<item xmlns="http://omeka.org/schemas/omeka-xml/v5" itemId="2401" public="1" featured="0" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://omeka.org/schemas/omeka-xml/v5 http://omeka.org/schemas/omeka-xml/v5/omeka-xml-5-0.xsd" uri="https://sleepyhollow.localarchives.org/items/show/2401?output=omeka-xml" accessDate="2026-09-19T09:31:32+00:00">
  <fileContainer>
    <file fileId="2401">
      <src>https://sleepyhollow.localarchives.org/files/original/80a22ab9d407a80c786ee75b1c36b5c6.pdf</src>
      <authentication>ea9b770597b29f7b6b8112df3c4f152e</authentication>
      <elementSetContainer>
        <elementSet elementSetId="4">
          <name>PDF Text</name>
          <description/>
          <elementContainer>
            <element elementId="52">
              <name>Text</name>
              <description/>
              <elementTextContainer>
                <elementText elementTextId="20888">
                  <text>/•"

1

NORTH TARRYTOWN PLANNING BOARD

December 2, 1987

Present:Chairman J. Galgano
.Ray Wandas
Miguel Jimenez
John O'Leary
Frank Rey
Tom Homan, Vill. Admin
John Hughes, Vill. Att

Chairman Galgano called the meeting to order at 8:10 p.m.
North Tarrytown Realty Associates Site Plan
Mr. Karpel, speaking for the N. Tarrytown Realty Associates, gave
a detailed account on the history of the development . Almost 150 meetings have been held with the village, county, and state. Access to the
site was to originally to have been through Amos St., but the state,
county and village recommended access off of Bedford Road.

But, an

emergency alternative access road was needed, and Amos St. was the choice
of the fire department. It would be chained off, with bushes to discourage any use of the area other than emergency vehicles.
Mr. Karpel noted zoning regulations allowed for 17 single family
units, which was reduced to 15 units in three cluster buildings. Extra
parking -a total of 45 spaces - was supplied when only 15 spaces were
required. A turn around area was made for easier entrance/exit. Benefits
of the development are many, as this will contribute to the village
taxes-'— he estimated sveral thousand dollars per year, per unit. The
roads will be private, and maintained by the property owners, and
garbage removal will be done by a private firm.
On approval of the site plan, N. Tarrytown Assoc, will give approximately $25,000.00 for recreational purposes, and $75,000.00 will go to

�/

a sewar rehabilitation fund.
In consideration of neighboring properties, it was said there
would be no building on heavily wooded areas, leaving the trees and
plantings as they are now, nor will roads disturb trees or bushes. A
setback from the property lines is planned for on the northern side.
It was noted that the old cottonwood trees won't be affected.
There will be 4 buildings, three with four units, and one with
three units.Each unit will have its own driveway and garage.
Mrs. Andrycich asked how high the buildings will be. She was
told they would be 2*5 stories high, approximately 35 feet high.
Mr. Hayes read his letter to the Board to all present, expressing
his concern over the development, and its being too close to property
ownners on Amos St.
When asked about setbacks, Mr. Karpel said they were in compliance
with the zoning codes. He said sewar pipes will be put in by N. Tarrytown Realty Associates, not the village.
Residents asked if they were covered by the village for any possible
damage that might occur from the blasting. They were told yes.
Concerns over bus stops and left turns onto Bedford Rd. from the
development were expressed. Mr. Zegarelli asked if there might be a
better road than Amos St. to use as an access.
Mr. Karpel said a stockade fence would be installed along the
property line at Amos St.
Some residents asked why the special fire access road was needed.
Board members explained the fire chief said it was so needed. Residents
asked for aguarantee that Amos St. would only be used for fire and/or
emergency vehicles.
Mr. Ceconi asked the Board to delay their vote so that residents
in the area might obtain a lawyer.

�Mr. Zegarelli asked if catch basins were planned for. Mr. Lackowitz
said yes, and that they would run together, with a zero runoff.

The

sanitary sewer and the storm sewer would run under the aqueduct at
different points.

A total of $75,000.00 is for the North Broadway

downhill sewer.
Mr. Hayes asked why had plans changed from 14 units to 15 units.
It was expalined that had been for 14 individual units versus the now
four buildings on the site.
A resident who lives on New Broadway asked if the board would
guarantee no new runoff?
be installed.

