drained

100

acres

^il

acres

N/A

% of sJte
% of site

OModerately well drained

% of site

b. If any agricultural land is involved, how many acres of soil are classified within soil group 1 through 4 of the NY!
V
Land Classification System?
N/A
a c r e s (See 1 NYCRR 370).
4 Are there bedrock outcroppings on project site?
a. What is depth to bedrock? Approx. 10-15

DYes
SNo
(m feet)

L
L

�§

$. Approximate percentage of proposed project site with slopes

r

6 Is oro/ect substantially contiguous to. or contain a building, s *e. or district, listed on the State or the National
Regufers of Historic Places?
DYes
BNo

1

EO-10%
100
D 1 5 % or greater

%

Dl0-1596
%

7 Is preset substantially contiguous to a site listed on the Register on National Natural Landmarks?

%

CYes

ENo

8 What is the depth of the water table? Approx. (j n f e et)
9. Is site located over a primary, principal, or sole source aquifer?

OYes

BNo

10. Do hunting, fishing or shell fishing opportunities presently exist in the project area?

DYes

ENo

11 Does project site contain any species of plant or animal life that is identified as threatened or endangered?
DYes

©No

According to

Identify each species

'

12 Are there any unique or unusual land forms on the project site? (i.e., cliffs, dunes, other geological formations)
DYes

ENo

Describe

:

13. Is the project site presently used by the community or neighborhood as an open space or recreation area?
DYes
63 No
If yes. explain
_______________»_.
14.

Does the present site include scenic views known to be important to the community?
DYes
®No

15. Streams within or contiguous to project area:

___£__:

-__-___-_____

a. Name of Stream and name of River to which it is tributary
16. Lakes, ponds, wetland areas within or contiguous to project area:
a. Name
None.
Is the site served by existing public utilities?

GSYes

b. Size (In acres)

DNo

a) If Yes, does sufficient capacity exist to allow connection?

SYes

b) If Yes, will improvements be necessary to allow connection?

DNo

SI Yes

DNo

18 Is the site located in an agricultural district certified pursuant to Agriculture and Markets Law. Article 25-AA,
Section 303 and 304?
DYes
®No
19. Is the site located in or substantially contiguoys-Xo a Critical Environmental Area designated pursuant to Article 8
of the ECL, and 6 NYCRR 617?
JgJYes
(pte
20 Has the site ever been used for the disposal of solid or hazardous wastes?

DYes

ENo

B. Project Description
1. Physical dimensions and scale of project (fill in dimensions as appropriate)
a Total contiguous acreage owned or controlled by project sponsor
b. Project acreage to be developed.

"33

c. Project acreage to remain undeveloped
d. Length of project, in miles:

N/A

«33

acres initially;
None

acres.

«33

acres ultimately.

acres.

(If appropriate)

e. If the project is an expansion, indicate percent of expansion proposed
f. Number of off-street parking spaces existing

None

g. Maximum vehicular trips generated per hour

-&gt; ^

'

%•
1 2 - Subject t o P l a n n i n g Boar*

(upon completion of project)?

h. If residential: Number and type of housing units:
One Family
Two Family

MultipleTamily

Initially

^

/

Ultimately
i Dimensions (in feet) of largest proposed structure

100

proposed Approx.

2 ( _&gt;-*=w*il"p
2

35

Condominium

(

height;

I Linear feet oi frontage along a public thoroughfare project will occupy is?

• 3
width;
65

length. Subject to AR*
ft.

�'.Ml^U- *|£

None

2 How much natural material (i e . rock, earth, etc.) will be removed from the site'
3. Will disturbed areas be reclaimed'

DYes

ENo '

tons/cubic y*i*d&gt;

ON/A

a. If yes. for what i n t e n d . , purpose is the site being reclaimed?
b. Will topsoil be stockpiled for reclamation?

DYes

.

DNo

c. Will upper subsoil be stockpiled for reclamation?

C

DYes

DNo

4 How many acres of vegetation (trees, shrubs, ground covers) will be removed from site?

None

acres.

5. Will any mature forest (over 100 years old) or other locally-important vegetation be removed by this project?
DYes
®No
6. If single phase project: Anticipated period of construction

6-8

months, (including demolition).

7. If multi-phased:
a. Total number of phases anticipated

I
N

'

A

(number).

|

b. Anticipated date of commencement phase 1

month

c. Approximate completion date of final phase

month

d. Is phase 1 functionally dependent on subsequent phases?
8. Will blasting occur during construction?

DYes

9. Number of jobs generated: during construction
10. Number of jobs eliminated by this project

DYes

year.

I

DNo

*

'

/

•

A

N

; after project is complete

/

A

|

A

11. Will project require relocation of any projects or facilities?

12. is surface liquid waste disposal involved?

:

BNo
N

N

year, (including demolition)

DYes

DYes

BNo

If yes, explain

|

SNo

a. If yes, indicate type of waste (sewage, industrial, etc.) and amount
b. Name of water body into which effluent will be discharged
J 3. Is subsurface liquid waste disposal involved?

