<?xml version="1.0" encoding="UTF-8"?>
<item xmlns="http://omeka.org/schemas/omeka-xml/v5" itemId="308" public="1" featured="0" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://omeka.org/schemas/omeka-xml/v5 http://omeka.org/schemas/omeka-xml/v5/omeka-xml-5-0.xsd" uri="https://sleepyhollow.localarchives.org/items/show/308?output=omeka-xml" accessDate="2026-09-20T09:58:06+00:00">
  <fileContainer>
    <file fileId="308">
      <src>https://sleepyhollow.localarchives.org/files/original/d3e48d7978fa8bd4f04eddb817fd6237.pdf</src>
      <authentication>68bc576d4ef447571255cbb5067297ff</authentication>
      <elementSetContainer>
        <elementSet elementSetId="4">
          <name>PDF Text</name>
          <description/>
          <elementContainer>
            <element elementId="52">
              <name>Text</name>
              <description/>
              <elementTextContainer>
                <elementText elementTextId="18796">
                  <text>Village of Sleepy Hollow
Architectural Review Board Meeting - APPROVED
April 24, 2013
Sean McCarthy called the meeting to order at 8:00pm.
Present:

Sean McCarthy (Village of Sleepy Hollow/Building Department)
Krista Callaghan

Also Present:

Mary Gerlanc [Recording Secretary)

Announcements • There were no announcements.

Proposed Agenda:
1)
2)
3)
4)

Laurentino Rodrigues
eras Real Estate
El Mirador Cuencano
Approval of Minutes

1 ) Laurentino Rodrigues

1 7 2 Valley Street
3 8 Beekman Avenue
5 6 - 6 0 Clinton Street

1 7 2 Valley Street

Continued
Continued
Continued
March 2 7 , 2 0 1 3

Continued

Laurentino Rodrigues, property owner, and William Simeoforides, architect represented
this application, which is for a 3-story mixed-use building.
Mr. Simeoforides stated the changes to the plan:
• The base of the building.
• The roofline.
• The windows now line up with the entrance.
• The openings into the garage.
• The glass in the commercial portion of the building.
• The "legs" for the tower portion are thicker in dimension.
• A new circular window at the top of the tower.
• More detail added around the windows.
• Added brick to the base and extended it around the corner to the Depeyster street
side of the building where it intersects the residential portion of the building.
• The stairway to the second floor of the residential side of the building has been
enclosed.
• The roof material will be shingle.

�•
•
•

The upper part of the building will be stucco. There will be two colors of stucco.
The building has been lowered a foot to accommodate the ramp.
The front entrance on Valley Street has moved slightly.

Sean McCarthy asked the width of the sidewalk on the Depeyster Street side. Mr.
Simeoforides stated the sidewalk is 6 feet wide but the wall protrudes out onto the
sidewalk. When the new wall is built on the property line, the sidewalk will become wider.
Mr. McCarthy asked about a planting strip along that wall to break up the impervious
surface. The applicant needs to check on the accuracy of the property line. Mr. McCarthy
stated according to Village Code, the sidewalk has to be a minimum of four feet and at least
three feet around obstructions. He also stated the applicant should match the sidewalk
width to the sidewalk in front of the adjoining property. The Board feels a planting strip
would be good for this property.
Discussion ensued about the "green" space along the wall and what could be planted.
Sean McCarthy asked about the roof pitch and what would be up in that area. Mr.
Simeoforides stated it was 7/12 and would contain the mechanicals in that space such as
air handlers. It would be used as utility space.
Mr. Simeoforides stated that the windows would be aluminum and all operable except for
the lower commercial storefront window and the circular window in the tower.
He also stated the applicant would be installing black, wrought iron
square grilles on
the openings for the parking area. The gate would also be wrought iron. The gate on
Depeyster would be a tubular rail.
Sean McCarthy asked about the need for a gate to the parking area. He recommended the
applicant install cameras inside the garage and outside the building that could be
connected to the police department for better security.
Discussion ensued about the gate and wrought iron openings to the parking area.
The Board feels a lower wrought iron rail would be better. Krista Callaghan stated it
should be more decorative and there should be some down lighting to illuminate the area.
Mr. Simeoforides stated if there was no gate needed then a smaller wrought iron rail with
some plantings might look better.
Sean McCarthy suggested an automatic gate with a motion sensor and a timer that could be
set so it wouldn't open at certain times. The gate should be functional and open during
business hours.
Mr. McCarthy stated the maximum height of a fence for a commercial space is six feet high
but he suggested the applicant construct something that is aesthetically pleasing and has
planting along it. A low wall or a planter with wrought iron on top of it that is not higher
than four feet. Krista Callaghan stated they could incorporate a decorative lighting fixture
on the brick columns to make it a more pedestrian friendly sidewalk. Mr. McCarthy stated
the lighting should be down light and have a shield so it doesn't extend in to the street.