Mr. Lackowitz said that the new sewer is to

Every development has its water supply, runnoff and

downstream problems checked in advance.
Mr. Zegarelli asked if the $75,000 would dover the entire cost for
the sewer lines?

Was there any margin for a higher cost?

Mr. Lackowitz noted the Webber Avenue sewer comes down Pine Street
to New Broadway where past problems existed when roots had grown inside
the pipes and the cleaning then done was only a "band-aid approach."
He said depending on the competitive bidding by contractors, the cost
could range from $35 to $50 thousand.

He said for $75 thousand

the

entire sewer lines so far mentioned, and that sewer from Pine Street
to New Broadway could be done.
Mr. Lackowitz said the size of the sewer and the CFS can be increased
at New Broadway.
A resident asked Chairman Galgano what his feelings were regarding
having Bedford Road used as the site's entrance.

Chairman Galgano noted

that access to and from Webber Road to Route 448 is dangerous, as
there is less sight there than directly onto Bedford Road from the

�- 4 development.

i

Member Ray Windas said no matter which road is used, access to the
development from Bedford Road will be hard, when making a left turn.
Mr. Ceconi asked that a fence be built to keep contractors from
parking on Amos Street.

He also expressed concern about the playground

area.
A resident read from the January 26, 1987 minutes that safety
issues concerned then Mayor Zegarelli.
were hired four years ago.

Mr. Zegarelli said consultant-

The four cluster home were all right with

him, but the fire department's request for access from Amos Street
concerned him.

He asked if school buses would have difficulty entering

and leaving the development.
Business Meeting
Mr. Hayes said he would prefer a buffer hedge.

He was told the

site will have proper, lovely landscaping.
When asked, no "guesstimate" would be given as to the possible
cost of these units.
Mr. Homan read several changes in the resolution to all present.
They concerned:
1.

Regarding

fire safety, page 4.

2.

Performance guarantee, paragraph 9, page 5.

Mr. Ceconi asked Village Attorney, John Hughes if he would give
the residents any legal advice.

Mr. Hughes declined, saying it would

be fair, as he represented the Planning Board.
Mr. windas asked the public what where they against.

Mr. Ceconi

asked for a five-foot buffer hedge at the emergency entrance/exit to
keep AMos Street safe for the children who live there.
A resident asked if North Tarrytown zoning allowed for cluster
housing?

Mr. Zegarelli said he felt cluster housing was better than

17 or 14 separate units.

�-5f

Board member Frank Rey said he felt an access from Webber Rd. is
not needed. And, Amos St. will not become an access road to the
property for residents of the new development.
Mr. Ceconi said a fence and shrubbery would keep owners from
parking on Amos St.
It was asked if a dead end sign on Amos St. would help deter
traffic. The Board said they would look into this.
Mr. O'Leary asked how much a fence would cost, and said he joined
with the residents over their concerns. The developer said he couldn't
give a figure. Mr. O'Leary said the Planning Board has worked hard to
make adjustments and to help all concerned. A certificate of occupancy
will not be given by the Planning Board unless they give the site plan
their final approval.
A motion to end the public hearing was made by Mr. O'Leary,

seconded

by Mr. Rey, and carried by a unanimous vote.
BUSINESS MEETING

It was decided

that the banking of the houses be buffered as ori-

ginally planned.
Mr, windas said that on p.9, paragraph 3, the word "may" should be
changed to "will". He noted that the entrance onto Bedford Rd. may need
special treatment.
It was noted that the state DOT recommended that no light was
needed at the entrance/exit at Bedford Rd. However, the DOT will look
at the plans again before giving their final approval.
Mr. Margotta said the fence should be installed before the construction begins.
Mr. Rey said he wanted a deacceleration lane on Bedford Rd. as

�-6-

an access to the entrance/exit

of the condominiums.