DYes

BNo

Type

*14 Will surface area of an existing water body increase or decrease by proposal?
Explain
15 Is project or any portion of project located in a 100 year flood plain?
16. Will the project generate solid waste?

DYes

DYes

DYes

BNo

BNo

BNo

a. If yes, what is the amount per month

tons

b. If yes, will an existing solid waste facility be used?

DYes

c. If yes, give name

DNo

; location

d. Will any wastes not go into a sewage disposal system or into a sanitary landfill?

DYes

DNo

e. If Yes, explain
17. Will the project involve the disposal of solid waste?

DYes

BNo

a. If yes, what is the anticipated rate of disposal?
b

tons/month.

If yes, what is the anticipated site life?

18 Will project use herbicides or pesticides?

years.
DYes

BNo

19 Will project routinely produce odors (more than one hour per day)? DYes

BNo

20 Will project produce operating noise exceeding the local ambient noise levels?
21. WiJI project result in an increase in energy use?

DYes

DYes

BNo

BNo

If yes , indicate type(s)
If water supply is from wells, indicate pumping capacity
• K

Total anticipated water usage per day

N

'A

&gt;9S ^gallons/day

24 Does project involve Local, State or Federal funding?

DYes

gallons/minute.
^ ^

^

t

°~^

\

ENo

If Yes, explain

l.
it

�I

25: Approval* Required:

r

City. Town. Village Board

OYes

BNo

J

City. Town. Village Plaur ng Board

®Yes

DNo

City. Town Zoning Board

®Yes

DNo

City, County Health Department

DYes

DNo

Other Local Agencies

DYes

DNo

Other Regional Agencies

DYes

DNo

State Agencies

DYes

DNo

Federal Agencies

DYes

DNo

Submittal
Date

Type

Subdivision/Site Plan

9/93

Variance - Rear Yard

Received 8/93

•
•.

C. Zoning and Planning Information
1

Does proposed action it volve a planning or zoning decision?

BYes

DNo

If Yes, indicate decision required
Ozoning amendment

Ezoning variance

Dnew/revision of master plan

Dresource management plan_

2. What is t h e zoning classification(s)of the site?
3

Dspecial use permit

^Subdivision

rfsite

plan

Dother

R-5

What is t h e maximum potential development of the site if developed as permitted by the present zoning?

Nitie (9) dwelling u n i t s
4

What is t h e proposed zoning of the site?

N/A

5. What is the maximum potential development of the site if developed as permitted by the proposed zoning?

N/A

;

Is the proposed action consistent with the recommended uses in adopted local land use plans?

BYes

DNo

What are t h e predominant land use(s) and zoning classifications within a V* mile radius of proposed action?

Residential and light commerical uses
Is the proposed action compatible with adjoining/surrounding land uses within a V* mile?
If the proposed action is the subdivision of land, how many lots are proposed?
a. What is the minimum lot size proposed?

EYes

DNo

DYes

BNo

2

5TdC&gt;0 £a n -

10

Will proposed action require any authorization(s) for the formation of sewer or water districts?

11

Will the proposed action create a demand for any community provided services (recreation, education, police,
fire protection)?
DYes
BNo
a. If yes, is existing capacity sufficient to handle projected demand?

12

DYes

DNo

Will the proposed action result in the generation of traffic significantly above present levels?
a. If yes, is the existing road network adequate to handle the additional traffic?

DYes

DYes

ElNo

DNo

D. informational Details
Attach any additional information as may be needed to clarify your project. If there are or may be any adverse
impacts associated with your proposal, please discuss such impacts and the measures which you propose to mitigate or
avoid them.

E. Verification
I certify that the information provided above is true to the best of my knowledge.
Ipplicant/Sponsor Name
Signature ^-&lt;

ARLINDO RUIVO

J ^ *'---?-^-&gt; - A~ -

Date

10-13-93

Title 4 &amp; £ i £ J

If the action is in the Coastal Area, and you are a state agency, complete the Coastal Assessment Form before proceeding
with this assessment5
#

i

�Part 2—PROJECT IMPACTS AND THEIR MAGNITUDE
Responsibility of Lead Agency
General Information (Read Carefully)
•• in completing the form the reviewer should be guided by ti r question: Have my responses and determinations been^
t&gt;?sonable? The reviewer is not expected to be an expert environmental analyst.
£

»

ro^ntifying that an impact will be potentially large (column 2) does not mean that it is also necessarily significant,
Any large impact must be evaluated in PART 3 to determine significance. Identifying an impact in column 2 .simply
asks that it be looked at further.
• The Examples provided are to assist the reviewer by showing types of impacts and wherever possible the threshold of
magnitude that would trigger a response in column 2. The examples are generally applicable throughout the State and
for most situations. But, for any specific project or site other examples and/or lower thresholds may be appropriate
for a Potential Large Impact response, thus requiring evaluation in Part 3.
•„The impacts of each project, on each site, in each locality, will vary. Therefore, the examples are illustrative and
have been offered as guidance. They do not constitute an exhaustive list of impacts and thresholds to answer each question.
• The number of examples per question does not indicate the importance of each question.
• In identifying impacts, consider long term, short term and cumlative effects.

