<?xml version="1.0" encoding="UTF-8"?>
<item xmlns="http://omeka.org/schemas/omeka-xml/v5" itemId="989" public="1" featured="0" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://omeka.org/schemas/omeka-xml/v5 http://omeka.org/schemas/omeka-xml/v5/omeka-xml-5-0.xsd" uri="https://sleepyhollow.localarchives.org/items/show/989?output=omeka-xml" accessDate="2026-09-19T08:50:09+00:00">
  <fileContainer>
    <file fileId="989">
      <src>https://sleepyhollow.localarchives.org/files/original/4ff6778a02f098129ab735bff6166738.pdf</src>
      <authentication>607c11a2243841df3bf6bae355029709</authentication>
      <elementSetContainer>
        <elementSet elementSetId="4">
          <name>PDF Text</name>
          <description/>
          <elementContainer>
            <element elementId="52">
              <name>Text</name>
              <description/>
              <elementTextContainer>
                <elementText elementTextId="19477">
                  <text>Village of Sleepy Hollow
Board of Trustees
March 29, 2005
Work Session
In attendance:

Mayor Philip E. Zegarelli
Trustee Mario DiFelice
Trustee Tom Capossela
Trustee Kay Brown Grala
Trustee Richard Spota
Trustee Richard Zieja
Joel Sachs, Esq., Special Counsel
David Smith, Planning Consultant
Dwight Douglas, Village Administrator

Absent:

Trustee Andrew Murray

At 7:30 p.m., Mayor Zegarelli opened the Work Session with an announcement for
cable television regarding conserving water for the March 30th shut down of the Catskill
Aqueduct from 9:00 a.m. to 10:00 p.m.
The Board then went on to discuss the draft review report regarding commenting on
the DEIS for Lighthouse Landing. Dave Smith highlighted key components among the
73 issues raised.
At 8:25 p.m., Mayor Zegarelli called the Board of Trustees into Special Session to deal
with one attached item. This resolution was duly adopted as shown.
Special Counsel Joel Sachs noted that in addition to the Village Board of Trustees
comments, other consultants working directly for the Village will be directly providing
comments to the applicant by the April 4, 2005 deadline. On the motion of Trustee
DiFelice, seconded by Trustee Spota, the special meeting was dosed at 8:30 p.m.

Respectfully submitted,

&lt;&amp;~4»Dwight H. Douglas

�Meeting Date:
Resolution #:

03/29/05
3/46/05

RESOLUTION TRANSMITTING SUBSTANTIVE COMMENTS
ON THE
LIGHTHOUSE LANDING AT SLEEPY HOLLOW
DRAFT ENVIRONMENTAL IMPACT STATEMENT
WHEREAS, on January 11,2005, the Mayor and Board of Trustees (the Village Board) did
accept as complete a Draft Environmental Impact Statement (DEIS) for the Lighthouse
Landing at Sleepy Hollow Riverfront Development Concept Plan and Special Permit
prepared on behalf of Roseland/Sleepy Hollow, LLC and General Motors Corporation (jointly
the Applicant); and
WHEREAS, the Village Board held two public meetings on the DEIS on February 8 and 15,
2005, and two public hearings on the DEIS on February 19 and 22, 2005 and has been
receiving and reviewing written comments; and
WHEREAS, the Village Board convened six subcommittees composed of no more that
three trustees, village staff and consultants that were open to participation by members of
the community to study in detail the information and issues presented in the DEIS; and
WHEREAS, the subcommittees held a series of several meetings during February and
March 2005, each focused on the respective committee's designated impact issues; and
WHEREAS, on March 22, 2005, the Village Board representatives from each of the
subcommittees reported back to tine full Village Board with preliminary comments on the
DEIS; and
WHEREAS, after a careful and thorough review of the DEIS document, public comments,
and the sub-committee reports the Village Board has compiled a list of substantive
comments on the DEIS that must be addressed as part of the environmental review
process;
NOW THEREFORE BE IT RESOLVED, that the Village Board does hereby authorize the
Mayor to transmit the attached list of substantive comments to the Applicant together with
such clarifications and minor changes as he so deems necessary, and to require that each
comment be responded to in the Final Environmental Impact Statement; and be it further
RESOLVED, that a copy of this resolution and the attached comments be kept on record in
the Village Administrator's and Village Clerk's offices.