Architectural Review Board Meeting, April 24, 2013 - APPROVED 4

�Krista Callaghan commended the architect for listening to the Board's recommendations
and making changes to the plan.
Sean McCarthy asked about the height of the tower. Mr. Simeoforides stated he had
lowered the height to 33 feet at the top of the tower.
Krista Callaghan asked about the horizontal and vertical lines at the end of the building.
Mr. Simeoforides stated they were surface lines, faux lines.
Krista Callaghan asked if the brick on the building was on one plane and if the section of the
tower was set back. She asked if the applicant could treat the commercial portion of the
building as one piece to break up the look of the building no matter if they were using brick
or stucco. Discussion ensued about materials for the building.
Jose Chevere, 70 Depeyster Street lives right across the street from the property in this
application. His concern regarding this application is that the architecture is not similar to
any other home in the area. He also stated that he would be looking at the height of the 33foot tall tower, which is directly across from his property.
Sean McCarthy asked the architect if there was an aesthetic way to lessen the impact of the
tall building to the neighborhood. Discussion ensued.
William Simeoforides suggested they could put in a planting bed with trees and shrubs
however their issue is the slope of the property.
Krista Callaghan asked if there were some way to scale the details of the tower to make it
more residential in scale. William Simeoforides stated the width of the tower was 12 feet
across which is not a large commercial space. Discussion ensued about the side of the
tower and the commercial space.
Jose Chevere asked what the tower would be used for. William Simeoforides stated the
second floor on Valley Street is a commercial space that is open to the first floor and the
third floor in the tower is office space.
Sean McCarthy asked the architect if he checked the Building Code regarding the proposed
circular staircase to the upper level. He stated the applicant would not be able to use that
space as an office if it doesn't meet the egress requirements plus the window does not
open.
Krista Callaghan stated if that space couldn't be used according to Village Code then the
whole tower should be lowered slightly. Mr. McCarthy stated the applicant could have a
focal point for their plan but he suggested they try another design.
Discussion ensued regarding the roof styles. Sean McCarthy stated the applicant needed to
present a true roof style to be approved. He also suggested making the commercial space
including the tower all brick to make it special and set it apart from the stucco area of the
building. Mr. McCarthy stated the applicant should construct a well planned out building
that takes into account the benefits to the applicant versus the detriments to the
neighborhood.

Architectural Review Board Meeting, April 24, 2013 - APPROVED 4

�Sean McCarthy suggested an awning over the window of the commercial portion.
Krista Callaghan asked about the scale of the openings of the windows being in proportion
to the size of the tower.
Mr. McCarthy asked the applicant to modify the mass of the tower and consider using brick
as the material for the tower space and stucco for the center portion of the building.
Mr. McCarthy stated that the architect should make color recommendations for the stucco
and the brick. He suggested they choose a color other than beige, since there are so many
buildings in the area the same color. The applicant needs to provide the Board with
samples of all the colors and materials for the project.
Sean McCarthy suggested the applicant construct a metal roof on the tower instead of
shingles.
Krista Callaghan stated she was glad the applicant had enclosed the entr)Avay to the
residential area of the building. She asked the architect to review the horizontal element
and the windows next to the entr5way. Sean McCarthy asked for detail over the residential
entryway. Discussion ensued.
Mr. McCarthy asked for a better landscape plan with a list of plants for the plaza. He also
asked if it was necessary to have a fence on top of the wall in the courtyard. There was
discussion about the height of the fence. Sean suggested a 3-foot fence and some plantings
Krista Callaghan suggested they add lighting to the columns in the courtyard.
Mr. McCarthy stated the applicant should make changes to the plan and send them to the
Board before the next meeting.

2) Gras Real Estate

38 Beekman Avenue

Continued

The applicant did not appear for this application, which was a continuation of a proposal
for a new sign.
Based on information submitted, the Board stated the applicant should put together a
complete set of drawings and the location for the proposed sign. The applicant should
revisit the comments previously made by the Board at the November 2 0 1 2 meeting. The
Board will also ask the applicant to remove the current signage.