j
|

.
f

f

[

Instructions (Read carefully)
a. Answer each of the 19 questions in PART 2. Answer Yes if there will be any impact.
T
b. Maybe answers should be considered as Yes answers.
I
c. If answering Yes to a question then check the appropriate box (column 1 or 2) to indicate the potential size of the
impact. If impact threshold equals or exceeds any example provided, check column 2, If impact will occur but threshold
is lower than example, check column 1.
d. If reviewer has doubt about size of the impact then consider the impact as potentially large and proceed to PART 3.
e. If a potentially large impact checked in column 2 can be mitigated by changes) in the project to a small to moderate
impact, also check the Yes box in column 3. A No response indicates that such a reduction is not possible. This
must be explained in Part 3.

r

IMPACT ON LAND
1. Will the proposed action result in a physical change to the project site?
ENO
DYES
Examples that would apply to column 2
• Any construction on slopes of 15% or greater, (15 foot rise per 100
foot of length), or where the general slopes in the project area exceed
10%.

1
Small to
Moderate
Impact

Potential
Large
Impact

D

D

DYes

DNo

•

D

D Y es

DN&lt;

n
D

D
D

DYes
DYes

DNO

D

D

DYes

DNO

2

Can Impact Be
Mitigated By
Project Change

• Construction on land where the depth to. the water table is less than
3 feet.
• Construction of paved parking area for 1,000 or more vehicles.
• Construction on land where bedrock is exposed or generally within
3 ieet of existing ground surface.
• Construction that will continue for more than 1 year or involve more
than one phase or stage.
• Excavation for mining purposes that would remove more than 1,000
tons of natural material (i.e., rock or soil) per year.
• Construction or expansion of a sanitary landfill.
• Construction in a designated floodway.
• Other impacts

D

D

DYes

DNO

D
D
D

D
D

DYes
DYes
DYes

DNO
DNO

Will there be an effect t&lt;. ...iy unique or unusual land forms found on
the site? (i.e., cliffs, dunes, geological formations, etcjENO
DYES
Specific land forms:

D

DYes

DNo

•
D

DNo

DNO

�2

r

IMPACT ON WATER
Will proposed action affect any water body designated as protected'
(Under Articles 15. 24. 25 of the Environmental Conservation Law. ECL)
ENO
CYES
Examples that would apply to column 2
Developable area of site contains a protected water body
Dredging more than 100 cubic yards of material from channel of a
protected stream.
Extension of utility distribution facilities through a protected water body.
Construction in a designated freshwater or tidal wetland.
Other impacts:

Will proposed action affect any non-proi ?cted existing or new body
of water?
ENO
DYES
Examples that would apply to column 2
• A 1 0 % increase or decrease in the surface area of any body of water
or more than a 10 acre increase or decrease.

Small to
Moderate
Impact

Potential
Large
Impact

•
•
•
•
•

•
•
•
•
•

•
•
•

•
•
•

•
•
•
•
•
•
•
•

•
•
•
•
•
•
•
•

•
•
•

•
•
•

•

•

3
Can Impact Be
Mitigated By
Project Change

•Yes
•Yes

•No
•NO

•Yes DNO
•Yes DNO
•Yes DNo

4

• Construction of a body of water that exceeds 10 acres of surface area.
• Other impacts:

5. Will Proposed Action affect surface or groundwater
quality or quantity?
®NO
Examples that would apply to column 2

Proposed Action requires use of a source of water that does not
have approval to serve proposed (project) action.
Proposed Action requires water supply from wells with greater than 45
gallons per minute pumping capacity.
Construction or operation causing any contamination of a water
supply system.
Proposed Action will adversely affect groundwater.
Liquid effluent will be conveyed off the site to facilities which presently
do not exist or have inadequate capacity.
Proposed Action would use water in excess of 20.000 gallons per
day.
Proposed Action will likely cause siltation or other discharge into an
existing body of water to the extent that there will be an obvious visual
contrast to natural conditions.
Proposed Action will require the storage of petroleum or chemical
products greater than 1,100 gallons.
Proposed Action will allow residential uses in areas without water
and/or sewer services.
Proposed Action locates commercial and/or industrial uses which may
require new or expansion of existing waste treatment and/or storage
facilities.
impacts:

Will proposed action alter drainage flow or patterns, or surface
water runoff?
ENO
DYES
Examples that would apply to column 2
Proposed Action would change flood water flows
7

DN&lt;

•Yes
•Yes

•No
•No

•Yes
•Yes

•NO
•NO

•Yes

•NO

•Yes

• NO

•Yes
•Yes

•NO

•Yes

•NO

•Yes

• NO

•Yes

DNo

•Yes

DNo

•Yes

DNo

•

• Yes

DNo

•

• Yes

CNO

DYES

• Proposed Action will require a discharge permit.