Moved: Trustee Zieja

Seconded: Trustee Grala

Vote: Unanimous

�6a

Village of Sleepy Hollow
Dwight H. D o u g l a s

Philip E. Zegarelli

Mayor
(914)366-5107

Administrator
(914)366-5105

Mario DiFelice
Deputy Mayor
(914)366-5107

Angela Everett
Village Clerk
(914)366-5106

TRUSTEES
Kay Brown Grala
Thomas Capossela
Andrew T. Murray
Richard J. Spota
Richard Zieja
(914)366-5107

fiew Vork
1874

More than a Zegend

TO:

Jonathan Stein, Roseland Property Company

FROM:

Village of Sleepy Hollow Mayor and Board of Trustees

DATE:

March 29, 2005

RE:

Substantive Review Lighthouse Landing DEIS

Robyn G DeCarlo
Treasurer
(914)366-5144
Robert Ponzini
Village Attorney

The Mayor and Board of Trustees of the Village of Sleepy Hollow, acting as the Lead Agency
under the State Environmental Quality Review laws of the State of New York, do hereby
transmit the following substantive comments on the Lighthouse Landing Draft Environmental
Impact Statement. On February 22, 2005, the Village Board closed the public hearing on the
DEIS. Since that time the various members of the Village Board met as sub-committees on
seven separate occasions along with members of the public, Village staff, village consultants and
the Applicant and their representatives to discuss specifics topical sections of the DEIS
document. On March 22, at a duly noticed work session of the Village Board, the Board
members did discuss various aspects of the DEIS relative to additional information that they
would like to see provided as part of the Final EIS, and overall comments and concerns with
respect to the Proposed Action as outlined in the DEIS document. Based upon all of the public
input provided to date, and the Board's own initial assessment of the Proposed Action with
mitigation as identified in the DEIS document, it is clear that the proposed development is too
dense and will benefit from an overall reduction in the residential density. Provided herein are
substantive comments raised during the course of the review period that the Board, after due
consideration and deliberation, would like to have addressed as part of the Final EIS document.
The Village Board views the DEIS as one more important step towards the eventual
redevelopment of the former General Motors site. The DEIS builds upon the other efforts of the
Village including the Local Waterfront Redevelopment Program, the underlying RF-Riverfront
Development District and the Waterfront Linkage Study.
The Village Board thanks the Applicant for its cooperation and participation in this important
process.

28 Beekman Avenue • Sleepy Hollow, New York 10591
Telephone (914) 366-5100 • Fax (914) 631-5880
www.sleepyhollowny.org

�Building Design and Visual Impacts
1.

The site layout should respond differently to Kingsland Point Park (KPP). There should
be more of a buffer between KPP and the proposed development, including the potential
idea of allowing the green space to penetrate somewhat into the development, breaking
up the parallel parking, and altering the character of the roadway and landscaping so that
it has a more natural feel that responds to the Park and provides a contrast to the
formalized boulevards. Any additional buffer provided should be set aside and plantings
or other suitable screening installed as part of the initial stages of site development so as
to better protect the park from the effects of site development.

2.

The Village Board is generally satisfied with the design concept and treatment for
Beekman Place, although the Applicant will need to identify how loading and refuse
removal would be accommodated. However, the interior residential blocks have not yet
received the same level of detail and basically represent potential building templates.
Additional analysis regarding scale, massing, and place-making for the multifamily
residential buildings is necessary, including the precedent examples of multi-family
development (e.g., Bronxville, Scarsdale and Forest Hill Gardens were cited as
examples). The Applicant is encouraged to work with Village staff and their consultants
in preparing an alternate neighborhood design concept(s). This would include such
issues as roadway design, facade treatments, use of materials and relationship to
landscape treatments and open space.

3.

The Village Board is particularly concerned about the uniform four-story bulk throughout
the site. The project should be designed to include much more variety in building height,
something that is allowed for in the RF District regulations and is in keeping with the
Village character which contains many varied building heights from two to five stories.
For instance, the area along the railroad tracks has zoning limitations that need to be
reconsidered given the lack of development activity along the East Parcel. In some
instances, such as the area abutting Ichabod's Landing, there needs to be a different scale
of development (see also comments raised by the Planning Board), the selected use of
five stories and other signature vertical elements needs to be evaluated.

4.

It will be vitally important for the interior residential buildings to exhibit variety.
Additional discussion or visuals of how this effect will be achieved are necessary. The
Village Board also notes that there may be the potential for different architects to execute
the different blocks. This could be a method to produce the minor variations that will
create a place that feels "real". The use of unifying elements throughout the development
such as building materials consisting of wood, stone and brick would be consistent with
the "old Hudson River Village" theme identified in the LWRP and RF District, and
subsequently illustrated in the Waterfront Linkage Study. The Applicant has indicated