3) El Mirador Cuencano

56-60 Clinton Street

New Application

Janet Mendia represented this application for a new sign along with Laurentino Rodrigues,
owner of the building. The tenant for this space had already installed a new sign without
approval from the Architectural Review Board.
Sean McCarthy asked what material the sign was made from. Mr. Rodrigues stated it was
plastic. Mr. McCarthy stated that material was not allowed and the phone number was also

Architectural Review Board Meeting, April 24, 2013 - APPROVED

4

�not allowed on the sign according to Village Code. He asked if there were any other signs in
the window. Ms. Mendia said there were no other signs.
Mr. Rodrigues stated the tenant moved in in December and the store opened in January
2013. Sean McCarthy asked the term of the lease. Mr. Rodrigues stated it was a 10-year
lease.
The Board stated the sign was put into an existing sign box without permission. Sean
McCarthy suggested they would accept this sign as installed with conditions. Mr. Rodrigues
as building owner was responsible for installing and filing a permit for an approved sign if
the tenant changes, the sign breaks or the business name changes.
These conditions would be attached to this property for future reference. A new sign
would then have to be installed with the Board's approval.
Sean McCarthy asked if there were any public comments. There were none.

4) Approval of Minutes

March 27. 2013

The Board approved the minutes as amended for March 27, 2 0 1 3

The meeting was adjourned at 9:30pm.

Architectural Review Board Meeting, April 24, 2013 - APPROVED 4

�</text>
                </elementText>
              </elementTextContainer>
            </element>
          </elementContainer>
        </elementSet>
      </elementSetContainer>
    </file>
  </fileContainer>
  <collection collectionId="47">
    <elementSetContainer>
      <elementSet elementSetId="1">
        <name>Dublin Core</name>
        <description>The Dublin Core metadata element set is common to all Omeka records, including items, files, and collections. For more information see, http://dublincore.org/documents/dces/.</description>
        <elementContainer>
          <element elementId="50">
            <name>Title</name>
            <description>A name given to the resource</description>
            <elementTextContainer>
              <elementText elementTextId="6511">
                <text>Architectural Review Board Minutes-2013</text>
              </elementText>
            </elementTextContainer>
          </element>
        </elementContainer>
      </elementSet>
    </elementSetContainer>
  </collection>
  <itemType itemTypeId="1">
    <name>Text</name>
    <description>A resource consisting primarily of words for reading. Examples include books, letters, dissertations, poems, newspapers, articles, archives of mailing lists. Note that facsimiles or images of texts are still of the genre Text.</description>
  </itemType>
  <elementSetContainer>
    <elementSet elementSetId="1">
      <name>Dublin Core</name>
      <description>The Dublin Core metadata element set is common to all Omeka records, including items, files, and collections. For more information see, http://dublincore.org/documents/dces/.</description>
      <elementContainer>
        <element elementId="50">
          <name>Title</name>
          <description>A name given to the resource</description>
          <elementTextContainer>
            <elementText elementTextId="1850">
              <text>MINS_ARB_2013-04-24</text>
            </elementText>
          </elementTextContainer>
        </element>
        <element elementId="49">
          <name>Subject</name>
          <description>The topic of the resource</description>
          <elementTextContainer>
            <elementText elementTextId="1851">
              <text>Architectural Review Board Minutes-2013</text>
            </elementText>
          </elementTextContainer>
        </element>
        <element elementId="40">
          <name>Date</name>
          <description>A point or period of time associated with an event in the lifecycle of the resource</description>
          <elementTextContainer>
            <elementText elementTextId="1852">
              <text>2013</text>
            </elementText>
          </elementTextContainer>
        </element>
        <element elementId="47">
          <name>Rights</name>
          <description>Information about rights held in and over the resource</description>
          <elementTextContainer>
            <elementText elementTextId="1853">
              <text>Village of Sleepy Hollow All Rights Reserved.</text>
            </elementText>
          </elementTextContainer>
        </element>
        <element elementId="51">
          <name>Type</name>
          <description>The nature or genre of the resource</description>
          <elementTextContainer>
            <elementText elementTextId="1854">
              <text>Text</text>
            </elementText>
          </elementTextContainer>
        </element>
      </elementContainer>
    </elementSet>
  </elementSetContainer>
</item>