Other

•Yes

• NO

�1
Small to
Moderate
Impact

r
a

2
Potential
Largo
Impact

D
D

D
D
D
D

D

• Proposed Action wili result in the incineration of more than 1 ton of
refuse per hour.

• Proposed Action ' ^ay cause substantial erosion
Proposed Actio?, is incompatible with existing drainage patterns.

Can Impact Be
Mitigated By
Project Change
DYes

DNo

DYes

. DNo

DYes

DNo

DYes

DNo

D

DYes

DNo

D

D

DYes

DNo

• Emission rate of total contaminants will exceed 5 lbs. per hour or a
heat source producing more than 10 million BTU's per hour.

D

D

DYes

DNO

• Proposed action will allow an increase in the amount of land committed
to industrial use.

D

D

DYes

DNO

• Proposed action will allow an increase in the density of industrial
development within existing industrial areas.

D

D

DYes

DNO

• Other impacts:

D

D

DYes

DNO

• Reduction of one or more species listed on the New York or Federal
list, using the site, over or near site or found on the site.

D

D

DYes

DNo

• Removal of any portion of a critical or significant wildlife habitat.

D
D

D
D

DYes

DNo

DYes

DNo

DYes

DNo

• Proposed Action will allow development in a designated floodway.
• Other impacts:

.

IMPACT ON AIR
7 - W i l l proposed action affect air quality?
0NO DYES
Examples that would apply t o column 2
• Proposed Action will induce 1.000 or more vehicle trips in any given
hour.

IMPACT ON PLANTS A N D A N I M A L S
Will Proposed Action affect any threatened or endangered
species?
BNO
Examples that would apply to column 2

DYES

• Application of pesticide or herbicide more than twice a year, other
than for agricultural purposes.
• Other

9

impacts:

D

w,

Will Proposed Action substantially affect non-threatened or
non-endangered species?
BNO
Examples that would apply to column 2

DYES

• Proposed Action would substantially interfere with any resident or
migratory fish, shellfish or wildlife species.

D

D

DYes

DNo

• Proposed Action requires the removal of more than 10 acres
of mature forest (over 100 years of age) or other locally important
vegetation.

D

D

DYes

DNo

D

D

DYes

DNo

IMPACT ON AGRICULTURAL L A N D RESOURCES
10

Will the Proposed Action affect agricultural land resources?
ENO
DYES
Examples that would apply to column 2
^ H i e proposed action would sever, cross or limit access to agricultural
^ ^ a n d (includes cropland, hayfields, pasture, vineyard, orchard, etc.)
8

i

1

�J

I
r
i

»

• Construction activity would excavate or compact the soil profile of
agricultural land.
The proposed action would irreversibly convert more than 10 acres
of agricultural land or, if located in an Agricultutal District, more
than 2.5 acres oi agricultural land.
The proposed action would disrupt or prevent installation of agricultural
land management systems (e.g., subsurface drain lines, outlet ditches,
-strip cropping); or create a need for such measures (e.g. cause a farm
field to drain poorly due to increased runoff)
Other impacts:

IMPACT O N AESTHETIC RESOURCES
W i l l proposed action affect aesthetic resources?
BNO
DYES
(If necessary, use the Visual EAF Addendum in Section 617.21.
Appendix B.)
Examples that would apply t o column 2
• Proposed land uses, or project components obviously different from
or in sharp contrast to current surrounding land use patterns, whether
man-made or natural.
• Proposed land uses, or project components visible to users of
aesthetic resources which will eliminate or significantly reduce their
enjoyment of the aesthetic qualities of that resource.
Project components that will result in the elimination or significant
screening of scenic views known to be important to the area.
Other impacts,

2

3

Small to
Moderate
Impact

Potential
Large
Impact

Can Impact Be
Mitigated By
Project Change

D

D

DYes

DNo

D

D

DYes

DNo

DYes

DNo

DYes

DNo

D

D

11

IMPACT O N HISTORIC A N D ARCHAEOLOGICAL RESOURCES
12. Will Proposed Action impact any site or structure of historic, prehistoric or paieontological importance?
ENO
DYES
Examples that would apply to column 2
• Proposed Action occurring wholly or partially within or substantially
contiguous to any facility or site listed on the State or National Register
of historic places.
• Any impact to an archaeological site or fossil bed located within the
project site.
• Proposed Action will occur in an area designated as sensitive for
archaeological sites on the NYS Site Inventory.
• Other impacts:

D

D

DYes

DNo

D

D

DYes

DNO

D

D

DYes

DNO

D

D

DYes

DNO

D

D

DYes

DNo

D

D

DYes

DNo

D

D

DYes

DNo

D

D

DYes

DNo

D
D
D

D
D
D

DYes
DYes
DYes

DNo
DNo
DNo

IMPACT ON OPEN SPACE AND RECREATION
13

Will Proposed Action affect the quantity or quality of existing or
future open spaces or recreational opportunities?
Examples that would apply to column 2
ENO
DYES
The permanent foreclosure of a future recreational opportunity.
• A major reduction of an open space important to the community.
• Other impacts:

9

�1

2

Small to
Moderate
Impact

Potential
Larc?
Impact

D
D
D

D
D
D

• Y e s ' _ONO
•Yes
DNo
DYes DNo

D

•

•Yes

DNo

• Proposed Action will require the creation.or extension of an energy
transmission or supply system to serve more than SO single or two family
residences or to serve a major commercial or industrial use.

D

D

•Yes

DNo

• Other impacts:

D

D

•Yes

DNo

D

D

•Yes

•No

D
D

•
D

•Yes
•Yes

•No
•No

• Proposed Action will remove natural barriers that would act as a
noise screen.

D

D

•Yes

•NO

• Other

D

•

•Yes

•NO

• Proposed Action may cause a risk of explosion or release of hazardous
substances (i.e. oil, pesticides, chemicals, radiation, etc.) in the event of
accident or upset conditions, or there may be a chronic low level
discharge or emission.

D

D

•Yes

DNo

• Proposed Action may result in the burial of "hazardous wastes" in any
form (i.e. toxic, poisonous, highly reactive, radioactive, irritating,
infectious, etc.)

D

D

•Yes

DNo

• Storage facilities for one million or more gallons of liquified natural
gas or other flammable liquids.

D

D

•Yes

DNo

Proposed action may result in the excavation or other disturbance
within 2.000 feet of a site used for the disposal of solid or hazardous
waste.

D

D

•Yes

DNO

D

D

• Yes

DNo

IMPACT O N TRANSPORTATION
14

Will there be an effect to exiting transportation systems?
BNO
Examples that would apply to c lumn 2

DYES

• Alteration of present patterns of movement of people and/or goods.
• Proposed Action will result in major traffic problems.
• Other impacts:

Can Impact Be
Mitigated By
Project Change/

IMPACT O N ENERGY
15. Will proposed action affect the community's sources of fuel or
energy supply?
E)NO
DYES
Examples that would apply to column 2
• Proposed Action will cause a greater than 5% increase in the use of
any form of energy in the municipality.

NOISE A N D ODOR IMPACTS
16

k»

Will there be objectionable odors, noise, or vibration as a result
of the Proposed Action?
BNO
DYES
Examples that would apply to column 2

Blasting within 1,500 feet of a hospital, school or other sensitive
facility.

• Odors will occur routinely (more than one hour per day).
• Proposed Action will produce operating noise exceeding the local
ambient noise levels for noise outside of structures.

impacts:

IMPACT ON PUBLIC HEALTH
17

Will Proposed Action affect public health and safety?
BNO
Examples that would apply to column 2

• Other impacts:

10

DYES

�r,

8

IMPACT ON GROWTH AKD CHARACTER
OF COMMUNITY OR NEIGHBORHOOD
Will proposed actio.- affect the character of the existing community?
EJNO DYES
Examples that woulc apply to column 2

The permanent population of the city, town or village in which the
project is located is likely to grow by more than 5%.
The municipal budget for capital expenditures or operating services
will increase by more than 5% per year as a result of this project.
Proposed action will conflict with officially adopted plans or goals.
Proposed action will cause a change in the density of land use.
'Proposed Action will replace or eliminate existing facilities, structures
or areas of historic importance to the community.
Development will create a demand for additional community services
(e.g. schools, police and fire, etc.)
Proposed Action will set an important precedent for future projects.
Proposed Action will create or eliminate employment.
Other

impacts:

______

""

1

2

3

Small to
Moderate
Impact

Potential
Large
Impact

Can Impact Be
Mitigated By
Project Change

D

•

DYes ' -DNo

.D

D

DYes

DNo

D
D
D

D
D

a

DYes
DYes
DYes

DNo
DNo
DNo

D

D

DYes

DNo

D
D
D

D
D
D

DYes
DYes
DYes

DNo
DNo
DNo

19. Is there, or is there likely to be, public controversy related to
potential adverse environmental impacts?
JSlNO
DYES

If Any Action fn Pari 2 Is Identified as a Potential Large Impact or
If You Cannot Determine the Magnitude of Impact, Proceed to Part 3

Part 3-EVALUATION OF THE IMPORTANCE OF IMPACTS
Responsibility of Lead Agency
Part 3 must be prepared if one or more impact(s) is considered to be potentially large, even if the impact(s) may be
mitigated.
Instructions
Discuss the following for each impact identified in Column 2 of Part 2:
1. Briefly describe the impact.
2. Describe (if applicable) how the impact could be mitigated or reduced to a small to moderate impact by project changefs).
3. Based on the information available, decide if it is reasonable to conclude that this impact is important.
To answer the question of importance, consider:
• The probability of the impact occurring
• The duration of the impact
• Its irreversibility, including permanently lost resources of value
• Whether the impact can or will be controlled
• The regional consequence of the impact
•
• Its potential divergence from local needs and goals
• Whether known objections to the project relate to this impact.
(Continue on attachments)