�that they intend to use EIFS as a building material. Comments raised during design subcommittee meetings indicated the inappropriateness of this material in certain instances
and its potential inability to hold up over time. The Village needs to require that the
Applicant be very specific about the use of this material, if at all, as part of the design
palette.
The consensus of the Village Board was that design concept relative to the "spirit of an
old Hudson River waterfront community" does not necessarily preclude the use of more
modern features. While the residential area should generally have a historic style, the
Village Board feels that it is important that some contemporary elements be introduced in
the residential blocks to provide emphasis or visual interest. Hudson River communities
developed over time and it is not necessarily out of character to have these different
elements.
There is a small cove below Kingsland Point Park. The possibility for adding some
water-related use in this area should be further explored, including a possible boathouse
for hand launching. Precedent examples of boathouses need to be provided for further
evaluation.
The application of the RF zoning district height regulation results in a situation where
buildings with lower heights are located nearer the railroad tracks. We understand that
this provision was created to allow for views from development on the east side of the
tracks. Now that circumstances have changed (i.e., no development proposed on the east
side) it seems that having shorter buildings near the tracks does not make as much sense.
The Village, along with the Applicant, needs to reconsider the appropriateness of the
height regulations for this part of the site. The buildings along the tracks could be of a
different configuration /use such that they could be used for business incubator type uses,
live/work lofts and the like. This would introduce the potential for opportunities for
increased employment and tax generation. Any residential use proposed along the
railroad tracks needs to have a landscaped buffer. In the event that the proposed senior
housing is moved away from the currently proposed location along the tracks, other
potential locations need to be identified, such as the South Parcel.
During the course of the discussions, it was generally recognized that the hotel offers an
opportunity to create a "jewel" for the site and the Village; the design concept for this
building should be fleshed out in greater detail; the architectural treatment of the facade
facing the Hudson River is of particular importance. We recommend the Applicant
review historic hotel precedents from the region to identify elements that could create a
distinctive architecture for this building. There have been some general concerns
regarding hotel related uses such as conference space and events. Given that the RF
District allows for valet parking arrangements for hotel uses, the Applicant should

�provide some indication of how those types of hotel related functions could be
accommodated on site, even if in a limited format.
9.

The Applicant should present street designs that introduce a few minor shifts to the grid
or flaring that could introduce variation and interest. A narrower roadway pattern could
be explored for certain sections of the site, particularly in the areas serving the
townhouses. This could be viewed as a consistent design approach for a historic Hudson
River village development pattern.

10.

A general question was raised as to the appropriate time to install landscaping and street
trees; the Applicant needs to outline an installation program relative to other site
improvements, including Beekman Place.

11.

There should be some comparison relative to the typical size for different units such as
apartment vs. condominium.

12.

The Applicant has indicated during the sub-committee meeting process that a potential
location for a fire/ambulance/police substation could be the lower level of the proposed
parking garage just off of Beekman Avenue and adjacent to the proposed train station.
The Village should have some general indication of what that would look like,
conceptually. Further, the Applicant may want to explore a design concept that would
have residential units built along the face of the parking garage, providing a screen to the
balance of the parking facility and potentially to capitalize on views given existing
elevation. Additionally, the potential for a free standing "civic" building should be
considered. Said building would be provide support facilities such as a kitchen and
bunkroom and be designed to serve future potential full time/part time paid fire and
ambulance personnel.

13.

As part of the site development and construction subcommittee, there is an opportunity
to replace the existing Beekman Avenue Bridge with a bridge designed to handle heavier
loads necessary for site construction purposes. This also presents an opportunity to create
a gateway feature as part of the new bridge design. The Applicant needs to provide
precedent examples of bridge designs for the Lead Agency's consideration and indicate
how the bridge replacement will be factored into the construction-phasing plan.

Community Facilities
Schools:
14.
What happens to the proportionate share of the school tax load between Sleepy Hollow
and Tarrytown as a result of the proposed development? The Superintendent indicated
that it fluctuates every year depending on changing market conditions. The District's

�total tax levy is approximately S35 million. The GM project will potentially result in
approximately S6 million in school tax revenue, which is a major portion. This effect
will provide some relief for residents, but will also likely increase Sleepy Hollow's value
and could affect the municipalities' proportions. The extent of this effect needs to be
evaluated.
The recent bond referendum passed by the School District included improvements that
are expected to be complete by fall 2008. Another proposal will come out over the next
couple of years for the other two schools at the primary school level. This will allow the
District to get a sense of the magnitude of Lighthouse Landing (i.e., number of units) and
take that into account in it's planning. The potential impact of the closure of the Morse
School and its reuse needs to be evaluated as it relates to the Beekman Avenue corridor.
The Applicant should consider the previous efforts of the Village regarding the reuse of
Morse School, including parking and commercial reuse of the building.
The Superintendent noted anecdotally, that local trends indicate increased family
occupancy of condos, which might not necessarily be included in schoolchild generation
figures. There was also a question as to whether there is pricing sensitivity (more
expensive units do not produce as many schoolchildren). For example, Wyldwood
(recently approved townhouse development in Tanytown School District) has only 5
students. The Applicant noted their own experience with high end, smaller units in Port
Imperial and Jersey City has been that the units produce very few kids. The Applicant
provided examples of buildings with approximately 300 units and 2-5 kids, generally
non-school age. Surveys of these types of units, and developments such as the Tallyrand
Crescent community located on the south side of Route 119 in Tarrytown should be
included as part of the evaluation of anticipated impacts.
The question was raised whether new taxes would provide suitable mitigation, or is other
mitigation required? The District indicated that with the improvements it is doing now,
the capacity should be sufficient for the interim. In two years, the District can look and
see what else they need to do. The District indicated that it felt confident that there will
be enough new tax revenues to cover what they are doing now, and what they expect to
do in two years.