Mr. Jimenez suggested a higher hedge. Mr. Rey then said thattrees
and buffers should be continuous along Mr. Haye's property.
A motion for a temporary barrier to deter entrance from Amos St.
was made, along with a final barrier to be installed upon completion
of the housing, was made by "

and seconded by Mr O'Leary, and

carried by a unanimous vote.
00
Larry Rodrigues Site Plan
Mr. Homan said the resolution re the preliminary site plan puts
into writing all that was discussed at the last meeting.
Mr. Windas asked if all property on the site plan was in the
same zone? Mr. Margotta said yes.
Mr. Windas said he questioned the use of the property now coming
down Depeyster St. that is used as a parking lotr— was this the same
piece of land? Mr. Margotta said it was not.
Mr. Rey said p.3, paragraph 5.3 of the resolution should have the
words "in the vicinity" deleted.
Mr. Homan asked Mr. Weidle to please show a more detailed land
plan in regard to the landscaping for the next meeting. He suggested
grating around the trees.
A motion to pass said resolution for Larry Rodrigues' site plan
was made by Mr. O'Leary, seconded by Mr. Jimenez, and was carried by
a unanimous vote.
Chairman Galgano asked if there was any other pending business.
There being none, the meeting was adjourned at 10:10 p.m.

Respectfully submitted,

Linda T. Fukuchi, Clerk

�PLANNING BOARD
VILLAGE OP NORTH TARRYTOWN
RESOLUTION:

SITE PLAN/CLUSTER SUBDIVISION APPROVAL
PROPOSED: 15 UNITS OF TOWNHOUSING
OWNER: NORTH TARRYTOWN ASSOCIATES
LOCATION:
BEDFORD ROAD ACCESS (AMOS STREET,
WEBBER AVENUE)
TAX DESIGNATION: SECTION 17, BLOCK 7, LOTS 2A-1,
3, 4, 4A, 5, 6, 7 and 8
ZONING:
APPLICATION #

WHEREAS, the Planning Board of the Village of North
Tarrytown has reviewed an application for site plan approval
and related subdivision approval pursuant to Zoning Ordinance
Article VIII, Site Plan Review and Article XIV, Modification of
Zoning in Connection with Subdivision Review by the Planning
Board, and the Village Subdivision Regulations to construct 15
units of single-family housing in three and four unit attached
structures, including related off-street parking, landscaping,
storm drainage and other supporting utilities and facilities,
on a site approximately two acres in size, as shown on five
drawings prepared in the offices of Joseph R. Crocco, Architect
and Howard Lieberman, Consulting Engineer, and identified as
follows :
1.

S-1 Site Plan - last revised 11/4/87, scale 1" * 20';

2.

Site Plan, Grading - last revised 8/7/87, scale of 1" =
20' ;

3.

S-3 Site Plan, Landscaping - last revised 8/7/87;

4.

Site Plan, Grading, Preliminary
scale of T* » 20', undated;

5*

Details, undated, and

WHEREAS, in the course of
agency pursuant to provisions of
Conservation Law, the Planning
findings and caused, noted
activities :

for

Site

Plan Review,

its review and acting as lead
Article 8 of the Environmental
Board has made the following
or conducted
the following

1.

Received an application fee of $250.00 paid for the
15 dwelling units and theoretical subdivision lots under
review;

2.

Caused field inspections to be made of the property under
review and surrounding area;

�Requested and reviewed a conventional subdivision design
of the property, held a public hearing thereon pursuant to
Article XIV, Modification of Zoning in Connection with
Subdivision Review by the Planning Board and made a
determination that:
1.

The proposed development will be consistent with the
Comprehensive Development Plan and with the Official
Map of the Village.

2.

The maximum population density will be no greater than
would otherwise be permitted by the regulations of the
district in which it is located.

3.

The land coverage will not exceed the coverage which
would otherwise be permitted by the regulations for
the district in which it is located .

4.

The appropriate use of
adequately safeguarded.

adjoining

land

will

be

Conducted or caused field inspections to be made of the
site so as to ascertain field conditions and determined
that :
4. 1 The site is steeply sloped downwards
Road northward toward Webber Avenue;

from Bedford

4. 2 The New York State Department of Transportation and
the Westchester County Department of Public Works
find the project's access to Bedford Road (County
Route 448) acceptable;
4. 3 The frontage along Webber Avenue is extremely steep;
4.4

The access via Amos Street would put further traffic
burdens upon that already crowded street ; and

4.5

In consideration of the above, the best access is via
the southwesterly frontage of Bedford Road.

Requested and received reports from Village authorities
and/or the applicant on such matters as water supply,
sewage disposal, storm drainage, fire safety, police
protection, traffic impact and access safety.
Referred the development proposal to the Westchester
County Department of Planning pursuant to Sections 239 1,
m and n of the General Municipal Law.
Acting as lead agency, requested, received and reviewed an
Environmental Assessment Form (EAF) in compliance with
SEQR.