11

�RESOLUTION
Adopted at the October 21, 1993 Meeting of the
Village of North Tarrytown Planning Board
RESOLUTION:

SITE PLAN AND SUBDIVISION APPROVAL
PROPOSED: 2-LOT SUBDIVISION AND CONSTRUCTION OF
THREE-FAMILY RESIDENCE IN 2 1/2 STORY BUILDING
OWNER: MR. AND MRS. ARLINDO RUIVO
LOCATION: 39 DEPEYSTER STREET (AT NORTHWEST CORNER
WITH WASHINGTON STREET)
TAX DESIGNATION: SECTION 16, BLOCK 12, LOT 2
ZONING: R-5 RESIDENTIAL

WHEREAS, the Planning Board of the Village of North Tarrytown
has reviewed an application for site plan and subdivision approval
pursuant to the Subdivision Regulations of the Village of North
Tarrytown, Chapter 62, Zoning, of the Code of the Village of North
Tarrytown and other requirements of the Village Code considered
pertinent to the application, which application is to subdivide a
property that is approximately 14,000 square feet in size and is
located at the northwest corner of Washington Street and Depeyster
Street, and is known as tax Lot 16A of Section 15, Block 13, into
two lots, to construct a three-family 2 1/2-story residence with
three paved parking spaces and three garage spaces on the smaller
lot, and to construct three paved parking spaces and to provide for
the potential future development of three landbanked spaces on the
larger lot, which contains an existing three-family residence, as
shown on the drawing prepared in the office of Samuel F. Vieira,
R.A., and further identified as follows:
"Site Plan, Proposed Sub-division for: Mr. &amp; Mrs. Arlindo
Ruivo, 39 Depeyster St., N. Tarrytown, NY," dated 9/7/93 and
last revised 10/19/93, scale 1" = 20'; and
WHEREAS, the plan proposes the subdivision of the property
into two lots, the larger to be approximately 8,100 square feet and
the smaller to be approximately 5,800 square feet in size; and
WHEREAS, the larger lot will contain the existing three-family
three-story frame residence and the Applicant proposes to build a
new macadam driveway and three paved spaces shown as P4, P5 and P6
on the plan, with spaces PI, P2 and P3 to be shown as "future
parking" and to be landscaped until they may be needed or required
by the Planning Board in the future; and
WHEREAS, the Applicant proposes to construct a 2 1/2 story
three-family residence with three garage parking spaces, a macadam
driveway and three paved parking spaces on the smaller lot; and
WHEREAS, evergreen hedges will be placed along the Washington
Street side of the property to screen the view of the paved parking
spaces on the larger lot as shown on the plan; and

�WHEREAS, the smaller lot will be landscaped and a 5-foot high
attractive fence will be located on the western boundary of the lot
to screen parking spaces PI, P2 and P3; and
WHEREAS, fencing, for safety purposes, will also be provided
on the top of the proposed retaining walls; and
WHEREAS, the Applicant has stated that the lighting in the
parking areas will be controlled with motion detectors for energyefficiency and that the fixtures will be directed downward onto the
property so that there will not be glare onto other properties; and
WHEREAS, the Applicant has received an area variance for the
size deficiency of the rear yard of the larger lot from the Zoning
Board of Appeals of the Village of North Tarrytown; and
WHEREAS, the site has been visited by the Village's Planning
and Engineering Consultants and the Planning Board is thoroughly
familiar with the site and all aspects of the proposed project; and
WHEREAS, a duly advertised public hearing was held at the
Village Hall on October 21, 1993, at which time those wishing to be
heard were given the opportunity to be heard; and
WHEREAS, in the course of its review and acting as Lead Agency
pursuant to Part 617 of the implementing regulations pertaining to
Article 8 of the Environmental Conservation Law, the Planning Board
has made the following findings and caused, noted, or conducted the
following activities:
1.

Received an application fee of $250;

2.

Caused field inspections to be made of the property and of the
surrounding areas;

3.

Requested, received and considered comments from the Village
Planning and Engineering Consultants and the Building
Inspector;

4.

Acting as Lead Agency, requested, received and reviewed a Full
Environmental Assessment Form (EAF) in compliance with the New
York State Environmental Quality Review Act (SEQRA);

5.