Can Kingsland Point Park provide a second emergency access? Road may need to be
upgraded and should be evaluated. What other potential upgrades would be needed to:
enhance emergency access by ambulance, fire and police; and, to assist in the evacuation
of the site in the event of an emergency. The FEIS should also consider water route for
evacuation. Fire Department noted that it is looking for location for docking/storage of

�its rescue boat. Fire Department will provide boat specifications to the Applicant so they
can try to incorporate.
The garage area under the grocery store has a 22' clear height at the lower level. Village
would like to move a company down to Lighthouse Landing, plus boat storage and lowprofile vehicle. Department noted that apparatus bays should be sized to accommodate
new vehicles. Existing firehouses don't have living quarters and can't accommodate
residential volunteers who would potentially live at the firehouse in shifts full-time. The
Department feels it would be prudent to consider bunkhouse and meeting room in new
firehouse or community service building. There needs to be an evaluation of whether the
Village should move a fire company down to the project site, or create a new company
and the attendant impacts on Village fire fighting requirements and insurance regulations.
To serve the new development effectively, the Village has indicated that it wants to have
a full company, specialized equipment and the necessary accessory space for support at
the site. The Applicant notes that the potential space identified for a fire substation not
be viewed necessarily, as just a garage. It could have a masonry face and be sheetrocked
and finished out inside. The Applicant will provide a conceptual floor plate. The Village
is requesting an alternative design be included with the FEIS that incorporates a free
standing building that would be designed to support the requirements of a new substation.
The Applicant noted that garages will be sprinklered and have standpipes. It was further
noted that the current design has changed from the original proposal in that the project
now has individual garages and bigger floor to ceiling heights. The Applicant claims that
in approximately V2 the garages, normal fire equipment will be able to access the specific
parking facility. There needs to be an evaluation, based on site plan revisions, as to the
necessity for specific pieces of apparatus to serve the site.

The Police Chief indicated that the project would require two posts, one to patrol the
residential portion and one to patrol the commercial portion. The Chief indicated two
posts would be adequate to handle commuters from new train station. However, the
Applicant has indicated they would be providing their own security service. Would fulltime security service affect the need for municipal police service?
How would a full
time security service interface with the Police Department?
The Police Department participates in a joint marine unit (Zodiac-type boat) that has a
seasonal staffing effect. Can this use be accommodated on-site?
Given the new development and enhanced connections to Kingsland Point Park will the
Department need to send additional bike patrols to the newly created open space and

�(ban

Kingsland Point Park?
area?
24.

Should park rangers be considered for this expanded waterfront

There needs to be an additional evaluation as to the presence of a Police substation, either
for a full-time or part-time office. The Chief has indicated that a full time substation
would have the two posts and a desk officer reporting there. A part-time substation
would not need lockers, since staff would use the Village's existing facility. For
seasonal/special events, the Police Department indicated that it would like some place for
officers to gather to receive assignments and take breaks. The design of part-time
substation could be incorporated as part of one of the proposed open space
outbuildings/information center in the vicinity of the lighthouse. The Applicant should
coordinate with the Village and the Police Department regarding more specific details.

Ambulance:
25.

The Ambulance Corps noted an approximately 15% annual increase in calls over the past
years. The Corps indicated that they currently meet the needs of the Village and provide
many mutual aid calls to other surrounding municipalities and is one of the last volunteer
services in the area. Average 3-5 minute response time. Existing facility is just basically
a garage, although it is well located for accessibility of volunteers to ambulance and
accessibility of ambulance to incidents.
The Corps expect calls for service would increase approximately 30% with the new
development. This needs to be confirmed based on existing ratio of calls for service vs.
population.

26.

The Corps noted national trend of decline in volunteerism, which suggests it is not
unreasonable to see a partial pay emergency service in the future. The Ambulance Corps
has access to reports that identified staffing costs for full time and part time service.
Current ambulance corps budget is approximately S50,000, switching to a professional
service would be a major change. Given the anticipated demands on the Ambulance
Corps, the Village needs to better understand the cost implications of going to a part time
and full time ambulance service to cover the Village, including the establishment of an
ambulance district.

27.

The Ambulance Corps noted that there were a number of variables related to Ambulance
Corps facilities: whether to split ambulances or centralize, adequacy of facility. Whether
the Village goes to a paid staff or not, it would make sense to keep an ambulance with the
fire apparatus, so that they could cross-staff and handle EMT calls. These issues need to
be outlined in greater detail in the FEIS.

�Public Works:
28.

The DPW is currently in space that is inadequate for their needs and a new facility is
needed, particularly as a result of the proposed action. There is an opportunity, as
indicated on the conceptual plan, to relocate the DPW facility to the East Parcel. Could
the school district be accommodated, in a limited way, as part of the proposed expansion
of the DPW facility? The Village needs to be provided with a clear evaluation of the subsurface conditions under the East Parcel in the vicinity of the proposed DPW facility
location.

29.

The issue of snow removal was discussed. A designated snow emergency road needs to
be identified. DPW can probably stockpile snow on the east parcel and open space areas
at Lighthouse Landing.

30.