2

�8.

As l e a d agency for s i t e plan and s u b d i v i s i o n review in the
V i l l a g e of North Tarrytown,. the Planning Board,
after
r e v i e w of
said f i e l d conditions,
recommendations and
environmental assessment form as w e l l a s o t h e r m a t t e r s
noted a b o v e , has determined that the proposed a c t i o n i s an
U n l i s t e d type and hereby i s s u e s a " n e g a t i v e d e c l a r a t i o n "
d e t e r m i n a t i o n of n o n - s i g n i f i c a n c e and environmental impact
for t h i s u n l i s t e d a c t i o n ; and

WHEREAS, in
the opinion of
the Planning
applicant
has
complied
with
the
Village's
R e g u l a t i o n s e x c e p t as may be noted below;

Board the
Development

NOW, THEREFORE, BE IT RESOLVED, that s a i d s i t e
plan
a p p l i c a t i o n and s i t e plan drawings noted above be and hereby
are granted s i t e plan approval and that t h e a p p l i c a n t may
o b t a i n t h e endorsed approval of the Planning Board Chairman o r ,
as an a l t e r n a t e , the V i l l a g e Administrator, on a copy of t h i s
s i t e plan r e s o l u t i o n and upon the f i n a l l i n e n copy of the s i t e
plan drawing r e v i s e d as necessary to show compliance with the
f o l l o w i n g c o n d i t i o n s , which endorsement s h a l l permit f i l i n g in
the o f f i c e s of the V i l l a g e Building Department for purposes of
o b t a i n i n g a b u i l d i n g permit in accordance with t h i s r e s o l u t i o n
and a l l b u i l d i n g code requirements, p r o v i d e d , however, t h a t
t h i s approval s h a l l e x p i r e one (1) year from the d a t e of t h i s
r e s o l u t i o n i f the f o l l o w i n g m o d i f i c a t i o n s and c o n d i t i o n s have
not been completed t o the s a t i s f a c t i o n of t h e Planning Board
and/or the a p p l i c a n t has not obtained a b u i l d i n g p e r m i t :
1.

Use - The s i t e plan i s approved for a maximum of 15 u n i t s
of housing as shown on the s i t e p l a n .
Accessory u s e s
s h a l l be t h o s e permitted in t h e . zoning d i s t r i c t w i t h i n
which the p r o p e r t y i s l o c a t e d .

2.

Utilities
- Storm d r a i n a g e , water s u p p l y and sewage
d i s p o s a l s h a l l be approved by the Planning Board or i t s
design engineering representative:
2.1

Storm water runoff s h a l l comply w i t h the
Board's p o l i c y of "zero" i n c r e a s e in r a t e of

2.2

The a p p l i c a n t s h a l l submit a w r i t t e n r e p o r t , with
back-up c a l c u l a t i o n s
indicating h i s
intention
to
p r o v i d e adequate f i r e flow, water supply and p r e s s u r e
for the s i t e .

2.3

The a p p l i c a n t s h a l l d e s i g n a t e storm water
catch
b a s i n s where and as approved by the Planning Board.

2.4

As s u g g e s t e d by the a p p l i c a n t , the a p p l i c a n t s h a l l
c o n t r i b u t e $75,000 at the time of i s s u a n c e of t h e
b u i l d i n g p e r m i t , t o be used for improvements t o the
V i l l a g e ' s s a n i t a r y sewerage system below the s i t e in
o r d e r t o m i t i g a t e impacts of the p r o p o s a l upon t h e
system.
3

Planning
runoff.

�2.5

All utilities including conditions noted above shall
be reviewed and approved by the Planning Board or its
designated engineering consultant.

2.6

The applicant shall discuss with the New York State
Department of Transportation the feasibility of
providing a deceleration lane on Bedford Road for
vehicles traveling southeast wishing to enter the
site. Such deceleration lane, shall be constructed if
approved by the New York State Department of
Transportation.