After review of the application, EAF, and property as well as
other information submitted by the Applicant, the Planning
Board declared itself Lead Agency and circulated a "Negative
Declaration," dated October 21, 1993, in which the Planning
Board stated its determination of non-significance of
environmental impact for this Type I action;

NOW, THEREFORE, BE IT RESOLVED, that said application for site
plan and subdivision approval and the plan noted above be and
hereby are granted site plan and subdivision approval and that the
Applicant may obtain the endorsed approval of the Planning Board
Chairman or, as an alternate, the Village Administrator, on a copy
2

�of this site plan and subdivision resolution and upon the final
mylar copy of the site plan and the final mylar copy of the
subdivision plat drawing revised as necessary to show compliance
with the following conditions, and the Applicant may obtain the
endorsement of the Westchester County Department of Health on the
final subdivision plat which endorsements shall permit filing in
the offices of the Village Building Department, for purposes of
obtaining a building permit in accordance with this resolution and
all building code requirements, and the offices of the Westchester
County Clerk, provided, however, that this site plan approval shall
expire within twelve (12) months of the date of this resolution if
the following modifications and conditions have not been completed
to the satisfaction of the Planning Board and/or the Applicant has
not obtain a building permit and the subdivision approval shall
expire within ninety (90) days from the date of this resolution if
the following modifications and conditions have not been completed
to the satisfaction of the Planning Board:
1.

All references to the "Applicant"
Applicant's successor and assigns.

2.

Fees - The Applicant
Tarrytown:

3.

shall

include

the

shall pay to the Village of North

2.1

An inspection fee for construction inspection of the
property for compliance with the approved site plan in
accordance with the Village of North Tarrytown Zoning
Code;

2.2

A recreation fee in the amount of $
, subject to
the approval of the Village Board of Trustees;

2.3

The reimbursement of all application review fees as noted
and required in Section 62-30(f) of the Village Zoning
Code, as approved by the Village Attorney.

Revision of the above noted plan, to the satisfaction of the
Planning and Engineering Consultants, to demonstrate the
following:
3.1

The signature block shall be revised to comply with the
wording in Section HA(l)c(14c) of the Subdivision
Regulations and to provide a line for the endorsement of
the Westchester County Department of Health;

3.2

Parking spaces PI, P2 and P3 shall be shown on the plan
as "future parking" to be implemented by the Applicant as
needed or within 180 days of being determined necessary
by the Planning Board;

3.3

The plan drawing shall be revised and titled "Final Site
Plan" and a separate drawing showing the subdivision line
but not including the proposed development shall be
submitted and titled "Final Subdivision Plat";

3

�3.4

The date of this resolution shall be noted on the final
subdivision plat and on the final site plan.

4.

The landscaping to be provided on the smaller lot and the
additional hedges and other landscaping materials shown to be
provided on the larger lot shall be maintained in a healthy
growing condition. There shall be diversity in the species of
vegetation planted.

5.

Prior to the issuance of a certificate of occupancy, the
Applicant shall submit to the Village Building Inspector a
mylar reproduction of the site plan complete with the
certification
of
a professional
architect
and/or a
professional engineer attesting to construction of the site
plan and its improvements as shown thereon.

6.

All elements of this approved site plan shall be completed to
the satisfaction of the Village Building Inspector within a
period of eighteen (18) months from the date of the issuance
of the building permit and prior to the issuance of a
certificate of occupancy. The Planning Board may issue an
extension on this time limit, or may modify any of the above
conditions with respect thereto, for good cause.

7.

The Planning Board reserves the right to make a final field
inspection of the project after construction of the
facilities, upon notice of the Building Inspector, and before
the issuance of a certificate of occupancy. The purpose of
this final inspection is to review the development and to
require any modifications.to parking, drainage, access, paving
and other site plan details, which do not comply with the
approved plan and interest of safety, convenience, aesthetics
and the enjoyment and peace and quiet of adjacent neighbors.

PLANNING BOARD
VILLAGE OF NORTH TARRYTOWN

500\not3-0A5.sjp.crc

4

�Approved with respect to substance and form;

Villager Attorney

Dated:

J^tJ?y

Approved by the Planning Board

Chairman of Aotinq^Chairman
Dated: /

Filed with Village Clerk

Clerk or Deputy Clerk
Dated: ^ ^ y

S^pk^Us

Date of Heeti
Heetmg

2 3 M3

�FREDERICK P. CLARK ASSOCIATES, INC.
Planning/Development/Environment/Transportation

4.

Referral. Under Section 239-M of the General Municipal Law,
this application will need to be referred to the Westchester
County Planning Board, because the property has frontage on
State Route 9 and because the property is located within 500
feet from the boundary of the Village.