The DPW indicated that to handle sewer, street and open space maintenance they would
likely require 10 additional personnel and three trucks. The Department requests that the
pathways and esplanade be designed to handle a pickup truck.

31.

Trash pickup and recycling will need to be detailed, including the use, general location,
and specification of compaction dumpsters. Pickup for individual townhouses units will
need to be detailed. The Applicant needs to provide some additional details as to garbage
collection for the retail establishments, including the proposed restaurants and other food
establishments.

32.

The Applicant needs to confirm that the main thoroughfares will be owned and
maintained by the Village and that the private areas are essentially just the rear drives
providing access to the townhomes.

33.

The Applicant needs to provide additional details relative to water metering. Typically
townhouses will have one meter and apartment building will have one meter. How will
the mixed-use commercial buildings along Beekman Place be metered?

Other Community Facility Issues:
34.

Is there sufficient space on the site, or in the proposed community center or proposed
theatre to include space for a community facility to be shared by various local Village
organizations?

35.

The Applicant has, to date, and in the opinion of the Lead Agency proposed limited
public water dependent uses as part of the proposed plan. In an effort to address this
issue, the Applicant needs to explore: a. onsite amenities such as a boat house in the
vicinity of the cove area between KPP and the GM site, creation of a wharf/pier that

�could be used during the site development process and then turned over to the Village for
use as a fishing pier or dockage for excursion ferries, interpretive/support facility for the
1883 Lighthouse, and replacement of a portion of the existing rip-rap with bulkhead to
accommodate a potential area for transient boat tie ups; b. efforts to promote water
dependent uses off site such as at Horan's Landing where the Village may need some
assistance in disposing of dredged material; and c. exploring with the County and the
Village improvements to Kingsland Point Park such as: the creation of dingy docks that
would support a potential mooring field for transient boat traffic, restoration of the beach
area and expanding the parking to serve the park facility. Further the Applicant should
explore further the concept of the temporary use of the existing bathhouse at KPP for
project offices (construction, sales) and then turning it over to the Village for park
support activities.
36.

The NYSDOT has prepared a preliminary report on the feasibility of reusing the existing
pedestrian overpass connecting DeVries Park with KPP. In an effort to enhance and
promote future water related access to the KPP beach the Applicant should explore the
repair and restoration of the existing pedestrian footbridge.

Site Development and Construction
37.

The Applicant needs to further explore additional measures to minimize the amount of
truck traffic that will be required during the construction period. During subcommittee
discussions, the Applicant indicated that it would not likely be feasible to utilize barges
or the railroad to bring in much of the construction materials. An explanation of the
factors that limit the feasibility of these alternatives should be included in the FEIS.
Those materials that could be supplied effectively by rail or barge also need to be
identified. Who owns the rail sidings located in proximity to the East and West parcels?

38.

It was noted during discussions that using barges would require building a wharf out over
the riprap. Contact should be made with the ACOE and DEC to discuss what permitting
issues are involved, as this type of structure could have potential for adaptive reuse, after
construction is complete, as a valuable water-dependent use and public amenity. The
Applicant needs to confirm and verify the location of the Federal channel needs to be
confirmed with the appropriate sources (ACOE and or the Coast Guard) and through a
survey instrument.

39.

In order to accommodate construction vehicles, the Beekman Avenue Bridge needs to be
upgraded. The Applicant should describe the extent of the upgrade required, the
anticipated timing to complete as part of the overall project, and potential traffic or utility
impacts from this construction. Ownership of the bridge also needs to be definitively
determined. The Applicant should also identify height or other Metro-North related issues

�with the bridge reconstruction. Is it possible to construct a new bridge next to the
existing bridge and then roll over to minimize disruption? Potential design features to
create a more appealing and distinctive gateway should also be discussed and provided.
A construction routing plan needs to incorporate potential disruption to the Beekman
Avenue Bridge.
40.

What steps will the Applicant take to encourage local contractors and skilled workforce
as part of developing and implementing local programs for hiring initiatives?

41.

Significant portions of the waterfront open space are proposed to be improved in years 4
and 5. The Village is interested in the opportunity to provide at least a rudimentary open
space connection and access along the River from Horan's Landing through to Kingsland
Point Park, as early as possible. It is suggested that the installation of buffering and
plantings near Kingsland Point Park also be incorporated into the earliest stages of
construction (year 1). Year 2 should be the completion of the open space area at the
adjacent to and in the vicinity of the extension of Beekman Avenue with the balance
(with the exception of the plaza area in front of the hotel by year 3. In this way the
completed riverwalk component is open to the public as soon as possible at the end of the
year 3 construction cycle.

42.

The Applicant needs to provide an indication as to why the hotel and accompanying plaza
could not be completed as part of the year 3 construction phasing.

43.

The construction of the public works facility should occur in Phase 1 fit into the
proposed construction-phasing plan to enable the orderly relocation of the DPW onto the
East Parcel.

44.