Safety - The Village Fire Department has indicated the
desire for emergency access via Amos Street. For purposes
of safety, screening of vehicle lights and to restrict the
casual use of the emergency access, yet to make it
possible for emergency vehicles to gain entrance the
applicant shall install a five (5) foot tall cedar
stockade-type fence, with evergeen shrub plantings where
it can be viewed from Amos Street, to extend (finished
side out) along the entire easterly property line to
points approximately seventy-five (75) feet in from
Bedford Road and Webber Avenue so as not to interfere with
traffic sight distances. The fence shall include a locking gate, capable of being opened at least ten (10) feet
wide, to make it possible for fire, police or ambulance
vehicles to gain access.
The emergency access shall be
used only for emergency vehicles and neither the gate or
Amos Street shall be used for construction vehicles, site
workers vehicles or occupants of.the site during or after
construction.
A temporary fence may be provided during
construction but the permanent fence shall be in place
prior to the issuance of a certificate of occupancy. No
trees greather than 6" caliper shall be removed during the
fence installation and the alignment of the fence may be
adjusted as reasonably necessary to achieve its purposes.
Landscaping - All landscaping shown on the site plan shall
Ee maintained in a healthy growing condition so as to
maintain the certificate of occupancy.
A typical landscaping plan around one of the buildings shall be
submitted for approval by the Planning Board or its
designated representative.
Final review of tree cutting
shall be made by the Village Tree Committee.
Exterior Lighting - All exterior light structures shall be
screened so as to prevent glare upon adjacent properties.
All driveways and parking areas shall be contained by
stone set in concrete or poured-in-place reinforced
concrete curbs.
All parking for occupants and users of
the project shall be confined to the site.

4

�Review Fees - The applicant shall pay to the Village of
North Tarrytown:
7. 1 An inspection fee for construction inspection of the
proposed site plan to include buildings, drainage
system, sewage, landscaping, lighting and other site
plan elements for compliance with the approved site
plan in the amount of $5, 000.00.
7.2

A site plan escrow account pursuant to SEQR and in
the amount of $5,000.00 or such specific amount which
is billed to the Village and approved and paid for
consulting services rendered in the review of this
project, whichever is the greater amount.

7.3

A recreation fee of $1,000.00 per dwelling or
$15,000.00 for the acquisition or maintenance of
recreation facilities in the vicinity of the project
and available for use by occupants of the housing
facilities.

7.4

The above fees shall be paid prior to the signing of
the final site plan by the Chairman.

Performance Guarantee - Prior to the issuance of a certificate of occupancy, the applicant shall complete the
construction of all facilities shown on the site plan to
the satisfaction of the Building Inspector. Alternatively,
the applicant shall post a bond in an amount to be
determined by the Building Inspector to ensure the satisfactory construction
and
installation
of driveways,
parking
areas,
drainage
facilities,
water
supply
utilities, sanitary
sewers, arid landscaping.
Such
guarantee shall be satisfactory to the Village Attorney as
to form, sufficiency, and execution, and shall be issueds
by a bonding or surety company approved by the Village
Board or by the owner with security acceptable to the
Village Board. The term of the bond shall be fixed for a
period of three (3) years; however, the term may be
extended with the consent and agreement of all parties.
The guarantee shall extend for a period of one (1) year
beyond the date of completion of the required improvements
to ensure their satisfactory condition. Any defects in
construction or faulty equipment shall be repaired or
replaced by the applicant without cost to the Village.
The Planning Board reserves the right to make and shall
make a final field inspection of the project after
construction of the facilities upon notice by the Building
Inspector but before the issuance of a certificate of
occupancy.
The purpose of this final inspection is to
review the development and to require any modifications to
parking, landscaping, signs, drainage, access, paving and

5

�other site plan details in the interest of safety,
convenience, enjoyment of peace and quiet of adjacent
neighbors and aesthetics.
The applicant shall maintain
all elements of the approved site plan including landscaping in a neat and healthy condition so as to retain an
approved certificate of occupancy.
10.

Prior to obtaining a building permit, four (4) copies of
this final site plan as revised to meet the above
conditions shall be submitted to the Planning Board office
for final approval. This final site plan review shall be
accomplished by the Village Engineering Department or
consultant and shall incorporate all applicable conditions
of this resolution and the construction standards of the
Village of North Tarrytown as they may be appropriate.