Of course, we are willing to meet with the Applicant to review our
comments, if the Applicant so desires.
Susan J. Portman, AICP
Associate/Planning
cc:

William T. Regan, Village Administrator
Janet A. Gandolfo, Esq., Village Attorney
James T. Margotta, Building Inspector
Joseph A. Gulino, P.E., Village Engineer
Vincent Del Bagno

500\not3-021.sjp:aj:ev

3

�FREDERICK P. CLARK ASSOCIATES, INC.
Planning/Development/Environment/Transportation
Rye, New York and Southport, Connecticut

David J. Portman, AICP
Howard!- Reynolds, PE
David H. Stolman, AICP

350 Theodore Fremd Avenue
Rye, New York 10580
(914) 967-6540

Michael A. Galante
Joanne P Meder, AICP
Jim Donovan, RLA. ASLA

MEMORANDUM
To:

Village of North Tarrytown Planning Board

Date:

September 21, 1993

Subject:

Review of Revised Site Plan for Serina Proper-tv

As requested, we have reviewed the revised site plan for the Serina
property. The site is 2,207 square feet in size and is located on
the western side of Lawrence Avenue, in the R-5 Residential
District.
The Applicant is proposing the demolition of the
existing garage and construction of a two-story, 1,200 square foot
building to contain one office and one apartment. According to the
Applicant, all necessary variances have been obtained from the
Village of North Tarrytown Zoning Board of Appeals.
The Applicant has submitted the following revised plan:
"Proposed Mixed-Use / 2 Story, Emma B. Serina, 9 Lawrence
Ave., N. Tarrytown, N.Y.," scale 1" = 10', dated April
25, 1993 and revised August 1, 1993, prepared by Barstow
Architects.
REVIEW COMMENTS
1.

Plan Revisions: The floor area of the proposed building has
been reduced by 60 square feet to 1,200 square feet, reducing
the building lot coverage by three percent. The location of
the proposed building has been moved towards the center of the
property.
As a result, although the undersized rear yard
decreases by approximately six inches, the front yard setback
is increased by three and a half feet. This new design allows
for adequate side yards and proper size parking spaces. A
four foot wide walk is shown between the street and the
building.

2.

Landscaping:
The Applicant should
indicate whether
landscaping or pavement will be placed in the areas on the
site to the north and south of the proposed building. The
area directly to the east of the proposed building is shown as
landscaped. The Applicant should provide more information
regarding landscaping, including the location of the

Connecticut -(203)255-3100

FAX • (914) 967-6615

Long Island •(516)364-4544

�FREDERICK P. ClXARK ASSOCIATES, INC.
Planning/Developmer—it/Environment/Transportation

plantings, their sizes and species. It is also not clear
whether
a hedge is to be provided along the side yards to
screen
the parking area.
We recommend that a hedge be
provided.
Susan J. Portman, AICP
Associate/Planning
cc:

William T. Regan, Village Administrator
Janet A . Gandolfo, Esq., Village Attorney
James T . Margotta, Building Inspector
Joseph ^A. Gulino, P.E., Village Engineer
Robert £3arstow

500\not3-062.sjp:ev

2

�</text>
                </elementText>
              </elementTextContainer>
            </element>
          </elementContainer>
        </elementSet>
      </elementSetContainer>
    </file>
  </fileContainer>
  <collection collectionId="134">
    <elementSetContainer>
      <elementSet elementSetId="1">
        <name>Dublin Core</name>
        <description>The Dublin Core metadata element set is common to all Omeka records, including items, files, and collections. For more information see, http://dublincore.org/documents/dces/.</description>
        <elementContainer>
          <element elementId="50">
            <name>Title</name>
            <description>A name given to the resource</description>
            <elementTextContainer>
              <elementText elementTextId="14837">
                <text>Planning Board Minutes &amp; Resolutions-1993</text>
              </elementText>
            </elementTextContainer>
          </element>
        </elementContainer>
      </elementSet>
    </elementSetContainer>
  </collection>
  <itemType itemTypeId="1">
    <name>Text</name>
    <description>A resource consisting primarily of words for reading. Examples include books, letters, dissertations, poems, newspapers, articles, archives of mailing lists. Note that facsimiles or images of texts are still of the genre Text.</description>
  </itemType>
  <elementSetContainer>
    <elementSet elementSetId="1">
      <name>Dublin Core</name>
      <description>The Dublin Core metadata element set is common to all Omeka records, including items, files, and collections. For more information see, http://dublincore.org/documents/dces/.</description>
      <elementContainer>
        <element elementId="50">
          <name>Title</name>
          <description>A name given to the resource</description>
          <elementTextContainer>
            <elementText elementTextId="14261">
              <text>MINS_PLAN_1993-10-21</text>
            </elementText>
          </elementTextContainer>
        </element>
        <element elementId="49">
          <name>Subject</name>
          <description>The topic of the resource</description>
          <elementTextContainer>
            <elementText elementTextId="14262">
              <text>Planning Board Minutes &amp; Resolutions-1993</text>
            </elementText>
          </elementTextContainer>
        </element>
        <element elementId="40">
          <name>Date</name>
          <description>A point or period of time associated with an event in the lifecycle of the resource</description>
          <elementTextContainer>
            <elementText elementTextId="14263">
              <text>1993</text>
            </elementText>
          </elementTextContainer>
        </element>
      </elementContainer>
    </elementSet>
  </elementSetContainer>
</item>