The Applicant should provide details relative to current ownership of the viaduct and
describe the condition of the viaduct leading to the east parcel and any repairs that would
be necessary for it to serve as an access for DPW trucks, construction vehicles, etc. The
Applicants should undertake improvements as pait of the Phase 1 construction activity
and discuss the benefits of undertaking the improvements prior to commencement of
improvements to the Beekman Avenue Bridge. Further, the Applicant needs to consider
other mitigation relative to site construction impacts to the community, such as installing
recreation amenities on the East Parcel as part of the first phase of the development
and constructing the public works garage, thus permitting DPW's relocation and
expediting the redevelopment of the old site on River St.

45.

Given that the Village is seeking to relocate its DPW facilities to the east parcel, the soil
bearing capacities on this parcel should be investigated to ensure the viability of
constructing new buildings in that location. Is there the potential for capture and use of
energy production from methane from the East Parcel?

�46.

The Applicant has indicated that they could set up a concrete batch plant on-site. This
could help limit the impact from large numbers of trucks arriving in a concentrated period
for big pours, and reduce the amount of regional truck trips. An on-site asphalt plant
would not be viewed as favorably by the subcommittee since it has more significant dust
and noise impacts. The Applicant needs to identify impacts related to the operation of
such construction-related operations as a concrete batch plan and rock crushing.

47.

The NYSDEC has approved a conceptual remedial plan for the site. When will a detailed
plan be prepared and how does the environmental cleanup factor into the timing of the
site development? The Village also refers to the technical review prepared by Roux
Associates and separately transmits to the Applicant that report for review and comment.

48.

The Applicant expects that replacement of 30% of the piles will be required. The
potential impacts from this pile driving activity should be more fully evaluated relative to
hours of operation, noise and length of operation.

49.

A county trunk sewer runs across the project site. The Applicant has indicated that the
sewer, which will pass under/through buildings, will be framed out with a clear area
around to provide full access. Is this a typical and reasonable solution to this issue?
Does the County have any comments or concerns with this solution?

50.

The Applicant should indicate how the construction-related timing would affect the
installation of Beekman Place. Certain portions of the adjoining development (buildings
2, 6 and 8) are scheduled to be constructed in years four and five. Is it correct in
assuming that the foundations for these buildings will also act as the foundation for
Beekman Place?

Fiscal &amp; Socio-economics Impacts
51.

As currently proposed, the project contains 1,122 rental units (including senior buildings)
and 440 ownership units. The Village Board feels that the ratio of rental to owneroccupied units should be adjusted to include more ownership units. Economic impacts
associated with the ownership/rental change needs to be documented.

52.

It does not appear that the fiscal analysis presented in the DEIS used the non-homestead
tax rate for rental units. The Applicant should present the fiscal results using the nonhomestead rate and with the conversion of some apartments to condominium units.

�53.

The cost projections utilized in the DEIS should be refined by coordinating responses
from the department heads regarding equipment and staffing needs to relevant standards
(e.g., police officers/capita, calls to service/capita).

54.

The analysis employed in the DEIS is based on a per capita/worker average of current
General Fund expenditures. The Village Board notes that the Village is currently
functioning with a relatively austere budget and provision of services related to the loss
of revenue from the GM site. The methodology employed might not accurately capture a
more accurate picture of Village service costs. Cost estimates from comparable
communities should be factored into the analysis of the cost to service the new
development.

55.

Given the Village's concern with respect to taxes and jobs, the Applicant should explore
in greater detail the ability to incorporate some flex office, live/work lofts, business
incubators uses to provide tax ratables and potential employment opportunities for area
residents? Further, the Applicant should prepare a matrix of the alternate uses that could
be accommodated on site and provide anticipated impacts of each, to the extent known.

56.

During subcommittee discussions, the Applicant indicated that a Master Association
would be providing landscaping maintenance. What other services would the Master
Association provide the new development and residents? Would a master association
preclude the potential use of a business improvement district for the Beekman Place area?

57.

The Village is concerned that the proposed development may not have a positive impact
on the balance of the Village's commercial district given the proposed removal of onstreet parking, the increased traffic congestion which could impact the pedestrian
environment and the potential competition of uses. What impact will the development of
this project have on the upper Beekman Avenue corridor? It is noted that the ERA report
contains several recommendations that could help strengthen and organize the existing
Beekman Avenue businesses.
The Applicant should identify how these
recommendations could be incorporated. The Village would request that the Applicant
consider providing assistance relative to preparing design plans for improving the
appearance of the Beekman Avenue corridor as it is a gateway to the new development,
provision of additional off-street parking, and help form and partially fund a merchant's
association.

58.

The Village is currently in the process of reviewing a 65-unit affordable senior housing
proposal. Since some of the need for senior housing will be satisfied by this other
project, the Lighthouse Landing mix should be adjusted to include a different mix of
affordable units, with more non-senior households.

�(o33

59.

The Applicant should indicate if, and for what elements of the project, a PILOT is being
considered. How would this potentially affect sales tax projections?

60.