[/Date

"

Jamafe "Gaigano, PlannJm/g Board Chairman

DPF/22:crc
November 30, 1987

6

�y&gt;

PLANNING BOARD
VILLAGE OF NORTH TARRYTOWN
RESOLUTION:

PINAL SITE PLAN
PROPOSED: MIXED RESIDENTIAL/COMMERCIAL USES
OWNER: RODRIGUES ENTERPRISES
LOCATION: VALLEY STREET
TAX DESIGNATION: SECTION 16, BLOCK 12, LOTS 6A,
6B, 7, 7A, 7B, 7C, AND 7E
ZONING: C-2 GENERAL COMMERCIAL
APPLICATION #
WHEREAS, the Planning Board of the Village of North
Tarrytown has reviewed an application for site plan approval
pursuant to Zoning Ordinance Article VIII, Site Plan Review to
construct 12 units of multiple-dwelling housing, 2,460 square
feet of office space, 2,460 square feet of retail space, and 21
parking spaces within a single structure, including related
off-street parking, landscaping, storm drainage and other
supporting utilities and facilities, on a site approximately
13,700 square feet in size, as shown on six drawings prepared
in the offices of Turnquist Architects
and identified as
follows:
1.

Site &amp; Location

—

dated 11/18/87, scale 1" * 10*;

2.

Valley Street Level —

3.

Parking Level —

4.

Dwelling Units (12) —

5.

Typical Dwelling Unit —

6.

Untitled (front and rear elevations) —
and

no date, no scale;

revised 11/16/87, scale 1/8" • I 1 ;
no date, no scale;
no date, no scale;

WHEREAS, in the course of
agency pursuant to provisions of
Conservation Law, the Planning
findings and caused,
noted
activities:

no date, no scale;

its review and acting as lead
Article 8 of the Environmental
Board has made the following
or conducted the
following

1.

Will receive an application fee of $580.00 paid for the 12
dwelling units and 4,920 square feet of nonresidential
space under review prior to the issuance of a building
permit;

2.

Caused field inspections to be made of the property under
review and surrounding area;

�3.

Requested and received reports from Village authorities
and/or the applicant on such matters as water supply,
sewage disposal, storm drainage, fire safety, and
parking.

4.

Acting as lead agency, requested, received and reviewed an
Environmental Assessment Form (EAF) in compliance with
SEQR.

5.

As lead agency for site plan and subdivision review in the
Village of North Tarrytown, the Planning Board, after
review of said field conditions, recommendations, and
environmental assessment form, as well as other matters
noted above, has determined that the proposed action is an
unlisted type and hereby issues a "negative declaration"
determination of non-significance and environmental impact
for this unlisted action; and

WHEREAS, in the opinion of the Planning Board the
applicant
has
complied
with
the
Village's
Development
Regulations except as may be noted below;
NOW, THEREFORE, BE IT RESOLVED, that said site plan
application and site plan drawings noted above be and hereby
are granted site plan approval and that the applicant may
obtain the endorsed approval of the Planning Board Chairman or,
as an alternate, the Village Administrator on a copy of this
site plan resolution and upon the final linen copy of the site
plan drawing revised as necessary to show compliance with the
following conditions, which endorsement shall permit filing in
the offices of the Village Building Department for purposes of
obtaining a building permit in accordance with this resolution
and all building code requirements, provided, however, that
this approval shall expire six (6) months from the date of this
resolution if the following modifications and conditions have
not been completed to the satisfaction of the Planning Board
and/or the applicant has not obtained a building permit:
1

-

Utilities —
Storm drainage, water supply and sewage
disposal shall be approved by the Planning Board or its
design engineering representative:
1.1

Storm water runoff shall comply with the Planning
Board's policy of zero increase in rate of runoff.

1.2

The applicant shall submit a written report, with
back-up calculations indicating his intention to
provide adequate fire flow, water supply and pressure
for the site.

1.3

The applicant shall designate storm water catch
basins where and as approved by the Planning Board.

2

�1.4

All utilities including conditions noted above shall
be reviewed and approved by the Planning Board or its
designated engineering consultant.

1.5

All habitable space within the building shall have a
fire suppression sprinkler systems in place prior to
the issuance of a certificate of occupancy.

1.6

Fire water supply
parking area.