The Applicant should provide examples of the contemplated commercial tenant mix for
Beekman Place and provide examples of how they have incorporated such tenants into
other projects. Fast food uses are not in keeping, in general, with a historic Hudson River
community and should be restricted or eliminated from any future retail mix. Zoning
ordinance codifications to effect this change should be considered.

61.

With the now contemplated inclusion of 5 or 6 new restaurants, plus other stores,
including national retailers, the potential effects of the proposed development on
immediate and secondary market area (basically the inner village and Tarrytown) should
be examined more closely so that the Village has a better understanding of potential
impacts.

62.

The Applicant needs to work with the Village to provide locations of on-street parking
meters and an analysis of the project revenues. Additionally, revenues for the proposed
commuter lot should be projected and allocated to the Village as a potential positive
economic impact.

Traffic and Transportation
63.

Since one of the major reasons for increased traffic is the significant density of the
Development, the Applicant should consider ways to decrease density in a beneficial
manner so as not to deteriorate significantly tax revenue generation. This concern is
discussed elsewhere by other Committees but is reinforced by the comments made at the
Traffic Subcommittee hearing. One alternative discussed was a recommendation to see
what happens to traffic analysis if some apartment units are substituted with townhomes
(maintaining the same s.f. of development, but fewer units).

Traffic Mitigation Measures and Parking Impacts:
64.

Traffic improvements at selected intersections in the Village of Sleepy Hollow would
result in the loss of 26 parking spaces (approximately 10 at the Beekman/Route 9
intersection and 16 at the Beekman/Pocantico/Cortlandt intersections).
However,
recommendations included use of full-length tapers and discussions with NYSDOT
suggest these could likely be reduced, which would reduce the loss of on-streel parking
along the Route 9 section.
Because on-street parking is at such a premium, particularly in the inner-village, any loss
of parking will need to be replaced on at least a one for one basis. The Applicant needs

�(p2M

to evaluate how improvements could be made while eliminating as few parking spaces as
possible. The Applicant indicated that they are willing to help provide or finance, but are
limited in what they can do relative to the ability to acquire property for parking. The
Village would potentially need to help identify and acquire land that could be used for
parking in proximity to the lost spaces if that is the direction taken. As an example, the
area along the Route 9 frontage for the High School was identified as a possible area for
parking expansion and should be evaluated.
65.

The Applicant's traffic study also included recommendations for problematic
intersections within Tarrytown (Rt. 9/Neperhan, Rt. 9/Franklin and Rt. 9/Rt. 119).
Recommended improvements include similar measures (restriping, turn lanes, etc.) that
could result in loss of parking spaces at certain Tarrytown intersections. What kind of
coordination has there been between the Applicant and the Village of Tarrytown
regarding anticipated impacts and proposed mitigation? We encourage continued
discourse among the Sleepy Hollow Board, Applicant and the new Tarrytown Board to
develop mutually agreed upon traffic mitigation matters.

Railroad:
66.

The traffic analysis used estimates that 40% of peak hour trips will be via rail. This
appears fairly conservative based on survey data from other comparable developments
and results in a calculation of approximately 195 train commuters from Lighthouse
Landing during the peak hour. However, the Applicant should provide additional
background as to transit-oriented developments and how the proposed development could
be further enhanced so as to further reduce potential vehicle trips.

67.

The commuter lot indicated on the plan is sized at 400 spaces. Metro-North would like to
see even more (up to 1200 spaces) due to existing and anticipated demand along the
Hudson Line. The Applicant and Village felt that this would draw additional, potentially
undesirable traffic and would be unfair for the Village to provide for the Hudson Line's
entire parking need. Who would ultimately own and maintain the commuter lot? It was
noted that users of a commuter lot would likely be diversions of existing traffic and
wouldn't be adding more volume to Route 9. There is the possibility that operation of
Route 9 to the south could be improved with commuter lot at Lighthouse, however this
still needs to be confirmed.

I'arking:
6S.

There was general concern with the limitations of parking along Beekman Avenue and
that the potential removal of on-street parking would create issues with the businesses in
that area. Sub-committee members described alternative concepts: to provide parking at

�(53C

I
the Morse School; remove some of the Beekman Avenue sidewalk width to allow for the
ability to maintain and or increase parking; and utilizing the area behind the stores along
Beekman Avenue to create more parking. These alternative design approaches need to be
evaluated further.
Development Parking:
69.

I

I

It was noted that the development provides approximately 1.5 spaces per unit. Should the
Applicant provide 2 per unit, or conversely would it be better to try to limit parking to a
more commuter-oriented focus with 1 car per unit? The parking areas for the mixed-use
portion can also potentially be used as a shared parking resource for residents/guests
although there needs to be more details provided, such as how would the retail lots
operate - municipal lots, metered, permits, Applicant owned?

Miscellaneous:
70.

Following up on recommendations in the Village's Linkage Study what is the potential
for a trolley loop system linking other local attractions and the Sleepy Hollow, Tarrytown
downtowns? What volume would be necessary to support? Has Westchester County
offered any opinions as to its feasibility?

71.