1.7

The location and size of the water supply shall be
acceptable to the Chief of the Fire Department of the
Village of North Tarrytown.

shall

be

available

within

the

Landscaping —
All landscaping shown on the site plan
shall be maintained in a healthy growing condition so as
to maintain the certificate of occupancy. Landscape Plan
A, dated January 1983, is attached hereto. Prior to the
issuance of a certificate of occupancy, the applicant
shall provide landscaping in accordance with the plan.
Exterior Lighting — All exterior light structures shall
be screened so as to prevent glare upon adjacent
properties.
All driveways and parking areas shall be contained
poured-in-place reinforced concrete curbs.

by

Review Fees — The applicant shall pay to the Village of
North Tarrytowns
5.1

An inspection fee for construction inspection of the
proposed site plan to include buildings, drainage
system, sewage, landscaping, lighting and other site
plan elements for compliance with the approved site
plan in the amount of $5,000.00.

5.2

A site plan escrow account pursuant to SEQR and in
the amount of $5,000.00 or such specific amount which
is billed to the Village and approved and paid for
consulting services rendered in the review of this
project, whichever is the greater amount.

5.3

A recreation fee of $1,000.00 per dwelling or $12,000
for the acquisition or maintenance of recreation
facilities and available for use by occupants of the
housing facilities.

5.4

The above fees shall be paid prior to the signing of
the final site plan by the Chairman.

3

�6.

The Planning Board reserves the right to make and shall
make a final field inspection of the project after
construction of the facilities upon notice by the Building
Inspector but before the issuance of a certificate of
occupancy.
The purpose of this final inspection is to
review the development and to require any modifications to
parking, landscaping, signs, drainage, access, paving and
other site plan details in the interest of safety,
convenience, enjoyment of peace and quiet of adjacent
neighbors and aesthetics. The applicant shall maintain
all elements of the approved site plan including landscaping in a neat and healthy condition so as to retain an
approved certificate of occupancy.

7.

Prior to obtaining a building permit, four (4) copies of
this final site plan as revised to meet the above
conditions shall be submitted to the Planning Board office
for final approval. This final site plan review shall be
accomplished by the Village Engineering Department or
consultant and shall incorporate all applicable conditions
of this resolution and the construction standards of the
Village of North Tarrytown as they may be appropriate.

j Date '

James Galgano, Planning Board Chairman

DPPy22:crc
January 18, 1988

4

�</text>
                </elementText>
              </elementTextContainer>
            </element>
          </elementContainer>
        </elementSet>
      </elementSetContainer>
    </file>
  </fileContainer>
  <collection collectionId="128">
    <elementSetContainer>
      <elementSet elementSetId="1">
        <name>Dublin Core</name>
        <description>The Dublin Core metadata element set is common to all Omeka records, including items, files, and collections. For more information see, http://dublincore.org/documents/dces/.</description>
        <elementContainer>
          <element elementId="50">
            <name>Title</name>
            <description>A name given to the resource</description>
            <elementTextContainer>
              <elementText elementTextId="14831">
                <text>Planning Board Minutes &amp; Resolutions-1987</text>
              </elementText>
            </elementTextContainer>
          </element>
        </elementContainer>
      </elementSet>
    </elementSetContainer>
  </collection>
  <itemType itemTypeId="1">
    <name>Text</name>
    <description>A resource consisting primarily of words for reading. Examples include books, letters, dissertations, poems, newspapers, articles, archives of mailing lists. Note that facsimiles or images of texts are still of the genre Text.</description>
  </itemType>
  <elementSetContainer>
    <elementSet elementSetId="1">
      <name>Dublin Core</name>
      <description>The Dublin Core metadata element set is common to all Omeka records, including items, files, and collections. For more information see, http://dublincore.org/documents/dces/.</description>
      <elementContainer>
        <element elementId="50">
          <name>Title</name>
          <description>A name given to the resource</description>
          <elementTextContainer>
            <elementText elementTextId="14457">
              <text>MINS_PLAN_1987-12-02</text>
            </elementText>
          </elementTextContainer>
        </element>
        <element elementId="49">
          <name>Subject</name>
          <description>The topic of the resource</description>
          <elementTextContainer>
            <elementText elementTextId="14458">
              <text>Planning Board Minutes &amp; Resolutions-1987</text>
            </elementText>
          </elementTextContainer>
        </element>
        <element elementId="40">
          <name>Date</name>
          <description>A point or period of time associated with an event in the lifecycle of the resource</description>
          <elementTextContainer>
            <elementText elementTextId="14459">
              <text>1987</text>
            </elementText>
          </elementTextContainer>
        </element>
      </elementContainer>
    </elementSet>
  </elementSetContainer>
</item>