In the event a shuttle system is used, can the Lighthouse Landing shuttle be an electric
vehicle? Applicant has discussed with GM and it remains a possibility that they may
produce a vehicle that could be used. Who will be responsible for operating the shuttle?
What would be the hours and days of week for its operations?

72.

What is the effect to the level of service at the intersection of Beekman Avenue/Route 9
if Hudson Street is made into a one-way eastbound?

73.

The Applicant has indicated that several of the intersections will need to be monitored in
the future, after the project is complete. Who will be responsible for the monitoring?
What happens if, during the course of time, or at full build-out the intersection in
question fails, or is severely impacted?

Next Steps - Community Outreach
Regarding next steps, the Applicant has indicated that they are looking for guidance and
direction from the Village regarding alternative planning concepts for site layout. It is suggested
that the Applicant work together with the Village, its staff and consultants to begin shaping an
alternative design layout that better responds to issues raised as part of the environmental review
process.

�The sub-committee discussed different ways the Village could consider to broaden the outreach
efforts, including use of cable television, notices in bulletins and newspapers. The Village Board
would recommend that, after the close of the public comment period, a publication be prepared
in a simple question and answer format that will address specific issues. The Village may also
want to think about preparing incremental progress reports to keep the public updated during the
balance of the review.
It was also suggested that it might be useful to have issue oriented meetings every couple of
weeks to allow for revisions to be made and further discussion. These meetings could also
include representatives of the various involved agencies such as Westchester County, NYSDOT
and NYSDEC.
Efforts were made to engage the Village of Tarrytown in the past, given recent events, the
Village should consider an approach that would allow for meaningful dialogue between both
communities.
Cc:

Dwight Douglas, Village Administrator
Robert Ponzini, Village Attorney
Sean McCarthy, Village Architect
Angela Everett, Village Clerk
Joel Sachs, Special Counsel to the Village
David B. Smith, Village Planning Consultant
Andrew Tung, Divney Tung Schwalbe
Mark Weingarten, DelBello, Donnellan, et al.
Mark Chertok, Sive, Paget, et al.
Bob Feder, Cuddy &amp; Feder
Planning Board
Waterfront Advisory Committee
Architectural Review Board
Parking Authority
DEIS Sub-committee Review members

�</text>
                </elementText>
              </elementTextContainer>
            </element>
          </elementContainer>
        </elementSet>
      </elementSetContainer>
    </file>
  </fileContainer>
  <collection collectionId="84">
    <elementSetContainer>
      <elementSet elementSetId="1">
        <name>Dublin Core</name>
        <description>The Dublin Core metadata element set is common to all Omeka records, including items, files, and collections. For more information see, http://dublincore.org/documents/dces/.</description>
        <elementContainer>
          <element elementId="50">
            <name>Title</name>
            <description>A name given to the resource</description>
            <elementTextContainer>
              <elementText elementTextId="12285">
                <text>Board of Trustees Meeting Minutes &amp; Resolutions-2005</text>
              </elementText>
            </elementTextContainer>
          </element>
        </elementContainer>
      </elementSet>
    </elementSetContainer>
  </collection>
  <itemType itemTypeId="1">
    <name>Text</name>
    <description>A resource consisting primarily of words for reading. Examples include books, letters, dissertations, poems, newspapers, articles, archives of mailing lists. Note that facsimiles or images of texts are still of the genre Text.</description>
  </itemType>
  <elementSetContainer>
    <elementSet elementSetId="1">
      <name>Dublin Core</name>
      <description>The Dublin Core metadata element set is common to all Omeka records, including items, files, and collections. For more information see, http://dublincore.org/documents/dces/.</description>
      <elementContainer>
        <element elementId="50">
          <name>Title</name>
          <description>A name given to the resource</description>
          <elementTextContainer>
            <elementText elementTextId="6285">
              <text>MINS_TRUST_2005-03-29</text>
            </elementText>
          </elementTextContainer>
        </element>
        <element elementId="49">
          <name>Subject</name>
          <description>The topic of the resource</description>
          <elementTextContainer>
            <elementText elementTextId="6286">
              <text>Board of Trustees Minutes-2005</text>
            </elementText>
          </elementTextContainer>
        </element>
        <element elementId="40">
          <name>Date</name>
          <description>A point or period of time associated with an event in the lifecycle of the resource</description>
          <elementTextContainer>
            <elementText elementTextId="6287">
              <text>2005</text>
            </elementText>
          </elementTextContainer>
        </element>
        <element elementId="47">
          <name>Rights</name>
          <description>Information about rights held in and over the resource</description>
          <elementTextContainer>
            <elementText elementTextId="6288">
              <text>Village of Sleepy Hollow All Rights Reserved.</text>
            </elementText>
          </elementTextContainer>
        </element>
        <element elementId="51">
          <name>Type</name>
          <description>The nature or genre of the resource</description>
          <elementTextContainer>
            <elementText elementTextId="6289">
              <text>Text</text>
            </elementText>
          </elementTextContainer>
        </element>
      </elementContainer>
    </elementSet>
  </elementSetContainer>
</item>